This document package includes construction drawings and specifications for replacing the fire sprinkler system in the loading dock area of a Department of Veterans Affairs medical center, as well as the related solicitation posting for that project.

The construction drawings provide details on the scope of work, which involves replacing the existing dry pipe fire sprinkler system with new piping, valves and air compressor. Thirty-three new dry pendent sprinkler heads will be installed. Notes specify requirements for coordinating sprinkler shutdowns, maintaining fire protection, conducting fire watches when systems are down, cleaning up debris, and ensuring all work complies with NFPA 13. The solicitation from the VA seeks bids to replace the loading dock canopy roof and conduct concrete repairs, in addition to the fire sprinkler system replacement shown in the drawings. The solicitation number is 36C24223B0015 and opportunity type is listed as an invitation for bid.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS

AND REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING

NECESSARY TO PERMIT THE INSTALLATION OF NEW WORK.

3. NEW METAL PANEL CEILINGS ARE BEING PROVIDED FOR THE LOADING DOCK. ALL FIRE

SPRINKLER PENDANT HEADS LOCATED IN THE CEILING SHALL BE PROVIDED WITH

ESCUTCHEONS WHICH ALLOW FOR COVERAGE OF OVERSIZED OPENINGS REQUIRED FOR

CEILING INSTALLATION. SEE ARCHITECTURAL DRAWINGS FOR EXTENT OF CEILINGS.

4. PROVIDE NEW DRY SPRINKLER HEADS FOR THE LOADING DOCK. THE CONTRACTOR

SHALL REPIPE AND RELOCATE THE POSITION OF SPRINKLER HEADS OR PROVIDE

ADDITIONAL SPRINKLER HEADS AND/OR PIPING AS NECESSARY TO PROVIDE FOR

PROPER SPRINKLER HEAD SPACING FOR THE TYPE OCCUPANCY INDICATED.

OCCUPANCY SHALL BE "ORDINARY HAZARD OCCUPANCY GROUP 2" UNLESS NOTED

OTHERWISE. ALL SPRINKLER HEADS SHALL BE POSITIONED IN THE CENTER OF 2'x2'

CEILING TILES OF LOADING DOCK. BRANCH RUNOUTS AND DROPS SHALL BE PROVIDED

AS NECESSARY TO ACCOMMODATE THE REQUIRED COVERAGE PER THE REQUIREMENTS

OF NFPA 13 AND TO AVOID OBSTRUCTIONS. COORDINATE NEW LOCATIONS AND

METHODS OF CONSTRUCTION WITH ALL TRADES AND THE COR. EXCEPT AS NOTED

OTHERWISE, PIPE SHALL BE GALVANIZED SCHEDULE 40 STEEL. INSTALLATION SHALL BE

PER NFPA 13.

5. ALL NEW SPRINKLER HEADS SHALL BE QUICK RESPONSE, UL LISTED, FM APPROVED DRY

PENDENT TYPE. THE BASIS OF DESIGN IS STAR PENDANT BY "TYCO" MODEL DS-1, TY3225,

QR, OH, 5.6K, 1 INCH, 135°F, 175 PSI OR APPROVED EQUAL.

6. COORDINATE ALL SPRINKLER SHUTDOWNS ONE WEEK IN ADVANCE WITH VA SAFETY AND

FIRE PROTECTION ENGINEER AND PROJECT MANAGER.

7. ALL WORK SHALL BE IN ACCORDANCE WITH NFPA 13 LATEST EDITION. COORDINATE ALL

WORK WITH ALL TRADES TO AVOID INTERRUPTION OF SERVICE EXCEPT AS

SPECIFICALLY PERMITTED OTHERWISE BY THE COR.

8. EXISTING PIPE RISERS TO REMAIN.

9. THE EXISTING LOADING DOCK FIRE PROTECTION SYSTEM IS A "WATER-BASED

FIRE-SUPPRESSION SYSTEM" WITH DRY PIPES. THE SYSTEM SHALL BE MAINTAINED

IN-SERVICE EXCEPT AS SPECIFICALLY PERMITTED OTHERWISE BY THE COR.

10. SYSTEM OUT OF SERVICE: WHEN THE REQUIRED FIRE PROTECTION SYSTEM IS

SCHEDULED TO BE OUT OF SERVICE, THE FIRE DEPARTMENT, THE VA DESIGNATED "SITE

FIRE SAFETY MANAGER", AND THE COR/RE SHALL BE NOTIFIED AND AN APPROVED "FIRE

WATCH" SHALL BE PROVIDED BY THE CONTRACTOR.

11. FIRE WATCH PERSONNEL SHALL BE PROVIDED WITH A MEANS OF IDENTIFYING

THEMSELVES AS AUTHORIZED REPRESENTATIVES OF THE FACILITY. INDIVIDUALS SHALL

BE DEDICATED SOLELY TO FIRE WATCH DUTY.

12. FIRE WATCH SHALL BE MAINTAINED AT ALL TIMES WHEN THE FIRE PROTECTION SYSTEM

IS OUT OF SERVICE AND FOR (30) MINUTES AFTER THE SYSTEM HAS BEEN RESTORED TO

SERVICE. THE FIRE WATCH SHALL HAVE APPROVED FIRE EXTINGUISHERS READILY

AVAILABLE.

13. THE ROUTE TO BE COVERED BY THE FIRE WATCH PERSONNEL SHALL BE PROVIDED WITH

INSTRUCTIONS, ALL DETAILS REGARDING THE ROUTE, AND THE FUNCTIONS TO BE

CARRIED OUT IN COVERING THE ROUTE.

14. DURING THE ROUNDS, THE FIRE WATCH PERSONNEL SHALL MAKE A THOROUGH

INSPECTION OF THE AREA (SPACES) COVERED BY THE FIRE PROTECTION SYSTEM. FIRE

WATCH PERSONNEL SHALL SIGN A LOG SHEET AT THE BEGINNING AND END TIME OF

EACH INDIVIDUAL ROUND.

15. FIRE WATCH LOG: THE SITE SAFETY MANAGER SHALL MAINTAIN A RECORD OF

INSPECTIONS IN AN APPROVED LOCATION WHICH SHALL BE AVAILABLE FOR REVIEW

UPON REQUEST. LOG SHEET(S) SHALL STATE BEGIN TIME AND END TIME OF EACH

INDIVIDUAL ROUND.

16. PRIOR TO TAKING A FIRE PROTECTION SYSTEM OUT OF SERVICE, ALL AREAS

PROTECTED BY THE SYSTEM SHALL BE INSPECTED BY THE RESPONSIBLE PERSON(S)

BEFORE WORK IS AUTHORIZED.

17. FIRE WATCH PERSONNEL SHALL BE PROVIDED WITH AN APPROVED MEANS FOR

CONTINUOUS COMMUNICATIONS WITH A CONSTANTLY ATTENDED LOCATION WITHIN THE

MEDICAL CENTER IN THE EVENT OF AN EMERGENCY.

18. A CONTINUOUSLY UPDATED DIRECTORY OF NAMES, TELEPHONE NUMBERS, AND OTHER

INFORMATION TO ASSIST IN MAKING EMERGENCY CALLS SHALL BE KEPT AS DIRECTED

BY SITE FIRE SAFETY MANAGER.

19. ANY DAMAGE DONE TO VA FACILITY SHALL BE REPAIRED IN KIND AT NO EXPENSE TO THE

VA. ANY DEBRIS OR REFUSE RESULTING FROM DRY PIPE FIRE SPRINKLER SYSTEM

REPLACEMENT SHALL BE CLEANED UP AND REMOVED BY CONTRACTOR.

20. ALL PIPING AND FITTINGS LOCATED IN THE LOADING DOCK DRY PIPE SPRINKLER SYSTEM

SHALL BE REPLACED IN KIND OR APPROVED EQUAL.

21. INSTALL 33 DRY PIPE PENDENT SPRINKLER HEADS IN LOADING DOCK AREA. VERIFY

CORRECT NUMBER OF HEADS IN THE FIELD.

FIRE PROTECTION KEY NOTES

FIRE PROTECTION NOTES

REPLACE IN KIND FIRE SPRINKLER PIPE SYSTEM

X

DRY PIPE SPRINKLER SYSTEM

REPLACEMENT PLAN

FP101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Revisions: Date:

REPLACE IN KIND FIRE SPRINKLER HEAD, SEE NOTES (TYP.)

REPLACE IN KIND EXISTING FIRE SPRINKLER DRY PIPE VALVE ASSEMBLY AND AIR COMPRESSOR

ALL SUPERVISORIES TO REMAIN. REMOVE AND STORE THEM FOR REINSTALLATION INTO

REPLACEMENT DRY PIPE SPRINKLER SYSTEM.

BRANCH CONNECTION

BLACKENED STEEL DRY PIPE SPRINKLER PIPING

QUICK RESPONSE, UL LISTED, FM APPROVED DRY PENDENT SPRINKLER HEAD

FIRE PROTECTION SYMBOLS

AutoCAD SHX Text

TANK STORAGE

AutoCAD SHX Text

GC-08B

AutoCAD SHX Text

GC-08A

AutoCAD SHX Text

GC-08C

AutoCAD SHX Text

GC-08D

AutoCAD SHX Text

FIRE STAIR

AutoCAD SHX Text

FIRE STAIR

AutoCAD SHX Text

GC-08E

AutoCAD SHX Text

GC-08

AutoCAD SHX Text

DRY PIPE SPRINKLER SYSTEM REPLACEMENT PLAN

AutoCAD SHX Text 1/4" - 1'-0"

AutoCAD SHX Text

FP101

AutoCAD SHX Text

AutoCAD SHX Text

REPLACE LOADING DOCK CANOPY ROOF

AutoCAD SHX Text

JAMES J. PETERS VA MEDICAL CENTER

AutoCAD SHX Text 5/3/2022

AutoCAD SHX Text 526-19-529

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

MK

AutoCAD SHX Text

JA

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

DRY PIPE SPRINKLER SYSTEM

DETAILS

FP102

1. DETAIL 1 CAN BE FOUND ON THE RELIABLE SPRINKLER WEBSITE.

2. DETAIL 2 CAN BE FOUND ON THE GAST WEBSITE.

FIRE PROTECTION DETAIL NOTES

4" NPT

OUTLET17" 15"

11" 4 12"

5"

6 12"

3 12"

2x 1 116"

6 316"

1 12"

16"

3 5 16"

32"

2 132"

4 15 16"

2x 15 16"

2 916"

10"

16"

2 12"

2x 3"

2 5 16"

1 3 8"

2 132"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Revisions: Date:

AutoCAD SHX Text

GAST AIR COMPRESSOR; MODEL 6HCA-10-M616NEX - ELEVATION

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FP102

AutoCAD SHX Text E2

AutoCAD SHX Text

RELIABLE DRY PIPE VALVE ASSEMBLY; MODEL D - ELEVATION

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FP102

AutoCAD SHX Text E1

AutoCAD SHX Text

REPLACE LOADING DOCK CANOPY ROOF

AutoCAD SHX Text

JAMES J. PETERS VA MEDICAL CENTER

AutoCAD SHX Text 5/3/2022

AutoCAD SHX Text 526-19-529

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

MK

AutoCAD SHX Text

JA

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

RELIABLE DRY PIPE VALVE ASSEMBLY; MODEL D - DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FP102

AutoCAD SHX Text D1

AutoCAD SHX Text

GAST AIR COMPRESSOR; MODEL 6HCA-10-M616NEX - DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FP102

AutoCAD SHX Text D2

AutoCAD SHX Text E2

AutoCAD SHX Text

FP102

AutoCAD SHX Text E1

AutoCAD SHX Text

FP102

Sheets and Views
FP101_JA-FP101
FP102_JA-FP102

File details come from the government source that posted it. Updated .