Replace Loading Dock Canopy BID Drawings - Volume 2.pdf
PDF 317 KB Posted
- Solicitation number
- 36C24223B0015
About this file
This document package includes construction drawings and specifications for replacing the fire sprinkler system in the loading dock area of a Department of Veterans Affairs medical center, as well as the related solicitation posting for that project.
The construction drawings provide details on the scope of work, which involves replacing the existing dry pipe fire sprinkler system with new piping, valves and air compressor. Thirty-three new dry pendent sprinkler heads will be installed. Notes specify requirements for coordinating sprinkler shutdowns, maintaining fire protection, conducting fire watches when systems are down, cleaning up debris, and ensuring all work complies with NFPA 13. The solicitation from the VA seeks bids to replace the loading dock canopy roof and conduct concrete repairs, in addition to the fire sprinkler system replacement shown in the drawings. The solicitation number is 36C24223B0015 and opportunity type is listed as an invitation for bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24223B0015 0002.docx | DOCX document | |
| WAREHOUSE AREA_ RAMP DETAIL FOR ALTERNATE 2 WORK.pdf | ||
| 36C24223B0015 0001.docx | DOCX document | |
| LOADING DOCK CANOPY_METAL CEILING PANELS.pdf | ||
| 2477_001.pdf | ||
| LOADING DOCK CANOPY REVISED BID PRICING SHEET-5.3.2023.docx | DOCX document | |
| 36C24223B0015_1.docx | DOCX document | |
| Replace Loading Dock Canopy BID Drawings - Volume 1.pdf | ||
| Replace Loading Dock Canopy Roof_Davis Bacon Wage Rates_Bronx County_2.24.23.docx | DOCX document | |
| 526-19-529_SPEC Volume 1.pdf | ||
| 526-19-529_SPEC Volume 2.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS
AND REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING
NECESSARY TO PERMIT THE INSTALLATION OF NEW WORK.
3. NEW METAL PANEL CEILINGS ARE BEING PROVIDED FOR THE LOADING DOCK. ALL FIRE
SPRINKLER PENDANT HEADS LOCATED IN THE CEILING SHALL BE PROVIDED WITH
ESCUTCHEONS WHICH ALLOW FOR COVERAGE OF OVERSIZED OPENINGS REQUIRED FOR
CEILING INSTALLATION. SEE ARCHITECTURAL DRAWINGS FOR EXTENT OF CEILINGS.
4. PROVIDE NEW DRY SPRINKLER HEADS FOR THE LOADING DOCK. THE CONTRACTOR
SHALL REPIPE AND RELOCATE THE POSITION OF SPRINKLER HEADS OR PROVIDE
ADDITIONAL SPRINKLER HEADS AND/OR PIPING AS NECESSARY TO PROVIDE FOR
PROPER SPRINKLER HEAD SPACING FOR THE TYPE OCCUPANCY INDICATED.
OCCUPANCY SHALL BE "ORDINARY HAZARD OCCUPANCY GROUP 2" UNLESS NOTED
OTHERWISE. ALL SPRINKLER HEADS SHALL BE POSITIONED IN THE CENTER OF 2'x2'
CEILING TILES OF LOADING DOCK. BRANCH RUNOUTS AND DROPS SHALL BE PROVIDED
AS NECESSARY TO ACCOMMODATE THE REQUIRED COVERAGE PER THE REQUIREMENTS
OF NFPA 13 AND TO AVOID OBSTRUCTIONS. COORDINATE NEW LOCATIONS AND
METHODS OF CONSTRUCTION WITH ALL TRADES AND THE COR. EXCEPT AS NOTED
OTHERWISE, PIPE SHALL BE GALVANIZED SCHEDULE 40 STEEL. INSTALLATION SHALL BE
PER NFPA 13.
5. ALL NEW SPRINKLER HEADS SHALL BE QUICK RESPONSE, UL LISTED, FM APPROVED DRY
PENDENT TYPE. THE BASIS OF DESIGN IS STAR PENDANT BY "TYCO" MODEL DS-1, TY3225,
QR, OH, 5.6K, 1 INCH, 135°F, 175 PSI OR APPROVED EQUAL.
6. COORDINATE ALL SPRINKLER SHUTDOWNS ONE WEEK IN ADVANCE WITH VA SAFETY AND
FIRE PROTECTION ENGINEER AND PROJECT MANAGER.
7. ALL WORK SHALL BE IN ACCORDANCE WITH NFPA 13 LATEST EDITION. COORDINATE ALL
WORK WITH ALL TRADES TO AVOID INTERRUPTION OF SERVICE EXCEPT AS
SPECIFICALLY PERMITTED OTHERWISE BY THE COR.
8. EXISTING PIPE RISERS TO REMAIN.
9. THE EXISTING LOADING DOCK FIRE PROTECTION SYSTEM IS A "WATER-BASED
FIRE-SUPPRESSION SYSTEM" WITH DRY PIPES. THE SYSTEM SHALL BE MAINTAINED
IN-SERVICE EXCEPT AS SPECIFICALLY PERMITTED OTHERWISE BY THE COR.
10. SYSTEM OUT OF SERVICE: WHEN THE REQUIRED FIRE PROTECTION SYSTEM IS
SCHEDULED TO BE OUT OF SERVICE, THE FIRE DEPARTMENT, THE VA DESIGNATED "SITE
FIRE SAFETY MANAGER", AND THE COR/RE SHALL BE NOTIFIED AND AN APPROVED "FIRE
WATCH" SHALL BE PROVIDED BY THE CONTRACTOR.
11. FIRE WATCH PERSONNEL SHALL BE PROVIDED WITH A MEANS OF IDENTIFYING
THEMSELVES AS AUTHORIZED REPRESENTATIVES OF THE FACILITY. INDIVIDUALS SHALL
BE DEDICATED SOLELY TO FIRE WATCH DUTY.
12. FIRE WATCH SHALL BE MAINTAINED AT ALL TIMES WHEN THE FIRE PROTECTION SYSTEM
IS OUT OF SERVICE AND FOR (30) MINUTES AFTER THE SYSTEM HAS BEEN RESTORED TO
SERVICE. THE FIRE WATCH SHALL HAVE APPROVED FIRE EXTINGUISHERS READILY
AVAILABLE.
13. THE ROUTE TO BE COVERED BY THE FIRE WATCH PERSONNEL SHALL BE PROVIDED WITH
INSTRUCTIONS, ALL DETAILS REGARDING THE ROUTE, AND THE FUNCTIONS TO BE
CARRIED OUT IN COVERING THE ROUTE.
14. DURING THE ROUNDS, THE FIRE WATCH PERSONNEL SHALL MAKE A THOROUGH
INSPECTION OF THE AREA (SPACES) COVERED BY THE FIRE PROTECTION SYSTEM. FIRE
WATCH PERSONNEL SHALL SIGN A LOG SHEET AT THE BEGINNING AND END TIME OF
EACH INDIVIDUAL ROUND.
15. FIRE WATCH LOG: THE SITE SAFETY MANAGER SHALL MAINTAIN A RECORD OF
INSPECTIONS IN AN APPROVED LOCATION WHICH SHALL BE AVAILABLE FOR REVIEW
UPON REQUEST. LOG SHEET(S) SHALL STATE BEGIN TIME AND END TIME OF EACH
INDIVIDUAL ROUND.
16. PRIOR TO TAKING A FIRE PROTECTION SYSTEM OUT OF SERVICE, ALL AREAS
PROTECTED BY THE SYSTEM SHALL BE INSPECTED BY THE RESPONSIBLE PERSON(S)
BEFORE WORK IS AUTHORIZED.
17. FIRE WATCH PERSONNEL SHALL BE PROVIDED WITH AN APPROVED MEANS FOR
CONTINUOUS COMMUNICATIONS WITH A CONSTANTLY ATTENDED LOCATION WITHIN THE
MEDICAL CENTER IN THE EVENT OF AN EMERGENCY.
18. A CONTINUOUSLY UPDATED DIRECTORY OF NAMES, TELEPHONE NUMBERS, AND OTHER
INFORMATION TO ASSIST IN MAKING EMERGENCY CALLS SHALL BE KEPT AS DIRECTED
BY SITE FIRE SAFETY MANAGER.
19. ANY DAMAGE DONE TO VA FACILITY SHALL BE REPAIRED IN KIND AT NO EXPENSE TO THE
VA. ANY DEBRIS OR REFUSE RESULTING FROM DRY PIPE FIRE SPRINKLER SYSTEM
REPLACEMENT SHALL BE CLEANED UP AND REMOVED BY CONTRACTOR.
20. ALL PIPING AND FITTINGS LOCATED IN THE LOADING DOCK DRY PIPE SPRINKLER SYSTEM
SHALL BE REPLACED IN KIND OR APPROVED EQUAL.
21. INSTALL 33 DRY PIPE PENDENT SPRINKLER HEADS IN LOADING DOCK AREA. VERIFY
CORRECT NUMBER OF HEADS IN THE FIELD.
FIRE PROTECTION KEY NOTES
FIRE PROTECTION NOTES
REPLACE IN KIND FIRE SPRINKLER PIPE SYSTEM
X
DRY PIPE SPRINKLER SYSTEM
REPLACEMENT PLAN
FP101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Revisions: Date:
REPLACE IN KIND FIRE SPRINKLER HEAD, SEE NOTES (TYP.)
REPLACE IN KIND EXISTING FIRE SPRINKLER DRY PIPE VALVE ASSEMBLY AND AIR COMPRESSOR
ALL SUPERVISORIES TO REMAIN. REMOVE AND STORE THEM FOR REINSTALLATION INTO
REPLACEMENT DRY PIPE SPRINKLER SYSTEM.
BRANCH CONNECTION
BLACKENED STEEL DRY PIPE SPRINKLER PIPING
QUICK RESPONSE, UL LISTED, FM APPROVED DRY PENDENT SPRINKLER HEAD
FIRE PROTECTION SYMBOLS
AutoCAD SHX Text
TANK STORAGE
AutoCAD SHX Text
GC-08B
AutoCAD SHX Text
GC-08A
AutoCAD SHX Text
GC-08C
AutoCAD SHX Text
GC-08D
AutoCAD SHX Text
FIRE STAIR
AutoCAD SHX Text
FIRE STAIR
AutoCAD SHX Text
GC-08E
AutoCAD SHX Text
GC-08
AutoCAD SHX Text
DRY PIPE SPRINKLER SYSTEM REPLACEMENT PLAN
AutoCAD SHX Text 1/4" - 1'-0"
AutoCAD SHX Text
FP101
AutoCAD SHX Text
AutoCAD SHX Text
REPLACE LOADING DOCK CANOPY ROOF
AutoCAD SHX Text
JAMES J. PETERS VA MEDICAL CENTER
AutoCAD SHX Text 5/3/2022
AutoCAD SHX Text 526-19-529
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text
MK
AutoCAD SHX Text
JA
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
DRY PIPE SPRINKLER SYSTEM
DETAILS
FP102
1. DETAIL 1 CAN BE FOUND ON THE RELIABLE SPRINKLER WEBSITE.
2. DETAIL 2 CAN BE FOUND ON THE GAST WEBSITE.
FIRE PROTECTION DETAIL NOTES
4" NPT
OUTLET17" 15"
11" 4 12"
5"
6 12"
3 12"
2x 1 116"
6 316"
1 12"
16"
3 5 16"
32"
2 132"
4 15 16"
2x 15 16"
2 916"
10"
16"
2 12"
2x 3"
2 5 16"
1 3 8"
2 132"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Revisions: Date:
AutoCAD SHX Text
GAST AIR COMPRESSOR; MODEL 6HCA-10-M616NEX - ELEVATION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FP102
AutoCAD SHX Text E2
AutoCAD SHX Text
RELIABLE DRY PIPE VALVE ASSEMBLY; MODEL D - ELEVATION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FP102
AutoCAD SHX Text E1
AutoCAD SHX Text
REPLACE LOADING DOCK CANOPY ROOF
AutoCAD SHX Text
JAMES J. PETERS VA MEDICAL CENTER
AutoCAD SHX Text 5/3/2022
AutoCAD SHX Text 526-19-529
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text
MK
AutoCAD SHX Text
JA
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
RELIABLE DRY PIPE VALVE ASSEMBLY; MODEL D - DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FP102
AutoCAD SHX Text D1
AutoCAD SHX Text
GAST AIR COMPRESSOR; MODEL 6HCA-10-M616NEX - DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FP102
AutoCAD SHX Text D2
AutoCAD SHX Text E2
AutoCAD SHX Text
FP102
AutoCAD SHX Text E1
AutoCAD SHX Text
FP102
| Sheets and Views |
| FP101_JA-FP101 |
| FP102_JA-FP102 |
File details come from the government source that posted it. Updated .