Replace Loading Dock Canopy BID Drawings - Volume 1.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24223B0015
About this file
This document contains bidding drawings and specifications for a federal construction contract opportunity to replace the roof of a loading dock canopy and conduct concrete repairs at a Department of Veterans Affairs medical center. The key project details include replacing the roof system on an approximately 1,900 square foot loading dock canopy, abating any asbestos-containing materials, and repairing concrete surfaces. Bidders must follow all safety codes and regulations during demolition and construction work. The project is located at the James J. Peters DVA Medical Center in Bronx, New York and has a solicitation number of 36C24223B0015.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24223B0015 0002.docx | DOCX document | |
| WAREHOUSE AREA_ RAMP DETAIL FOR ALTERNATE 2 WORK.pdf | ||
| 36C24223B0015 0001.docx | DOCX document | |
| LOADING DOCK CANOPY_METAL CEILING PANELS.pdf | ||
| 2477_001.pdf | ||
| LOADING DOCK CANOPY REVISED BID PRICING SHEET-5.3.2023.docx | DOCX document | |
| 36C24223B0015_1.docx | DOCX document | |
| Replace Loading Dock Canopy Roof_Davis Bacon Wage Rates_Bronx County_2.24.23.docx | DOCX document | |
| Replace Loading Dock Canopy BID Drawings - Volume 2.pdf | ||
| 526-19-529_SPEC Volume 1.pdf | ||
| 526-19-529_SPEC Volume 2.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
/1
/2
:3
:0
P
M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
U.S. Department of Veterans Affairs
LIST OF DRAWINGS
PROJECT CONTACT DIRECTORY
LOCATION MAP
CONTRACT OFFICER CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103
Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com
APPROVALS
Approved by Medical Center Director Approved by Director of Facility Management Service
Approved by Project COR Approved by Medical Director
Approved by Infection Control Approved by Safety Officer
Approved by Project CO
Approved by
Gavin T. McManaman, PE Cell: (484) 862-5937 gmcmanaman@acela-ae.com
PROJECT INFORMATION
CONTRACT SPECIALIST
GI101
COVER SHEET
8-24-2021 GTMc BS
James J. Peters DVA Medical Center
526-19-529REPLACE LOADING DOCK CANOPY
ROOF
REPLACE LOADING DOCK CANOPY
ROOF
James J. Peters DVA Medical Center
ISSUED FOR BID
130 W. Kingsbridge Road Bronx, NY 10468
Michael J.S. Kaleda Michael.Kaleda@va.gov 718-584-9000 Ext: 6904
Patricia Cordero Patricia.Codero@va.gov 718-584-9000 Ext 4928
GENERAL INFORMATION
Number Name
GI101 COVER SHEET
GI102 GENERAL INFORMATION
ARCHITECTURAL ELEMENTS
Number Name
AE101 CANOPY ROOF PLAN - NEW WORK
AE102 SECTIONS & DETAILS
ARCHITECTURAL DEMOLITION
Number Name
AD101 CANOPY ROOF PLAN - DEMOLITION
HAZARDOUS ABATEMENT
Number Name
HA101 CANOPY ROOF ASBESTOS ABATEMENT PLAN
STRUCTURAL ELEMENTS
Number Name
SF101 STRUCTURAL PLAN & DETAILS
Revisions: Date:
1. PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR
WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS.
BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE
OCCUPIED BY MEDICAL CENTER STAFF.
2. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.
3. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT.
4. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION
RATIO.
5. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO
RECEIVE NEW FINISHES DESIGNATED.
6. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE.
7. WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR
ITEMS OR SURFACES SHOWN ON THE DRAWINGS.
8. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR AND THE ARCHITECT OF RECORD FOR REVIEW OF EXISTING
CONDITIONS.
9. ALL ROOFS MUST BE COVERED AND OR WATERPROOFED THE SAME DAY TO PREVENT WATER DAMAGE TO CANOPY STRUCTURE AND BUILDING.
10. ALL DESIGNS TO BE DONE AS PER VA SPECIFICATIONS, NFPA 99, 101, NEC, VA DESIGN MANUALS, ANSI/TIA AND BICSI STANDARDS.
11. COORDINATE ALL CONSTRUCTION WITH COR PRIOR TO START OF WORK.
12. ALL PENETRATIONS MADE DURING INSTALLATION AROUND WIRING, CONDUITS, JUNCTION BOXES, PULL BOXES, PIPES, ETC. MUST BE SEALED WITH
FIRE SEALANT CAULKING AND/OR MATERIALS. HILTI FIRE SEALANT IS HOSPITAL STANDARD.
13. ALL PLUMBING WORK TO BE COORDINATED WITH PROJECT COR AND IN-HOUSE PLUMBING FOREMEN.
14. PROVIDE PATCHWORK, PAINT, REPLACEMENT OF CEILING TILES, ETC. TO ANY AREA DESTROYED DURING CONSTRUCTION. ALL MATERIALS MUST
MATCH EXISTING TYPE. VA TO PROVIDE PANEL MANUFACTURER INFORMATION.
15. ANY DRAWINGS PROVIDED BY THE GOVERNMENT ARE FOR REFERENCE ONLY AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD
VERIFY ALL DRAWINGS, INSTALLATION METHODS AND DIMENSIONS FOR ACCURACY.
16. GENERAL CONTRACTOR IS RESPONSIBLE TO CLEAN CONSTRUCTION SITE ON A DAILY BASIS.
17. CONTRACTOR IS TO FURNISH ALL WARRANTIES, OPERATION AND SERVICE MANUALS FOR THE JOB AND NEW EQUIPMENT PRIOR TO FINAL
PAYMENT. ALL WARRANTIES BEGIN WHEN APPROVED AND ACCEPTED BY BRONX VA.
18. CONTRACTOR IS RESPONSIBLE FOR SECURING THE CONSTRUCTION SITE, WHILE MAINTAINING THE INTEGRITY OF THE MEDICAL CENTER
SECURITY.
19. CONTRACTOR MUST COMPLY WITH ALL NECESSARY JAMES J. PETERS BRONX VA MEDICAL CENTER POLICIES IN REGARDS TO SECURITY ISSUES.
PARKING, SAFETY PROCEDURES, INFECTION CONTROL MEASURES, CONSTRUCTION WASTE MANAGEMENT, ETHICAL CONDUCT, ETC.
20. CONTRACTOR SHALL ESTABLISH ALL NECESSARY FALL PROTECTION SYSTEMS IN ACCORDANCE WITH OSHA 29 CFR SUBPART M 1926.502.
ADDITIONALLY, THE CONTRACTOR, INCLUDING ANY SUBCONTRACTORS THAT WILL BE PERFORMING THE WORK ON THE ROOF, SHALL HAVE
SUCCESSFULLY BEEN TRAINED AND CERTIFIED UNDER THE OSHA 30 TRAINING.
21. CONTRACTOR SHALL FABRICATE AND INSTALL GUARDRAIL SYSTEM AS NOTED ON SHEETS AE101 & SF101 PRIOR TO PERFORMING ANY WORK.
22. THE GENERAL CONTRACTOR SHALL PROVIDE A $10,000 MATERIAL AND LABOR ALLOWANCE TO BE USED AT THE ARCHITECT'S/ENGINEER'S
DISCRETION FOR UNKNOWN CONDITIONS. THE GENERAL CONTRACTOR SHALL CREDIT THE VA ANY ALLOWANCE REMAINING AFTER FINAL
PROJECT APPROVAL BY THE OWNER.
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACM ASBESTOS CONTAINING
MATERIAL
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INDLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PCM PHASE CONTRAST MICROSCOPY
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VPIH/CIH VA PROFESSIONAL INDUSTRIAL
HYGIENIST/CERTIFIED INDUSTRIAL
HYGIENIST
VB BAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS
SHOWN MAY NOT BE USED ON
THIS PROJECT. CERTAIN COMMON
ABBREVIATIONS MAY NOT BE
SHOWN.
CENTER LINE
DETAIL INDICATOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DIMENSION LINE
DRAWING BLOCK TITLE, TYPICAL
CORRIDOR ELEVATION INDICATOR
BUILDING SECTION INDICATOR
TYPICAL DETAIL INDICATOR
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
CG
FEC
A
DETAIL NUMBER
SHEET NUMBER
XX-XX
1"
D2
XX-XX
XX-XX
CL
XX-XX
x'-x" SPOT ELEVATION
1 REVISION
REVISION CLOUD
BREAK LINE
X
EXISTING DOOR OPENING
View Name 1/8" = 1'-0"
AE888
SHEET NUMBERDETAIL
NUMBER
N
PN
X
INDICATES DIRECTION OF PITCH (DOWN)
ROOF DRAIN, SET IN 24"x24" SUMPRD
EXISTING COMPONENTS
EX. DOCK LIFT
EX. DOCK RAMP
EX. BALER
EX. MECH. EQUIPMENT
E X
. C O
N T
A
IN
E R
E X
. C O
N
TA
IN
E
R
E X
. M E
C H
. E Q
U
IP
M E
N T
E X
. M E
C H
. E Q
U
IP
M E
N T
EX. DUMPSTER
EX. DUMPSTER
EX. DUMPSTER
EX. DUMPSTER
EX. DUMPSTER
EX. FENCE
EX. FENCE
EX. BLDG
EX. BLDG
E X
. S A
F E
T Y
B A
R R
IE
R
E X
. S A
F E
T Y
B A
R R
IE
R
E X
. S A
F E
T Y
B A
R R
IE
R
C O
N T
R A
C T
O R
L A
Y D
O W
N A
R E
A A
P P
R O
X . 1
S F
EX. CONCRETE
LOADING DOCK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Z
P ro je ct s\ -U
S D
V A
-1 \3
-C A
D D ra w in g s\
.3
-A rc h it e ct u re
\2 -U
S D
V A
-1 B
R O
N X
V A
.r vt
/1
/2
:5 :0
P
M
GI102
GENERAL INFORMATION
8-24-2021 GTMc BS
James J. Peters DVA Medical Center
526-19-529REPLACE LOADING DOCK CANOPY
ROOF
ISSUED FOR BID
GENERAL PROJECT CONDITION NOTESARCHITECTURAL ABREVIATIONS ARCHITECTURAL SYMBOLS
1" = 20'-0"2
WORK AREA SITE PLAN
N
PN
A. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE REMOVAL AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AS NOTED INCLUDING THE REMOVAL OF ALL NON ASBESTOS-CONTAINING MATERIALS SUCH AS FLASHING AND ROOF PLIES , AND ANY DEMOLITION, REMOVAL AND DISPOSAL NECESSARY TO EXPOSE ASBESTOS CONTAINING MATERIALS AND DEBRIS INCLUDING ALL REQUIRED PREPARATION, CLEANING, ENCAPSULATION AND DECONTAMINATION IN ACCORDANCE WITH ALL REGULATORY AGENCY REQUIREMENTS AND THE PROJECT PLANS AND SPECIFICATIONS.
B. IF SUSPECTED ASBESTOS OR HAZARDOUS MATERIAL IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL STOP WORK IMMEDIATELY , AND NOTIFY THE OWNER/ARCHITECT IN WRITING, PRIOR TO CONTINUING WORK.
C. INSTALL WARNING SIGNS TO ESTABLISH ABATEMENT WORK AREAS PRIOR TO THE START OF REMOVAL AND DISPOSAL OF
HAZARDOUS MATERIALS PER THE PROJECT SPECIFICATIONS.
D. FOR MATERIALS REPORTED TO CONTAIN <1% ASBESTOS, FOLLOW OSHA REQUIREMENTS FOR MATERIALS WITH 1% OR LESS ASBESTOS, INCLUDING WET HANDLING, CLEAN UP, DISPOSAL IN LEAK TIGHT CONTAINERS, AND AN EXPOSURE ASSESSMENT.
E. AN ASBESTOS SURVEY REPORT FOR THE ENTIRE AREA IS INCLUDED IN THE SPECIFICATIONS.
C
7.1
BX-3
BX-1
BX-8
BX-14
BX-5
BX-12
BX-10
BX-6
BX-2
BX-4
BX-9
BX-11
BX-7
BX-13
THE ABOVE ASBESTOS REPORT WAS SUPPLIED BY ECS MID-ATLANTIC, LLC TO ACELA ARCHITECTS + ENGINEERS. THE GC SHALL CONFIRM ALL ABATEMENT PRIOR TO START OF DEMOLITION AND REMOVAL WITHIN THE WORK AREA. THEY WILL
NOTIFY THE ARCHITECT OF ANY DISCREPANCIES PRIOR TO THE START OF ABATEMENT WORK.
SCOPE OF ABATEMENT WORK. REFER TO NOTES AND SUMMARY
OF MATERIALS FOR ADDITIONAL INFORMATION
REMOVAL AND CONTAINMENT GENERAL REQUIREMENTS:
1. THE CONTRACTOR SHALL HAVE ESTABLISHED ASBESTOS HAZARD ABATEMENT PLAN (AHAP) IN PRINTED FORM AND LOOSE LEAF FOLDER CONSISTING OF SIMPLIFIED TEXT, DIAGRAMS, SKETCHES, AND PICTURES THAT ESTABLISH AND EXPLAIN CLEARLY THE WAYS AND PROCEDURES TO BE FOLLOWED DURING ALL PHASES OF THE WORK BY THE CONTRACTOR'S PERSONNEL. THE AHAP MUST BE MODIFIED AS NEEDED TO ADDRESS SPECIFIC REQUIREMENTS OF THE PROJECT. THE AHAP SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO THE START OF ANY ABATEMENT WORK. SEE PROJECT SPECIFICATIONS FOR MINIMUM
TOPICS AND AREAS TO BE COVERED UNDER THE AHAP.
2. ACCESS TO THE REGULATED AREA IS ALLOWED ONLY THROUGH THE PERSONNEL DECONTAMINATION FACILITY (PDF), IF REQUIRED. ALL OTHER MEANS OF ACCESS SHALL BE ELIMINATED AND OSHA DANGER DEMARCATION SIGNS POSTED AS REQUIRED BY OSHA. IF THE REGULATED AREA IS ADJACENT TO OR WITHIN VIEW OF AN OCCUPIED AREA, PROVIDE A VISUAL BARRIER OF 6 MIL OPAQUE FIRE RETARDANT POLY SHEETING TO PREVENT BUILDING OCCUPANT OBSERVATION. IF THE
ADJACENT AREA IS ACCESSIBLE TO THE PUBLIC, THE BARRIER MUST BE SOLID.
3. COMPLETELY SEPARATE ANY OPENINGS INTO THE REGULATED AREA FROM ADJACENT AREAS USING FIRE RETARDANT POLY AT LEAST 6 MILS THICK AND DUCT TAPE. INDIVIDUALLY SEAL WITH TWO LAYERS OF 6 MIL POLY AND DUCT TAPE ALL HVAC OPENINGS INTO THE REGULATED AREA. INDIVIDUALLY SEAL ALL LIGHTING FIXTURES, CLOCKS, DOORS, WINDOWS, CONVECTORS, SPEAKERS, OR ANY OTHER OBJECTS IN THE REGULATED AREA. HEAT MUST BE SHUT OFF ANY OBJECTS COVERED WITH POLY.
4. A LOOSE LAYER OF 6 MIL FIRE RETARDANT POLY SHALL BE USED AS A DROP CLOTH TO PROTECT THE FLOOR/HORIZONTAL SURFACES FROM DEBRIS GENERATED DURING THE CLASS II WORK, EXCEPT FOR FLOOR TILE ABATEMENT. THIS LAYER SHALL BE
REPLACED AS NEEDED DURING THE WORK.
5. THE VA WILL EMPLOY AN INDEPENDENT INDUSTRIAL HYGIENIST (VPIH/CIH) CONSULTANT AND/OR USE ITS OWN IH TO PERFORM VARIOUS SERVICES ON BEHALF OF THE VA. THE VPIH/CIH WILL PERFORM THE NECESSARY MONITORING, INSPECTION, TESTING, AND OTHER SUPPORT SERVICES TO ENSURE THAT VA PATIENTS, EMPLOYEES, AND VISITORS WILL NOT BE ADVERSELY AFFECTED BY THE ABATEMENT WORK, AND THAT THE ABATEMENT WORK PROCEEDS IN ACCORDANCE WITH THESE SPECIFICATIONS, THAT THE ABATED AREAS OR ABATED BUILDINGS HAVE BEEN SUCCESSFULLY DECONTAMINATED. THE WORK OF THE VPIH/CIH CONSULTANT IN NO WAY RELIEVES THE CONTRACTOR FROM THEIR RESPONSIBILITY TO PERFORM THE WORK IN ACCORDANCE WITH CONTRACT/SPECIFICATION REQUIREMENTS, TO PERFORM CONTINUOUS INSPECTION, MONITORING AND TESTING FOR THE SAFETY OF THEIR EMPLOYEES, AND TO PERFORM OTHER SUCH SERVICES AS SPECIFIED. THE COST OF THE VPIH/CIH AND THEIR SERVICES WILL BE BORNE BY THE VA EXCEPT FOR ANY REPEAT OF FINAL INSPECTION AND TESTING THAT MAY BE REQUIRED DUE
TO UNSATISFACTORY INITIAL RESULTS.
A. TASK 1: ESTABLISH BACKGROUND LEVELS BEFORE ABATEMENT BEGINS BY COLLECTING BACKGROUND SAMPLES.
RETAIN SAMPLES FOR POSSIBLE TEM ANALYSIS.
B. TASK 2: PERFORM CONTINUOUS AIR MONITORING, INSPECTION, AND TESTING OUTSIDE THE REGULATED AREA DURING ACTUAL ABATEMENT WORK TO DETECT ANY FAULTS IN THE REGULATED AREA ISOLATION AND ANY ADVERSE IMPACT ON
THE SURROUNDINGS FROM REGULATED AREA ACTIVITIES.
C. TASK 3: PERFORM UNANNOUNCED VISITS TO SPOT CHECK OVERALL COMPLIANCE OF WORK WITH CONTRACT/SPECIFICATIONS. THESE VISITS MAY INCLUDE ANY INSPECTION, MONITORING, AND TESTING INSIDE AND OUTSIDE THE REGULATED AREA AND ALL ASPECTS OF THE OPERATION EXCEPT PERSONNEL MONITORING.
D. TASK 4: PROVIDE SUPPORT TO THE VA REPRESENTATIVE SUCH AS EVALUATION OF SUBMITTALS FROM CONTRACTOR, RESOLUTION OF UNFORESEEN DEVELOPMENTS, ETC.
E. TASK 5: PERFORM, IN THE PRESENCE OF THE VA REPRESENTATIVE, FINAL INSPECTION AND TESTING OF A DECONTAMINATED REGULATED AREA OR BUILDING AT THE CONCLUSION OF THE ABATEMENT AND CLEAN-UP WORK TO
CERTIFY COMPLIANCE WITH ALL REGULATIONS AND THE VA REQUIREMENTS/SPECIFICATIONS.
F. TASK 6: ISSUE CERTIFICATE OF DECONTAMINATION FOR EACH REGULATED AREA OR BUILDING AND PROJECT REPORT.
6. THE VA MUST BE NOTIFIED AT LEAST 24 HOURS IN ADVANCE OF ANY WASTE REMOVED FROM THE CONTAINMENT. ALL APPLICABLE REQUIREMENTS OF OSHA, EPA, AND DOT SHALL BE FOLLOWED DURING CLASS II WORK. KEEP MATERIALS INTACT;
DO NOT DISTURB; WET WHILE WORKING WITH IT; WRAP AS SOON AS POSSIBLE WITH 2 LAYERS OF 6 MIL PLASTIC FOR DISPOSAL.
7. ROOFING MATERIAL SHALL BE REMOVED IN AN INTACT STATE TO THE EXTENT THAT IT IS FEASIBLE.
8. WET METHODS SHALL BE USED TO REMOVE ROOFING MATERIALS THAT ARE NOT INTACT, OR THAT WILL BE RENDERED NOT INTACT DURING REMOVAL, UNLESS SUCH WET METHODS ARE NOT FEASIBLE OR WILL CREATE SAFETY HAZARDS
9. CUTTING MACHINES SHALL BE CONTINUOUSLY MISTED DURING USE, UNLESS A COMPETENT PERSON DETERMINES THAT
MISTING SUBSTANTIALLY DECREASES WORKER SAFE.
10. WHEN REMOVING BUILT-UP ROOFS WITH ASBESTOS-CONTAINING ROOFING FELTS AND AN AGGREGATE SURFACE USING A POWER ROOF CUTTER, ALL DUST RESULTING FROM THE CUTTING OPERATION SHALL BE COLLECTED BY A HEPA DUST COLLECTOR, OR SHALL BE HEPA VACUUMED BY VACUUMING ALONG THE CUT LINE. WHEN REMOVING BUILT-UP ROOFS WITH ASBESTOS-CONTAINING ROOFING FELTS AND A SMOOTH SURFACE USING A POWER ROOF CUTTER, THE DUST RESULTING FROM THE CUTTING OPERATION SHALL BE COLLECTED EITHER BY A HEPA DUST COLLECTOR OR HEPA VACUUMING ALONG THE CUT LINE, OR BY GENTLY SWEEPING AND THEN CAREFULLY AND COMPLETELY WIPING UP THE STILL-WET DUST AND DEBRIS LEFT
ALONG THE CUT LINE.
11. ASBESTOS-CONTAINING MATERIAL THAT HAS BEEN REMOVED FROM A ROOF SHALL NOT BE DROPPED OR THROWN TO THE GROUND. UNLESS THE MATERIAL IS CARRIED OR PASSED TO THE GROUND BY HAND, IT SHALL BE LOWERED TO THE GROUND VIA COVERED, DUST-TIGHT CHUTE, CRANE OR HOIST AND WRAPPED IN TWO LAYERS OF 6 MIL POLY WRAP.
12. ANY ACM THAT IS NOT INTACT SHALL BE LOWERED TO THE GROUND AS SOON AS IS PRACTICABLE, BUT IN ANY EVENT NO LATER THAN THE END OF THE WORK SHIFT. WHILE THE MATERIAL REMAINS ON THE ROOF IT SHALL EITHER BE KEPT WET, PLACED
IN AN IMPERMEABLE WASTE BAG, OR WRAPPED IN PLASTIC SHEETING.
13. INTACT ACM SHALL BE LOWERED TO THE GROUND AS SOON AS IS PRACTICABLE, BUT IN ANY EVENT NO LATER THAN THE END
OF THE WORK SHIFT.
14. UPON BEING LOWERED, UNWRAPPED MATERIAL SHALL BE TRANSFERRED TO A CLOSED RECEPTACLE IN SUCH MANNER SO
AS TO PRECLUDE THE DISPERSION OF DUST.
15. NOTWITHSTANDING ANY OTHER PROVISION OF THIS SECTION, REMOVAL OR REPAIR OF SECTIONS OF INTACT ROOFING LESS THAN 25 SQUARE FEET IN AREA DOES NOT REQUIRE USE OF WET METHODS OR HEPA VACUUMING AS LONG AS MANUAL METHODS WHICH DO NOT RENDER THE MATERIAL NON-INTACT ARE USED TO REMOVE THE MATERIAL AND NO VISIBLE DUST IS CREATED BY THE REMOVAL METHOD USED. IN DETERMINING WHETHER A JOB INVOLVES LESS THAN 25 SQUARE FEET, THE EMPLOYER SHALL INCLUDE ALL REMOVAL AND REPAIR WORK PERFORMED ON THE SAME ROOF ON THE SAME DAY.
16. BEFORE DECONTAMINATION STARTS, ALL ACM WASTE FROM THE REGULATED AREA SHALL BE REMOVED, ALL WASTE COLLECTED AND REMOVED, AND THE SECONDARY BARRIER OF POLY REMOVAL AND DISPOSED OF ALONG WITH ANY GROSS
DEBRIS GENERATED BY THE WORK.
17. AFTER AN ACCEPTABLE FINAL VISUAL INSPECTION BY THE VPIH/CIH AND VA REPRESENTATIVE, THE VPIH/CIH WILL PERFORM THE FINAL TESTING. AIR SAMPLES WILL BE COLLECTED AND ANALYZED IN ACCORDANCE WITH PROCEDURES FOR PCM IN THIS SPECIFICATION. IF THE RELEASE CRITERIA ARE NOT MET, THE CONTRACTOR SHALL REPEAT THE FINAL CLEANING AND CONTINUE
DECONTAMINATION PROCEDURES.
A. IF THE RESULTS OF THE PCM ARE ACCEPTABLE, REMOVE THE CRITICAL BARRIERS. ANY SMALL QUANTITIES OF RESIDUE MATERIAL FOUND UPON REMOVAL OF THE POLY SHALL BE REMOVED WITH A HEPA VACUUM AND LOCALIZED ISOLATION.
IF SIGNIFICANT QUANTITIES ARE FOUND AS DETERMINED BY THE VPIH/CIH, THEN THE ENTIRE AREA AFFECTED SHALL BE
CLEANED AS SPECIFIED IN THE FINAL CLEANING.
B. IF RELEASE CRITERIA ARE MET, PROCEED TO PERFORM THE ABATEMENT CLOSEOUT AND TO ISSUE THE CERTIFICATE OF
COMPLETION IN ACCORDANCE WITH THESE SPECIFICATIONS.
18. CONTRACTOR'S RELEASE CRITERIA: WORK IN A REGULATED AREA IS COMPLETE WHEN THE REGULATED AREA IS VISUALLY CLEAN AND AIRBORNE FIBER LEVELS HAVE BEEN REDUCED TO OR BELOW 0.01 F/CC, AS MEASURED BY PCM METHODS.
19. AFTER THOROUGH DECONTAMINATION, COMPLETE ASBESTOS ABATEMENT WORK UPON MEETING THE REGULATED AREA
CLEARANCE CRITERIA AND FULFILLING THE FOLLOWING:
A. REMOVE ALL EQUIPMENT, MATERIALS, AND DEBRIS FROM THE PROJECT AREA.
B. PACKAGE AND DISPOSE OF ALL ASBESTOS WASTE AS REQUIRED.
C. REPAIR OR REPLACE ALL FINISHES DAMAGED DURING THE ABATEMENT WORK.
20. AN ASBESTOS SURVEY REPORT FOR THIS AREA WAS PREPARED BY ECS MID-ATLANTIC, LLC AND SHALL BE MADE AVAILABLE
TO THE CONTRACTOR AT THE TIME OF BID.
WARNING SIGN REQUIREMENTS:
1. POST OSHA DANGER SIGNS MEETING THE SPECIFICATIONS OF OSHA 29 CFR 1926.1101 AT ANY LOCATION AND APPROACHES TO THE REGULATED AREA WHERE AIRBORNE CONCENTRATIONS OF ASBESTOS MAY EXCEED AMBIENT BACKGROUND LEVELS. SIGNS SHALL BE POSTED AT A DISTANCE SUFFICIENTLY FAR ENOUGH AWAY FROM THE REGULATED AREA TO PERMIT ANY PERSONNEL TO READ THE SIGN AND TAKE THE NECESSARY MEASURES TO AVOID EXPOSURE. ADDITIONAL SIGNS WILL BE POSTED
FOLLOWING CONSTRUCTION OF THE REGULATED AREA ENCLOSURE.
2. POSTED WARNING SIGNS DEMARCATING THE AREA MUST BE EASILY READABLE AND UNDERSTANDABLE. THE SIGNS MUST
BEAR THE FOLLOWING INFORMATION:
DANGER
ASBESTOS
CANCER AND LUNG DISEASE HAZARD
AUTHORIZED PERSONNEL ONLY
RESPIRATORY AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Z
P ro je ct s\ -U
S D
V A
-1 \3
-C A
D D ra w in g s\
.3
-A rc h it e ct u re
\2 -U
S D
V A
-1 B
R O
N X
V A
.r vt
/1
/2
:5 :1
P
M
HA101
CANOPY ROOF ASBESTOS
ABATEMENT PLAN
8-24-2021 GTMc BS
James J. Peters DVA Medical Center
526-19-529REPLACE LOADING DOCK CANOPY
ROOF
ISSUED FOR BID
ABATEMENT - GENERAL NOTES
N
PN
1/8" = 1'-0"1
CANOPY ROOF ASBESTOS ABATEMENT PLAN
1/8" = 1'-0"
0' 8'4' 16'2'
DISCLAIMER - ASBESTOS ABATEMENT
ABATEMENT KEY NOTES & LEGEND
NUMBER DESCRIPTION
1 REMOVE ASBESTOS CONTAINING ROOF TAR AND FLASHING IN ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE
FEDERAL, STATE, AND LOCAL REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN
X
ASBESTOS ABATEMENT PLAN GENERAL NOTES
ABATEMENT SCHEDULE
KEY PLAN
1. REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND
INFORMATION.
2. PRIOR TO THE START OF AMY DEMOLITION WORK, THE CONTRACTOR SHALL DEVELOP AND SUBMIT AN ENGINEERED FALL PROTECTION PLAN FOR APPROVAL. PROVIDE CERTIFIED DOCUMENTS EITHER BY THE MANUFACTURER OR AN ENGINEER LICENSED IN THE STATE OF NEW YORK THAT CONFIRMS THE FALL PROTTECTION SYSTEM PROPOSED FOR THE PROJECT
IS ADEQUATE TO SUPPORT ANY OSHA RECOMMENDED LOADS.
3. CONTRACTOR SHALL NOT USE THE ANGLE STRUT MEMBER OR ASSOCIATED CONNECTIONS AS AN ANCHOR POINT FOR
FALL PROTECTION.
4. CONTRACTOR SHALL SUBMIT A WRITTEN PLAN ALONG WITH ANY NECESSARY DETAILS FOR REVIEW OF ALL DAILY REMOVAL OF ROOFING THAT MUST BE REPLACED AND/OR WATERPROOFED THE SAME DAY TO PREVENT DAMAGE TO THE
STRUCTURE OR ADJACENT BUILDING.
5. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF SPECIFIED WORK REQUIRED FOR
THE PROJECT.
6. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK.
REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.
7. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.
8. THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM, INCLUDING THE CANOPY ROOF, SHALL REMAIN IN
OPERATION DURING THE ENTIRE CONSTRUCTION PHASE.
9. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE
INTENDED WORK SPECIFIED FOR THIS PROJECT.
10. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE
SALVAGED.
11. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.
12. REFER TO DETAIL Q/AE102 FOR TYPICAL METAL ROOF DECK REPAIRS. CONTRACTOR SHALL PROVIDE UP TO 25 SF OF
METAL ROOF DECK REPAIR AS SHOWN IN DETAIL Q/AE102.
C
7.1
EXISTING VENT PIPE
TO REMAIN
EXISTING VENT PIPE
TO REMAIN
EXISTING BUILDING
ROOF
PITCH
EXISTING PITCH POCKET (TYP.)
RD
RD
RD
RD
CONTRACTOR SHALL PROVIDE A (4)
FOUR FOOT HIGH ORANGE COLORED
SAFETY BARRIER FENCE AROUND THE
WORK AREA. FINAL LAYOUT LOCATION(S)
TO BE COORDINATED WITH THE
PROJECT COR.
AREA OF WORK
EXISTING PIPE TO REMAIN
EXISTING ROOF TO
BE REMOVED
LP
156'-10"
B.O.S.
167'-11"
EXISTING W BEAM (TYP.)
REMOVE EXISTING SOFFIT PANEL(S) AS
REQUIRED TO INSTALL SHORING POST.
FASTEN TOP OF POST TO BEAM
W/ TELEPOST "H" PLATE
4"⌀x11 GA. SHORING POST BY
TELEPOST OR EQUIVALENT
FASTEN POST TO DOCK SLAB W/ TELEPOST
SWIVEL PLATE. USE (4) 3/8" HILTI KWIK HUS
SCREW ANCHOR W/ 2 1/2" MIN. EMBEDMENT.
GROUT PLATE AS REQUIRED TO LEVEL
NOTES:
1. ONLY (2) ANGLE STRUTS ARE PERMITTED TO
BE REMOVED AT ONE TIME, PROVIDE (1)
SHORING POST AT EACH STRUT LOCATION.
2. PROVIDE (2) SAFETY CONES PER SHORING
POST MIN.
EXISTING SOFFIT
EX. ANGLE STRUTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Z
P ro je ct s\ -U
S D
V A
-1 \3
-C A
D D ra w in g s\
.3
-A rc h it e ct u re
\2 -U
S D
V A
-1 B
R O
N X
V A
.r vt
/1
/2
:5 :0
P
M
AD101
CANOPY ROOF PLAN -
DEMOLITION
8-24-2021 GTMc BS
James J. Peters DVA Medical Center
526-19-529REPLACE LOADING DOCK CANOPY
ROOF
ISSUED FOR BID
GENERAL DEMOLITION NOTES
1/8" = 1'-0"1
CANOPY ROOF DEMO PLAN
KEY PLAN
N
PN
DEMOLITION KEYNOTES
Mark Description
1 ROOFING DEMOLITION INCLUDES THE REMOVAL OF ANY LOOSE GARBAGE AND DEBRIS NOT A PART OF THE ROOF SYSTEM, EXISTING STONE BALLAST, ROOF MEMBRANE, RECOVERY BOARD, AND INSULATION DOWN TO THE ROOF DECKING. ALL AREAS SHALL BE PREPAIRED FOR NEW WORK.
2 DEMOLISH THE ROOF EDGE INCLUDING THE CANOPY FASCIA. THE EXISTING SOFFIT PANELS ARE NOT TO BE DEMOLISHED.
3 DEMO EXISTING ROOF DRAIN AND PIPE ELBOW, CLEAN AND PREP PIPE FOR NEW CONNECTION.
4 EXISTING EXPANSION JOINT TO BE DEMOLISHED DOWN TO THE EXISTING ROOF DECK.
5 EXISTING ANTENNA, G.C. SHALL COORDINATE THE REMOVAL AND REINSTALLATION OF THE ANTENNA IN ORDER TO COMPLETE THE WORK.
6 DEMO EXISTING PITCH POCKET DOWN TO ROOF DECK
X
EXISTING PITCH POCKET
0 16' 24' 32'8'
Graphic Scale: 1 inch = 8 feet
1 1/2" = 1'-0"A
EXISTING ROOF DRAIN DETAIL
EXISTING FASCIA
EXISTING EXPANSION JOINT
1/2" = 1'-0"5
PROPOSED SHORING POST
C
G
AE102
7.1
1D
AE102
1B
AE102
AE101 3
AE101
AE101
AE102
EXISTING BUILDING
F
AE102
E
AE102
PITCH DN
1/8" / FT
EXPANSION JOINT
SEE DETAIL
NEW FASCIA PANELS
SEE SECTION
NEW FASCIA PANELS
SEE SECTION
NEW FASCIA PANELS
SEE SECTION
EXIST. STRUCTURAL SUPPORT
ANGLES TO REMAIN (TYP.)
EXISTING VENT PIPE
TO REMAIN
EXIST. VENT PIPE
TO REMAIN
RD
RD
RD
RD
CRICKET PITCH DIRECTION,
CRICKETS SHALL BE PITCHED
@ THE SAME PITCH AS THE
ROOF
1B
AE102
ROOF PITCH DIRECTION INDICATES
DIRECTION OF ROOF GOING DOWN IN
ELEVATION, THE STRUCTURE IS PITCHED.
NEW ROOF DRAIN (TYP),
SEE DETAILS J & K
AE102
SF101
AREA OF WORK
C
EXISTING GRADE
NEW FASCIA PANELS
EXISTING
BLDG
BOTTOM OF CANOPY ROOF
ELEV. 167'-5 1/2"
LOADING DOCK SLAB
ELEV. 156'-10"
653 4 7 8 9
7.1
NEW FASCIA PANELS
BOTTOM OF CANOPY FASCIA
ELEV. 167'-5 1/2"
EXISTING LOADING DOCK FLOOR
ELEV. 156'-10"
EXISTING
BLDG
BEYOND
EXISTING
MECH. UNIT
EXISTING
BALER
ROOF CANOPY
STRUTS-TYP 8
EXP. JOINT
EXISTING
DOCK RAMP
EXISTING
DOCK LIFT
EXISTING
DOCK STAIRS
EXISTING DOCK
LEVELERS-3 TYP
EXISTING
BLDG
EXISTING
ACCENT BAND
EXISTING GRADE
ELEV. 152'-10"
ROOF ACCESS
LADDER WITH LOCKED
GUARD DOOR
NEW POST & GUARDRAIL
SYSTEM, SEE SHEET SF101 FOR
ADDITIONAL INFORMATION
NEW FASCIA PANELS
EXISTING GRADE
EXISTING
BLDG
BOTTOM OF CANOPY ROOF
ELEV. 167'-5 1/2"
LOADING DOCK SLAB
ELEV. 156'-10"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Z
P ro je ct s\ -U
S D
V A
-1 \3
-C A
D D ra w in g s\
.3
-A rc h it e ct u re
\2 -U
S D
V A
-1 B
R O
N X
V A
.r vt
/1
/2
:5 :0
P
M
AE101
CANOPY ROOF PLAN - NEW WORK
8-24-2021 GTMc BS
James J. Peters DVA Medical Center
526-19-529REPLACE LOADING DOCK CANOPY
ROOF
ISSUED FOR BID
1/8" = 1'-0"1
CANOPY ROOF PLAN
KEY PLANN
PN
1/8" = 1'-0"5
ELEVATION
1/8" = 1'-0"3
ELEVATION
1/8" = 1'-0"4
ELEVATION
1/8" = 1'-0"
0' 8'4' 16'2'
AE102
1D
1C
AE102
AE102
1A
EXIST ANGLE SUPPORTS,
CLEAN, PRIME AND PAINT SEE
SPECIFICATIONS
NEW PITCH POCKET BEYOND, SEE
DETAIL
EXISTING SOFFIT PANELS, NO
CHANGE
NEW 3/16" ALUMINUM
FASCIA PANEL.
AE102
1B
AE102
M
AE102
L
NOTE:
EXISTING COMPONENTS
SHADED IN GREY
EXISTING SLATE WALL FINISH
EXISTING ROOF DECK
2 PLY ROOFING MEMBRANE
RIGID INSULATION
5/8" RECOVERY BOARD
RUN NEW ROOF PLIES UP ONTO EXISTING METAL
CANT AND FASTEN TERMINATION BAR W/ #14
STAINLESS STEEL SCREWS @ 6" O.C.
CUT EXISTING FLASHING LEAVING 1" MIN TO RIVET NEW
FLASHING EXTENSION ONTO THE EXISTING.
4"
NEW WOOD BLOCKING AS SHOWN
0.040 CONTINUOUS METAL CLEAT, SECURED
W/ (2) FASTENERS @ 6" O.C.
EXTEND CAP SHEET OVER WOOD BLOCKING
AND SECURE @ 8" O.C.
RUBBERIZED ASPHALT SEALANT
MULTIPLY BUILT UP ROOFING
MEMBRANE
MEMBRANE FLASHING PLY
MIN 9" ON FIELD
BASE FLASHING PLY MIN
6" ON FIELD
METAL EDGE SET IN ROOF CEMENT, NAILED
3" O.C. STAGGERED
NEW 3/16" ALUMINUM FASCIA
PANEL SECURED @ 24" O.C.
NOTE:
EXISTING COMPONENTS
SHADED IN GREY
C
NOTE:
EXISTING
COMPONENTS
SHADED IN GREY
EXISTING METAL PANEL WALL FINISH
RUN NEW ROOF PLIES UP ONTO EXISTING METAL CANT AND
FASTEN WITH TERMINATION BAR 6" O.C. W/ #14 STAINLESS
STEEL SCREWS
EXISTING ROOF DECK
2 PLY ROOFING MEMBRANE
CRICKET RIGID INSULATION
(PITCHED)
5/8" RECOVERY BOARD
EXISTING METAL CANT TO REMAIN
RIGID INSULATION
CUT EXISTING FLASHING LEAVING 1" MIN TO RIVET NEW
FLASHING EXTENSION ONTO THE EXISTING.
C
NOTE:
EXISTING
COMPONENTS
SHADED IN GREY
EXISTING METAL PANEL WALL FINISH
EXISTING ROOF DECK
2 PLY ROOFING MEMBRANE
5/8" RECOVERY BOARD
EXISTING METAL CANT TO REMAIN
RUN NEW ROOF PLIES UP ONTO EXISTING METAL CANT AND
FASTEN WITH TERMINATION BAR 6" O.C. #14 STAINLESS
STEEL SCREWS
RIGID INSULATION
CUT EXISTING FLASHING LEAVING 1" MIN TO RIVET NEW
FLASHING EXTENSION ONTO THE EXISTING.
7 7.1
(2
M M
8" M
IN
H P
MULTIPLY BUILT UP ROOFING MEMBRANE
MEMBRANE FLASHING PLY MIN 9" ON FIELD
BASE FLASHING PLY MIN 6" ON FIELD
EXISTING
STRUCTURE
EXISTING ROOF
DECKING
FLEXIBLE WATER PROOF MEMBRANE CLOSURE
PREMANUFACTURED EXPANSION JOINT COVER
CHAMFER EACH SIDE OF WOOD CURB TO DRAIN
METAL CAP SECURED @ 12" O.C. W/ FASTENER
& NEOPRENE WASHER
MEMBRANE FLASHING SECURED @ 8" O.C.
FLEXIBLE VAPOR RETARDER TO SERVE AS INSULATION
RETAINER, ATTACH TO TOP OF CURB
WOOD CANT STRIP
NOTE:
EXISTING COMPONENTS
SHADED IN GREY
SHEET METAL PITCH PAN SOLDERED/WELDED
WATERTIGHT 7" MIN HEIGHT, BE SURE TO COVER
EXIST. PLATE.
SEALANT
CAP FLASHING PLY 9" MIN. [288MM] ON FIELD
BASE FLASHING PLY 6" MIN [152MM] ON FIELD
MODIFIED MEMBRANE
BASE PLY
RECOVERY BOARD
INSULATION (PITCHED)
ROOF DECK
WOOD NAILERS
PREPARE AND PRIME EXIST STRUCTURE
POURABLE SEALANT, 2 PART, 2" [51.5 MM] MIN.
NON-SHRINK GROUT, 2" [51.5 MM] MIN.
103 MM
4" MIN
NOTE:
EXISTING COMPONENTS
SHADED IN GREY
RECOVERY BOARD
INSULATION
WOOD NAILERS
SHEET METAL PITCH PAN SOLDERED/WELDED
WATERTIGHT 7" MIN HEIGHT, BE SURE TO COVER
EXIST. PLATE.
SEALANT
CAP FLASHING PLY 9" MIN. [288MM] ON FIELD
BASE FLASHING PLY 6" MIN [152MM] ON FIELD
MODIFIED MEMBRANE
BASE PLY
PREPARE AND PRIME PROJECTION
POURABLE SEALANT, 2 PART, 2" MIN.
NON-SHRINK GROUT, 2" MIN.
SEALANT
DRAWBAND
WATERTIGHT SHEET METAL RAIN COLLAR OVERLAPPING
PENETRATION POCKET
ROOF DECK
SEAL GAP AROUND PIPES
WITH FOAM
101 MM
4" MIN
EXISTING WALL EXTRUSION
EXISTING GUSSET PLATE AND
ANGLE CONNECTION
NEW (2) PIECE CLOSURE PLATE SET IN
SILICONE SEALANT & ATTACHED AT TOP TO
EXIST. WALL PANELS. WELD AT CENTER
JOINT SEAM
EXISTING WALL FINISH
SEALANT
NOTCH COVER PLATE AS
REQUIRED AROUND
ANGLE STRUTS.
SEALANT
EXISTING WALL EXTRUSION
EXISTING GUSSET PLATE
NEW (2) PIECE CLOSURE PLATE, ATTACHED
AT TOP TO EXIST. WALL PANELS.
EXISTING WALL FINISH
EXISTING WALL FINISH
C
EXISTING WALL EXTRUSION
SEALANT
(ALL FOUR SIDES)
UNDERDECK CLAMP ROOF MEMBRANE
SUMP RECEIVER
RIGID INSULATION AT
SUMP PITCHED 1/4"/FT
2'- 0" x 2'- 0" SUMP
ROOF DECK
ROOF DRAIN
TOP FLASHING MEMBRANE, 48" SQUARE MIN.
BASE FLASHING MEMBRANE, 40" SQUARE MIN.
4 LB LEAD FLASHING, 30" SQUARE MIN., SET IN
ROOF MASTIC, TURN DOWN 2" MIN INTO DRAIN
CLAMPING RING
REMOVE EXISTING GUSSET
PLATE. PROVIDE NEW
1/2"x10"x10" PLATE
CUT LINE OF EXISTING PLATE
(3) 3/4"⌀ A325 BOLTS
(2) 2 1/2"x2 1/2"x1/4"
ANGLE STRUTS
(EXISTING)
NOTES:
1. THIS REPAIR IS ONLY AS REQUIRED AT THE ARCHITECTS/ENGINEERS DISCRETION FOLOWING DEMOLITION
2. CONTRACTOR SHALL ASSUME (3) REPAIRS WILL BE REQUIRED. VA WILL BE PROVIDED A CREDIT IF ACTUAL
CONDITIONS DO NOT WARRANT REPAIR AS DIRECTED BY THE ARCHITECT/ENGINEER.
3/16
3/16
EXISTING BEAM
REMOVE AND MATCH
EXISTING GUSSET PLATE.
(2) 2 1/2"x2 1/2"x1/4" ANGLE STRUTS (EXISTING)
(3) 3/4"⌀ A325 BOLTS
NOTES:
1. CONTRACTOR TO FIELD VERIFY DIMENSIONS OF EXISTING PLATE
2. THIS REPAIR IS ONLY AS REQUIRED AT THE ARCHITECTS/ENGINEERS DISCRETION FOLOWING DEMOLITION
3. CONTRACTOR SHALL ASSUME (3) REPAIRS WILL BE REQUIRED AND PROVIDE A COST PER REPAIR. VA WILL BE PROVIDED A CREDIT IF ACTUAL CONDITIONS DO NOT WARRANT REPAIR AS DIRECTED BY THE
ARCHITECT/ENGINEER.
EXISTING WALL EXTRUSION
EXISTING GUSSET PLATE AND
ANGLE CONNECTION
NEW (2) PIECE CLOSURE PLATE SET IN
SILICONE SEALANT & ATTACHED AT TOP TO
EXISTING WALL PANELS. WELD AT CENTER
JOINT SEAM
EXISTING WALL EXTRUSION
EXISTING PIPE
NEW ROOF
NO-HUB BANDNEW ROOF DRAIN, SEE DETAIL J
FOR ROOF SETTING DETAILS
SEE DETAIL E FOR
ROOF TERMINATION
EXISTING WALL
REINFORCEMENT SCHEDULE
DIA. OR WIDTH OF
DAMAGE OR HOLE
REQUIRED REINFORCEMENT
< = 6"
NO REINFORCING OR 0.045" PLATE
MINIMUM
< = 8" 0.045" PLATE MINIMUM
< = 13" 0.057" PLATE MINIMUM
> = 13" DESIGN BY ENGINEER
FACE OF WALL
GUSSET PLATE
ANGLE STRUT
EXISTING JOINT EXTRUSION ABOVE
AND BELOW GUSSET PLATE
NEW 20 GA A653 GALVANIZED COVER
PLATE EACH SIDE OF GUSSET PLATE
SEALANT
(ALL FOUR SIDES)
RIVET NEW COVER TO EXISTING METAL
PANEL. PROVIDE BOND BREAKER TAPE
BETWEEN OLD AND NEW METALS
WHEREVER CONTACT MAY BE MADE.
PROVIDE SPRAY
INSULATION AS REQUIRED
TO FULLY SEAL ANY VOIDS
BETWEEN NEW COVER
PLATE AND EXISTING WALL
PANEL AND EXTRUSIONS.
2 PLY ROOFING MEMBRANE
5/8" RECOVERY BOARD
1" RIGID INSULATION
EXISTING ROOF DECK
SLOPED WITH STRUCTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Z
P ro je ct s\ -U
S D
V A
-1 \3
-C A
D D ra w in g s\
.3
-A rc h it e ct u re
\2 -U
S D
V A
-1 B
R O
N X
V A
.r vt
/1
/2
:5 :0
P
M
AE102
SECTIONS & DETAILS
8-24-2021 GTMc BS
James J. Peters DVA Medical Center
526-19-529REPLACE LOADING DOCK CANOPY
ROOF
ISSUED FOR BID
3/4" = 1'-0"1
SECTION @ ROOF SUPPORTS
1 1/2" = 1'-0"F
ROOF TERMINATION DETAIL
1 1/2" = 1'-0"1D
TYPICAL ROOF EDGE DETAIL
1 1/2" = 1'-0"E
ROOF TERMINATION DETAIL
1 1/2" = 1'-0"1B
ROOF TERMINATION DETAIL
1 1/2" = 1'-0"G
EXPANSION JOINT DETAIL
1 1/2" = 1'-0"1C
PITCH POCKET DETAIL @ STRUCTURAL SUPPORTS
1 1/2" = 1'-0"H
PITCH POCKET DETAIL @ PIPE PENETRATION
1 1/2" = 1'-0"1A
WALL CLOSURE DETAILS
SECTION ELEVATION
1 1/2" = 1'-0"J
TYPICAL ROOF DRAIN DETAIL
1 1/2" = 1'-0"L
ROOF STRUT CONNECTION REPAIR DETAIL @ WALL
1 1/2" = 1'-0"M
STRUT CONNECTION REPAIR DETAIL @ ROOF
1 1/2" = 1'-0"K
NEW ROOF DRAIN DETAIL
1" = 1'-0"P
DECK REPAIR DETAIL
PLAN
3D VIEW
1 1/2" = 1'-0"N
ROOF DETAIL
SF101
A-A
SF101
B-B
SF101
C
7.1
4' - 0" 4' - 0" 4' - 0" 3' - 3"
2'
4"
EX. W14
EX. W12
5'
0"
S E
C T
IO
N
S
(2
5' -0
R
E M
O V
A B
LE
P O
S T
S
'-0
O
C 3'
8"
E X
. W
E X
. W
E X
. W
E X
. W
E X
. W
E X
. W
E X
. W
E X
. W
E X
. W
12EX. W10EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
EX. W10
SF101
SF101
SF101
4' - 0" 5' - 0" 4' - 9"
8 5/8" 5' - 0" 5' - 0" 5' - 0"
6" 6"
SEE DETAIL
6/SF101
ROOF DECK
DIRECTION
ROOF STEEL PITCH
1/8"/FT TOWARDS
BLDG, TYP.
HP LP
HOOP "C"
HOOP "D"
HOOP "D"
HOOP "D"
R U
N G
S E
Q U
A
LL
Y S
P A
C E
D
'-0
O
C
8' -0
M
A X
7'
M
IN
H O
O P
S P
A C
IN
G
4' -0
M
A X
IM
U
M
C3x4.1 SIDE RAIL
TOP CANOPY ROOF EDGE
1/4" THK X 1 1/4" BAR
LANDING
6'-0" LADDER GUARD
BY COTTERMAN OR
SIMILAR
SEE DETAIL 10/SF101
9" 9"
40°
HOOP "C"
1/4" THK x 3" BAR
R = 1'-5"
9"
1'-1 7/8"
R = 1'-1 1/2"
1'- 1 7/8"
9" 9"
9"
40°
HOOP "D"
1/4" THK x 3" BAR
SAFETY GATE
3/16
3/16
TYP.
1/
2"
6"X3/8"X1'-6" LG
GALV PL
3/16
3/16
ROOF
1'
1"
6"
1' - 6"
1' - 4"
2"X1/4"X0'-6" LG
STIFF PL
6"
7"
5 1/2"
6"X3/8"X0'-7" LG
GALV PL
1/
2"
3/16
3/16
ROOF
1'
1"
6"X3/8"X0'-9" LG
GALV PL
3/16
3/16
ROOF
1/
2"
1'
1"
6"
9"
7 3/8"
AREA OF WORK
PART 1 – GENERAL REQUIREMENTS AND DESIGN CRITERIA
1.1 BUILDING CODES AND REFERENCED STANDARDS
A. "STRUCTURAL DESIGN MANUAL FOR HOSPITAL PROJECTS - 2014", DEPARTMENT OF VETERANS AFFAIRS.
B. "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES", (ASCE 7/SEI), AMERICAN SOCIETY OF
CIVIL ENGINEERS.
C. "INTERNATIONAL BUILDING CODE - 2018", INTERNATIONAL CODE COUNCIL, INC.
1.2 DESIGN LOADS
A. DEAD LOADS:
PERMANENT STATIONARY CONSTRUCTION INCLUDING MECHANICAL EQUIPMENT AND THEIR WEIGHTS HAVE
BEEN NOTED ON THE STRUCTURAL DRAWINGS. ANY EQUIPMENT NOT SHOWN ON THE STRUCTURAL
DRAWINGS AND EXCEEDING 300 LBS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF
RECORD PRIOR TO INSTALLATION.
B. ROOF LIVE LOAD 20 PSF
C. ROOF SNOW LOAD PARAMETERS
WHERE APPROPRIATE, DRIFTING SNOW LOADS HAVE BEEN CONSIDERED IN ACCORDANCE WITH SECTION
7.7 OF ASCE/SEI 7-16.
1. GROUND SNOW LOAD, Pg 25 PSF
2. FLAT ROOF SNOW LOAD, Pf 21 PSF
3. SNOW EXPOSURE FACTOR, Ce 1.0
4. SNOW LOAD IMPORTANCE FACTOR, Is 1.0
5. THERMAL FACTOR, Ct 1.20
E. WIND LOAD PARAMETERS
1. BASIC WIND SPEED (3 SECOND GUST), VU 115 MPH
2. RISK CATEGORY II
3. WIND EXPOSURE B
4. INTERNAL PRESSURE COEFFICIENT ±0.18
5. COMPONENT AND CLADDING
a. TO BE DETERMINED IN ACCORDANCE WITH THE GOVERNING BUILDING CODE AS REQUIRED.
F. SEISMIC LOAD PARAMETERS
1. SEISMIC IMPORTANCE FACTOR, Ie 1.0
2. SPECTRAL RESPONSE ACCELERATION, SS 0.295
3. SPECTRAL RESPONSE ACCELERATION, S1 0.061
4. SITE CLASS D (DEFAULT)
5. SPECTRAL RESPONSE COEFFICIENT, SDS 0.307
6. SPECTRAL RESPONSE COEFFICIENT, SD1 0.097
7. SEISMIC DESIGN CATEGORY B
1.3 GENERAL
A. REFER TO PROJECT SPECIFICATIONS FOR DETAILED REQUIREMENTS FOR MATERIAL AND WORKMANSHIP.
B. UNLESS OTHERWISE NOTED, DETAILS, SECTIONS AND NOTES CONTAINED IN THE STRUCTURAL CONTRACT
DOCUMENTS SHALL BE CONSIDERED TYPICAL FOR ALL SIMILAR CONDITIONS EVEN IF NOT EXPLICITLY
REFERENCED.
C. DEFICIENT WORK AND/OR WORK NOT IN CONFORMANCE WITH THE CONTRACT DOCUMENTS SHALL BE REPAIRED AT THE CONTRACTOR’S EXPENSE. THE CONTRACTOR SHALL COMPENSATE THE CLIENT FOR SERVICES ARISING FROM DEFICIENT WORK, REVIEW OF MODIFICATIONS/CONTRACTOR SUBSTITUTION, OR
EXPEDITING OF SUBMITTALS.
D. COST OF INVESTIGATION AND/OR REDESIGN INCURRED BY THE ENGINEER OF RECORD DUE TO
CONTRACTOR ERRORS WILL BE AT THE CONTRACTOR EXPENSE.
E. THE CONTRACTOR SHALL SUBMIT A SINGLE DIMENSIONED AND COORDINATED DRAWING FOR EACH LEVEL SHOWING THE LOCATIONS OF ALL SLEEVES AND OPENINGS REQUIRED BY ALL TRADES PRIOR TO
INITIALIZING ANY WORK.
F. ALL DIMENSIONS, ELEVATIONS AND CONDITIONS SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTORS AND ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD FOR CLARIFICATION BEFORE PROCEEDING WITH THE AFFECTED PART OF THE WORK. DIMENSIONS AND ELEVATIONS NOTED IN THE CONTRACT DOCUMENTS AS (+/-) AND ALL FIELD CONDITIONS SHALL BE VERIFIED IN THE FIELD (V.I.F.) BY THE CONTRACTORS PRIOR TO THE SUBMISSIONS OF SHOP DRAWINGS.
1.4 SHOP DRAWINGS
A. SHOP DRAWINGS FOR ALL NEW STRUCTURAL ELEMENTS SHOWN ON THE CONTRACT DOCUMENTS, MUST
BE SUBMITTED BY THE GENERAL CONTRACTOR AND REVIEWED BY THE ENGINEER. SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S APPROVAL STAMP CERTIFYING HE HAS VERIFIED ALL CONSTRUCTION CRITERIA INCLUDING FIELD MEASUREMENTS, MATERIAL AND SIMILAR DATA AND HAS CHECKED THE SUBMITTAL FOR
COMPLETENESS, COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS.
B. UNAUTHORIZED REPRODUCTION OF ANY PORTION OF THE STRUCTURAL DRAWINGS FOR RESUBMITTAL AS SHOP DRAWINGS IS PROHIBITED. SHOP DRAWINGS PRODUCED IN SUCH A MANNER WILL BE REJECTED AND
RETURNED.
C. IF THE CONTRACTOR FAILS TO OBTAIN THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS, THE ENGINEER WILL NOT BE RESPONSIBLE FOR THE STRUCTURAL CERTIFICATION AND DESIGN OF THE PROJECT. SHOP DRAWINGS ARE REVIEWED BY THE ENGINEER AS A CONVENIENCE TO THE GENERAL CONTRACTOR AND
ARE NOT A CONTRACT DOCUMENT.
D. CONTRACTORS SHALL FURNISH DIMENSIONED SHOP DRAWINGS AT ALL LEVELS LOCATING DOCK AND ROOF EDGES AND LOCATING ALL SLEEVES AND OPENINGS REQUIRED BY ALL TRADES FOR REVIEW BY THE
STRUCTURAL ENGINEER.
E. AT THE TIME OF SHOP DRAWING SUBMISSION, THE GENERAL CONTRACTOR SHALL INFORM THE ENGINEER, IN WRITING, OF ANY DEVIATIONS OR OMISSIONS FROM THE CONTRACT DOCUMENTS.
PART 2 – STRUCTURAL STEEL
2.1 STANDARD SPECIFICATIONS
A. AISC 360 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS.
B. AWS D1.1 STRUCTURAL WELDING CODE – STEEL.
C. RCSC SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH STRENGTH BOLTS.
2.2 STRUCTURAL SHAPES
A. WIDE FLANGE SHAPES ASTM A992 (FY = 50 KSI)
B. HOLLOW STRUCTURAL SECTIONS ASTM A500 (FY = 46 KSI)
C. ANGLES ASTM A36 (FY = 36 KSI)
D. CHANNELS ASTM A36 (FY = 36 KSI)
E. PLATES ASTM A36 (FY = 36 KSI)
F. PIPES ASTM A53, TYPE E, GRADE B OR
ASTM A501 (FY = 42 KSI)
2.3 BOLTED CONNECTIONS
A. ASTM A325 AND A490, IN STD. HOLES WITH ASTM A563 GRADE DH NUTS.
B. FULLY PRETENSION ALL BOLTS IN ACCORDANCE WITH RCSC UNO. DIRECT TENSION INDICATING WASHERS
SHALL BE USED IN SLIP-CRITICAL CONNECTIONS. TWIST-OFF TORQUE BOLTS ARE NOT PERMITTED IN SLIP
CRITICAL CONNECTIONS.
2.4 WELDING ELECTRODES
A. CONFORM TO AWS SPECIFICATIONS FOR ELECTRODES BASED ON WELDING PROCESS AND THE TYPE AND
GRADE OF STEEL. E70XX ELECTRODES (MIN.) FOR FILLET WELDS.
2.5 FABRICATION
A. SHOP FABRICATE TO GREATEST EXTENT POSSIBLE BY WELDING INCLUDING STIFFENERS, CAPS AND BASES, HOLES, AND CONNECTIONS.
B. SUBMIT COMPLETE SHOP DRAWINGS FROM FIELD DIMENSIONS FOR THE ARCHITECT’S APPROVAL OF ALL
STRUCTURAL STEEL PRIOR TO FABRICATION.
2.6 ERECTION
A. DO NOT FIELD CUT, OR FIELD MODIFY ANY STRUCTURAL STEEL WITHOUT PRIOR WRITTEN APPROVAL BY
ARCHITECT FOR EACH SPECIFIC CASE.
2.7 PAINT
A. SHOP PRIME ALL STEEL NOT ENCASED IN CONCRETE OR NOT FIREPROOFED.
B. SEE ARCHITECTURAL SPECIFICATIONS FOR FINISH COAT REQUIREMENTS.
2.8 HOT-DIP GALVANIZING
A. ALL NEW STEEL, UNO THAT IS EXPOSED TO THE EXTERIOR ELEMENTS (WEATHER) SHALL BE HOT-DIPPED
GALVANIZED. ALL FIELD WELDS, OR AREAS WHERE HOT-DIP GALVANIZING IS DAMAGED, SHALL BE TOUCHED-UP WITH A ZINC-RICH PAINT (“COLD GALVANIZING”) AFTER STEEL IS COMPLETELY INSTALLED.
B. PLUG WELD VENT HOLES AFTER GALVANIZING.
C. SEAL WELD SEAMS NOT OTHERWISE WELDED.
2.9 POST-INSTALLED ANCHORS
A. POST-INSTALLED ANCHORS SHALL BE AS FOLLOWS UNLESS OTHERWISE INDICATED ON DRAWINGS:
1. EXPANSION BOLTS INTO CONCRETE
• HILTI KWIK BOLT TZ OR APPROVED EQUAL
2. SCREW ANCHOR INTO CONCRETE
• HILTI KWIK HUS EZ OR APPROVED EQUAL
3. ADHESIVE ANCHOR INTO CONC.
• HILTI HIT HY 200 SAFE SET SYSTEM (ESR-3187) WITH HILTI HIT Z-ROD OR HILTI HIT HY 200
SAFE SET WITH HOLLOW DRILL BIT WITH HILTI HAS-E THREADED ROD OR APPROVED EQUAL;
DRY OR WATER SATURATED CONCRETE HOLES PERMITTED; CONCRETE SHALL HAVE A
MINIMUM AGE OF 21 DAYS AT THE TIME OF ANCHOR INSTALLATION.
1/8"
2" 2"
4"
RAIL (STEEL)
SHOP WELD ONE END
PIPE INSERT
(MAX.)
2'-0"
CENTER TO CENTER OF POST, TYP.
5' - 0"
ALL JOINTS WELDED
AND GROUND
SMOOTH (TYP.)
REFER TO APPLICABLE
DETAILS FOR POST
ATTACHMENT
4" KICK PLATE
1'
9" 1'
9"
ROOF EDGE
ROOF SURFACE
TOP OF STEEL BEAM
NOTE: RAILING SHALL HAVE MITERED CORNERS.
6"
1/2" DRAIN HOLE
LOCATION
1 1/2" Ø SCH. 80
PIPE
2" Ø SCH. 80
PIPE
4"
3/8" Ø LOOP-GRIP
CLEVIS PIN
1 1/2" 1 1/2"
1/2" Ø X 5" EMB. HILTI
KWIK BOLT TZ
STAINLESS STEEL
WEDGE ANCHOR
L 3X3X3/8
ROOF
1'
9" 1'
9"
3'
6"
1'
1"
1 1/2" Ø SCH. 40 PIPE
GUARDRAIL
1 1/2" Ø SCH. 80 PIPE
POST
4" KICK PLATE
6"X3/8"X1'-0" LG
GALV PL
3/16
3/16
EX. BEAM
LADDER RAIL
3/16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Z
P ro je ct s\ -U
S D
V A
-1 \3
-C A
D D ra w in g s\
.3
-A rc h it e ct u re
\2 -U
S D
V A
-1 B
R O
N X
V A
.r vt
/1
/2
:5 :1
P
M
SF101
STRUCTURAL PLAN & DETAILS
8-24-2021 GTMc RS
James J. Peters DVA Medical Center
526-19-529REPLACE LOADING DOCK CANOPY
ROOF
ISSUED FOR BID
N
PN
1/8" = 1'-0"1
EXISTING CANOPY ROOF FRAMING PLAN
1/2" = 1'-0"5
CAGED LADDER ELEVATIONSECTION A-A
SECTION B-B
1 1/2" = 1'-0"2
SECTION 1
1 1/2" = 1'-0"3
SECTION 2
1 1/2" = 1'-0"4
SECTION 3
KEY PLAN
GENERAL STRUCTURAL NOTES
3" = 1'-0"7
RAIL SPLICE DETAIL
3/4" = 1'-0"9
GUARDRAIL ELEVATION
3" = 1'-0"6
REMOVABLE GUARDRAIL DETAIL
3/4" = 1'-0"10
LADDER ANCHOR DETAIL
3/4" = 1'-0"8
GUARDRAIL DETAIL
1 1/2" = 1'-0"11
LADDER RAIL EX. BEAM CONNECTION
OMITTED SHEET ON 8-24-2021 BID SET 11-15-2021
| Sheets |
| GI101 - COVER SHEET |
| GI102 - GENERAL INFORMATION |
| HA101 - CANOPY ROOF ASBESTOS ABATEMENT PLAN |
| AD101 - CANOPY ROOF PLAN - DEMOLITION |
| AE101 - CANOPY ROOF PLAN - NEW WORK |
| AE102 - SECTIONS & DETAILS |
| SF101 - STRUCTURAL PLAN & DETAILS |
File details come from the government source that posted it. Updated .