This is a construction plans document for the Long Beach Water Department in Long Beach, California, detailing the Cathodic Protection Improvement of Recycled Water Systems Project – Phase 5, designated as project WD-33-22. The project encompasses cathodic protection system installations at two primary locations: Heartwell Park (Location 1) and El Dorado Park East with Willow Street recycled lines (Location 2). The work involves installing new cathodic protection test stations with magnesium anodes on 20-inch, 24-inch, and 30-inch diameter CML&C steel pipes used for recycled water distribution. The project includes six new test stations at Location 1, eight new test stations at Location 2, and modifications to existing test stations. A total of 80 magnesium anodes are specified across all test stations. The plans were submitted in August 2022 by Benjamin E. Entrekin, a licensed professional engineer, and approved by Robert Verceles, Director of Engineering/Chief Engineer, on October 13, 2022. The contractor must arrange a pre-construction meeting with the LBWD Project Engineer at minimum seven business days prior to construction start and must notify the LBWD inspector seven days before any construction activity begins.

The construction work shall conform to the Long Beach Water Department Standard Specifications for the Construction of Water and Sewer Facilities and LBWD Standard Drawings. All steel hardware must be Type 316 stainless steel with no carbon steel permitted. Construction hours are limited to 7:30 a.m. to 4:00 p.m., Monday through Friday, except LBWD holidays. The contractor is responsible for damage to existing utilities, pavement, curbs, traffic striping, and landscaping resulting from project operations and must restore all areas to original condition. Water service shutdowns are limited to a maximum of four hours; any construction exceeding this duration requires temporary high-line connections as deemed applicable by LBWD. The contractor must provide written notice to local businesses and residents seven days prior to construction with follow-up 24-hour door hanger reminders. All materials must be approved by LBWD, and the contractor shall maintain copies of plans, specifications, and submittals on the job site at all times.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REO-0204

SHEET OF SHEETS

DRAWING / FILE NUMBER:

FAMIS PROJECT:

G-1

MUNIS PROJECT:

6005020005

1 21

LONG BEACH WATER DEPARTMENT

LONG BEACH, CALIFORNIA

PLANS FOR THE CONSTRUCTION OF

AUGUST, 2022

GENERAL MANAGER

CHRISTOPHER J. GARNER

WD-33-22

ROBERT VERCELES - DIRECTOR OF ENGINEERING / CHIEF ENGINEER DATE

LONG BEACH WATER DEPARTMENT

APPROVED BY:

BENJAMIN E. ENTREKIN R.C.E. 34599 DATE

CATHODIC PROTECTION

IMPROVEMENT OF RECYCLED WATER

SYSTEMS PROJECT - PHASE 5

SUBMITTED BY:

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

EXP 9/30/2023

September 19, 2022

Digitally signed by Benjamin E Entrekin DN: E=benjaminearle@gmail.com, CN=Benjamin E Entrekin, C=US Reason: I have reviewed this document Contact Info: EntrekinB@PondCo.com Date: 2022.09.19 14:24:24-04'00'10/13/22

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

TYPICAL SYMBOLS

M

A

SUBJECT IRRIGATION/RECYCLED WATER PIPE

EXISTING WATER PIPE

EXISTING GAS PIPE

FLANGED OUTLET IN VAULT

VALVE BOX

IN-LINE VALVE

METER BOX

CP TEST STATION

ANODE

EXISTING CP TEST STATION

TS

GENERAL NOTES

1. ALL WORK AND MATERIALS SHALL BE APPROVED BY LBWD AND BE IN ACCORDANCE WITH THE AMENDMENTS TO THE STANDARD SPECIFICATIONS FOR

PUBLIC WORKS CONSTRUCTION (LATEST EDITION GREEN BOOK), THE CURRENT LBWD STANDARD DRAWINGS, AND THE LATEST LBWD STANDARDS AND

SPECIFICATIONS FOR THE CONSTRUCTION OF WATER AND SEWER FACILITIES. THE CONTRACTOR IS REQUIRED TO HAVE THESE SPECIFICATIONS ON THE JOB

SITE AT ALL TIMES.

2. THE CONTRACTOR SHALL ARRANGE FOR A PRE-CONSTRUCTION MEETING WITH THE LBWD PROJECT ENGINEER AT (562-570-2419) A MINIMUM OF SEVEN (7)

BUSINESS DAYS PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL APPLY FOR INSPECTION FROM THE LBWD AT (562-244-9334) AT LEAST 48

HOURS PRIOR TO STARTING WORK ON ANY PROJECT.

3. THE CONTRACTOR SHALL NOTIFY THE LBWD INSPECTOR SEVEN (7) DAYS PRIOR TO ANY CONSTRUCTION.

4. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT AT (811) A MINIMUM OF TWO DAYS PRIOR TO EXCAVATION.

5. FOR WATER SERVICE DURING CONSTRUCTION, CONTRACTOR SHALL CONTACT LBWD AT (562-570-2419) REGARDING SERVICE APPLICATION AND WATER

COSTS.

6. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES IMPACTED BY THIS PROJECT AND REQUEST THEIR ATTENDANCE TO THE PRE-CONSTRUCTION MEETING.

7. CONSTRUCTION HOURS ARE LIMITED FROM 7:30 A.M. TO 4:00 P.M. MONDAY THROUGH FRIDAY EXCEPT LBWD HOLIDAYS OR AS REQUIRED BY THE PERMIT.

8. ARRANGEMENTS FOR INSPECTION AT OTHER TIMES REQUIRE PRIOR APPROVAL FROM LBWD.

9. THE CONTRACTOR SHALL VERIFY THE LOCATION, DEPTH, VERTICAL AND HORIZONTAL ALIGNMENT AND PROTECT-IN-PLACE ALL EXISTING WATER MAINS AND

UNDERGROUND STRUCTURES.

10. ALL PIPELINE STATIONS AND OFFSETS ARE REFERENCED TO CENTERLINE OF STREET EXCEPT AS NOTED. CONTRACTOR SHALL CHANGE LOCATION OF TEST

STATIONS UP TO 5 FEET WITHOUT REQUIRING FORMAL APPROVAL, AS REQUIRED TO AVOID INTERFERENCE WITH UTILITIES AND OTHER STRUCTURES.

11. GRADE POINT ELEVATIONS ARE TO BOTTOM OF PIPE EXCEPT WHERE OTHERWISE NOTED.

12. VALVE NUMBERS ARE FOR LBWD RECORD ONLY.

13. THE CONTRACTOR SHALL REMOVE AND RESTORE EXISTING ROADWAY PAVEMENT, SIDEWALK, CURB AND OTHER SURFACE IMPROVEMENTS OVER THE PIPE.

14. TRENCH AND PLACE TEMPORARY RESURFACING IN ACCORDANCE WITH THE APPLICABLE PROVISION OF THE STANDARD SPECIFICATIONS AS SUPPLEMENTED

BY LBWD STANDARD DRAWINGS NO. WDS-406 FOR TRENCH RESTORATION. LONG BEACH WATER DEPARTMENT RESERVES THE RIGHT TO REQUIRE SLURRY

BACKFILL AT ITS DISCRETION.

15. THE CONTRACTOR IS REQUIRED TO SUBMIT TRENCH GRADE SHEETS SHOWING ELEVATIONS TO BOTTOM OF PIPE PRIOR TO WATER LINE CONSTRUCTION.

16. PLANS SHALL COMPLY WITH LONG BEACH FIRE DEPARTMENT (LBFD) REQUIREMENTS. LBFD STAMPED PLAN APPROVAL MUST BE OBTAINED PRIOR TO PLAN

APPROVAL BY LBWD.

17. THE CONTRACTOR SHALL HAVE A COPY OF THESE PLANS, SPECIFICATIONS AND SUBMITTALS FOR THIS PROJECT ON THE SITE AT ALL TIMES, AND THE

CONTRACTOR SHALL BE FAMILIAR WITH ALL APPLICABLE STANDARDS AND SPECIFICATIONS.

18. WORK SHOWN OR INDICATED ON THESE PLANS, OR CALLED FOR IN THE SPECIFICATIONS, BUT NOT INCLUDED AS PAY QUANTITY ITEMS, SHALL BE

CONSIDERED INCIDENTAL WORK COST OF WHICH SHALL BE INCLUDED IN THE CONTRACTOR'S BID FOR PAY QUANTITY ITEMS.

19. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPORT DISCREPANCIES IN THE PLANS AND/OR FIELD CONDITIONS IMMEDIATELY TO DESIGN ENGINEER FOR

RESOLUTION PRIOR TO CONSTRUCTION AND SHALL BE RESPONSIBLE FOR DISCREPANCIES NOT SO REPORTED AND RESOLVED.

20. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, AND THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL

WORKING HOURS.

21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING UTILITIES, PAVEMENT, CURBS, TRAFFIC STRIPING AND MARKINGS, TRAFFIC SIGNAL

DETECTOR LOOPS, STRUCTURES, SIGNS, TREES, LANDSCAPING, AND IRRIGATION SYSTEMS, AS A RESULT OF HIS OPERATIONS, AND WILL BE REQUIRED TO

REPAIR OR REPLACE IN KIND TO THE SATISFACTION OF AND AS DIRECTED BY THE CITY, THE ENGINEER, UTILITY COMPANY, OR PROPERTY OWNER.

22. CONTRACTOR SHALL DEMONSTRATE EXTREME CAUTION WHEN TRENCHING IN CLOSE PROXIMITY OF OTHER UTILITIES. ANY SIGN OF DEGRADATION OF THE

TRENCH WALL INTEGRITY WILL NOT BE TOLERATED AND WILL FORCE THE STOPPAGE OF WORK UNTIL THE TRENCH INTEGRITY IS ADEQUATELY RESTORED.

23. ALL LANDSCAPING AND GRASS AREAS SHALL BE RESTORED TO ITS ORIGINAL CONDITION (REPLACE GRASS WITH SOD). THE CONTRACTOR SHALL REPAIR

AND/OR REMODEL EXISTING IRRIGATION SYSTEMS AS NECESSARY TO FACILITATE CONSTRUCTION TO THE SATISFACTION OF THE WATER DEPARTMENT AND

LONG BEACH DEVELOPMENT SERVICES.

MATERIALS

1. ALL MATERIALS MUST CONFORM TO THE LATEST LBWD SPECIFICATIONS FOR THE CONSTRUCTION OF WATER AND SEWER FACILITIES FOR DEVELOPER BUILT

PROJECTS UNLESS OTHERWISE SPECIFIED AND APPROVED BY LBWD. IN LIEU OF REFERENCE TO LBWD SPECIFICATIONS, ALL STEEL HARDWARE SHALL BE TYPE

316 STAINLESS. NO CARBON STEEL SHALL BE USED.

SHUTDOWNS

1. ONLY THE LBWD AND THEIR APPROVED REPRESENTATIVES SHALL OPERATE VALVES. WHEN IT IS NECESSARY TO SHUT DOWN AN EXISTING WATER SYSTEM

FOR THE PURPOSES OF CONNECTING TO AND/OR THE TESTING OF THE NEWLY-INSTALLED FACILITIES, THE CONTRACTOR SHALL REQUEST A SCHEDULED SHUT

DOWN FROM THE LBWD THROUGH THE PROJECT INSPECTOR. THE CONTRACTOR SHALL GIVE A MINIMUM ADVANCE NOTICE OF SEVEN (7) DAYS WHEN

REQUESTING LBWD VALVE OPERATIONS.

2. THE CONTRACTOR SHALL NOTIFY THE LOCAL BUSINESSES AND RESIDENTS IN WRITING SEVEN (7) DAYS PRIOR TO THE DATE OF THE CONSTRUCTION WITH A

NOTICE INFORMING THEM OF ALL POSSIBLE INCONVENIENCES INCURRED BY THE CONSTRUCTION. CONTRACTOR SHALL FOLLOW WITH A (24) HOUR DOOR

HANGER REMINDER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF ALL NOTICES. SAID NOTIFICATIONS SHALL INCLUDE

CONTRACTOR'S NAME AND TELEPHONE NUMBER FOR CONTACT.

3. THE LBWD CANNOT GUARANTEE A COMPLETE SHUTDOWN OF EXISTING WATER MAINS DUE TO THE AGE AND CONDITION OF EXISTING VALVES. THE LBWD

WILL ATTEMPT TO SHUT DOWN APPLICABLE MAINS AS COMPLETELY AS POSSIBLE; HOWEVER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

DEWATERING OF THE CONSTRUCTION SITE AND THE PROPER DISPOSAL OF WATER RUN OFF IN ACCORDANCE WITH THE NPDES REQUIREMENTS.

4. IN CASES WHERE THE LBWD DETERMINES THAT THE PROPOSED SHUT DOWN MAY NOT BE FEASIBLE OR MAY CAUSE AN EXCESSIVE HARDSHIP TO EXISTING

CUSTOMERS, THE DEVELOPER/CONTRACTOR WILL BE REQUIRED TO PROPOSE AN ALTERNATIVE PLAN FOR LBWD APPROVAL EXPLAINING THE

CONSTRUCTABILITY OF THE DESIGN. CONTINGENCY PLANS INCLUSIVE OF BOTTLED WATER AND PORTABLE TOILETS PER NUMBER OF CUSTOMERS MAY BE

REQUIRED.

5. THE SHUTDOWN OF WATER SERVICES FOR THE PURPOSE OF CONSTRUCTION SHALL BE LIMITED TO A MAXIMUM OF FOUR (4) HOURS. FOR CONSTRUCTION

THAT EXCEEDS (4) HOURS THE CONTRACTOR MUST PROVIDE TEMPORARY HIGH LINE CONNECTIONS WHERE DEEMED APPLICABLE BY THE LBWD.

PUBLIC AGENCIES

1. LONG BEACH PUBLIC WORKS (562) 570-6331

2. CITY OF LONG BEACH FIRE DEPARTMENT - ALARM OFFICE (562) 845-7631

3. CITY OF LB POLICE DEPARTMENT - DISPATCH (562) 435-6711

4. LONG BEACH TRANSIT (562) 845-7594

5. PARKS, RECEPTION AND MARINE (562) 570-3100

STREET CENTERLINEC/L

GENERAL NOTES, TYPICAL SYMBOLS

G-2

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

EXP 9/30/2023

10/11/2022

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

LOCATION 1 - HEARTWELL PARK

N B

E L L F

L O

W E

R S

T

E CARSON ST

HARVEY WAY

E CONANT ST

E WARLOW RD

E MONLACO ST

E HARCO ST

S A

N A

N S

E L

IN

E A

V E

W O

O D

R U

F F

A V

E

P A

L O

V E

R D

E A

V E

N B

E L L F

L O

W E

R S

T

LO

S C

O Y O

T E S D

IA

G

O N

A L

LOCATION 2 - EL DORADO

PARK EAST IRRIGATION

AND WILLOW STREET

RECYCLED LINES

E STEARNS ST

WILLOW ST

E SPRING ST

N S

T U

D E

B A

K E

R R

D

S T

E V

E L Y

A V

E

KATELLA AVE

P A

L O

V E

R D

E A

V E

SHEET INDEX

NO. DWG NO. DESCRIPTION

1 REO-0204-G-1 TITLE SHEET

2 REO-0204-G-2 GENERAL NOTES, TYPICAL SYMBOLS

3 REO-0204-G-3 VICINITY MAP, SHEET INDEX, LOCATION MAPS

4 REO-0204-CP-01 LOCATION 1 OVERALL SITE PLAN AND SCHEDULE OF CP TEST STATIONS

5 REO-0204-CP-02 LOCATION 2 OVERALL SITE PLAN AND SCHEDULE OF CP TEST STATIONS

6 REO-0204-CP-03 EL DORADO PARK EAST PLAN 1 OF 7

7 REO-0204-CP-04 EL DORADO PARK EAST PLAN 2 OF 7

8 REO-0204-CP-05 EL DORADO PARK EAST PLAN 3 OF 7

9 REO-0204-CP-06 EL DORADO PARK EAST PLAN 4 OF 7

10 REO-0204-CP-07 EL DORADO PARK EAST PLAN 5 OF 7

11 REO-0204-CP-08 EL DORADO PARK EAST PLAN 6 OF 7

12 REO-0204-CP-09 EL DORADO PARK EAST PLAN 7 OF 7

13 REO-0204-CP-10 EL DORADO PARK EAST IRRIGATION AND WILLOW STREET RECYCLED PLAN 1 OF 4

14 REO-0204-CP-11 EL DORADO PARK EAST IRRIGATION AND WILLOW STREET RECYCLED PLAN 2 OF 4

15 REO-0204-CP-12 EL DORADO PARK EAST IRRIGATION AND WILLOW STREET RECYCLED PLAN 3 OF 4

16 REO-0204-CP-13 EL DORADO PARK EAST IRRIGATION AND WILLOW STREET RECYCLED PLAN 4 OF 4

17 REO-0204-CP-14 WILLOW STREET RECYCLED LINE PLAN

18 REO-0204-CP-15 CP DETAILS SHEET 1 OF 4

19 REO-0204-CP-16 CP DETAILS SHEET 2 OF 4

20 REO-0204-CP-17 CP DETAILS SHEET 3 OF 4

21 REO-0204-CP-18 CP DETAILS SHEET 4 OF 4

VICINITY MAP

LOCATION MAPS

VICINITY MAP, SHEET INDEX, LOCATION MAPS

PROJECT LOCATION

G-3

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

8" WATER

6" WATER 6" WATER 6" WATER 6" WATER 6" WATER 6" WATER 6" WATER

" W

A T

E R

" W A

T E

R

2" G

A S

2" GAS 2" GAS 2" GAS 2" GAS 2" GAS 2" GAS 2" GAS 2" GAS 2" GAS

16" WATER

16" WATER 16" WATER

16" WATER

16" WATER

6" WATER

6" W

A

TE

R

16" WATER 16" WATER

16" W

ATER

16" WATER 16" WATER

16" WATER 16" WATER

16" WATER

W A

T E

R

" G

A S

" W

A T

E R

" S

E W

E R

" w

8" V.C.P. S.

" IR

R

" M W

D

8" WATER

4" GAS

8" SEWER 8" SEWER 8" SEWER

8" WATER

8" WATER

8" WATER 8" WATER 8" WATER 8" WATER 8" WATER 8" WATER

4" GAS

4" GAS 4" GAS 4" GAS 4" GAS 4" GAS 4" GAS 4" GAS 4" GAS

" G

A S

" W

A T

E R

" W

A T

E R

" W

A T

E R

" G

A S

" G

A S

" W

A T

E R

" G

A S

" W

A T

E R

" G

A S

" S

E W

E R

" S

E W

E R

" W

A T

E R

" G

A S

" W

A T

E R

" G

A S

12" WATER

12" WATER

8" WATER

" W A

T E

R

12" WATER

C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L

C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L

C /L

C /L

C /L

C /L

C /L

" G

A S

" W A

T E

R

PARKREST ST

M A

R B

E R

A V

E

B E

L L

F L

O W

E R

B L

V B

" W A

T E

R

PARKREST ST

HEARTWELL PARK HEARTWELL PARK

PARKREST ST

HEARTWELL PARK HEARTWELL PARK HEARTWELL PARK

HEARTWELL PARK

HEARTWELL PARK HEARTWELL PARK

HEARTWELL PARK

HEARTWELL PARK

HEARTWELL GOLF

COURSE

PARKREST ST

S A

N A

N S

E L

IN

E

A V

E

A L

B U

R Y

A V

E

W O

O D

R U

F F

A V

E

PARKREST ST PARKREST ST PARKREST ST PARKREST ST

S E

N A

S A

C A

V E

G O

N D

A R

A V

E

M c N

A B

A V

E

S N

O W

D E

N A

V E

C A

N E

H

IL

L A

V E

C A

R F

A X

A V

E

C O

N Q

U

IS

T A

A V

E

P A

L O

V E

R D

E A

V E

PARKREST ST

STA 181STA 182

STA 183

STA 184STA 185STA 186STA 187STA 188STA 189

STA 190

STA 191STA 192STA 193

195196197199 198STA 200STA 201STA 202STA 203STA 204STA 205STA 206

STA 207

STA 209STA 210STA 211STA 212STA 213

STA 214

STA 215

STA 216

STA 217

STA 218

STA 208 STA 174

STA 173

STA 172 STA 171 STA 170 STA 169 STA 168 STA 167

STA 166

STA 165 S

T

A

STA 163 STA 162

6" WATER6" WATER

2" GAS2" GAS2" GAS2" GAS

STA 208STA 208

2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS

2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS

" W A

T E

R

" W

A T

E R

" W A

T E

R

" W

A T

E R

" W A

T E

R

" W A

T E

R

" W

A T

E R

STA 217

2" GAS2" GAS

2" GAS2" GAS2" GAS2" GAS2" GAS

16" WATER16" WATER

STA 188STA 188

STA 185STA 185

HEARTWELL PARKHEARTWELL PARK

16" WATER16" WATER

STA 188STA 188 STA 186STA 186

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

HEARTWELL PARK

" G

A S

" G

A S

HEARTWELL GOLF

COURSE

HEARTWELL GOLF

C /L

C /L

C /L

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

Sheet CP-03 Sheet CP-04 Sheet CP-05 Sheet CP-06 Sheet CP-07 Sheet CP-08 Sheet CP-09

HEARTWELL PARKHEARTWELL PARK

HEARTWELL PARKHEARTWELL PARK

HEARTWELL PARK

PARKREST ST

PARKREST ST

E CARSON ST

E CARSON ST

N B

E L

L F

L O

W E

R B

L V

D

HEARTWELL PARKHEARTWELL PARK

N B

E L

L F

L O

W E

R B

L V

D

W O

O D

R U

F F

A V

E

P A

L O

V E

R D

E A

V E

W O

O D

R U

F F

A V

E

E HARCO ST

S A

N A

N S

E L

IN

E

A V

E

M A

R B

E R

A V

E

A L

B U

R Y

A V

E

PARKREST ST PARKREST ST

LOCATION 1 - HEARTWELL PARK - OVERALL SITE PLAN

LOCATION 1 - OVERALL SITE PLAN AND SCHEDULE

OF CP TEST STATIONS

20" PIPELINE

SCHEDULE OF CP TEST STATIONS AT LOCATION 1

TS ID PIPE STA. LAT. LONG. TYPE SHEET NO.

QTY. OF

ANODES

N/A 20" 217+14.00 33.830383 -118.12501 TEST ACCESS ONLY CP-03 NONE

20-CPTS-01 20" 207+22.00 33.830293 -118.12183 NEW TEST STATION AT VALVE CP-04 10

20-CPTS-02 20" 202+22.00 33.830335 -118.12048 NEW TEST STATION AT VALVE CP-05 4

20-CPTS-03 20" 190+31.00 33.830444 -118.11642

EXISTING TEST STATION WITH NEW

ANODES

CP-06 12

20-CPTS-04 20" 183+62.00 33.830429 -118.11411 NEW TEST STATION CP-07 6

20-CPTS-05 20" 172+83.50 33.830328 -118.11085 NEW TEST STATION AT VALVE CP-08 10

20-CPTS-06 20" 164+70.00 33.830337 -118.10804 NEW TEST STATION AT RISER CP-09 9

CP-01

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

" G A

S

" G

A S

" G A

S

30" GAS

24" SEWER

48" SEWER

" W

A T

E R

8" WATER

8" WATER

" W

A T

E R

" W A

T E

R " W

A T

E R

42" WATER 12" SD

" W

A T

E R

C/L C/L

C/L

C/LC/L

C/L

C/L

WILLOW ST

WILLOW ST

P U

M P

S T

A T

IO

N

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

STA 148

STA 141

STA 147

S

TA

STA 139

STA 138

STA 137

STA 136

S T

A

S T

A

S T

A

S

T A

S T

A

S

T A

S T

A

S

T A

S T

A

S

T A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S

T A

STA 1+05.00

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

S C

E S

C E

S C

E

S C

E

SCE SCESCE

S C

E S

C E

S C

E S

C E

S C

E S

C E

S C

E S

C E

S C

E S

C E

S C

E S

C E

S C

E S

C E

S C

E

SCE SCE SCE SCE

S T

A

S T

A

S T

A

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

Sheet CP-10

Sheet CP-11

Sheet CP-12

Sheet CP-13

Sheet CP-14

E WILLOW ST

LOCATION 2 - EL DORADO PARK EAST IRRIGATION AND WILLOW STREET

RECYCLED LINES - OVERALL SITE PLAN

LOCATION 2 - OVERALL SITE PLAN AND SCHEDULE

OF CP TEST STATIONS

24" PIPELINE

20" AND 30" PIPELINES

F R

W Y

C O

Y O

T E

C R

E E

K F

C

S A

N G

A B

R

IE

L R

IV

E

R F

C

300' SO CAL. EDISON EASEMENT

SCHEDULE OF CP TEST STATIONS AT LOCATION 2

TS ID PIPE STA. LAT. LONG. TYPE SHEET NO.

QTY. OF

ANODES

20-CPTS-07 20" 20+63.00 33.803937 -118.088649 NEW TEST STATION AT TEE CP-10 4

30-CPTS-01 30" 148+65.25 33.803937 -118.088649 NEW TEST STATION AT TEE CP-10 7

20-CPTS-08 20" 14+15.00 33.802183 -118.088687 NEW TEST STATION AT VALVE CP-11 6

30-CPTS-02 30" 158+00.00 33.801453 -118.088648 EXISTING TEST STATION CP-11 7

20-CPTS-09 20" 08+10.00 TBD TBD NEW TEST STATION CP-12 9

30-CPTS-03 30" 163+90.00 TBD TBD NEW TEST STATION CP-12 9

20-CPTS-10 20" 1+10.00 33.798575 -118.088442

NEW TEST STATION AT PUMP

STATION

CP-13 9

24-CPTS-01 24" 140.13.00 33.804722 -118.088685

EXISTING TEST STATION WITH NEW

ANODES

CP-14 8

CP-02

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

" W

A T

E R

" W A

T E

R

2" G

A S

2" GAS

16" WATER

16" WATER

6" WATER

6" W

A

TE

R

C/L C/L

" W A

T E

R

PARKREST ST

M A

R B

E R

A V

E

B E

L L

F L

O W

E R

B L

V B

" W A

T E

R

HEARTWELL PARK

STA 212STA 213

STA 214

STA 215

STA 216

STA 217

STA 218

2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS2" GAS

" W A

T E

R

" W

A T

E R

STA 217

C /L

C /L

C /L

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

20" CML&C STEEL PIPE

20" FLANGED OUTLET IN

VAULT (STA 217+14.00)

SEE NOTES.

EL DORADO PARK EAST - PLAN 1 OF 7 ( STA 211+54.09 TO STA 218+34.80 )

(NO WORK AT THIS LOCATION)

NOTES:

1. FLANGED OUTLET SHOWN FOR REFERENCE ONLY; NO WORK AT THIS LOCATION. THE

OUTLET HAS BEEN CONFIRMED TO BE ELECTRICALLY CONTINUOUS WITH PIPE AT STA

207+00 AND SHOULD BE USED FOR TESTING TO VERIFY EFFECTIVENESS OF THE CP

SYSTEM.

2. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

3. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

EL DORADO PARK EAST

PLAN 1 OF 7

31'

10' LBWD EASEMENT

SEE NOTES

CP-03

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

6" WATER 6" WATER

2" GAS 2" GAS 2" GAS

16" WATER

C/L C/L C/L C/L C/LPARKREST ST

HEARTWELL PARK

STA 206

STA 207

STA 209STA 210STA 211 STA 208

6" WATER6" WATER

2" GAS2" GAS

STA 208STA 208

2" GAS2" GAS

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

20" CML&C STEEL PIPE

A A A A AA A A A A

NEW TEST STATION W/

10 ANODES (STA 207+22.00)

TS ID: 20-CPTS-01

SEE DETAIL 1/CP-15

VALVE BOX (STA 207+05)

PROTECT IN PLACE

5' TYP.

EL DORADO PARK EAST - PLAN 2 OF 7 ( STA 205+54.54 TO STA 211+54.09 )

TS

EL DORADO PARK EAST

PLAN 2 OF 7

86'

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE PUBLIC RIGHT-OF-WAY BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

EXISTING CP TEST STATION

AT INSULATED BUTTERFLY

VALVE TO REMAIN

CP-04

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

6" WATER 6" WATER

2" GAS 2" GAS

16" WATER

16" WATER

16" WATER

" W

A T

E R

" S

E W

E R

" w

8" V.C.P. S.

C/L C/L C/L C/L C/LPARKREST ST

HEARTWELL PARK

S A

N A

N S

E L

IN

E A

V E

STA 200STA 201STA 202STA 203STA 204STA 205

2" GAS2" GAS2" GAS 2" GAS2" GAS

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A A

5' TYP.

20" CML&C STEEL PIPE

HEARTWELL PARK- EAST

METERED CONNECTION VAULT

NEW TEST STATION W/ 4 ANODES (STA 202+22.00)

TS ID: 20-CPTS-02

SEE DETAIL 1/CP-15

VALVE BOX (STA 202+83.50)

PROTECT IN PLACE

EL DORADO PARK EAST - PLAN 3 OF 7 ( STA 199+26.00 TO STA 205+54.54 )

EL DORADO PARK EAST

PLAN 3 OF 7

177'

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE PUBLIC RIGHT-OF-WAY BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

TS

CP-05

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

16" WATER 16" WATER

" G

A S

" IR

R

" M W

D

8" WATER

4" GAS

8" SEWER

8" WATER

C/L C/L C/L C

/L C

/L C

/L

" G

A S

HEARTWELL PARK

HEARTWELL PARK

A L B

U R

Y A

V E

W O

O D

R U

F F

A V

E

STA 187STA 188STA 189

STA 190

STA 191STA 192STA 193

16" WATER

STA 188STA 188

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A A A

5' TYP.

A A A A A

20" CML&C STEEL PIPE

EXISTING TEST STATION (STA 190+31.00) TO REMAIN.

ROUTE LEADS FROM TWELVE (12) NEW ANODES

TO TEST STATION AND CONNECT TO THE

EXISTING PIPE LEADS.

TS ID: 20-CPTS-03

SEE DETAIL 3/CP-15

EL DORADO PARK EAST - PLAN 4 OF 7 ( STA 186+77.94 TO STA 193+18.64 )

EL DORADO PARK EAST

PLAN 4 OF 7

A

A

102'

137'

PARKCREST ST

10' LBWD EASEMENT

SEE NOTES

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

CP-06

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

16" WATER 16" WATER

8" SEWER 8" SEWER

8" WATER

8" WATER

4" GAS

4" GAS 4" GAS

" W

A T

E R

" G

A S

" S

E W

E R

C/L C/L C/L C/L

C /L

C /L

HEARTWELL PARK

PARKREST ST

S E

N A

S A

C A

V E

STA 181STA 182

STA 183

STA 184STA 185STA 186 STA 185

HEARTWELL PARKHEARTWELL PARK

16" WATER16" WATER

STA 186

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

20" CML&C STEEL PIPE

A A A A A

5' TYP.

HERSEY METERED VAULT

TO BE PROTECTED IN PLACE

NEW TEST STATION

W/ 6 ANODES (STA 183+62.00)

TS ID: 20-CPTS-04

SEE DETAIL 1/CP-15

EL DORADO PARK EAST - PLAN 5 OF 7 ( STA 180+56.51 TO STA 186+77.94 )

EL DORADO PARK EAST

PLAN 5 OF 7

A

125'

10' LBWD EASEMENT

SEE NOTES

TS

4" FLANGED PIPE OUTLET

AT STA (183+75.00)

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

CP-07

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

8" WATER 8" WATER

4" GAS 4" GAS 4" GAS

" G

A S

" W

A T

E R

" G

A S

" S

E W

E R

" W

A T

E R

" G

A S

C/L C/L C/L

HEARTWELL PARK

PARKREST ST

C A

N E

H

IL

L A

V E

C A

R F

A X

A V

E

STA 174

STA 173

STA 172 STA 171 STA 170 STA 169

HEARTWELL PARK

" G

A S

" G

A S

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A A A

5' TYP.

A A A A A

M

20" CML&C STEEL PIPE

HERSEY METERED VAULT

TO BE PROTECTED IN PLACE

4" FLANGED PIPE OUTLET AT

STA (172+91.00)

EL DORADO PARK EAST - PLAN 6 OF 7 ( STA 168+10.33 TO STA 174+16.26 )

TS

EL DORADO PARK EAST

PLAN 6 OF 7

C /L

NEW TEST STATION W/ 10 ANODES

(STA 172+83.50)

TS ID: 20-CPTS-05

SEE DETAIL 1/CP-15

117'

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE PUBLIC RIGHT-OF-WAY BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

CP-08

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

4" GAS

" W

A T

E R

" G

A S

12" WATER

12" WATER

8" WATER

" W A

T E

R

C/L C/L

HEARTWELL PARK

HEARTWELL GOLF

COURSE

PARKREST ST

C

O N

Q U

IS

T

A A

V E

P A

L O

V E

R D

E A

V E

PARKREST ST

STA 168 STA 167

STA 166

STA 165 S

T

A

STA 163 STA 162

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

" W

A T

E R

HEARTWELL GOLF

COURSE

HEARTWELL GOLF

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A A A

5' TYP.

A A A

20" CML&C STEEL PIPE

NEW TEST STATION

W/ 9 ANODES (STA 164+70.00)

TS ID: 20-CPTS-06

SEE DETAIL 1/CP-15

EL DORADO PARK EAST - PLAN 7 OF 7 ( STA 161+48.58 TO STA 168+10.33 )

TS

EL DORADO PARK EAST

PLAN 7 OF 7

A

138' 94.50'

10' LBWD EASEMENT

SEE NOTES

C /L

C /L

C /L

C /L

LA

. C

O . F

LO

O

D C

O N

T R

O L

LO

S C

E R

R

IT

O S C

H A N

N E L

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

CP-09

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

30" GAS

30" GAS

30" GAS

" G A

S

" S E

W E

R

" S E

W E

R

8" WATER

" W

A T

E R

" W

A T

E R

C /L

C /L

W

IL

L O

W S

T

STA 149

STA 150

STA 151

STA 152

STA 153

S T

A

S T

A

STA 17

STA 18

STA 19

STA 20

STA 21

STA 22

SCE

SCE

SCE

SCE

S C

E S

C E

S C

E

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A A

5' TYP.

A A A A

A A

A

NEW TEST STATIONS WITH 4 ANODES

(STA 20+63.00)

TS ID: 20-CPTS-07

SEE DETAIL 2/CP-15

EXPOSE PIPES AT CONNECTION

AND BOND ACROSS ALL FLANGED

CONNECTIONS.

SEE DETAIL 8/CP-16

24" CML&C

STEEL PIPE

20" CML&C STEEL PIPE

30" CML&C STEEL PIPE

EL DORADO PARK EAST IRRIGATION AND WILLOW STREET RECYCLED LINES - PLAN 1 OF 4 ( STA 16+20.54 TO STA 122+47.39 )

TS

EL DORADO PARK EAST IRRIGATION AND WILLOW

STREET RECYCLED - PLAN 1 OF 4

300' SCE EASEMENT

TS

101'

SCE ELECTRICAL BOX

30" BUTTERFLY VALVE, AIR AND

VACUUM RELEASE VALVE ASSEMBLY

IN VAULT (STA 149+16.60)

FOR INFORMATION ONLY

300' SCE EASEMENT

NEW TEST STATIONS WITH 7 ANODES

(STA 148+65.25)

TS ID:30-CPTS-01

SEE DETAIL 2/CP-15

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

10' LBWD EASEMENT

SEE NOTES

CP-10

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

STA 153

STA 154

STA 155

STA 13

STA 157

STA 158

STA 159

STA 156

STA 14

STA 15

STA 16

STA 10

STA 11

STA 12

SCESCE

SCE

SCE

SCE

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A

A A A

A A A A

5' TYP.

A A A

ADD 7 ANODES TO THE EXISTING

TEST STATION (STA 158+00.00)

TS ID: 30-CPTS-02

SEE DETAIL 3/CP-15

30" CML&C STEEL PIPE

20" CML&C

STEEL PIPE

EXPOSE PIPE AND INSTALL A NEW

TEST STATION W/ 6 ANODES (STA 14+15.00)

TS ID: 20-CPTS-08

SEE DETAIL 1/CP-15

20" CML&C STEEL PIPE

30" CML&C STEEL PIPE

EL DORADO PARK EAST IRRIGATION AND WILLOW STREET RECYCLED LINES - PLAN 2 OF 4 ( STA 9+84.53 TO STA 16+20.54 )

TS

EL DORADO PARK EAST IRRIGATION AND WILLOW

STREET RECYCLED - PLAN 2 OF 4

300' SCE EASEMENT

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

10' LBWD EASEMENT

SEE NOTES

CP-11

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

STA 160

STA 161

STA 162

STA 163

STA 164

STA 165

STA 4

STA 5

STA 6

STA 7

STA 8

STA 9

SCE

SCE

SCE

SCE

SCE

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A A A

A A A A

A A A A A

A A A A

20" CML&C STEEL PIPE

30" CML&C STEEL PIPE

INSTALL NEW TEST STATION ON 30" PIPE

W/ 9 ANODES (STA 163+90.00)

TS ID: 30-CPTS-03

SEE DETAIL 1/CP-15

INSTALL NEW TEST STATION ON 20" PIPE

W/ 9 ANODES (STA 08+10.00)

TS ID: 20-CPTS-09

SEE DETAIL 1/CP-15

EL DORADO PARK EAST IRRIGATION AND WILLOW STREET RECYCLED LINES - PLAN 3 OF 4 ( STA 3+82.69 TO STA 9+84.53 )

TS

TS

EL DORADO PARK EAST IRRIGATION AND WILLOW

STREET RECYCLED - PLAN 3 OF 4

300' SCE EASEMENT

5' TYP.

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

10' LBWD EASEMENT

SEE NOTES

5' TYP.

CP-12

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

36" WATER

12" WATER

12" WATER4

" W

A T

E R

" S

D

12" WATER

PUMP STATION

STA 2

STA 3

S T

A

.0

12" WATER12" WATER

12" WATER

SCE

SCE

SCE

SCE

SCE

STA 166

STA 167

STA 168

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A A A

A A A A

5' TYP.

INSTALL A 20" DIAMETER ISOLATION

FLANGE KIT ON RISER AT STA 1+00.00.

SEE DETAIL 11/CP-17

EXPOSE BURIED PIPING AND BOND

ACROSS FLANGED/VALVE CONNECTIONS

BETWEEN THE 20" AND 30" PIPELINES.

SEE DETAIL 9/CP-16

NEW TEST STATION W/ 9 ANODES

(STA 1+10.00)

TS ID: 20-CPTS-10

SEE DETAIL 1/CP-15

20" CML&C STEEL PIPE

30" CML&C STEEL PIPE

EL DORADO PARK EAST IRRIGATION AND WILLOW STREET RECYCLED LINES - PLAN 4 OF 4 ( STA 1+00 TO STA 3+82.69 )

TS

EL DORADO PARK EAST IRRIGATION AND WILLOW

STREET RECYCLED - PLAN 4 OF 4

EASEMENT (SCE) 300'

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

10' LBWD EASEMENT

SEE NOTES

CP-13

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

C/LC/L

C/L

C/L

WILLOW ST

STA 141

S

TA

STA 139

STA 138

STA 137

STA 136

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

SCALE: 1" = 20' 0 20' 40' 60'10'

A A A A

24" CML&C STEEL PIPE

ADD 8 ANODES TO THE EXISTING

TEST STATION (STN 140.13.00)

TS ID: 24-CPTS-01

SEE DETAIL 3/CP-15

WILLOW STREET RECYCLED LINE - PLAN ( STA 135+68.72 TO STA 141+22.56 )

TS

WILLOW STREET RECYCLED LINE PLAN

10' LBWD EASEMENT

SEE NOTES

A

A

A

A

5' TYP.

NOTES:

1. ALL WORK SHALL REMAIN WITHIN THE EASEMENT BOUNDARIES.

2. RECORD DRAWINGS ARE AVAILABLE FROM LBWD TO INDICATE PIPE DEPTH.

CP-14

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

30" PIPE

30" PIPELINE

9 CONNECTION AT PUMP STATION

NTS

8 24" AND 30" PIPES CONNECTION TO 20" PIPE

NTS

24" PIPELINE

#8AWG HMWPE

JUMPER BOND

(TYP.)

20" PIPE

20" PIPE

EXOTHERMICALLY WELDED

CONNECTION (TYP.) PER

DETAILS 14 AND 15/CP-180.01-OHM SHUNT, 8-AMP CAPACITY

#12 AWG HMWPE

STRUCTURE LEAD

CABLE

TERMINAL BOX

(COVER NOT SHOWN)

1" STAMPED BRASS TAG

(TYP.)

(2) #8 AWG

HMWPE ANODE

HEADER

CABLES

#14 AWG/RHH - RHW

COUPON LEAD CABLE (RED)

#14 AWG/RHH - RHW COUPON

LEAD CABLE (BLACK)

#14 AWG/RHH - RHW REFERENCE

ELECTRODE LEAD CABLE (BLUE)

5 COTT TEST STATION BOARD AND WIRING DETAIL

NTS

#12 AWG HMWPE

STRUCTURE LEAD

CABLE

7 NEW TEST LEADS CONNECTION TO PIPE AT VALVE

NTS

EXOTHERMIC WELD, PER

DETAILS 14 AND 15/CP-18.

(2) #12 AWG HMPWE

STRUCTURE LEADS ROUTED

BACK TO THE TEST STATION

AS NOTED ON PLANS

RECLAIMED WATER

MAIN

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

CATHODIC PROTECTION DETAILS

SHEET 2 OF 4

EXOTHERMICALLY WELDED

CONNECTION (TYP.), PER

DETAILS 14 AND 15/CP-18.

24"

FLUSH WITH TOP OF CURB

CURB FACE

6 CONCRETE PAD INSTALLATION

NTS

CP TEST

NOTES:

1. PROVIDE A CONCRETE PAD FOR TEST STATIONS LOCATED IN

UNPAVED AREAS.

2. FOR THE TWO (2) TEST STATIONS AT THE 30" TEE (STA 148+49.05)

PROVIDE A 24" BY 48" CONCRETE PAD.

20" PIPELINE

GENERAL NOTES:

1. ALLOW 18" SLACK IN WIRES AND TAPE AT CONDUIT ENTRANCE 3' LONG WITH

FOUR LAYERS OF ELECTRICIANS TAPE.

2. LABEL WIRES IN ANODE TEST STATION USING 1" STAMPED BRASS TAGS:

"ANODE", "REF", "PIPE", "COUPON"

#8AWG HMWPE JUMPER BOND (TYP.)

20" PIPELINE

20" VALVE

60" SANITARY DRAIN PIPE

PROTECT IN PLACE

(NO WORK)

12" SANITARY DRAIN PIPE

PROTECT IN PLACE

(NO WORK)

CP-16

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

CATHODIC PROTECTION DETAILS

SHEET 1 OF 4

NEW TEST STATION

NTS

VALVE

NEW TEST STATION AT PUMP STATION

NTS

EXISTING TEST STATION WITH NEW ANODES

NTS

NEW TEST STATION AT 24",30", 20"

NTS

PERMANENT COPPER/COPPER SULFATE

REFERENCE CELL WITH CP MONITORING

COUPON INSTALLED AT SPRINGLINE 1'

FROM PIPELINE. SEE DETAIL 16/CP-18.

PERMANENT COPPER/COPPER SULFATE

REFERENCE CELL WITH CP MONITORING COUPON

INSTALLED AT SPRINGLINE 1' FROM PIPELINE. SEE

NOTES AND DETAIL 16/CP-18.

PERMANENT COPPER/COPPER SULFATE

REFERENCE CELL WITH CP MONITORING

COUPON INSTALLED AT SPRINGLINE 1'

FROM PIPELINE. SEE DETAIL 16/CP-18.

PERMANENT COPPER/COPPER SULFATE

REFERENCE CELL WITH CP MONITORING

COUPON INSTALLED AT SPRINGLINE 1' FROM

PIPELINE. SEE DETAIL 16/CP-18.

EPOXY RESIN SPLICE.

SEE DETAIL 10/CP-17.

EPOXY RESIN SPLICE.

SEE DETAIL 10/CP-17.

EPOXY RESIN SPLICE,

SEE DETAIL 10/CP-17.

EPOXY RESIN SPLICE.

SEE DETAIL 10/CP-17.

#8 AWG HMWPE ANODE

HEADER CABLE (RED)

#8 AWG HMWPE ANODE

HEADER CABLE (RED)

#8 AWG HMWPE ANODE

HEADER CABLE (RED)

6" X 24" X 24" CONCRETE PAD,

SEE DETAIL 6/CP-16.

6" X 24" X 24" CONCRETE PAD,

SEE DETAIL 6/CP-16.

6" X 24" X 24" CONCRETE

PAD, SEE DETAIL 6/CP-16.

6" X 24" X 48" CONCRETE PAD,

SEE DETAIL 6/CP-16

F

T

(M A

X

5 FT.

PIPE LEADS FROM

EXOTHERMICALLY WELDED

CONNECTIONS ON THE PIPE

(TYP).

SEE DETAIL 7/CP-16.

FLUSH TO GRADE TEST

STATION W/ CAST IRON LID,

SEE DETAIL 12/CP-17.

WARNING TAPE: POLYTHYLENE, 3" WIDE, RED DETECTABLE METALLIC,

IMPRINTED CONTINUOUSLYIN BLACK AS SHOWN ABOVE.

CAUTION CAUTION CAUTION CAUTION

BURIED CATHODIC PROTECTION LINE BELOW

3" METAL BOLLARD

PRINTED YELLOW "CP TEST"

F

T

(M A

X

5'

30" PIPE

20" PIPE

20" PIPE

30" PIPE

60-LB. HP MAGNESIUM ANODES.

SEE DETAIL 13/CP-17.

60-LB. HP MAGNESIUM

ANODES. SEE DETAIL

13/CP-17.

60-LB. HP MAGNESIUM ANODES. SEE

DETAIL 13/CP-17.

60-LB. HP MAGNESIUM ANODES. SEE

DETAIL 13/CP-17.

FLUSH TO GRADE TEST STATION W/ CAST IRON LID,

SEE DETAIL 12/CP-17

FLUSH TO GRADE TEST STATION W/

CAST IRON LID, SEE DETAIL 12/CP-17.

FLUSH TO GRADE TEST STATION W/ CAST IRON LID'

SEE DETAIL 12/CP-17.

COTT TEST STATION,

SEE DETAIL

5/CP-16.

NOTES:

1. BOND ACROSS ALL VALVES AND FLANGES TO PROVIDE ELECTRICAL CONTINUITY IN PIPE.

2. PROVIDE ONE PIPE CONNECTION LEAD FROM EACH SIDE OF THE VALVE.

3. FOR THE TEST STATIONS WITHOUT A VALVE NEARBY, PROVIDE TWO (2) EXOTHERMICALLY

WELDED CONNECTION LEADS FROM THE PIPE.

4. 3" GALVANIZED PIPE MARKER REQUIRED ONLY AT TEST STATIONS NOT INSTALLED NEXT TO CURBS.

NOTES:

1. ALL ANODES NOT SHOWN FOR CLARITY

2. BOND 30" AND 20" PIPES PER DETAIL 9/CP-16.

3.3" GALVANIZED PIPE MARKER REQUIRED ONLY

AT TEST STATIONS NOT INSTALLED NEXT TO CURBS.

NOTES:

1. UTILIZE EXISTING PIPE LEADS INSIDE TEST STATION TO CONNECT THE ANODES

TO PIPE

2. DISCONNECT, CUT AND TAPE THE LEADS FROM EXISTING DEPLETED ANODES AT

TEST STATION.

30-CPTS-01

20-CPTS-07

COTT TEST STATION, SEE

DETAIL 5/CP-16

ROUTE TO 20-CPTS-07ROUTE TO 30-CPTS-0124" PIPE

NOTES:

1. ALL ANODES NOT SHOWN FOR CLARITY

2. BOND 30" AND 20" PIPES PER DETAIL 8/CP-16

3. 3" GALVANIZED PIPE MARKER REQUIRED ONLY

AT TEST STATIONS NOT INSTALLED NEXT TO CURBS.

COTT TEST STATION,

SEE DETAIL 5/CP-16.

COTT TEST STATION,

SEE DETAIL 5/CP-16.

WARNING TAPE: POLYTHYLENE, 3" WIDE, RED

DETECTABLE METALLIC, IMPRINTED

CONTINUOUSLYIN BLACK AS SHOWN ABOVE.

CAUTION CAUTION CAUTION CAUTION

BURIED CATHODIC PROTECTION LINE BELOW

SEE DETAIL

7/CP-16.

CP-15

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

ELEMENT CONTENT %

AL 0.010

Mn 0.50 TO 1.30

Cu 0.02 MAX

Ni 0.001 MAX

Fe 0.03 MAX

OTHER 0.05 EACH OR

0.3 MAX TOTAL

Mg REMAINDER

BACKFILL COMPOSITION

75% GYPSUM

20% BENTONITE

5% SODIUM SULPHATE

INGOT WEIGHT: 60 LBS

PACKAGED WEIGHT: ~130 LBS

#10 AWG THHN INSUL.

ANODE LEAD CABLE

SECURE W/ TIE WIRE

SILVER SOLDERED

CONNECTION

EPOXY

MAGNESIUM ALLOY

INGOT

GALV. STEEL CORE

CLOTH BAG

PACKAGED BACKFILL

8"

SPLIT BOLT

CONNECTOR

PLASTIC MOLD

EPOXY RESIN

SPLICE KIT

FILLER HOLE

#10 AWG THHN ANODE

LEAD CABLE

#8 AWG HMWPE ANODE

HEADER CABLE

#8 AWG HMWPE ANODE

HEADER CABLE

13 HIGH POTENTIAL MAGNESIUM ANODE

NTS

10 EPOXY RESIN SPLICE KIT

NTS

FLANGE NUT

STEEL WASHER (TYP.)

INSULATING WASHER (TYP.)

INSULATING GASKET

INSULATING SLEEVE FLANGE BOLT

FLANGE

1. ISOLATION FLANGE KITS SHALL BE INSTALLED TO ELECTRICALLY

ISOLATE THE UNDERGROUND PIPING FROM ABOVEGROUND PIPING.

2. AFTER ASSEMBLY, TEST TO VERIFY THAT ISOLATION IS EFFECTIVE. IF

ISOLATION IS NOT EFFECTIVE, REPAIR AS NECESSARY AND RETEST.

THIS PROCESS SHALL CONTINUE UNTIL ISOLATION IS VERIFIED AS

EFFECTIVE.

3. AFTER VERIFYING EFFECTIVE ISOLATION, COAT THE ENTIRE FLANGE

AND ALL EXPOSED METAL INCLUDING BOLTS, NUTS, AND WASHERS

WITH FOUR COMPONENTS OF DENSO OR TRENTON WAX TAPE COATING

SYSTEM. COATING SYSTEM SHALL EXTEND A MINIMUM OF 12 INCHES

ON EITHER SIDE OF FLANGE.

GENERAL NOTES:

11 ISOLATION FLANGE KIT SCHEMATIC

NTS

11"

14-1/4"

11-1/8"

10-3/8"

9"

11-3/8"

12"

G5 CONCRETE VALVE BOX (TYP.)

CP TEST

LOCKING GRADE RING

12 CP TEST BOX DETAIL

NTS

CATHODIC PROTECTION DETAILS

SHEET 3 OF 4

L B W D

"LBWD" FIELD

WELDED ON LID

CP-17

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

APPROVED

RECOMMENDED

DEPARTMENT DATE

APP'D.BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

1"= 20'SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

WD-33-22

DATE

VARIOUS

DESCRIPTIONDATEREV. SHEET OF SHEETS

DRAWING / FILE NUMBER:

DATE

DATE

CHRISTOPHER J. GARNER

GENERAL MANAGER

LONG BEACH WATER DEPARTMENT

CATHODIC PROTECTION IMPROVEMENT OF

RECYCLED WATER SYSTEMS PROJECT

PHASE 5

GALATI, N

ENTERKIN,B __/__/__-

N/A

MUNIS PROJECT:

6005020005

32101045 21

08 03 22

08 17 22

REO-0204

NOTES:

1. EXOTHERMIC WELDS (MAX. CHARGE CA-15)

2. EXOTHERMIC WELDS MUST BE 6" APART ON THE PIPE.

3. CABLES LARGER THAN A.W.G. NO. 4 MUST BE SPLIT FOR PROPER ATTACHMENT.

4. ALL LEAD WIRES AWG #8 OR SMALLER SHALL BE INSTALLED USING COPPER SLEEVES FOR

PROPER ATTACHMENT.

5. ALL EXPOSED COPPER AND STEEL SHALL BE COATED PER FACTORY COATING

SPECIFICATIONS USING SPC 2888 TWO-PART EPOXY OR AS DIRECTED BY THE COMPANY

REPRESENTATIVE. IF CONTRACTOR IS NOT CERTIFIED BY MANUFACTURER FOR THE

INSTALLATION OF SPC 2888 TWO-PART EPOXY, THEN A COMBINATION OF TRENTON

GRAYCOAT COLD-APPLIED WAX COATING & GUARD-WRAP PATCH WRAPPER SHALL BE

APPLIED

STEP 1.

STEP 2.

OR CADWELD PLUS

STEP 3.

STEP 4.

PREPARE STRUCTURE CONNECTION AREA

(3"X3") TO BARE SHINY METAL AND CLEAN.

STEP 5.

STRIP INSULATION FROM WIRE. ATTACH

SLEEVE (IF REQUIRED) I.E. #8 AWG WIRE OR

SMALLER

HOLD MOLD FIRMLY WITH OPENING AWAY

FROM OPERATOR & IGNITE WITH FLINT GUN

REMOVE SLAG FROM CONNECTION & PEEN WELD

FOR SOUNDNESS. IF FIRST EXOTHERMIC WELD IS

UNACCEPTABLE, A SECOND EXOTHERMIC WELD

MUST BE MOVED A MINIMUM OF 3" AWAY

COVER CONNECTION AND EXPOSED STRUCTURE

SURFACE WITH AN APPROVED COATING SYSTEM.

1. FOLLOW ALL APPROPRIATE OPEN FLAME RESTRICTIONS AND UTILIZE PROPER SAFETY AND

FIRE EXTINGUISHER EQUIPMENT

GENERAL NOTES:

EXOTHERMIC WELD DETAIL

GRAPHITE COVER

STARTING

POWDER

METAL WELDING

POWDER

METAL DISC

COPPER SLEEVE

BOND OR TEST CABLE

COATING

PIPELINE

SURFACE

HOLD

HANDLE

EXOTHERMIC WELD

EXPOSED STEEL

SEE NOTE 5

PIPE WALL

GRAPHITE MOLD

SLEEVE

WIRE

14 EXOTHERMIC WELD PROCEDURE

15 EXOTHERMIC WELD DETAIL

NTS

NTS

CATHODIC PROTECTION DETAILS

SHEET 4 OF 4

#14 AWG/RHH-RHW REF CELL LEAD (BLUE)

#14 AWG/RHH-RHW CP COUPON LEAD (RED)

#14 AWG/RHH-RHW CP COUPON LEAD (BLACK)

1 SQ. CM COUPON

REFERENCE CAP

16 CP COUPON AND REFERENCE CELL ASSEMBLY

NTS

CP-18

L I

CE

NS

ED

PRO

FESSIONAL ENGINEER

STATE OF CAL I FO

RN

IA

BE

NJ

AM

IN E . ENTREKIN

MECHA N I CA

L

M34599

File details come from the government source that posted it. Updated .