This is a set of engineering plan and profile drawings for the Long Beach Water Department's El Dorado Park-East Pipeline project. The drawings, prepared by Lamry Associates (engineering consultants), depict a water pipeline installation extending across multiple pages and station locations within Long Beach, California.
The project involves the construction of an 1800 linear foot, 20-inch C.M.L. (cast metal lined) I.C. steel pipe with 0 gauge, transitioning to 20-inch E.M.L. (external metal lined) I.C. steel pipe. The pipeline passes through several areas including the Long Beach Water Reclamation Plant-L.A. County Sanitation District facility, El Dorado Park, Heartwell Park, and multiple residential streets (Parkcrest Street, Albury Avenue, Marber Avenue, San Anseline Avenue, and surrounding areas). The drawings show existing surface features, underground utilities, construction methodology, and profile elevations. The design includes specifications for weld joint requirements, construction staging, tree removal restrictions per standard specifications, and contractor responsibility for site restoration. Multiple profile sheets (P-1 through P-20) are provided showing horizontal scales of 1 inch equals 40 feet and vertical scales of 1 inch equals 4 feet, with detailed station-to-station information spanning from STA 0+00 to approximately STA 220+00.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .