This document is an Invitation for Bid (IFB) for a Firm-Fixed-Price Indefinite Delivery/Indefinite Quantity (IDIQ) construction contract for paving and sustainable infrastructure work at Fort Buchanan in Puerto Rico. The contract is a 100% small business set-aside with a NAICS code of 237310 and a $45 million size standard. The estimated contract value is between $5-10 million.

The work includes demolition, asphalt, concrete elements, traffic markings and signs, handicap ramps, wheel stoppers, drainage, sidewalks, and other related construction services. Bids are due by May 10, 2024 and must include a 20% bid bond. Contractors must be registered in the System for Award Management (SAM) and complete the required representations and certifications. The contract includes a base period and four 1-year option periods. Payment and performance bonds will be required for each period.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirement: Paving and Substainable Infrastructure at Fort Buchanan, Puerto Rico. Work Includes: demolition, asphalt, concrete elements, traff ic markings, traffic signs, construction of handicap ramps, installation of w heel stoppers, drainage & piping, construction of sidew alks, and other related construction services.

This requirement is 100% Small Business Set-Aside for f irms capable of completing the w ork idenditied w thin this requirement.

The resulting Contract w ill be aw arded as a Firm-Fixed Price IDIQ Type Contract.

Applicable NAICS is: 237310 w ith a Size Standard of $45Million.

The magnitude of this project is betw een $5,000,000.00 and $10,000,000.00

Contractor shall submit w ith their bid package a bid a guarantee in accordance w ith FAR 52.228-1 of 20% of the total estimated amount of the Base Period. Work under this contract w ill be issued and funded via individual Task Orders.

Attachments: 1. Price ELIN Schedule, Base and 4 Options

2. Statement of Work (SOW)/Specifications– 20240119 (608 Pages)

3. Draw ings (16 Pages)

3. Tech Exhibits 1-3

X

FELIX R. MARRERO 787-707-2494

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

10-Apr-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________10 May 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

MICC - FT BUCHANAN

FT BUCHANAN

DIRECTORATE OF CONTRACTING

34 SOUTH GATE RD, STE 1104

FORT BUCHANAN PR 00934-4206

W912C3

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 787-707-3985 TEL: FAX:

W912C324B0001 50

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912C324B0001

Section 00 10 00 - Solicitation

NOTICE TO BIDDER

SOLICITATION No : W912C3-24-B-0001, Contractor shall furnishing labor, materials, tools, equipment, supervision, transportation, insurance and all necessary to perform work in connection with the Paving and Sustainable Infrastructure at Fort Buchanan, PR 00934.

This solicitation is issued as 100% Small Buisness Set-Aside. All eiligible contractors cable of successfully completing the work identified in the requirement can submit a bid.

Note: Small Buisness Firms that are not local need to ensure they are familiar with Puerto Rico laws, tax information and any other required in order to suvcessfully submit a bid and complete the work. All interested firms need to ensure proper consideration of all required for successful completion of all work avoiding delays due to not being able to obtain personnel, equipment or materials.

Please carefully read and complete the entire solicitation. The following are highlighted for your attention:

1. Bidders shall incorporate total price for each period in the Schedule of Supplies/Services (CLINS), Section 0010. In addition, Bidders shall incorporate individual price for each work identified in the BID/CLIN Schedule attached. Total Price for all work in each period (Base, First Option, Second Option, etc.) in the attached spreadsheet shall match pricing incorporated in the CLIN Section (Section 0010) of the solicitation.

2. Bidders shall complete all representations and certifications in SAM (www.sam.gov) to include FAR 52.204-26.

3. Annotate their DUNS, CAGE Code and Tax ID Number with their bid.

4. Bidders shall complete the SF1442 first page of solicitation, including appropriate signature.

5. BIDDERS SHALL INCLUDE A 20% BID BOND GUARANTEE

AND/OR OTHER REQUIRED DOCUMENT WITH THEIR BID. FAILURE

TO INCLUDE MAY RENDER YOUR BID NOT ELIGIBLE FOR

CONSIDERATION FOR AWARD.

6. Bidders shall be registered in the System for Award Management (SAM). To obtain information on SAM and/or to register with SAM, visit their web site at www.sam.gov Bidders shall acknowledge and include a copy of any amendments issued to the solicitation with the bid, if applicable.

6. All questions shall be in writing and e-mailed to Maria Otero at maria.otero4.civ@army.mil and Felix Marrero at felix.r.marrero2.civ@army.mil no later than April 22, 2024 10:00 AM Puerto Rico local time.

7. It is the bidder’s responsibility that all bids submitted, regardless of method of submission, are received in this office prior to the time and date specified for receipt of bids.

8. The applicable NAICS code for this project is 237310 with a size standard of $45 Million.

9. The magnitude of this project is between $5 MILLION and $10 MILLION.

10. Period of performance: Base Period and four (4) 1-year Option Year periods. Each Delivery Order will specify the Period of Performance for the specific work.

11. BIDS ARE DUE NO LATER THAN THE DATE SPECIFIED IN

BLOCK 13A OF THE SOLICITATION OR AS INDICATED VIA

AMENDMENTS ISSUED, IF ANY.

12. EMAIL OR FAX – ARE NOT ACCEPTABLE

13. CONTRACTOR NEED TO SUBMIT THE FOLLOWING DOCUMENTS WITH

THEIR BID:

a. STANDARD FORM 1442 COMPLETED AND SIGNED

b. SOLICITATION PRICING CLIN SECTION (0010) FOR BASE AND EACH

OPTION

c. PRICING SPREADSHEET ELINS FOR BASE AND EACH OPTION

d. SIGNED COPY(IES) OF ANY AMENDMENTS ISSUED OR

ACKNOWLEDGEMENT IN STANDARD FORM 1442, BLOCK 19.

e. CAGE CODE, DUNS, AND TAX ID NUMBER

f. BID GUARANTEE

ALL ITEMS REQUIRING A BID PRICE SHALL BE FILLED. ANY BID

NOT SUBMITTING PRICING FOR ALL ITEMS MAY BE REMOVED

FROM FURTHER CONSIDERATION FOR AWARD. IT IS VERY

IMPORTANT THAT YOU VERIFY YOUR MATH CALCULATIONS.

BIDDERS ARE CAUTIONED TO CLEARLY PRINT INTENDED PRICES.

IN THE EVENT THERE IS A DIFFERENCE BETWEEN A UNIT PRICE

AND THE EXTENDED TOTAL, THE UNIT PRICE SHALL GOVERN AS

THE INTENDED PRICE. IF THE BIDDER SHOWS ONLY THE TOTAL

PRICE BUT FAILS TO ENTER A UNIT PRICE, THE TOTAL DIVIDED BY

THE ESTIMATED QUANTITY SHALL GOVERN TO BE THE INTENDED

PRICE. IF DURING THE EVALUATION OF THE PROPOSAL IT IS

NOTICE THAT THE TOTAL COST DOES NOT MACTH THE

MATHEMATICAL FORMULA, THE UNIT PRICE PREVAILS.

14. THE BIDDER IS REMINDED IT MUST BID ONLY ON THE

ITEMS/INFORMATION PROVIDED

IN THE SOLICITATION ISSUED WHICH INCLUDES PLANS, DRAWINGS,

AND SPECIFICATIONS AS AMENDED.

15. ANY INCORPORATION OF INFORMATION, DEVIATIONS,

CONDITIONS OR ATTACHMENTS SUBMITTED AS ADDITIONAL

INFORMATION FROM THE ORIGINAL INTENTION OF THE

SOLICITATION MAY RENDER THE BID NON-RESPONSIVE AND MAY

BE CAUSE FOR ITS REJECTION.

16. In accordance with Federal Acquisition Regulation 14.304, Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bid (IFB) by the time specified in the IFB. Any bid, modification, or withdrawal of a bid received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late.”

17. RECEIPT OF BIDS (HAND CARRIED OR MAIL)

17 a. HAND CARRIED BIDS: A bid box is provided for hand carried bids and is located at the Visitor Control Center (VCC) Fort Buchanan, The Borinqueneers’ Gate, PR28 (Goya). Once you arrive at the Borinqueneers Gate, Fort Buchanan (before the gate guard) stay on the far right lane that will lead you to the entrance of the VCC.

Hand carried bids must be deposited in the bid box prior to the time established for opening of bids. The bid box will be inside the Visitor Control Center. Only the MICC Contracting Office will have access to the bid box key. (Note: If bid package too big, it may not fit into bid box slot)

Bidders are cautioned that they should allow time to accomplish the submission of the bid. There may be lines or other restrictions at the gate due to current situation.

This will not be a reason for accepting the bid package late.

17 b. BID SHALL BE SUBMITTED IN A SEALED ENVELOPE WITH THE

FOLLOWING INFORMATION ON THE OUTSIDE:

Bidders Name Bidders Address Solicitation Number: W912C324B0001, Paving & Sustainable Infrastructure at Fort Buchanan, PR 00934 Bid Receipt Date: 9 May 2024 (or as amended) Bid Receipt Time: 10:00

17c. MAIL OF BIDS:

Bids may be mailed but shall be received before the date and time at the location designated for receipt of bids. Failure to submit the bid package so as to reach the Government at the location designated for receipt of bids, by the date and time set for receipt of bids, may be cause for rejection of the bid. Sealed bid envelope shall be identified with the same information on the outside of the envelope as indicated in item 1.2. above. See Federal Acquisition Regulation 14.304.

Mailing Address:

Mission and Installation Contracting Command Attn: Felix Marrero/Maria Otero (IFB No: W912C324B0001) 419th Contracting Support Brigade MICC-Fort Buchanan 34 South Gate Road, Suite 1104 Fort Buchanan

PR 00934

17d. BID OPENING:

THE DATE AND TIME FOR OPENING OF THE BIDS IS: 9 May 2024;

10:00 AM LOCAL PUERTO RICO TIME OR AS AMENDED.

Vendors wanting to participate in the bid opening will need to ensure they arrive, at least, an hour early in order to be sponsored onto Fort Buchanan.

Valid ID, Drivers license for personnel is required. Max Two (2) persons per company.

DUE TO RESTRICTED ACCESS TO FORT BUCHANAN, CONTRACTORS

THAT WILL BE HANDCARRYING THEIR BID ARE REQUIRED TO

CONTACT:

maria.d.otero4.civ@army.mil and to felix.r.marrero2.civ@army.mil in advance to ensure timely submission of the bid package and pick up of package. Contractor can also place your bid in the Visitor Center Bid Box for this Solicitation (Note: If bid package too big, it may not fit into bid box slot)

THE NAMES OF THOSE ATTENDING SHALL BE PROVIDED NOT

LATER THAN FIVE (5) FULL WORK DAYS PRIOR TO THE DATE/TIME

OF BID OPENING DATE.

CONTRACTORS ARE CAUTIONED THAT THERE MAY BE DELAYS AT

THE GATES AND SHOULD ALLOW ADEQUATE TIME FOR ENTERING

THE INSTALLATION TO ENSURE PACKAGES ARE RECEIVED PRIOR TO

THE TIME AND DATE FOR RECEIPT OF THE BID PACKAGE. ALL

INDIVIDUALS MUST HAVE A PICTURE ID AND NO SUBSTITUTIONS

ARE AUTHORIZED. VEHICLES ARE ALSO SUBJECT TO SEARCH. NOTE:

THIS OFFICE MAY ASSIST IN PROVIDING ACCESS TO THE VENDOR;

HOWEVER, THE VENDOR REMAINS RESPONSIBLE FOR ENSURING THE

BID IS RECEIVED AT THE LOCATION SPECIFIED ON THE STANDARD

FORM 1442 BEFORE THE DATE AND TIME SPECIFIED FOR RECEIPT OF

BIDS.

18. SITE VISIT INFORMATION: A site visit is not contemplated at this time.

19. The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b) (3), Equal Opportunity, is located http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm

20. The contractor shall comply with all Federal, State, and Local laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with the said compliance.

21. ELECTRONIC ANNUAL REPS/CERTS

Prospective contractors shall complete electronic annual representations and certifications at www.sam.gov in conjunction with the required registration in the System for Award Management database as required by FAR

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

PAVING AND SUSTAINABLE INFRASTRUCTURE

FFP

BASE PERIOD: Contractor shall provide labor, materials, equipment, supervision and all necessary for the successful completion of work associated with the Paving and Sustainable Infrastructure at Fort Buchanan, Puerto Rico project in accordance with Statement of Work, Specifications, Drawings, terms and conditions and all applicable regulations. Work Includes: demolition, asphalt, concrete elements, traffic markings, traffic signs, construction of handicap ramps, installation of wheel stoppers, drainage & piping, construction of sidewalks, and other related construction services.

SEE SPREADSHEET IFB W912C3-24-B-0001-ELIN PRICING- PAVING FOR

INCORPORATION OF INDIVIDUAL PRICING ON EACH WORK THAT

MAY BE INCLUDED IN FUTURE DELIVERY ORDERS.

THE TOTAL AMOUNT FOR THE BASE PERIOD ON THE SPREADSHEET

SHALL BE INCOPORATED IN THIS CLIN. AMOUNT SHALL MATCH. THE

VENDOR SHALL ENSURE PRICE FOR EACH WORK IDENTIFIED IN THE

SPREADSHEET INCORPORATES ALL COSTS ASSOCIATED WITH

SUCCESSFULL COMPLETION OF THAT WORK. FAILURE TO

INCORPORATE A COST REQUIRED FOR COMPLETION OF THE WORK

WILL BE AT THE EXPENSE OF THE CONTRACTOR.

NOTE: FOR FEDERAL, LOCAL, MUNICIPAL FEES OR TAX PURPOSES:

THERE IS NO WAY TO INDICATE WHICH DELIVERY ORDERS WILL BE

ISSUED TO BAYAMON OR GUAYNABO AREAS WITHIN FORT

BUCHANAN AT THE TIME THE CONTRACT IS AWARDED.

THEREFORE, VENDORS SHALL ENSURE ALL PRICES SUBMITTED FOR

THIS REQUIREMENT CONSIDER ANY FEDERAL, LOCAL, MUNICIPAL

AND ANY OTHER REQUIRED FEES OR TAXES APPLICABLE TO ANY

AREA WITHIN THE FORT BUCHANAN COMMUNITY

FOB: Destination

PSC CD: Y1LB

NET AMT

0002 1 Each

PERFORMANCE AND PAYMENT BONDS

FFP

BASE PERIOD BONDS - Contractor shall provide applicable Performance and Payment Bonds in accordance with FAR 52.228-15, Performance and Payment Bonds-Construction

1001 1 Job

OPTION PAVING AND SUSTAINABLE INFRASTRUCTURE

FFP

OPTION YEAR 1 PERIOD: Contractor shall provide labor, materials, equipment, supervision and all necessary for the successful completion of work associated with the Paving and Sustainable Infrastructure at Fort Buchanan, Puerto Rico project in accordance with Statement of Work, Specifications, Drawings, terms and conditions and all applicable regulations. Work Includes: demolition, asphalt, concrete elements, traffic markings, traffic signs, construction of handicap ramps, installation of wheel stoppers, drainage & piping, construction of sidewalks, and other related construction services.

SEE SPREADSHEET IFB W912C3-24-B-0001-ELIN PRICING- PAVING FOR

INCORPORATION OF INDIVIDUAL PRICING ON EACH WORK THAT

MAY BE INCLUDED IN FUTURE DELIVERY ORDERS.

THE TOTAL AMOUNT FOR THE BASE PERIOD ON THE SPREADSHEET

SHALL BE INCOPORATED IN THIS CLIN. AMOUNT SHALL MATCH.

VENDOR SHALL ENSURE PRICE FOR EACH WORK IDENTIFIED IN THE

SPREADSHEET INCORPORATES ALL COSTS ASSOCIATED WITH

SUCCESSFULL COMPLETION OF THAT WORK. FAILURE TO

INCORPORATE A COST REQUIRED FOR COMPLETION OF THE WORK

WILL BE AT THE EXPENSE OF THE CONTRACTOR

NOTE: FOR FEDERAL, LOCAL, MUNICIPAL FEES OR TAX PURPOSES:

THERE IS NO WAY TO INDICATE WHICH DELIVERY ORDERS WILL BE

ISSUED TO BAYAMON OR GUAYNABO AREAS WITHIN FORT

BUCHANAN AT THE TIME THE CONTRACT IS AWARDED.

THEREFORE, VENDORS SHALL ENSURE ALL PRICES SUBMITTED FOR

THIS REQUIREMENT CONSIDER ANY FEDERAL, LOCAL, MUNICIPAL

AND ANY OTHER REQUIRED FEES OR TAXES APPLICABLE TO ANY

AREA WITHIN THE FORT BUCHANAN COMMUNITY

1002 1 Each

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

OPTION YEAR 1 PERIOD BONDS - Contractor shall provide applicable Performance and Payment Bonds in accordance with FAR 52.228-15, Performance and Payment Bonds-Construction

2001 1 Job

OPTION PAVING AND SUSTAINABLE INFRASTRUCTURE

FFP

OPTION YEAR 2 PERIOD: Contractor shall provide labor, materials, equipment, supervision and all necessary for the successful completion of work associated with the Paving and Sustainable Infrastructure at Fort Buchanan, Puerto Rico project in accordance with Statement of Work, Specifications, Drawings, terms and conditions and all applicable regulations. Work Includes: demolition, asphalt, concrete elements, traffic markings, traffic signs, construction of handicap ramps, installation of wheel stoppers, drainage & piping, construction of sidewalks, and other related construction services.

SEE SPREADSHEET IFB W912C3-24-B-0001-ELIN PRICING- PAVING FOR

INCORPORATION OF INDIVIDUAL PRICING ON EACH WORK THAT

MAY BE INCLUDED IN FUTURE DELIVERY ORDERS.

THE TOTAL AMOUNT FOR THE BASE PERIOD ON THE SPREADSHEET

SHALL BE INCOPORATED IN THIS CLIN. AMOUNT SHALL MATCH.

VENDOR SHALL ENSURE PRICE FOR EACH WORK IDENTIFIED IN THE

SPREADSHEET INCORPORATES ALL COSTS ASSOCIATED WITH

SUCCESSFULL COMPLETION OF THAT WORK. FAILURE TO

INCORPORATE A COST REQUIRED FOR COMPLETION OF THE WORK

WILL BE AT THE EXPENSE OF THE CONTRACTOR

NOTE: FOR FEDERAL, LOCAL, MUNICIPAL FEES OR TAX PURPOSES:

THERE IS NO WAY TO INDICATE WHICH DELIVERY ORDERS WILL BE

ISSUED TO BAYAMON OR GUAYNABO AREAS WITHIN FORT

BUCHANAN AT THE TIME THE CONTRACT IS AWARDED.

THEREFORE, VENDORS SHALL ENSURE ALL PRICES SUBMITTED FOR

THIS REQUIREMENT CONSIDER ANY FEDERAL, LOCAL, MUNICIPAL

AND ANY OTHER REQUIRED FEES OR TAXES APPLICABLE TO ANY

AREA WITHIN THE FORT BUCHANAN COMMUNITY

2002 1 Each

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

OPTION YEAR 2 PERIOD BONDS - Contractor shall provide applicable Performance and Payment Bonds in accordance with FAR 52.228-15, Performance and Payment Bonds-Construction

3001 1 Job

OPTION PAVING AND SUSTAINABLE INFRASTRUCTURE

FFP

OPTION YEAR 3 PERIOD: Contractor shall provide labor, materials, equipment, supervision and all necessary for the successful completion of work associated with the Paving and Sustainable Infrastructure at Fort Buchanan, Puerto Rico project in accordance with Statement of Work, Specifications, Drawings, terms and conditions and all applicable regulations. Work Includes: demolition, asphalt, concrete elements, traffic markings, traffic signs, construction of handicap ramps, installation of wheel stoppers, drainage & piping, construction of sidewalks, and other related construction services.

SEE SPREADSHEET IFB W912C3-24-B-0001-ELIN PRICING- PAVING FOR

INCORPORATION OF INDIVIDUAL PRICING ON EACH WORK THAT

MAY BE INCLUDED IN FUTURE DELIVERY ORDERS.

THE TOTAL AMOUNT FOR THE BASE PERIOD ON THE SPREADSHEET

SHALL BE INCOPORATED IN THIS CLIN. AMOUNT SHALL MATCH.

VENDOR SHALL ENSURE PRICE FOR EACH WORK IDENTIFIED IN THE

SPREADSHEET INCORPORATES ALL COSTS ASSOCIATED WITH

SUCCESSFULL COMPLETION OF THAT WORK. FAILURE TO

INCORPORATE A COST REQUIRED FOR COMPLETION OF THE WORK

WILL BE AT THE EXPENSE OF THE CONTRACTOR

NOTE: FOR FEDERAL, LOCAL, MUNICIPAL FEES OR TAX PURPOSES:

THERE IS NO WAY TO INDICATE WHICH DELIVERY ORDERS WILL BE

ISSUED TO BAYAMON OR GUAYNABO AREAS WITHIN FORT

BUCHANAN AT THE TIME THE CONTRACT IS AWARDED.

THEREFORE, VENDORS SHALL ENSURE ALL PRICES SUBMITTED FOR

THIS REQUIREMENT CONSIDER ANY FEDERAL, LOCAL, MUNICIPAL

AND ANY OTHER REQUIRED FEES OR TAXES APPLICABLE TO ANY

AREA WITHIN THE FORT BUCHANAN COMMUNITY

3002 1 Each

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

OPTION YEAR 3 PERIOD BONDS - Contractor shall provide applicable Performance and Payment Bonds in accordance with FAR 52.228-15, Performance and Payment Bonds-Construction

PAVING AND SUSTAINABLE INFRASTRUCTURE

FFP

OPTION YEAR 4 PERIOD: Contractor shall provide labor, materials, equipment, supervision and all necessary for the successful completion of work associated with the Paving and Sustainable Infrastructure at Fort Buchanan, Puerto Rico project in accordance with Statement of Work, Specifications, Drawings, terms and conditions and all applicable regulations. Work Includes: demolition, asphalt, concrete elements, traffic markings, traffic signs, construction of handicap ramps, installation of wheel stoppers, drainage & piping, construction of sidewalks, and other related construction services.

SEE SPREADSHEET IFB W912C3-24-B-0001-ELIN PRICING- PAVING FOR

INCORPORATION OF INDIVIDUAL PRICING ON EACH WORK THAT

MAY BE INCLUDED IN FUTURE DELIVERY ORDERS.

THE TOTAL AMOUNT FOR THE BASE PERIOD ON THE SPREADSHEET

SHALL BE INCOPORATED IN THIS CLIN. AMOUNT SHALL MATCH.

VENDOR SHALL ENSURE PRICE FOR EACH WORK IDENTIFIED IN THE

SPREADSHEET INCORPORATES ALL COSTS ASSOCIATED WITH

SUCCESSFULL COMPLETION OF THAT WORK. FAILURE TO

INCORPORATE A COST REQUIRED FOR COMPLETION OF THE WORK

WILL BE AT THE EXPENSE OF THE CONTRACTOR

NOTE: FOR FEDERAL, LOCAL, MUNICIPAL FEES OR TAX PURPOSES:

THERE IS NO WAY TO INDICATE WHICH DELIVERY ORDERS WILL BE

ISSUED TO BAYAMON OR GUAYNABO AREAS WITHIN FORT

BUCHANAN AT THE TIME THE CONTRACT IS AWARDED.

THEREFORE, VENDORS SHALL ENSURE ALL PRICES SUBMITTED FOR

THIS REQUIREMENT CONSIDER ANY FEDERAL, LOCAL, MUNICIPAL

AND ANY OTHER REQUIRED FEES OR TAXES APPLICABLE TO ANY

AREA WITHIN THE FORT BUCHANAN COMMUNITY

4002 1 Each

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

OPTION YEAR 4 PERIOD BONDS - Contractor shall provide applicable Performance and Payment Bonds in accordance with FAR 52.228-15, Performance and Payment Bonds-Construction

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 03-JUN-2024 TO

02-JUN-2025

N/A W1H1 USAG FT BUCHANAN

BRAULIO BURGOS

DPW LOGISTICS DIVISION

BLDG 37 SOUTH GATE RD

FORT BUCHANAN 00934-4206

787-707-3311

W81YDN

0002 POP 03-JUN-2024 TO

02-JUN-2025

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 03-JUN-2025 TO

02-JUN-2026

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 03-JUN-2025 TO

02-JUN-2026

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 03-JUN-2026 TO

02-JUN-2027

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 03-JUN-2026 TO

02-JUN-2027

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 03-JUN-2027 TO

02-JUN-2028

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 03-JUN-2027 TO

02-JUN-2028

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 03-JUN-2028 TO

02-JUN-2029

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 03-JUN-2028 TO

02-JUN-2029

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.203-13 Contractor Code of Business Ethics and Conduct NOV 2021 52.203-14 Display of Hotline Poster(s) NOV 2021 52.203-15 Whistleblower Protections Under the American Recovery and

Reinvestment Act of 2009

JUN 2010

52.203-16 Preventing Personal Conflicts of Interest JUN 2020 52.203-17 Contractor Employee Whistleblower Rights NOV 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements

JAN 2017

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-6 Unique Entity Identifier OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-14 Service Contract Reporting Requirements OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities

DEC 2023

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-13 Time Extensions SEP 2000

52.211-18 Variation in Estimated Quantity APR 1984 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-12 Preparation Of Bids APR 1984 52.214-15 Period For Acceptance Of Bids APR 1984 52.214-18 Preparation of Bids-Construction APR 1984 52.214-26 Audit and Records--Sealed Bidding JUN 2020 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data -

Modifications - Sealed Bidding

JUN 2020

52.214-34 Submission Of Offers In The English Language APR 1991 52.217-5 Evaluation Of Options JUL 1990 52.219-8 Utilization of Small Business Concerns FEB 2024 52.219-14 Limitations On Subcontracting OCT 2022 52.222-3 Convict Labor JUN 2003 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-40 Notification of Employee Rights Under the National Labor Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons NOV 2021 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons.

JUN 2016

52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

JUN 2020

52.225-9 Buy American--Construction Materials OCT 2022 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

JUN 2020

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.227-14 Rights in Data--General MAY 2014 52.228-2 Additional Bond Security OCT 1997 52.228-11 Individual Surety--Pledge of Assets FEB 2021 52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-8 Other Contracts APR 1984 52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Products and Commercial

Services

FEB 2024

52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.247-64 Preference for Privately Owned U.S. - Flag Commercial

Vessels

NOV 2021

52.248-3 Value Engineering-Construction OCT 2020 52.249-2 Alt II Termination For Convenience Of The Government (Fixed

Price) (Apr 2012) - Alternate II

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

JAN 2023

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7002 Payment For Contract Line or Subline Items Not Separately

Priced

APR 2020

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7006 Billing Instructions--Cost Vouchers MAY 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

JAN 2023

252.205-7000 Provision Of Information To Cooperative Agreement Holders JUN 2023 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements JAN 2023 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7008 Restriction on Acquisition of Specialty Metals MAR 2013 252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.225-7048 Export-Controlled Items JUN 2013 252.227-7033 Rights in Shop Drawings APR 1966

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2022 252.247-7023 Transportation of Supplies by Sea JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of Contracting Officer and shall not be binding until so approved.

(End of clause)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under each Delivery Order upon awarded, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than “As specified in each Delivery Order”.

The time stated for completion shall include final cleanup of the premises.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $265.93 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)

(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.

(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.

(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.

(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-FixedPrice Indefinite Delivery Indefinite Quantity (IDIQ) type contract resulting from this solicitation.

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $0 , the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of $500,000. (insert dollar figure or quantity);

(2) Any order for a combination of items in excess of $750,000. (insert dollar figure or quantity); or

(3) A series of orders from the same ordering office within 30days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within three (3) days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after expiration].

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days;

provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 months.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (FEB 2024)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern--

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph

(d) of this clause.

(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13

CFR 121.103.

(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, when the Contracting Officer explicitly requires it for an order issued under a multiple-award contract.

(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.

(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition--

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraph (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.

(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code assigned to contract number .

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .]

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program.

The Contractor represents that it [ ] is, [ ] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .]

(9) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that--

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer's name and title.]

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

N/A 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .