209448 63 Old Marlboro 071520 Report.pdf
PDF 514 KB Posted
- Attached to
- Region1_Asbestos_Abatement_and_Electrical
- Solicitation number
- Region1_Asbestos_Testing_and_Abatement
- Issued by
-
Federal Emergency Management Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abatement and Electrical Q and A.pdf | ||
| Picture1.jpg | JPG image | |
| Picture2.jpg | JPG image | |
| FEMA R1 FRC SOW Asbestos-Electrical v1.1.docx | DOCX document | |
| Site Visit Sign In-FBO.docx | DOCX document | |
| Comms Center- Asbestos Abatement SOW REVISED.docx | DOCX document | |
| PRICING SHEET.docx | DOCX document | |
| Past Experience Questionnaire-Region 1.doc | DOC document | |
| DBA Wage Determination 202001.pdf | ||
| Contractor Entrance Requirements.docx | DOCX document | |
| Comms Center- Asbestos Abatement SOW.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 5, 2020
Mr. Robert Reinke Jr.
Region I RRCC Operations Specialist
Federal Emergency Management Agency
99 High Street
Boston, MA 02110
Re: 63 Old Marlboro Road, Maynard, MA
Limited Building Survey Findings
RPF File No. 209448
Dear Mr. Reinke:
On July 15, 2020, RPF Environmental, Inc. (RPF) conducted a survey at the Federal Regional
Center located at 63 Old Marlboro Road in Maynard, MA. The survey was performed in the affected areas of the building, as designated by you or your site representative, for accessible asbestos containing building material (ACBM) as indicated herein. Below is a summary of findings, discussion of the results and preliminary recommendations for proper management of the identified ACBM. Attached to this report are the survey data tables, laboratory results, survey methodologies and limitations.
This report is not intended to be used as an abatement specification or work plan. To proceed with abatement work, the following important steps are necessary:
1. A work plan or project design documents must be prepared prior to abatement by a certified abatement project designer.
2. The abatement specification or work plan should then be used to solicit bids from qualified abatement contractors. Only properly licensed contractors should be used for asbestos abatement and disposal.
3. A qualified industrial hygiene/testing consultant should conduct sufficient testing and inspections of the work, independent of the abatement contractor. The consultant should also prepare final abatement reports for the work.
Summary of Findings
The scope of the survey included accessible asbestos-containing building material in accordance with the initial asbestos inspection requirements prior to renovation or demolition work as stated in the State regulations and applicable federal regulations.
Federal Emergency Management Agency 63 Old Marlboro Road, Maynard, MA
Limited Building Survey Findings Page 2
In the accessible areas of Rooms 209 and 210, RPF identified several types of suspect ACBM, including friable and nonfriable suspect material. Based on the testing performed by RPF asbestos was detected in the gray cementboard wall panels throughout the rooms.
Depending on the extent of renovation and final construction plans, proper abatement and/or management of the materials will be required in accordance with applicable State and federal regulations. Renovation and demolition plans should be reviewed by a certified industrial hygienist and a licensed project designer for possible asbestos impact issues. Based on the impact assessment and planned usage, technical specifications should be prepared for abatement, as applicable. A management plan should also be prepared to address any asbestos or other hazardous material scheduled to remain after construction.
Discussion of Findings
Asbestos is the name for a group of naturally occurring minerals that separate into strong, very fine fibers. The adverse health effects associated with asbestos exposure have been extensively studied for many years. Results of these studies and epidemiological investigations have demonstrated that inhalation of asbestos fibers may lead to increased risk of developing one or more diseases. In all cases, extreme care must be used not to disturb asbestos-containing materials or to create fiber release episodes.
In the accessible locations surveyed, RPF identified seven (7) homogeneous groups of accessible suspect asbestos-containing building material. Suspect materials were identified based on current industry standards, EPA, and other guideline listings of potential suspect ACBM.
The following is a summary list of the suspect ACBM identified and sampled during this survey:
• Suspended ceiling tiles
• Acoustic Tile
• Gypsum Board
• Glue Daubs
• Cementboard Wall Panels
• Covebase Adhesive
• Joint Compound
A total of fourteen (14) samples were extracted from the different groups of suspect material in accordance with EPA sampling protocols. Of the samples collected by RPF, asbestos was detected in the cementboard wall panels which generally make up the lower half walls in both rooms 209 and 210.
Table 1 below includes a list of ACBM identified in the accessible areas surveyed, EPA category listings, and asbestos content. A listing of the different homogenous groups of suspect material identified, samples collected, and analytical results is included in Appendix A.
Limited Building Survey Findings Page 3
SUMMARY OF ACBM IDENTIFIED
Building Material
Location Approximate
Quantity
EPA Category Asbestos
Results Cementboard Wall
Panels
Rooms 209 and 210 540 square feet Category II
Nonfriable
30%
Chrysotile
The ACBM identified during this survey consists of nonfriable material which was observed to be in good to fair condition and, left undisturbed and properly managed, is unlikely to cause any major fiber release episodes
Table 1 does not include a listing of all ACBM and suspect ACBM present at the site, only the materials found to be ACBM during the limited testing of this limited survey. Full testing and inspections are required to further identify the types, locations and quantities of ACBM present at this site.
All quantities are approximate only and should be confirmed during abatement project design and abatement bidding. It is possible that some concealed or inaccessible ACBM is present. Care should be used when renovating/demolishing inaccessible building space. Further explorative survey work may be necessary during design and/or in conjunction with demolition.
Suspect materials encountered at the site subsequent to this survey, which are not included on the enclosed listings of suspect material sampled, should be assumed to be ACBM until proper testing proves otherwise (for example prior to any disturbance due to maintenance, renovation or demolition activity). Please notify RPF in this event to arrange for proper testing and assessments.
Please reference the attached methodology and limitations.
Conclusions
Based on the survey findings, Rooms 209 and 210 were found to contain ACBM in the form of cementboard wall panels.
In accordance with current regulatory requirements, ACBM that may be impacted or disturbed
(such that asbestos fiber release occurs) by renovation, demolition or other such activity must be removed by qualified, licensed firms. Although regulations for removal of nonfriable ACBM are somewhat less stringent than the requirements for friable ACBM, it should be noted that nonfriable
ACBM that is subjected to grinding, abrasion, and other forces, could be rendered friable. In this event, the nonfriable ACBM would be re-categorized friable ACBM.
ACBM that will not be impacted by renovation or demolition activity may be left in place if managed properly and if the materials are maintained in good condition. ACBM to remain in the building should be included in an asbestos management plan and operations and maintenance
(O&M) program detailing the measures to be used to safely occupy the building until the ACBM is fully removed. An accredited Management Planner should prepare the O&M Program in accordance with the guidelines set forth in 40 CFR Part 763 (AHERA).
Limited Building Survey Findings Page 4
Sufficiently in advance of the start of renovation and/or remediation work, abatement project design should be completed. As part the initial design steps any planned renovation and demolition activity should be reviewed for potential impact on ACBM. Asbestos removal is highly regulated at the State and federal level, and in some cases, at the local level also. Notification to the
Massachusetts Department of Environmental Protection is required 10-days prior to the start of abatement work and demolition. Only qualified, trained, and licensed firms, as applicable, should be engaged to complete asbestos removal or other abatement activity. Asbestos abatement work must be designed (abatement specifications or work plan prepared) by licensed personnel.
All employees and contractors that may access or otherwise disturb areas with suspect ACBM present should be notified of the presence of ACBM and possible hidden ACBM, and the need to use caution when proceeding with work. Appropriate notifications, labeling and other hazard communications should be completed to all employees, contractors and others in accordance with
US OSHA regulations and other applicable requirements (including asbestos labeling in accordance with 29 CFR Part 1926). The scope of RPF services for this survey did not include labeling of ACBM or hazard communications to other employees, building occupants, contractors, or subcontractors.
Documentation of current ACBM conditions and in-depth hazard assessment is beyond the scope-of-work for this initial survey. With the exception of the specific testing and analysis detailed herein, no other samples of materials, oil, water, ground water, air, or other suspect hazardous materials were collected in the course of this inspection that supports or denies these conclusions.
No additional services beyond those explicitly stated herein were performed and none should be inferred or implied. The summary and conclusions are based on reasonably ascertainable information as described in this report. RPF Environmental, Inc. makes no guarantees, warranties, or references regarding this property or the condition of the property after the period of this report.
If you have any questions at this time, or if you would like to discuss the remediation process, please call our office.
Sincerely, RPF ENVIRONMENTAL, INC.
Allan D. Mercier, CMC
Field Operations Manager
Licensed Asbestos Inspector
Enclosures:
Appendix A: Data and Analytical Table
Appendix B: Example Photographs and Field Sketch
Appendix C: Summary of Methodology and Limitations
209449 63 Old Marlboro 071520 Report
APPENDIX A
TABLE 1
FEDERAL EMERGENCY MANAGEMENT AGENCY
FEMA – Federal Reserve Center
63 Old Marlboro Road, Maynard, MA
Rooms 209 and 210
Polarized Light Microscopy – EPA 600/R-93/116 Method Samples Collected: Date July 15, 2020
Notes:
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description
Asbestos
Content
071520HG1a Suspended ceiling tile, white, Room 210 None Detected
071520HG1b Suspended ceiling tile, white, Room 209 None Detected
071520HG2a Acoustic tile, white, Room 210 None Detected
071520HG2b Acoustic tile, white, Room 209 None Detected
071520HG3a Gypsum, white, Room 210 None Detected
071520HG3b Gypsum, white, Room 209 None Detected
071520HG4a Glue daub, brown, Room 210 None Detected
071520HG4b Glue daub, brown, Room 209 None Detected
071520HG5a Wall panel, grey, Room 210 30% Chrysotile
071520HG5b Wall panel, grey, Room 209 *SFP
071520HG6a Covebase adhesive, brown, Room 210 None Detected
071520HG6b Covebase adhesive, brown, Room 209 None Detected
071520HG7a Joint compound, white, Room 210 None Detected
071520HG7b Joint compound, white, Room 209 None Detected 209448
APPENDIX B
APPENDIX B: SITE PHOTOGRAPHS
Site Address:
FEMA-FRC
65 Old Marlboro Road, Maynard, MA www.airpf.com
603-942-5432
Project No. 209448
1. Interior of Room 209/210. Lower half of walls covered with ACM cementboard panels.
2. Typical ACM cementboard panels throughout rooms.
3. Typical ACM cementboard panels throughout rooms.
APPENDIX C
Summary of Methodology: Asbestos-Containing Building Materials Survey
EPA accredited inspector(s) surveyed accessible space in the building or site areas included within the RPF Scope of
Work (SOW) to identify suspect asbestos-containing building material (ACBM). Suspect ACBM was inventoried and categorized into homogeneous groups of materials. To the extent indicated in the report, samples were then extracted from the different groups of homogeneous materials in accordance with applicable State and federal rules and regulations. For surveys in which the SOW included full inspections of the affect space, sampling methodologies were based on the requirements set forth in 40 CFR Part 763 (EPA) and 29 CFR Part 1926.1101
(OSHA). For preliminary or limited surveys, findings apply to only the affected material or space as indicated in the
RPF SOW and Report and additional inspection and testing will be required to satisfy regulatory obligations associated with renovation, demolition, maintenance and other occupational safety and health requirements.
Sampling methodologies used are as set forth in 40 CFR Part 763 (EPA):
• Surfacing Material: 3 bulk samples from each homogenous area and/or material that is 1,000 square feet or less. 5 bulk samples from each homogenous area that is greater than 1,000 square feet but less than or equal to 5000 square feet. 7 bulk samples from each homogenous area that is greater than 5,000 square feet.
• Thermal System Insulation: 3 bulk samples from each homogenous area. 1 bulk sample from each homogenous area of patched thermal system insulation if the patched section is less than 6 linear or square feet. Samples sufficient to determine whether the material is ACM from each insulated mechanical system where cement is utilized on tees, elbows, or valves.
• Miscellaneous ACM: 3 samples from each miscellaneous material. 1 sample if the amount of miscellaneous material is less than 6 square or linear feet.
Collected samples were individually placed into sealed containers, labeled, and submitted with proper chain of custody forms to the RPF NVLAP-accredited vendor laboratory. Sample containers and tools were cleaned after each sample was collected. Samples were analyzed for asbestos content using polarized light microscopy (PLM).
Although PLM is the method currently recognized in State and federal regulations for asbestos identification in bulk samples, PLM may not be sensitive enough to detect all of the asbestos fibers in certain types of materials, such as floor tile and other nonfriable ACBM. In the event that more definitive results are requested in cases of with negative or trace results of asbestos are detected, RPF recommends that confirmation testing be completed using transmission electron microscopy.
For each homogeneous group of suspect material, a “stop at first positive” (SFP) method may have been employed during the analysis. The SFP method is based on current EPA sampling protocols and means that if one sample within a homogeneous group of suspect material is found to contain >1% asbestos, then further analysis of that specific homogenous group samples is terminated and the entire homogeneous group of material is considered to be
ACBM regardless of the other sample results. This is based on the potential for inconsistent mix of asbestos in the product yielding varying findings across the different individual samples collected from the same homogeneous group. Unless otherwise noted in the report, sample groups found to have 1% to <10% asbestos content are assumed to be ACBM; to rebut this assumption further analysis with point count methods are required.
Inaccessible and hidden areas, including but not limited to wall/floor/ceiling cavity space, space with obstructed access (such as fiberglass insulation above suspended ceilings), sub floors, interiors of mechanical and process equipment, and similar spaces were not included in the inspection and care should be used when accessing these areas in the future. Unless otherwise noted in the RPF Report, destructive survey techniques were not employed during this survey.
In the event that additional suspect materials are encountered that are not addressed in this report, the materials should be properly tested by an accredited inspector. For example, during renovation and demolition it is likely that additional suspect material will be encountered and such suspect materials should be assumed to be hazardous until proper inspection and testing occurs.
RPF followed applicable industry standards; however, various assumptions and limitations of the methods can result in missed materials or misidentification of materials due several factors including but not limited to: inaccessible space due to physical or safety constraints, space that is difficult to reach to fully inspection, assumptions regarding the determination of homogenous groups of suspect material, assumptions regarding attempts to conduct representative sampling, and potential for varying mixtures and layers of material sampled not being representative of all areas of similar material. Also reference the Limitations document attached to the report.
LIMITATIONS
1. The observations and conclusions presented in the Report were based solely upon the services described herein, and not on scientific tasks or procedures beyond the RPF Environmental, Inc. Scope of Work
(SOW) as discussed in the proposal and/or agreement. The conclusions and recommendations are based on visual observations and testing, limited as indicated in the Report, and were arrived at in accordance with generally accepted standards of industrial hygiene practice and asbestos professionals. The nature of this survey or monitoring service was limited as indicated herein and in the report or letter of findings.
Further testing, survey, and analysis is required to provide more definitive results and findings.
2. For site survey work, observations were made of the designated accessible areas of the site as indicated in the Report. While it was the intent of RPF to conduct a survey to the degree indicated, it is important to note that not all suspect ACBM material in the designated areas were specifically assessed and visibility was limited, as indicated, due to the presence of furnishings, equipment, solid walls and solid or suspended ceilings throughout the facility and/or other site conditions. Asbestos or hazardous material may have been used and may be present in areas where detection and assessment is difficult until renovation and/or demolition proceeds. Access and observations relating to electrical and mechanical systems within the building were restricted or not feasible to prevent damage to the systems and minimize safety hazards to the survey team.
3. Although assumptions may have been stated regarding the potential presence of inaccessible or concealed asbestos and other hazardous material, full inspection findings for all asbestos and other hazardous material requires the use of full destructive survey methods to identify possible inaccessible suspect material and this level of survey was not included in the SOW for this project. For preliminary survey work, sampling and analysis as applicable was limited and a full survey throughout the site was not performed. Only the specific areas and /or materials indicated in the report were included in the SOW.
This inspection did not include a full hazard assessment survey, full testing or bulk material, or testing to determine current dust concentrations of asbestos in and around the building. Inspection results should not be used for compliance with current EPA and State asbestos in renovation/demolition requirements unless specifically stated as intended for this use in the RPF report and considering the limitations as stated therein and within this limitations document.
4. Where access to portions of the surveyed area was unavailable or limited, RPF renders no opinion of the condition and assessment of these areas. The survey results only apply to areas specifically accessed by
RPF during the survey. Interiors of mechanical equipment and other building or process equipment may also have asbestos and other hazardous material present and were not included in this inspection. For renovation and demolition work, further inspection by qualified personnel will be required during the course of construction activity to identify suspect material not previously documented at the site or in this survey report. Bordering properties were not investigated and comprehensive file review and research was not performed.
5. For lead in paint, observations were made of the designated accessible areas of the site as indicated in the
Report. Limited testing may have been performed to the extent indicated in the text of the report. In order to conduct thorough hazard assessments for lead exposures, representative surface dust testing, air monitoring and other related testing throughout the building, should be completed. This type of in depth testing and analysis was beyond the scope of services for the initial inspection. For lead surveys with
XRF readings, it is recommended that surfaces found to have LBP or trace amount of lead detected with readings of less than 4 mg/cm2 be confirmed using laboratory analysis if more definitive results are required. Substrate corrections involving destructive sampling or damage to existing surfaces (to minimize XRF read-through) were not completed. In some instances, destructive testing may be required for more accurate results. In addition, depending on the specific thickness of the paint films on different areas of a building component, differing amounts of wear, and other factors, XRF readings can vary slightly, even on the same building component. Unless otherwise specifically stated in the scope of services and final report, lead testing performed is not intended to comply with other state and federal regulations pertaining to childhood lead poisoning regulations.
RPF Service Limitations (cont.)
6. Air testing is to be considered a “snap shot” of conditions present on the day of the survey with the understanding that conditions may differ at other times or dates or operational conditions for the facility.
Results are also limited based on the specific analytical methods utilized. For phase contrast microscopy
(PCM) total airborne fiber testing, more sensitive asbestos-specific analysis using transmission electron microscopy (TEM) can be performed upon request.
7. For asbestos bulk and dust testing, although polarize light microscopy (PLM) is the method currently recognized in State and federal regulations for asbestos identification in bulk samples, some industry studies have found that PLM may not be sensitive enough to detect all of the asbestos fibers in certain nonfriable material, vermiculate type insulation, soils, surface dust, and other materials requiring more sensitive analysis to identify possible asbestos fibers. In the event that more definitive results are requested, RPF recommends that confirmation testing be completed using TEM methods or other analytical methods as may be applicable to the material. Detection of possible asbestos fibers may be made more difficult by the presence of other non-asbestos fibrous components such as cellulose, fiber glass, etc., by binder/matrix materials which may mask or obscure fibrous components, and/or by exposure to conditions capable of altering or transforming asbestos. PLM can show significant bias leading to false negatives and false positives for certain types of materials. PLM is limited by the visibility of the asbestos fibers. In some samples the fibers may be reduced to a diameter so small or masked by coatings to such an extent that they cannot be reliably observed or identified using PLM.
8. For hazardous building material inspection or survey work, RPF followed applicable industry standards;
however, RPF does not warrant or certify that all asbestos or other hazardous materials in or on the building has been identified and included in this report. Various assumptions and limitations of the methods can result in missed materials or misidentification of materials due to several factors including but not limited to: inaccessible space due to physical or safety constraints, space that is difficult to reach to fully inspect, assumptions regarding the determination of homogenous groups of suspect material, assumptions regarding attempts to conduct representative sampling, and potential for varying mixtures and layers of material sampled not being representative of all areas of similar material.
9. Full assessments often requires multiple rounds of sampling over a period of time for air, bulk material, surface dust and water. Such comprehensive testing was beyond the scope of RPF services. In addition clearance testing for abatement, as applicable, was based on the visual observations and limited ambient area air testing as indicated in the report and in accordance with applicable state and federal regulations.
The potential exists that microscopic surface dust remains with contaminant present even in the event that the clearance testing meets the state and federal requirements. Likewise for building surveys, visual observations are not sufficient alone to detect possible contaminant in settled dust. Unless otherwise specifically indicated in the report, surface dust testing was not included in the scope of the RPF services.
10. For abatement or remediation monitoring services: RPF is not responsible for observations and test for specific periods of work that RPF did not perform full shift monitoring of construction, abatement or remediation activity. In the event that problems occurred or concerns arouse regarding contamination, safety or health hazards during periods RPF was not onsite, RPF is not responsible to provide documentation or assurances regarding conditions, safety, air testing results and other compliance issues.
RPF may have provided recommendations to the Client, as needed, pertaining to the Client’s Contractor compliance with the technical specifications, schedules, and other project related issues as agreed and based on results of RPF monitoring work. However, actual enforcement, or waiving of, contract provisions and requirements as well as regulatory liabilities shall be the responsibility of Client and
Client’s Contractor(s). Off-site abatement activities, such as waste transportation and disposal, were not monitored or inspected by RPF.
11. For services limited to clearance testing following abatement or remediation work by other parties: The testing was limited to clearance testing only and as indicated in the report and a site assessment for possible environmental health and safety hazards was not performed as part of the scope of this testing.
Client, or Client’s abatement contractor as applicable, was responsible for performing visual inspections
RPF Service Limitations (cont.)
of the work area to determine completeness of work prior to air clearance testing by RPF.
12. For site work, including but not limited to air clearance testing services, in which RPF did not provide full site safety and health oversight, abatement design, full shift monitoring of all site activity, RPF expresses no warranties, guarantees or certifications of the abatement work conducted by the Client or other employers at the job site(s), conditions during the work, or regulatory compliance, with the exception of the specific airborne concentrations as indicated by the air clearance test performed by RPF during the conditions present for the clearance testing. Unless otherwise specifically noted in the RPF Report, visual inspections and air clearance testing results apply only to the specific work area and conditions present during the testing. RPF did not perform visual inspections of surfaces not accessible in the work area due to the presence of containment barriers or other obstructions. In these instances, some contamination may be present following RPF clearance testing and such contamination may be exposed during and after removal of the containment barriers or other obstructions following RPF testing services. Client or
Client’s Contractor is responsible for using appropriate care and inspection to identify potential hazards and to remediate such hazards as necessary to ensure compliance and a safe environment.
13. The survey was limited to the material and/or areas as specifically designated in the report and a site assessment for other possible environmental health and safety hazards or subsurface pollution was not performed as part of the scope of this site inspection. Typically, hazardous building materials such as asbestos, lead paint, PCBs, mercury, refrigerants, hydraulic fluids and other hazardous product and materials may be present in buildings. The survey performed by RPF only addresses the specific items as indicated in the Report.
14. For mold and moisture survey services, RPF services did not include design or remediation of moisture intrusion. Some level of mold will remain at the site regardless of RPF testing and Contractor or Client cleaning efforts. RPF testing associated with mold remediation and assessments is limited and may or may not be representative of other surfaces and locations at the site. Mold growth will occur if moisture intrusion deficiencies have not been fully remedied and if the site or work areas are not maintained in a sufficiently dry state. Porous surfaces in mold contaminated areas which are not removed and disposed of will likely result in future spore release, allergen sources, or mold contamination.
15. Existing reports, drawings, and analytical results provided by the Client to RPF, as applicable, were not verified and, as such, RPF has relied upon the data provided as indicated, and has not conducted an independent evaluation of the reliability of these data.
16. Where sample analyses were conducted by an outside laboratory, RPF has relied upon the data provided, and has not conducted an independent evaluation of the reliability of this data.
17. All hazard communication and notification requirements, as required by U.S. OSHA regulation 29 CFR
Part 1926, 29 CFR Part 1910, and other applicable rules and regulations, by and between the Client, general contractors, subcontractors, building occupants, employees and other affected persons were the responsibility of the Client and are not part of the RPF SOW.
18. The applicability of the observations and recommendations presented in this report to other portions of the site was not determined. Many accidents, injuries and exposures and environmental conditions are a result of individual employee/employer actions and behaviors, which will vary from day to day, and with operations being conducted. Changes to the site and work conditions that occur subsequent to the RPF inspection may result in conditions which differ from those present during the survey and presented in the findings of the report.
| 209448 63 Old Marlboro 071520 report |
| Appendix A |
| App A 209448 071520 Asb - Bulk PLM Tbl 0619 |
| Appendix B |
| App B 209448 63 Old Marlboro 071520 photos |
| App B 209448 071520 drawing |
| Appendix C - Copy |
| A - Methods Asb + HazMat Surveylh |
| RPF followed applicable industry standards; however, various assumptions and limitations of the methods can result in missed materials or misidentification of materials due several factors including but not limited to: inaccessible space due to physic... |
| RPF followed applicable industry standards for construction related identification in nonresidential settings; however, RPF does not warrant or certify that all lead or other hazardous materials in or on the building has been identified and included i... |
| RPF followed applicable industry standards; however, RPF does not warrant or certify that all hazardous material in or on the building has been identified and included in this report. Various assumptions and limitations of the methods can result in m... |
| A - Limitations 1211 lh |
| 1. The observations and conclusions presented in the Report were based solely upon the services described herein, and not on scientific tasks or procedures beyond the RPF Environmental, Inc. Scope of Work (SOW) as discussed in the proposal and/or agre... |
| 2. For site survey work, observations were made of the designated accessible areas of the site as indicated in the Report. While it was the intent of RPF to conduct a survey to the degree indicated, it is important to note that not all suspect ACBM m... |
| 3. Although assumptions may have been stated regarding the potential presence of inaccessible or concealed asbestos and other hazardous material, full inspection findings for all asbestos and other hazardous material requires the use of full destructi... |
| 4. Where access to portions of the surveyed area was unavailable or limited, RPF renders no opinion of the condition and assessment of these areas. The survey results only apply to areas specifically accessed by RPF during the survey. Interiors of m... |
| 5. For lead in paint, observations were made of the designated accessible areas of the site as indicated in the Report. Limited testing may have been performed to the extent indicated in the text of the report. In order to conduct thorough hazard ass... |
| 6. Air testing is to be considered a “snap shot” of conditions present on the day of the survey with the understanding that conditions may differ at other times or dates or operational conditions for the facility. Results are also limited based on th... |
| 7. For asbestos bulk and dust testing, although polarize light microscopy (PLM) is the method currently recognized in State and federal regulations for asbestos identification in bulk samples, some industry studies have found that PLM may not be sensi... |
| 8. For hazardous building material inspection or survey work, RPF followed applicable industry standards; however, RPF does not warrant or certify that all asbestos or other hazardous materials in or on the building has been identified and included in... |
| 9. Full assessments often requires multiple rounds of sampling over a period of time for air, bulk material, surface dust and water. Such comprehensive testing was beyond the scope of RPF services. In addition clearance testing for abatement, as app... |
| 10. For abatement or remediation monitoring services: RPF is not responsible for observations and test for specific periods of work that RPF did not perform full shift monitoring of construction, abatement or remediation activity. In the event that p... |
| 11. For services limited to clearance testing following abatement or remediation work by other parties: The testing was limited to clearance testing only and as indicated in the report and a site assessment for possible environmental health and safety... |
| 12. For site work, including but not limited to air clearance testing services, in which RPF did not provide full site safety and health oversight, abatement design, full shift monitoring of all site activity, RPF expresses no warranties, guarantees o... |
| 13. The survey was limited to the material and/or areas as specifically designated in the report and a site assessment for other possible environmental health and safety hazards or subsurface pollution was not performed as part of the scope of this si... |
| 14. For mold and moisture survey services, RPF services did not include design or remediation of moisture intrusion. Some level of mold will remain at the site regardless of RPF testing and Contractor or Client cleaning efforts. RPF testing associat... |
| 15. Existing reports, drawings, and analytical results provided by the Client to RPF, as applicable, were not verified and, as such, RPF has relied upon the data provided as indicated, and has not conducted an independent evaluation of the reliability... |
| 16. Where sample analyses were conducted by an outside laboratory, RPF has relied upon the data provided, and has not conducted an independent evaluation of the reliability of this data. |
| 17. All hazard communication and notification requirements, as required by U.S. OSHA regulation 29 CFR Part 1926, 29 CFR Part 1910, and other applicable rules and regulations, by and between the Client, general contractors, subcontractors, building oc... |
| 18. The applicability of the observations and recommendations presented in this report to other portions of the site was not determined. Many accidents, injuries and exposures and environmental conditions are a result of individual employee/employer ... |