This is a Best Value Technical Evaluation Support Tool designed to help the National Park Service organize and document technical evaluations for contractor quotes on the REER Wiring Replacement project (PR 0044037426). The workbook provides a standardized framework for scoring and comparing multiple contractor proposals using a 0-5 rating scale across five weighted evaluation factors: Technical Approach and Historic Resource Protection (35%), Relevant Experience (25%), Key Personnel (20%), Past Performance (10%), and Availability of Resources, Schedule, and Project Management (10%). Evaluators are instructed to document strengths, weaknesses, acceptability concerns, and clarifications needed for each contractor, then provide a final technical recommendation to the Contracting Officer.

The evaluation template accommodates up to five contractors and establishes specific scoring definitions and expectations for each rating level. Contractors must submit between three and five prior project examples demonstrating experience with electrical retrofit work in historic, older, public, institutional, or government buildings. A site visit is scheduled for Tuesday, May 12, 2026, at 10:00 AM ET with an alternate date of Wednesday, May 13, 2026, at 10:00 AM ET. The workbook explicitly notes that price is evaluated separately from technical scoring and should be assessed for fairness and reasonableness in accordance with FAR 13. This is a support tool for park technical review and does not replace the Contracting Officer's official evaluation process or final award decision.

View the file

Other files for this federal contract opportunity

Other files attached to Wiring Replacement for NPS, Reconstruction Era NHP, newest first.
File Type Posted
Site_Visit_Question_Log_0001.pdf PDF
Sol_140P5126Q0029_Amd_0001.pdf PDF
Sol_140P5126Q0029.pdf PDF
Darrah_Outlet_Switch_Light_Fixture_Diagram.pdf PDF
REER_Wiring_Replacement_Evaluation.pdf PDF
Beaufort_County_SC_-_Wage_Determinations.pdf PDF
Electrical_Diagram_Darrah_Hall.pdf PDF
SOW_Electric_Upgrades_-_REER_Darrah_Hall.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

How to Use

How to Use This Evaluation Workbook
PR 0044037426 – REER Wiring Replacement | Best Value Technical Evaluation Support Tool
ProjectREER Wiring ReplacementRecommended MethodBest Value Tradeoff
PR Number0044037426Primary UsePark technical review / CO support
1. Purpose of the Workbook
This workbook is intended to help the Park organize and document technical evaluations for contractor quotes. It supports the recommended Best Value Tradeoff approach by giving the evaluation team a consistent place to score factors, document strengths and weaknesses, note acceptability concerns, compare prior project examples, and provide a final technical recommendation to the Contracting Officer.
2. Workbook Layout
Tab / SectionHow to Use It
Evaluation SummaryUse this tab to compare contractors side-by-side after individual contractor tabs are completed.
Contractor TabsUse one tab per contractor. Replace the example contractor name with the actual vendor name once quotes are received.
DefinitionsUse this tab as the rating guide for score meanings, factor descriptions, and general evaluation expectations.
3. Evaluation Factors and Weights
FactorWeightWhat the Evaluator Should Look For
Technical Approach and Historic Resource Protection35%Code-compliant electrical approach, protection of historic fabric, safety, cleanup, dust control, and coordination with the COR.
Relevant Experience25%At least 3 but no more than 5 relevant projects, preferably electrical retrofit work in historic, older, public, institutional, or government buildings.
Key Personnel20%Qualifications and similar experience of the project manager, lead electrician, quality control representative, and other major project personnel.
Past Performance10%Quality and relevance of prior performance, including references and any available Government or client performance information.
Availability of Resources, Schedule, and Project Management10%Realistic schedule, staffing availability, materials/equipment readiness, site security, daily cleanup, and communication plan.
4. Scoring Guide
ScoreRatingMeaning
5OutstandingExceptional understanding, detailed approach, strong relevant experience, and very low performance risk.
4GoodSolid understanding, clear approach, relevant experience, and low to moderate performance risk.
3AcceptableMeets the basic requirements and demonstrates the ability to perform the work.
2MarginalShows weaknesses, limited detail, limited relevant experience, or increased performance risk.
1UnacceptableDoes not demonstrate adequate understanding or presents unacceptable performance risk.
0Not AddressedNo meaningful information was provided for the factor.
5. What to Document in Comments
AreaWhat to Enter
Basis for RatingExplain why the score was selected. Tie comments directly to the evaluation factor and the contractor’s submitted quote.
StrengthsIdentify clear advantages, strong experience, strong personnel, detailed methods, or lower performance risk.
Weaknesses / ConcernsIdentify missing information, unclear methods, schedule risk, lack of relevant experience, safety concerns, or historic protection concerns.
Clarifications NeededList specific items the CO may need to clarify before award, if applicable.
6. Prior Work Examples
For Relevant Experience, contractors should provide at least three (3), but no more than five (5), prior project examples. Each example should include the project title, client/customer, location, year completed, approximate contract value, scope performed, prime/subcontractor role, and client point of contact. Projects involving historic buildings, older buildings, government/public facilities, electrical retrofit work, or protection of existing finishes should be considered more relevant.
7. Acceptability, Price, and Final Recommendation
AcceptabilityA contractor may be considered technically unacceptable if the quote does not adequately address code-compliant electrical work, historic structure protection, safety, coordination, staffing, or ability to complete the required scope.
Price ReviewPrice should be reviewed separately from the technical score. The Park may note if price appears fair and reasonable, high but justified by technical advantages, low and potentially risky, or needing clarification.
Final RecommendationUse the recommendation area to state whether the contractor is recommended for award, acceptable but not strongest technically, clarification needed, not recommended, or technically unacceptable.
8. Note for the Contracting Officer
This workbook is a Park technical evaluation support tool. It is intended to help organize the Park’s technical review and recommendation. It does not replace the Contracting Officer’s official evaluation process, responsibility for price reasonableness, or final award decision.

Evaluation Summary

REER Wiring Replacement | Best Value Evaluation Workbook
Use this sheet as the overall summary. Enter detailed notes and factor scoring on each Contractor tab. Summary fields pull from those tabs automatically.
Method: Best Value Tradeoff | Basis: Technical factors are more important than price | Site Visit: Tue, May 12, 2026 at 10:00 AM ET | Alternate: Wed, May 13, 2026 at 10:00 AM ET
Offeror / VendorTechnical Approach & Historic Protection
35%Relevant Experience
25%Key Personnel
20%Past Performance
10%Schedule / Resources
10%Weighted Technical Score
0-100Technical RatingProposed PricePrice Reasonable?Acceptable?RecommendationConsensus / CO Notes
Contractor 12
Contractor 2
Contractor 3
Contractor 4
Contractor 5
Quick Scoring Guide / Use
ScoreRatingMeaningFactorWeightWhat to Look For
5OutstandingExceptional response; very low risk.Technical Approach & Historic Protection35%Code-compliant wiring replacement; protection of historic fabric; dust control; cleanup; safety; COR coordination.
4GoodStrong response; low to moderate risk.Relevant Experience25%At least three and no more than five similar projects from the last five years.
3AcceptableMeets requirement; acceptable risk.Key Personnel20%Project manager, lead electrician, QC, licenses/certifications, and similar project roles.
2MarginalWeaknesses or limited detail; may need clarification.Past Performance10%Quality/relevance of prior work and client references.
1UnacceptableDoes not adequately address the requirement.Schedule / Resources10%Staffing, materials, schedule, cleanup, site security, and ability to respond to field conditions.
0Not AddressedNo meaningful information provided.PriceSeparateEvaluate fairness, reasonableness, affordability, and balance in accordance with FAR 13.

Contractor 1

Contractor 1 Detailed Evaluation | PR 0044037426 - REER Wiring Replacement
Complete this sheet for one offeror. Use score 0–5 for each factor, then add detailed notes explaining whether the proposal is acceptable, marginal, or unacceptable.
Offeror / VendorEvaluator
Proposed PricePrice Reasonable?
Weighted Technical ScoreTechnical Rating
Overall RecommendationAcceptability Determination
Factor Scoring
Evaluation FactorWeightScore
0–5Auto RatingAcceptable?Notes / Basis for Rating
Technical Approach and Historic Resource Protection35%2Marginal
Relevant Experience25%
Key Personnel20%
Past Performance10%
Availability of Resources, Schedule, and Project Management10%
Detailed Comments / Evaluator Notes
FactorStrengthsWeaknesses / RisksClarifications NeededAcceptability NotesConsensus Notes
Technical Approach and Historic Resource Protection
Relevant Experience
Key Personnel
Past Performance
Availability of Resources, Schedule, and Project Management
Relevant Prior Work Examples - Offeror Should Provide 3 to 5
Example #Client / AgencyYear / LocationApprox. ValueScope / Relevance to Historic Electrical WorkReference / POC Notes
Project 1
Project 2
Project 3
Project 4
Project 5
Final Determination / Award Recommendation Support
Acceptable / Not Acceptable Determination
Basis for Recommendation
Price Notes
Consensus Notes / Items for CO

Contractor 2

Contractor 2 Detailed Evaluation | PR 0044037426 - REER Wiring Replacement
Complete this sheet for one offeror. Use score 0–5 for each factor, then add detailed notes explaining whether the proposal is acceptable, marginal, or unacceptable.
Offeror / VendorEvaluator
Proposed PricePrice Reasonable?
Weighted Technical ScoreTechnical Rating
Overall RecommendationAcceptability Determination
Factor Scoring
Evaluation FactorWeightScore
0–5Auto RatingAcceptable?Notes / Basis for Rating
Technical Approach and Historic Resource Protection35%
Relevant Experience25%
Key Personnel20%
Past Performance10%
Availability of Resources, Schedule, and Project Management10%
Detailed Comments / Evaluator Notes
FactorStrengthsWeaknesses / RisksClarifications NeededAcceptability NotesConsensus Notes
Technical Approach and Historic Resource Protection
Relevant Experience
Key Personnel
Past Performance
Availability of Resources, Schedule, and Project Management
Relevant Prior Work Examples - Offeror Should Provide 3 to 5
Example #Client / AgencyYear / LocationApprox. ValueScope / Relevance to Historic Electrical WorkReference / POC Notes
Project 1
Project 2
Project 3
Project 4
Project 5
Final Determination / Award Recommendation Support
Acceptable / Not Acceptable Determination
Basis for Recommendation
Price Notes
Consensus Notes / Items for CO

Contractor 3

Contractor 3 Detailed Evaluation | PR 0044037426 - REER Wiring Replacement
Complete this sheet for one offeror. Use score 0–5 for each factor, then add detailed notes explaining whether the proposal is acceptable, marginal, or unacceptable.
Offeror / VendorEvaluator
Proposed PricePrice Reasonable?
Weighted Technical ScoreTechnical Rating
Overall RecommendationAcceptability Determination
Factor Scoring
Evaluation FactorWeightScore
0–5Auto RatingAcceptable?Notes / Basis for Rating
Technical Approach and Historic Resource Protection35%
Relevant Experience25%
Key Personnel20%
Past Performance10%
Availability of Resources, Schedule, and Project Management10%
Detailed Comments / Evaluator Notes
FactorStrengthsWeaknesses / RisksClarifications NeededAcceptability NotesConsensus Notes
Technical Approach and Historic Resource Protection
Relevant Experience
Key Personnel
Past Performance
Availability of Resources, Schedule, and Project Management
Relevant Prior Work Examples - Offeror Should Provide 3 to 5
Example #Client / AgencyYear / LocationApprox. ValueScope / Relevance to Historic Electrical WorkReference / POC Notes
Project 1
Project 2
Project 3
Project 4
Project 5
Final Determination / Award Recommendation Support
Acceptable / Not Acceptable Determination
Basis for Recommendation
Price Notes
Consensus Notes / Items for CO

Contractor 4

Contractor 4 Detailed Evaluation | PR 0044037426 - REER Wiring Replacement
Complete this sheet for one offeror. Use score 0–5 for each factor, then add detailed notes explaining whether the proposal is acceptable, marginal, or unacceptable.
Offeror / VendorEvaluator
Proposed PricePrice Reasonable?
Weighted Technical ScoreTechnical Rating
Overall RecommendationAcceptability Determination
Factor Scoring
Evaluation FactorWeightScore
0–5Auto RatingAcceptable?Notes / Basis for Rating
Technical Approach and Historic Resource Protection35%
Relevant Experience25%
Key Personnel20%
Past Performance10%
Availability of Resources, Schedule, and Project Management10%
Detailed Comments / Evaluator Notes
FactorStrengthsWeaknesses / RisksClarifications NeededAcceptability NotesConsensus Notes
Technical Approach and Historic Resource Protection
Relevant Experience
Key Personnel
Past Performance
Availability of Resources, Schedule, and Project Management
Relevant Prior Work Examples - Offeror Should Provide 3 to 5
Example #Client / AgencyYear / LocationApprox. ValueScope / Relevance to Historic Electrical WorkReference / POC Notes
Project 1
Project 2
Project 3
Project 4
Project 5
Final Determination / Award Recommendation Support
Acceptable / Not Acceptable Determination
Basis for Recommendation
Price Notes
Consensus Notes / Items for CO

Contractor 5

Contractor 5 Detailed Evaluation | PR 0044037426 - REER Wiring Replacement
Complete this sheet for one offeror. Use score 0–5 for each factor, then add detailed notes explaining whether the proposal is acceptable, marginal, or unacceptable.
Offeror / VendorEvaluator
Proposed PricePrice Reasonable?
Weighted Technical ScoreTechnical Rating
Overall RecommendationAcceptability Determination
Factor Scoring
Evaluation FactorWeightScore
0–5Auto RatingAcceptable?Notes / Basis for Rating
Technical Approach and Historic Resource Protection35%
Relevant Experience25%
Key Personnel20%
Past Performance10%
Availability of Resources, Schedule, and Project Management10%
Detailed Comments / Evaluator Notes
FactorStrengthsWeaknesses / RisksClarifications NeededAcceptability NotesConsensus Notes
Technical Approach and Historic Resource Protection
Relevant Experience
Key Personnel
Past Performance
Availability of Resources, Schedule, and Project Management
Relevant Prior Work Examples - Offeror Should Provide 3 to 5
Example #Client / AgencyYear / LocationApprox. ValueScope / Relevance to Historic Electrical WorkReference / POC Notes
Project 1
Project 2
Project 3
Project 4
Project 5
Final Determination / Award Recommendation Support
Acceptable / Not Acceptable Determination
Basis for Recommendation
Price Notes
Consensus Notes / Items for CO

Definitions Definitions and Rating Guidance | PR 0044037426 - REER Wiring Replacement

Technical Rating Scale
ScoreRatingDefinition
5OutstandingExceptional understanding of the requirement; highly detailed, realistic approach; strong relevant experience; very low performance risk.
4GoodSolid understanding of the requirement; clear acceptable approach; relevant experience; low to moderate performance risk.
3AcceptableMeets the basic requirements and demonstrates ability to perform the work. Weaknesses, if any, do not create unacceptable performance risk.
2MarginalWeaknesses, limited detail, limited relevant experience, or approach may increase performance risk. Clarification may be needed.
1UnacceptableDoes not demonstrate adequate understanding of the requirement or presents unacceptable performance risk.
0Not AddressedThe proposal did not provide meaningful information for this factor.
Evaluation Factor Definitions
FactorWeightDefinition / Evaluation Focus
Technical Approach and Historic Resource Protection35%Evaluate the method for completing code-compliant electrical wiring replacement while protecting historic materials, finishes, walls, trim, flooring, and other character-defining features.
Relevant Experience25%Evaluate at least three and no more than five relevant projects completed within the last five years. Similar electrical retrofit work in historic, older, public, institutional, or government buildings may be rated more favorably.
Key Personnel20%Evaluate qualifications and experience of the project manager, lead electrician, quality control representative, and other personnel expected to play a major role.
Past Performance10%Evaluate the quality and relevance of submitted project performance, client references, and available past performance information.
Availability of Resources, Schedule, and Project Management10%Evaluate staffing, labor availability, material/resource plan, schedule realism, daily cleanup, site security, communication, and ability to respond to field conditions.
Technically Unacceptable Quote Reminder
A quote should be considered technically unacceptable if it does not adequately address code-compliant electrical work, protection of the historic structure, safety, project coordination, or the ability to complete the required scope. Price is evaluated separately for fairness, reasonableness, affordability, and balance in accordance with FAR 13.