About this file

This is a Statement of Work (SOW) for replacing outdated electrical wiring in Darrah Hall, a historic structure within Reconstruction Era National Historical Park in Beaufort, South Carolina.

The work scope involves removing existing non-compliant branch circuit wiring serving outlets, switches, and lighting fixtures, then installing new National Electrical Code (NEC)-compliant electrical wiring throughout the building. The contractor must provide all labor, supervision, materials, tools, and equipment to complete the project. Specific deliverables include removal of outdated wiring, installation of 12 AWG THHN copper conductors, replacement of damaged or non-compliant junction boxes as necessary, testing and commissioning of all branch circuits, and verification of proper grounding, bonding, and panel breaker connections. The electrical panel and service entrance installed in 2022 will remain in place and are not part of this scope. Estimated quantities include approximately 12 lighting fixtures, 8 light switches, 14 electrical outlets, 17 4x4 junction boxes, and 1 primary junction box. The contractor must complete all work within eight working days after issuance of the Notice to Proceed. The National Park Service retains the right to accept or reject all proposals. Contractor deliverables required with proposal submission include technical approach, safety plan, quality control plan, proof of insurance (business liability and workers compensation), all-levels certification, and three references for similar work. The contractor must be licensed for electrical work, carry appropriate insurance per South Carolina regulations, comply with OSHA requirements, and be registered in SAM.gov and IPP.gov for payment processing.

View the file

Other files for this federal contract opportunity

Other files attached to Wiring Replacement for NPS, Reconstruction Era NHP, newest first.
File Type Posted
Site_Visit_Question_Log_0001.pdf PDF
Sol_140P5126Q0029_Amd_0001.pdf PDF
REER_Wiring_Replacement_Evaluation.xlsx XLSX spreadsheet
Sol_140P5126Q0029.pdf PDF
Darrah_Outlet_Switch_Light_Fixture_Diagram.pdf PDF
REER_Wiring_Replacement_Evaluation.pdf PDF
Beaufort_County_SC_-_Wage_Determinations.pdf PDF
Electrical_Diagram_Darrah_Hall.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 1

Reconstruction Era National Historical Park 706 Craven Street

Beaufort, SC 29902

Darrah Hall

22 Penn Center Circle West St. Helena Island. SC 29920

STATEMENT OF WORK

Replace Outdated Wiring

DATED

March 13, 2026

NATIONAL PARK SERVICE

Southeast Region

Major Acquisition Buying Office

1. Background

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 2

Darrah Hall is a Folk-style structure located within the Penn Center Historic District on St.

Helena Island, South Carolina. The building is believed to have been constructed by students as part of a training program modeled after the Tuskegee and Hampton Institutes. Portions of the building are believed to have been constructed using salvaged materials from the original Darrah

Hall.

Historically, the structure served as a public gathering space for community activities including farmers’ days, temperance meetings, theatrical performances, and other community events. In later years the facility was used as an indoor basketball court, and portions of the court markings remain visible.

Darrah Hall is a contributing historic structure within the Penn Center campus and is now managed by Reconstruction Era National Historical Park.

In 2022, project work was completed to install a new mechanical and electrical service system including:

• HVAC equipment

• Power shutoff panels

• Electrical panel and breakers

• Electrical outlets and associated conduit

All installed service components meet current National Electrical Code (NEC) requirements and will remain in place as part of this project.

The remaining branch circuit wiring serving outlets, switches, and lighting fixtures is outdated and requires replacement to ensure safe operation and compliance with NEC standards

HVAC Power shutoff panels

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 3

New Panel New outlet covers

2. Current Conditions

Existing electrical wiring runs from the electrical panel through Schedule-40 PVC conduit located beneath the building structure.

Current observed conditions include:

• Conduit runs beneath the structure are accessible for maintenance and wiring replacement.

• Outlet junction boxes are mounted beneath the building and attached to exterior floor joists.

• Ceiling conduit is metal, exposed, and accessible for wiring replacement.

• Interior wall paneling and chair rail do not need to be removed to complete wiring replacement.

These conditions allow electrical wiring replacement to occur with minimal disturbance to the historic fabric of the structure.

Wall outlet junction Conduit Junction box Schedule 40 PVC

Boxes conduit

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 4

2.1 Required Services.

The work consists of replacing outdated electrical wiring and devices with a fully NEC-compliant system.

Contractor will:

• Remove existing non-compliant electrical wiring to outlets, switches, and fixtures.

• Coordinate with COR to access the facility.

• The contractor shall replace existing branch circuit wiring serving outlets, switches, and lighting fixtures within Darrah Hall while retaining the electrical panel and service entrance installed in 2022.

• Contractor shall replace damaged or non-compliant junction boxes as necessary to meet current National Electrical Code (NEC) requirements.

• The contractor shall complete all work within eight (8) working days after issuance of the Notice to Proceed.

3. Scope of Work

The contractor shall provide all labor, supervision, materials, tools, and equipment required to replace existing electrical branch circuit wiring serving outlets, switches, and lighting fixtures within Darrah Hall.

The electrical panel and service entrance installed in 2022 shall remain in place and will not be replaced.

Work shall include:

3.1 Removal

The contractor shall remove existing non-compliant branch circuit wiring serving:

• Electrical outlets

• Lighting fixtures

• Switches Removed materials shall be disposed of in accordance with applicable regulations.

3.2 Electrical Installation

The contractor shall install new NEC-compliant electrical wiring including:

• 12 AWG THHN copper conductors

• Electrical connectors and wire nuts

• Branch circuit wiring runs from the electrical panel to outlets, switches, and fixtures

• Replacement of damaged or non-compliant junction boxes as necessary to meet NEC requirements

3.3 Electrical Components

Installation shall include:

• Branch circuit conductors

• Junction boxes

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 5

• Conduit fittings and connectors

• Mounting hardware and fasteners

3.4 Testing and Commissioning

Upon completion of installation, the contractor shall:

• Test all branch circuits

• Verify proper grounding and bonding

• Confirm proper connection to panel breakers

• Ensure system compliance with NEC standards

• Demonstrate operational functionality to the COR

If existing conditions require deviation from the described approach, the contractor shall notify the COR prior to proceeding. Work shall be performed in accordance with the National Electrical

Code (NEC) and applicable federal, state, and local electrical regulations.

4. Electrical Device Quantities (Estimated)

The following quantities are provided for contractor estimating purposes.

Device Estimated Quantity

Lighting Fixtures Approx. 12

Light Switches Approx. 8

Electrical Outlets Approx. 14

4x4 Junction Boxes 17

Primary Junction Box 1

Quantities are approximate. Contractors are encouraged to attend a site visit to verify existing conditions prior to submitting a proposal.

These quantities align with material estimates used in the Independent Government Cost

Estimate (IGCE).

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 6

5. Electrical Reference Plan

An annotated electrical reference diagram will be provided with the solicitation package.

The diagram identifies approximate locations of:

• Electrical outlets

• Lighting fixtures

• Light switches

• Electrical panel

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 7

The diagram is intended to assist contractors in estimating wiring runs and labor requirements.

6. Contractor Responsibilities:

Duns number and contact information must be included on quote. Vendor must be registered in SAMS at www.sam.gov and to receive payment must be registered in IPP.gov. As defined in accordance with FAR 4.1102 and further prescribed at FAR 52.204-7.

Contractor management will ensure that employees properly comply with the performance work standards outlined in the statement of work, specifications, and contract documents. The tasks, duties, and responsibilities set forth in the Statement of Work and Specifications may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR).

Period of performance:

Upon award of this contract, work will be completed within 8 working days.

The NPS reserves the right to accept or reject all proposals based on the requirements described in the Statement of Work.

A site visit is highly encouraged and will be conducted at the vendor’s request.

7. Government Furnished Property, Materials & Supplies. NA

8. Park Point of Contact (POC) and Contract Officer Representative will be Sean Daly. Contact information is listed below:

Sean Daly

Maintenance Work Leader

Reconstruction Era National Historical Park 706 Craven Steet, Beaufort, SC 29902

Work Cell: 843-941-0661 Email: Sean_daly@nps.gov

Secondary POC:

Michael (Top) Trevino

Facility Manager/Contract Officer Representative Reconstruction Era National Historical Park

706 Craven Street, Beaufort, SC 29902 Work Cell: 843-592-0329 http://www.sam.gov/ mailto:Sean_daly@nps.gov

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 8

Email: Michael_trevino@Nps.gov

9. Management. The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on-time completion of this contract.

10. Safety & Environmental Compliance.

• The contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), and state, local, safety laws.

• The contractor shall report immediately to the COR all accidents resulting in employee injury or death or damage to property while performing this contract.

• The contractor shall be licensed for electrical work.

10.1. Insurance. The Contractor shall be insured in accordance with South Carolina insurance regulations. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.

• Workers Compensation: The contractor shall furnish proof of workers compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman’s Compensation Laws of South Carolina.

• Liability: The Contractor shall maintain a level of insurance that will protect the contractor and the Government from any claims because of bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.

11. Performance Requirements Summary (PRS). The contractor performance requirements are summarized into required services that relate directly to successful contract completion. The performance standard identifies the minimum acceptable levels of service allowed.

PWS

Section Required Service Standard

Incentive/

Disincentive

Required services 100% compliance Receipt of payment

12. Motor Vehicle & Traffic Regulations. NA mailto:Michael_trevino@Nps.gov

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 9

13. Employee Badges/Parking. No badges necessary/Parking is available.

14. Replacement of Contractor Employee for Security Reasons. The Government retains the right to request removal of the contractor’s employee(s), regardless of prior clearances.

15. Non-Payment for Additional Work. Any additional contractor performed services not specified in this contract, either at its own volution or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor. Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

16. Conflict of Interest. The contractor shall not employ Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.

17. Quality Control. The contractor shall provide potential frameworks, templates, and methodology to assist with decision process. The Performance Requirements Summary establishes performance standards that are the minimum requirements for acceptable performance of required services. The contractor’s QCP shall address methods for remedying poor performance. The Contractor shall develop QCP and submit with proposal package. The

Contractor’s QCP includes:

• Required services identified in Performance Requirements Summary

• Progress meetings with COR

17.1. Quality Assurance. The COR will monitor the contractor’s performance under this contract using face-to-face meetings. The quality assurance procedures specified in the Government’s Quality Assurance Surveillance Plan (QASP). The QASP may be modified after contract award upon review and acceptance of the contractor’s QCP to ensure both plans are mutually supportive. The purpose of the QASP is to ensure that the required services are performed in accordance with the contract requirements. The plan ensures reliable and continued operation by precluding unnecessary complaints and unacceptable performance.

Government’s QASP includes:

• Acceptance of the contractor’s quality control plan

• Random inspection of the contractor’s work

• Communicating customer complaints

• Progress meetings with the contractor

The implementation of this QASP does not relieve the contractor of its responsibility to implement and abide by the QCP incorporated into this contract, and to provide acceptable

Reconstruction Era National Historical Park-Replace outdated wiring Darrah Hall- SOW Page 10 performance of all required services listed herein. At the CO’s discretion, the contractor may incur a payment deduction for lack of compliance with the QCP, SOW or PRS.

18. Contractor’s Proposal Package. The following deliverables are to be submitted with offer in response to RFQ.

1. Technical approach to performing required services.

2. Contractor safety plan.

3. Contractor’s QCP

4. Proof of Insurance–Business Liability & Workers Compensation

5. Certification ALL LEVELS

6. Contractor will provide work experience with at least 3 references pertaining to this type of work. (See attached questionnaire)

7. This contract will be based on most advantageous to the government.

19. Inspection. The Government will conduct inspection upon completion of required services.

File details come from the government source that posted it. Updated .