PhillipBurton_Bridging Docs_011110.pdf
PDF 2 MB Posted
- Attached to
- RECOVERY- Burton FB HVAC Mechanical Improvement
- Solicitation number
- RECOVERY-GS-09P-10-KS-C-0041
About this file
Bridging documents
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Agreement R2.doc | DOC document | |
| Feb 15 Revised SF 1442.pdf | ||
| Bidders List Site Walk_021010.pdf | ||
| Bidders List Site Walk_020510.pdf | ||
| Energy Meter Spec 020910.doc | DOC document | |
| Single Line Main Feed.pdf | ||
| 450 GG HVAC Q A 2.doc | DOC document | |
| Feb 10 Revised SF 1442.pdf | ||
| Existing locations fans vfds.zip | ZIP file | |
| 450 GG HVAC Q A.doc | DOC document | |
| BURTON_Mechanical_SITE_VISIT_SIGN_IN.pdf | ||
| Revised Feb 8 SF1442.pdf | ||
| Subcontracting Plan as of 2009.doc | DOC document | |
| Amendment 3.zip | ZIP file | |
| General electrical specifications.doc | DOC document | |
| MANDATORY REFERENCE FORM.doc | DOC document | |
| specs for GSA furnished computers.pdf | ||
| Document Security Agreement.doc | DOC document | |
| Solicitation.zip | ZIP file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Energy Projects for Mechanical Systems
Concept Designs & Specifications
Phillip P. Burton Federal Building 450 Golden Gate Avenue San Francisco, CA 94102
Prepared For:
General Services Administration
Mark Levi
Buildings Services Branch 450 Golden Gate Ave. 4E 9PMFT
San Francisco, CA 94102
Prepared By:
100 Montgomery 18831 Bardeen Ave.
Suite 600 Suite 100
San Francisco, CA 94104-4331 Irvine, CA 92612
(415) 974-0390 (949) 862-2160
January 11, 2010
Copyright © 2010 GSA. All rights reserved.
For questions or comments pertaining to this report, contact Enovity Inc. Reproduction or distribution of the whole, or any part of the contents of, this document without permission of GSA is prohibited. Neither Enovity nor any of its employees makes any warranty, express or implied, or assumes any legal liability of responsibility for the accuracy, completeness, or usefulness of any data, information, method, product or process disclosed in this document, or represents that its use will not infringe any privately-owned rights, including but not limited to, patents, trademarks or copyrights.
© 2009 Enovity, Inc. All Rights Reserved
Preface
Site Information
Federal Building: 450 Golden Gate Avenue, San Francisco, CA 94102
Enovity Personnel
This work was performed by the following Enovity team members:
Name Company Role Phone Email
Jonathan Soper Enovity Inc. Principal 415-974-0390 jsoper@enovity.com
David Chan Enovity Inc. Engineer 415-974-0390 dchan@enovity.com
Client Personnel
The following personnel were involved in the audit work:
Name Company Role Phone Email
Mark Levi GSA
Buildings
Management
Specialist, Region 9
415-522-3374 mark.levi@gsa.gov
Table of Contents
1.0 SUMMARY
2.0 BUILDING DESCRIPTION
2.1 OVERVIEW AND OPERATION
2.2 LIGHTING SYSTEMS
2.3 HVAC, CONTROLS AND DOMESTIC WATER SYSTEMS
2.3.1 AIR-SIDE HVAC SYSTEMS
2.3.2 CHILLED AND HOT WATER SYSTEMS
2.3.3 CONTROL SYSTEM
2.3.4 DOMESTIC WATER SYSTEMS
3.0 ENERGY PROJECTS SCOPE OF WORK
3.1 PROJECT 1: CONVERT CONDENSER WATER DISTRIBUTION SYSTEM FROM CONSTANT FLOW
TO VARIABLE FLOW
3.2 PROJECT 2: FIX IN POSITION BACKDRAFT DAMPERS ON THE 20TH
FLOOR MAIN AIR
HANDLER RETURN FANS
3.3 PROJECT 3: REPAIR DAMAGED COLD DUCT ON AHU S20E3/4
3.4 PROJECT 4: INSTALL VFD ON BOILER ROOM SUPPLY FAN SUBW1
3.5 PROJECT 5: REPLACE VFDS ON S20W-4, S20E-3, S20W-1, R20E-2 AND SSBE-1 AND ADD 3-
PHASE ENERGY METERS
3.6 PROJECT 6: REPLACE STANDARD EFFICIENCY 1 HP AND GREATER MOTORS WITH PREMIUM
EFFICIENCY MOTORS
3.7 PROJECT 7: REPLACE STANDARD EFFICIENCY MOTORS WITH PREMIUM EFFICIENCY
MOTORS AND INSTALL NEW VFDS ON MAIN AIR HANDLERS
3.8 PROJECT 8: ENERGY METERS FOR ADDITIONAL HVAC EQUIPMENT
4.0 SPECIFICATIONS
4.1 GENERAL
4.1.1 SCOPE OF WORK
4.1.2 CONTRACTOR PROPOSALS
4.1.3 REFERENCE STANDARDS
4.1.4 QUALITY ASSURANCE
4.1.5 DEFINITIONS
4.1.6 DESIGN DOCUMENTS
4.1.7 SUBMITTALS
4.1.8 COMPLETION REQUIREMENTS
4.1.9 SCHEDULE OF WORK
4.1.10 GUARANTEE
4.1.11 DESIGN CRITERIA
4.1.12 SECURITY CLEARANCE
4.2 MATERIALS
4.2.1 VIBRATION ISOLATION & SUPPORTS
4.2.2 VARIABLE FREQUENCY DRIVES
4.2.3 MOTORS
4.3 COMMISSIONING
4.3.1 SECTION INCLUDES
4.3.2 DEFINITIONS
4.3.3 GENERAL DESCRIPTION
4.3.4 COMMISSIONING PROCESS OVERVIEW
4.3.5 SUBMITTAL REQUIREMENTS FOR COMMISSIONING
4.3.6 RESPONSIBILITIES
4.3.7 SEQUENCING
4.3.8 INSTRUMENTATION
4.3.9 EQUIPMENT START-UP TESTING, ADJUSTING, CALIBRATION
4.3.10 ACCEPTANCE PERIOD
4.3.11 OPERATOR TRAINING
4.4 EXECUTION
4.4.1 INSTALLATION AND WORKMANSHIP
4.4.2 SEISMIC CONTROL
4.4.3 VIBRATION ISOLATION
4.4.4 CLEANING
4.4.5 EQUIPMENT IDENTIFICATION
4.4.6 START UP
4.4.7 TESTING, ADJUSTING, AND BALANCING
5.0 DRAWINGS
Phillip Burton Federal Building 450 Golden Gate Ave, San Francisco, CA.
Concept Design and Specifications U.S. General Services Administration
© 2010 Enovity, Inc. All Rights Reserved 4
1.0 SUMMARY
This document presents the Bridging Document concept design scope of work and specifications for the
Phillip Burton Federal Building at 450 Golden Gate Avenue, San Francisco, CA. The bridging document will be used to obtain contractors bids for the energy efficiency measures (EEMs) per RCx report prepared by Enovity dated July 31, 2009. This document is presented in 4 sections:
1. Summary
2. Building and System Descriptions
3. Project Descriptions
4. Specifications
5. Drawings
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 5
2.0 BUILDING DESCRIPTION
This section provides a description of the building, lighting system, HVAC and domestic hot water systems. It also documents any of the environmental or system operational requirements, including the intended sequence of operation.
The Phillip P. Burton Federal building is located at 450 Golden Gate Ave. in San Francisco, California.
The facility consists of a 20 story building with 1,400,000 sq. ft. and was constructed in 1962. The building houses many important federal agencies including: The FBI, US Attorney, IRS, Federal Court Judges, US
Marshals. Ancillary spaces include corridors, conference rooms lobbies, break rooms, fitness center, locker rooms, and restrooms.
2.1 OVERVIEW AND OPERATION
The Phillip P. Burton Federal building is generally occupied from 6:00 AM to 6:00 PM Monday through
Friday with limited occupancy on the weekends. There are areas of the building that have 24/7 occupancy, but main building HVAC systems are not required to run during nights and weekends. There are approximately fifteen small computer rooms (< 5 tons cooling requirement) and one medium sized computer room (20 tons cooling requirement) that require 24/7 cooling; these computer rooms are all served by dedicated Computer Room Air Conditioning (CRAC) units.
2.2 LIGHTING SYSTEMS
Interior lighting systems consist mostly of T-8 fixtures with electronic ballasts and recessed canned fixtures with compact fluorescent lamps. The majority of the lighting is controlled by wall switches. Open space lighting on floors SB-7 was recently upgraded to suspended direct/indirect fixtures and a proposal has been submitted to upgrade the remaining floors in kind.
The lighting system in the building office areas are controlled by local area switches. All stairways and most of the bathrooms have occupancy sensors to control lighting. The exterior lighting is mostly metal halide and controlled by timers. The majority of the exit signs are the ‘radioactive’ type and consume no energy.
2.3 HVAC, CONTROLS AND DOMESTIC WATER SYSTEMS
This section provides summary description of the building’s HVAC and control system.
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 6
2.3.1 AIR-SIDE HVAC SYSTEMS
The building is served by eight main dual duct VAV air handlers. The air handlers have temperature economizer cycles, hot deck with heating coils and 2-way valves, cold deck with cooling coils and 2-way valves, one or two supply fans per air handler and two return fans per air handler. Two of the main air handlers are located in the sub-basement west serving floors 1 through 8 west side, two in the sub-basement east serving floors 1 through 8 east side, two in the 20th floor west serving floors 9 through 20 west and two in the 20th floor east serving floors 9 through 20 east. Table 2.3.1 below summarizes the eight main air handlers.
Table 2.3.1 Main Air Handlers
AHU
Equip.
Location
FAN
Area/System Served
Fan Flow Control
Type
Supply Air Flow
Supply Fan
Power
ID ID cfm hp
AHU 1
Sub Basmt
East SSBE-1 Floors 1-4 Variable 118,490 200
AHU 1
Sub Basmt
East RSBE-1 Floors 1-4 Variable 51,115 40
AHU 1
Sub Basmt
East RSBE-2 Floors 1-4 Variable 51,115 40
AHU 2
Sub Basmt
East SSBE-2 Floors 5-8 Variable 130,993 200
AHU 2
Sub Basmt
East RSBE-3 Floors 5-8 Variable 60,228 40
AHU 2
Sub Basmt
East RSBE-4 Floors 5-8 Variable 60,228 40
AHU 3
Sub Basmt
West SSBW-1 Floors 1-4 Variable 132,878 200
AHU 3
Sub Basmt
West RSBW-1 Floors 1-4 Variable 36,545 25
AHU 3
Sub Basmt
West RSBW-2 Floors 1-4 Variable 36,545 25
AHU 4
Sub Basmt
West SSBW-2 Floors 5-8 Variable 138,396 250
AHU 4
Sub Basmt
West RSBW-3 Floors 5-8 Variable 55,343 40
AHU 4
Sub Basmt
West RSBW-4 Floors 5-8 Variable 55,343 40
AHU 5
20th Floor
East S20E-1 Floors 14-20 Variable 84,462 125
AHU 5
20th Floor
East S20E-2 Floors 14-20 Variable 84,462 125
AHU 5
20th Floor
East R20E-1 Floors 14-20 Variable 77,412 50
AHU 5
20th Floor
East R20E-2 Floors 14-20 Variable 77,412 50
AHU 6
20th Floor
East S20E-3 Floors 9-13 Variable 84,927 150
AHU 6
20th Floor
East S20E-4 Floors 9-13 Variable 84,927 150
AHU 6
20th Floor
East R20E-3 Floors 9-13 Variable 72,639 50
AHU 6
20th Floor
East R20E-4 Floors 9-13 Variable 72,639 50
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 7
Table 2.3.1 Main Air Handler (continued)
There are also fourteen (14) (12 single zone and 2 multi-zone) air handlers that serve the courtrooms and jail cells and ten (13) (eight multi-zone (5am-5pm and five 100% outdoor air (24/7)) air handlers that serve mechanical, storage and office areas in the sub-basement and basement.
There are also thirty (30) AC units that are water cooled and three (3) AC units that are air cooled; these units serve mostly computer rooms throughout the building. There is a dedicated condenser water loop serving the east side water cooled AC Units. The loop has 2 x 2 HP condenser water pumps (100 GPM, 35 ft head) that run 24/7 and draw condenser water directly off the east side cooling towers; there is no plate and frame heat exchanger. Condenser water for the west side AC units comes off the main condenser water riser; there are 2 x 2 HP condenser water pumps that run 24/7 to keep water flowing through the loop when the chillers are not running. The water cooled AC units also have their own small dedicated condenser water booster pumps.
2.3.2 CHILLED AND HOT WATER SYSTEMS
Space cooling for the majority of the facility is provided by three Carrier water cooled centrifugal chillers.
The chiller system is located in the sub-basement and the rated capacity for two of the chillers are identical at 1050 tons, the third chiller is 550 tons for a total of 2650 tons. Two 65 ton Bohn air cooled screw type chillers are located on the roof and serve the Penthouse air handlers when the Carrier chillers are off. Two 35 ton Trane air cooled scroll chillers located in the roof serve the fan coil units which supply cooling for the FBI floors 24/7. Table 2.4.1 below is a summary of the chillers.
AHU
Equip.
Location
FAN
Area/System Served
Fan Flow Control
Type
Supply Air Flow
Supply Fan
Power ID ID cfm hp
AHU 7
20th Floor
West S20W-1 Floors 14-20 Variable 80,074 125
AHU 7
20th Floor
West S20W-2 Floors 14-20 Variable 80,074 125
AHU 7
20th Floor
West R20W-1 Floors 14-20 Variable 78,287 60
AHU 7
20th Floor
West R20W-2 Floors 14-20 Variable 78,287 60
AHU 8
20th Floor
West S20W-3 Floors 9-13 Variable 84,427 150
AHU 8
20th Floor
West S20W-4 Floors 9-13 Variable 84,427 150
AHU 8
20th Floor
West R20W-3 Floors 9-13 Variable 56,178 40
AHU 8
20th Floor
West R20W-4 Floors 9-13 Variable 56,178 40
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 8
Table 2.3.2 Chiller Summary
The chilled water distribution system is a primary only variable flow system. There are two chilled water pumps with VFDs that pump chilled water through a common header; each pump is 60 HP, 2,500 GPM and 70 ft head. Each of the three chillers has its own dedicated constant volume condenser water pump.
The condenser water pumps serving Chillers #1 & #2 are 50 HP, 2,400 GPM, 60 ft head and the condenser water pumps serving Chiller #3 is a 30 HP, 1650 GPM, 48 ft head. See Table 2.4.2 below main chilled water pump summary.
Table 2.3.3 Main Chilled and Condenser Water Pump Summary
The chilled water distribution systems for the Penthouse (courthouse) air handlers and the FBI fan coils are both primary only constant volume. Each FBI chiller has a dedicated 5 HP chilled water pump and each Courtroom chiller has a dedicated 7.5 HP chilled water pump.
Equip.
ID
Equip.
Location
Area Manuf.
Model
Number Serial #
Compressor Type
Refrigerant Type
Cond.
Type
Nominal Capacity
Nominal Effic.
Design
CHW
Flow
Evaporator Temps.
(Ent / Lvg)
Design CW Flow
Tons kW/ton GPM °F GPM
CH 1
Sub-
Basement All AHU systems
Carrier 19XR808 63072 Centrifugal 134A Cooling Tower
1050 0.49 2,016 54/42 2,400
CH 2
Sub-
Basement All AHU systems
Carrier 19XR808 63073 Centrifugal 134A Cooling Tower
1050 0.49 2,016 54/42 2,400
CH 3
Sub-
Basement All AHU systems
Carrier 19XR656 63071 Centrifugal 134A Cooling Tower
550 0.49 2,016 54/42 1,650
Court Chiller
Roof Court Room Bohn Heat
Transfer ACWC65SC N/A Screw
Air Cooled
65 N/A
Court Chiller
Roof Court Room Bohn Heat
Transfer ACWC65SC N/A Screw
Air Cooled
65 N/A
FBI
Chiller
Roof Fan Coil Units Trane CGADC404 N/A Scroll Air
Cooled
FBI
Chiller
Roof Fan Coil Units Trane CGADC404 N/A Scroll Air
Cooled
Equip. ID System Served
Manufacturer Model Pump Motor Size
Design Flow Rate
Design Head hp gpm Feet
CHWP 1
Building chilled water distribution Bell & Gosset HSC 10X12X17 60 2,500 70
CHWP 2
Building chilled water distribution Bell & Gosset HSC 10X12X17 60 2,500 70
CWP 1 CH 1 Bell & Gosset HSC 10X12X17 50 2,400 60
CWP 2 CH 2 Bell & Gosset HSC 10X12X17 50 2,400 60
CWP 3 CH 3 Bell & Gosset HSC 8X10X12S 30 1,650 48
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 9
Each of the three chillers has its own dedicated constant volume condenser water pump. The CW pumps draw water from the tower return piping and discharge it into the pump discharge piping. The circuit continues through the condensing (heat rejection) side of the chiller, to the CW supply piping, and to the enabled cooling towers. Once the water passes over the cooling tower fill and rejects the heat from the chillers, the condenser water collects in the sump at the bottom of the tower and drains into the tower return piping, which completes the cycle. Water lost through evaporation at the cooling tower is made-up through an auto-fill connection to water supply. This water supply undergoes chemical treatment to minimize corrosion and scaling in the tower.
Table 2.3.4 Cooling Tower Summary
There are three Universal natural gas-fired modulating capacity boilers rated at 12.5 MBTU input and 10
MBTU output. There are three 20 HP hot water pumps with VFDs serving a primary only variable flow hot water distribution system. There is a common header between the boilers and the pumps are controlled to maintain a DP, set point and to maintain minimum flow through the boilers based on HW valve position.
Table 2.5.1 below is a summary of the boilers and table 2.5.2 is a summary of the boiler pumps.
Table 2.3.5 Boiler Summary
Cooling Tower Quantity
Fan
Horsepower
(HP)
Measured
Electrical Demand
(Avg. kW)
Max Condenser
Water Flow
(GPM)
(each tower)
East Side 1‐3 3 20 16.1 833
West Side 4‐6 3 20 16.1 833
Chiller #3 550 tons, CW flow GPM, Design 1650, Min 959, Max 3840.
Chiller #1 or 2 1050 tons, CW flow GPM, Design 2400, Min 1110, Max 4450.
Equip.
ID
Equip.
Location
Area / System Served
Manufacturer Model
Number Type Fuel Type
Heating Output Type
Heating Input
Heating Output
Rated Efficiency
MBH MBH %
B1 Sub-
Basement All Bryan RW
Water Tube
Natural Gas
Hot Water 12,460 9,660 80%
B2 Sub-
Basement All Bryan RW
Water Tube
Natural Gas
Hot Water 12,460 9,660 80%
B3 Sub-
Basement All Bryan RW
Water Tube
Natural Gas
Hot Water 12,460 9,660 80%
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 10
Table 2.3.6 Boiler Pump Summary
2.3.3 CONTROL SYSTEM
The building was the first commercial demonstration of the BACnet protocol. The building is controlled through an Alerton Envision DDC system. All of the HVAC systems (Central cooling and heating plants, air handlers, AC units and VAV boxes) are controlled through the Alerton system. Enovity completed a controls upgrade of all the Alerton controllers to the latest version of firmware. There is also a Square D
PowerLogic system that monitors about 50 different electrical loads in the building.
2.3.4 DOMESTIC WATER SYSTEMS
There are two Bryant domestic hot water boilers located in the sub-basement boiler room. Each boiler provides hot water to a heat exchanger inside 525 gallon hot water tanks. Each tank has an isolation valve, allowing the building to be served by either tank or by both tanks. The Tanks are maintained at 180 psi, the Zone 4 pressure. The system is pressurized by the pressure booster system.
Equip. ID Equipment Location
System Served
Manufacturer Model Pump Motor Size
Design Flow Rate
Comments / Features hp gpm
HWP 1 Sub-Basement
Building heating hot water distribution
Paco 1800 20 500 Variable Flow
HWP 2 Sub-Basement
Building heating hot water distribution
Paco 1800 20 500 Variable Flow
HWP 3 Sub-Basement
Building heating hot water distribution
Paco 1800 20 500 Variable Flow
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 11
3.0 ENERGY PROJECTS SCOPE OF WORK
This section provides detail scope of work for each project.
3.1 PROJECT 1: CONVERT CONDENSER WATER DISTRIBUTION
SYSTEM FROM CONSTANT FLOW TO VARIABLE FLOW
Scope of Work: The Contractor shall install three variable frequency drives onto three condenser water pumps located in the sub-basement, CWP-1, CWP-2 and CWP-3, (2 at 50 hp and 1 at 30 hp).The starters for these three pumps are located on MCC-A in the chiller room.
The three VFDs shall be mounted in the sub-basement chiller room. The starters will be removed from the buckets in MCC-A that serve the three pumps and new wire shall be run from each of the three (3) MCC buckets directly to the VFDs. Figures 3.1.1 and 3.1.2 provide layouts and locations for the new VFDs.
The following hardware shall be required:
1. 3 x VFDs with integral starters.
2. Each of the three VFDs shall include BACnet cards that will facilitate the following Analogue Input
(AI) points: VFD Speed, VFD Amps, and the following Analogue Output (AO) points: VFD speed signal and the following Binary Output (BO) point: Fan Start.
3. Each of the three VFDs shall include by-pass switches.
4. 3 x Veris electrical meters, one for each motor; contractor shall purchase and install the meter, others will connect the meter to the Building Automation System.
The contractor shall provide factory start-up of the VFDs and shall test and commission the VFDs per the specifications. All equipment shall be labeled.
All controls work shall be performed by others: this includes the following:
1. Re-programming of all sequences of operation.
2. Connection of the Veris electrical meters to the Building Automation System.
3. Installation of flow meter into the common condenser water line header.
4. Connection of the VFD BACnet cards to the Building Automation System.
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 12
Figure 3.1.1: Chiller Room Layout
Figure 3.1.2: Condenser Pumps and VFD Mounting Location
Design and Project Documentation: GSA will provide the contractor with all available architectural, mechanical and electrical drawings showing existing conditions. In addition to the documentation
VFD mounting location
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 13 requirements in Section 3.2, Contractor shall include as a minimum the following in their design and project documentation:
1. Floor plans and elevations showing new and all existing equipment; new and existing equipment shall be identified as new or existing on the drawings.
2. Electrical and detailed wiring diagrams showing connection of the three new VFDs.
3. Detailed wiring diagrams showing new wiring inside the MCC.
Working Conditions: The work can be performed during normal working hours (6.00 AM to 6.00 PM), but the contractor shall perform the work such that one (1) large 1050-ton chiller is always available. Full commissioning and testing of the new equipment shall be performed outside of normal working hours.
3.2 PROJECT 2: FIX IN POSITION BACKDRAFT DAMPERS ON THE
20TH FLOOR MAIN AIR HANDLER RETURN FANS
Scope of Work: There are four (4) main built-up AHUs on the 20th floor; each AHU is served by two return fans, giving a total of eight (8) return fans. Each of the return fans has an outlet damper that acts as a back-draft prevention damper when the AHU fans are off. When operating, the return fans have to push open the back-draft dampers against resistance from a counter lever weight which holds the damper closed.
Contractor shall mechanically lock open the dampers on each return fan. Figure 3.2.1 shows a photo of one of the dampers on one of the return air back draft damper.
Figure 3.2.1: 20th Floor Air Handler’s Back Draft Damper
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 14 mechanical and electrical drawings showing existing conditions. Contractor is not required to provide design documentation for this EEM.
Working Conditions: The work shall be performed outside normal working hours (6.00 AM to 6.00 PM, Monday thru Friday), when the fans are off.
3.3 PROJECT 3: REPAIR DAMAGED COLD DUCT ON AHU S20E3/4
Scope of Work: Contractor shall repair damaged duct work on AHU S20E3/4. Figure 3.3.1 provides a photo of the damaged duct; the length of this crack is about 7 feet long. The scope of work shall involve the following steps:
1. Install angle iron bracket(s) to provide support for the new welds.
2. Seal gaps with high pressure duct sealant/mastic.
Figure 3.3.1 Photo of Damaged Duct mechanical and electrical drawings showing existing conditions. Contractor is not required to provide design documentation for this EEM.
Working Conditions: The work shall be performed outside normal working hours (6.00 AM to 6.00 PM, Monday thru Friday), when the fans are off.
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 15
3.4 PROJECT 4: INSTALL VFD ON BOILER ROOM SUPPLY FAN
SUBW1
Scope of Work: The supply fan system serving the boiler room is oversized. The supply fan SUBW-1 is 5 hp and provides 16,000 CFM. Ventilation air is not needed for the boiler room as the combustion air is natural draft through the louver wall.
The contractor shall install a variable frequency drive (VFD) on boiler supply fan SUBW1. The scope of this work involves the following:
1. Install 1 x VFD with integral starter.
2. The VFD shall include a by-pass switch.
3. The VFDs shall include a BACnet card that will facilitate the following Analogue Input (AI) points:
VFD Speed, VFD Amps, and the following Analogue Output (AO) points: VFD speed signal and the following Binary Output (BO) point: Fan Start.
4. Replace existing non-inverter duty motor with Inverter duty premium efficiency.
5. Install 1 x Veris Electrical Meter.
6. Start up of VFD with factory representative, per specifications.
7. Balance air flow by adjusting motor speed to provide minimum of 4,800 cfm during normal operation. When either emergency generator runs the VFD shall be overridden to 100% speed.
Contractor shall determine speed that fan needs to run to deliver 4,800 CFM and shall balance fan; others will install controls to set the min VFD speed at 4,800 CFM and to set the fan speed to maximum when the generator is running.
8. Fully test and commission VFDs per specifications.
9. Label all new equipment.
All controls work shall be performed by others: this includes the following:
1. Programming of all sequences of operation.
2. Connection of the VFD BACnet card to the Building Automation System.
3. Connection of the Veris meter to the Building Automation System (BAS).
4. Connection of generator signal to the VFD to run at 100% when the generator is running.
Figure 3.4.1 shows a layout of the boiler room. The supply fan is located above the catwalk and the new
VFD can be mounted on the wall adjacent to the double door as show on the diagram. The fan is being fed by the MCC (MCC-A) located in the adjacent chiller room. Figure 3.4.1 shows a photo of supply fan
SUBW1.
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 16
Figure 3.4.1: Boiler Room Layout
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 17
Figure 3.4.2: SUBW-1
Figure 3.4.3: New VFD Single Diagram mechanical and electrical drawings showing existing conditions. In addition to the documentation requirements in Section 3.2, Contractor shall include as a minimum the following in their design and
Catwalk
SUBW-1
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 18 project documentation:
1. Floor plans and elevations showing new and all existing equipment; new and existing equipment shall be identified as new or existing on the drawings.
2. Electrical and detailed wiring diagrams showing connection of the new VFD.
3. Detailed wiring diagrams showing new wiring inside the MCC.
Working Conditions: The work can be performed during normal working hours (6.00 AM to 6.00 PM)
Commissioning and testing of the new equipment can also be performed during normal working hours.
3.5 PROJECT 5: REPLACE VFDS ON S20W-4, S20E-3, S20W-1, R20E-
2 AND SSBE-1 AND ADD 3-PHASE ENERGY METERS
Scope of Work: There are five (5) original standard efficiency motors at horsepower ratings from 60-hp to 200-hp operating to support the main HVAC system for the building. Currently the motors are 40 years old and many of the motors have been re-wound multiple times within the past twenty years and the motors are operating at lower than rated efficiencies. The five (5) VFDs connected to these five motors have failed and are currently operating in bypass. Table 3.5.1 provides a list of motors and VFDs to be replaced.
The scope of this work includes new motors, VFDs and Veris energy meters for S20W-4, S20E-3, S20W-
1, R20E-2 and SSBE-1. Contractor shall provide the following:
1. Remove existing five (5) x motors from site.
2. Install five (5) x new premium efficiency totally enclosed fan cooled (TEFC) motors to match size of existing motors; frame adapters may be required depending on exact motor that contractor selects. Sheaves may require replacement depending on exact motor that contractor selects.
3. Remove existing five (5) x VFDs from site.
4. Install five (5) new replacement VFDs; existing racks may be re-used.
5. Each of the five (5) x VFDs shall include by-pass switches.
6. The VFDs shall include BACnet cards that will facilitate the following Analogue Input (AI) points:
VFD Speed, VFD Amps, and the following Analogue Output (AO) points: VFD speed signal, and the following Binary Output (BO) point: Fan Start.
7. Provide factory start-up of new motors and VFDs, per specifications.
8. Contractor shall assume that existing cable that connects VFD to motor and VFD can be re-used;
contractor shall bring to the attention of the Government any existing cable that is in poor condition.
9. Five (5) x Veris electrical meters, one for each motor; contractor shall purchase and install the meters, others will connect the meters to the Building Automation System.
10. Test all emergency motor push button kill switches and ensure that each switch is fully functional;
contractor is responsible for testing these switches after the new motors and VFDs have been
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 19 installed. All these switches are currently operational and contractor is responsible for ensuring they are operational after new motor has been installed.
11. Contractor shall fully test and commission new motors and VFDs, per specifications.
12. Label all new equipment.
All controls work shall be performed by others: this includes the following:
1. Programming of all sequences of operation.
2. Connection of the VFD BACnet cards to the Building Automation System.
3. Connection of the Veris meters to the Building Automation System (BAS).
Table 3.5.1 Motors and VFDs to be Replaced
The following photos shows the fan motor and VFD for each of the five fans listed on Table 3.5.1
S20W-4 Motor and VFD
Fan Name
VFD or No
VFD Quantity
Motor Size
(hp)
Existing
Efficiency
Proposed
Efficiency
SSBE‐1 VFD 1 200 95.0% 96.2%
R20E‐2 VFD 1 60 93.6% 95.0%
R20E‐3 VFD 1 150 95.0% 95.8%
S20W‐1 VFD 1 125 94.5% 95.4%
S20W‐4 VFD 1 150 95.0% 95.8%
Total 5
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 20
S20W-1 Motor and VFD
S20E-3 Motor and VFD
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 21
R-20E-2 Motor and VFD
SSBE-1 Motor and VFD mechanical and electrical drawings showing existing conditions.
Working Conditions: Preparation work can be performed during normal working hours (6.00 AM to 6.00
PM), but the contractor shall perform the work such that fans remain running and operational during normal working hours. Start up, commissioning and testing of the new equipment shall be performed outside of normal working hours.
3.6 PROJECT 6: REPLACE STANDARD EFFICIENCY 1 HP AND
GREATER MOTORS WITH PREMIUM EFFICIENCY MOTORS
Scope of Work: There are fifty (50) original 40-year old standard efficiency motors at horsepower ratings from 1-hp to 60-hp that require replacement; these fan motors are near the end of their life. Table 3.6.1 provides a list of motors to be replaced.
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 22
Table 3.6.1: List of Motors to be Replaced
Tag No. Qty HP
PH‐1 1 3
PH‐2 1 3
PH‐3 1 3
PH‐4 1 3
PH‐5 1 3
PH‐6 1 3
PH‐7 1 3
PH‐8 1 3
PH‐9 1 3
PH‐10 1 3
PH‐11 1 3
PH‐12 1 3
PH‐13 1 5
PH‐13 RH 1 1
PH‐14 1 7.5
PH‐14 RH 1 1
SUBW‐1 1 7.5
SUBW‐2 1 7.5
SUBW‐3 1 5
SUBW‐4 1 5
SUBW‐5 1 3
SUBE‐1 1 5
SUBE‐2 1 5
SUBE‐3 1 3
SUBE‐4 1 3
SUBE‐5 1 3
SUSBE‐1 1 5
XRE‐1 1 3
XRE‐2 1 3
XRE‐3 1 7.5
XRE‐4 1 40
XRE‐5 1 20
XRE‐6 1 1.5
XRE‐10 1 3
XPH‐14 1 1
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 23
Table 3.6.1 Continued
The Scope of Work includes the following: Contractor shall provide the following:
1. Remove existing fifty three (53) x motors from site.
2. Install fifty three (53) x new premium efficiency totally enclosed fan cooled (TEFC) motors to match size of existing motors; frame adapters may be required depending on exact motor that contractor selects. Sheaves may require replacement depending on exact motor that contractor selects.
3. Provide factory start-up of new motors.
4. Contractor shall assume that existing cables will be re-used; contractor shall bring to the attention of the Government any existing cable that is in poor condition.
5. Test all emergency motor push button kill switches and ensure that each switch is fully functional;
contractor is responsible for testing these switches after the new motors have been installed. All these switches are currently operational and contractor is responsible for ensuring they are operational after new motor has been installed.
6. After new motors have been installed contractor shall take the following readings for each new motor: Amps per phase, volts per phase, kVA, kW, power factor, using a factory calibrated power meter. Results shall be presented to Government in Excel soft copy format and written report.
7. Contractor shall fully test and commission new motors.
8. Label all new equipment.
The following pictures show the list of fan motors to be replaced with premium efficiency motors.
XRW‐1 1 7.5
XRW‐2 1 15
XRW‐3 1 15
SRE‐1 1 3
SRW‐1 1 7.5
XSBE‐1 1 5
XSBE‐2 1 1
XSBE‐5 1 3
XSBE‐6 1 7.5
XSBW‐1 1 15
XSBW‐2 1 3
XSBW‐3 1 3
XSBW‐4 1 1.5
XSBW‐5 1 3
XMPW‐1 1 15
XMPE‐1 1 15
XBW‐1 1 3
XBW‐2 1 5
Total 53
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 24
XSBW-5
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 25
XSBW-3
XSBW-4
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 26
XSBW-1
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 27
XMPW-1
XMPE-1
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 28
SUBE-1
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 29
XSBE-6
XSBE-2
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 30
XSBE-1
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 31
XSBE-5
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 32
SUBE-3
SUBE-4
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 33
SUBE-5
SUBE-2
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 34
PH-1 and 9
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 35
PH-8 and 13
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 36
PH-10 and 11
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 37
PH-2 and 3
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 38
PH-7 and 12
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 39
PH-4 and 6
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 40
SUPH-5 and 14
XPH-14 and XRE-10
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 41
XRE-4 and XRE-5
XRE-3 and XRW-1
SRW-1 and XRW-2
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 42
XRW-3 and XBW-2
SUBW-1
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 43
SUBW-3
SUBW-2
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 44
SUBW-4
SUBW-5
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 45
XRE-1
mechanical and electrical drawings showing existing conditions.
Working Conditions: Preparation work can be performed during normal working hours (6.00 AM to 6.00
PM), but the contractor shall perform the work such that fans remain running and operational during normal working hours. Start up, commissioning and testing of the new equipment shall be performed
3.7 PROJECT 7: REPLACE STANDARD EFFICIENCY MOTORS WITH
PREMIUM EFFICIENCY MOTORS AND INSTALL NEW VFDS ON
MAIN AIR HANDLERS
Scope of Work: There are twenty three (23) original 40-year old standard efficiency motors at horsepower ratings from 25-hp to 250-hp operating to support the main air handler systems at the building. The motors and VFDs on these fan motors are at the end of their life. Many of the motors have been re-wound multiple times within the past twenty years and the motors are operating at lower than rated efficiencies. The twenty three (23) VFDs connected to these motors have failed and been repaired multiple times.
Table 3.7.1 shows the list of motors and VFDs to be replaced. The scope of this work includes new motors, VFDs and Veris energy meters. Contractor shall provide the following:
1. Remove existing twenty three (23) x motors from site.
2. Install twenty three (23) x new premium efficiency totally enclosed fan cooled (TEFC) motors to match size of existing motors; frame adapters may be required depending on exact motor that
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 46 contractor selects. Sheaves may require replacement depending on exact motor that contractor selects.
3. Remove existing twenty three (23) x VFDs from site.
4. Install twenty three (23) new replacement VFDs; existing racks may be re-used.
5. Each of the twenty three (23) x VFDs shall include by-pass switches.
6. The VFDs shall include BACnet cards that will facilitate the following Analogue Input (AI) points:
VFD Speed, VFD Amps, and the following Analogue Output (AO) points: VFD speed signal, and the following Binary Output (BO) point: Fan Start.
7. Provide factory start-up of new motors and VFDs per speficications.
8. Contractor shall assume that existing cable that connects VFD to motor and VFD can be re-used;
contractor shall bring to the attention of the Government any existing cable that is in poor condition.
9. Twenty three (23) x Veris electrical meters, one for each motor; contractor shall purchase and install the meters, others will connect the meters to the Building Automation System.
10. Test all emergency motor push button kill switches and ensure that each switch is fully functional;
contractor is responsible for testing these switches after the new motors and VFDs have been installed. All these switches are currently operational and contractor is responsible for ensuring they are operational after new motor has been installed.
11. Contractor shall fully test and commission new motors and VFDs per specifications.
12. Label all new equipment.
All controls work shall be performed by others: this includes the following:
1. Programming of all sequences of operation.
2. Connection of the VFD BACnet cards to the Building Automation System.
3. Connection of the Veris meters to the Building Automation System (BAS).
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 47
Table 3.7.1 Motors and VFDs to be Replaced
The following photos show the fan motors and VFDs for the 23 fans listed on Table 4.7.1.
Fan Name VFD or
NoVFD
Equipment
Quantity
Motor Size
(hp)
Existing
Efficiency
Proposed
Efficiency
RSBE‐2 VFD 1 25 92.4% 93.6%
SSBE‐2 VFD 1 250 95.0% 96.2%
RSBE‐3 VFD 1 40 93.0% 94.1%
RSBE‐4 VFD 1 40 93.0% 94.1%
SSBW‐1 VFD 1 200 95.0% 96.2%
RSBW‐1 VFD 1 40 93.0% 94.1%
RSBW‐2 VFD 1 40 93.0% 94.1%
SSBW‐2 VFD 1 200 95.0% 96.2%
RSBW‐3 VFD 1 40 93.0% 94.1%
RSBW‐4 VFD 1 40 93.0% 94.1%
S20E‐1 VFD 1 125 94.5% 95.4%
S20E‐2 VFD 1 125 94.5% 95.4%
R20E‐1 VFD 1 60 93.6% 95.0%
S20E‐4 VFD 1 150 95.0% 95.8%
R20E‐3 VFD 1 40 93.0% 94.1%
R20E‐4 VFD 1 40 93.0% 94.1%
S20W‐2 VFD 1 125 94.5% 95.4%
R20W‐1 VFD 1 50 93.0% 94.5%
R20W‐2 VFD 1 50 93.0% 94.5%
S20W‐3 VFD 1 150 95.0% 95.8%
R20W‐3 VFD 1 50 93.0% 94.5%
R20W‐4 VFD 1 50 93.0% 94.5%
Total 22 4,917
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 48
SSBW-1 and VFD
SSBW-2 and VFD
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 49
RSBW-3, RSBW-4 and VFDs
SSBE-2 and VFDs
RSBE-3 and VFDs
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 50
RSBE-4 and VFDs
RSBE-2 and VFDs
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 51
S20W-3 and VFDs
S20W-2 and VFDs
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 52
R20W-3 and VFDs
R20W-4 and VFDs
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 53
R20W-2 and VFDs
R20W-1 and VFDs
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 54
S20E-1 and S20E-2
S20E-1 and S20E-2 VFDs
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 55
R20E-3 and VFD
R20E-4 and VFD
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 56
S20E-4 and VFD
R20E-1 and VFD
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 57
RSBW-1 and VFD
RSBW-2 and VFD
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 58 mechanical and electrical drawings showing existing conditions.
Working Conditions: Preparation work can be performed during normal working hours (6.00 AM to 6.00
PM), but the contractor shall perform the work such that fans remain running and operational during normal working hours. Start up,commissioning and testing of the new equipment shall be performed
3.8 PROJECT 8: ENERGY METERS FOR ADDITIONAL HVAC
EQUIPMENT
Scope of Work:
The Contractor shall provide and install energy meters (electrical and thermal and totalization gas meters where applicable) on the following HVAC equipment.
Veris electrical energy meters shall be installed on the following equipment:
Two (2) chilled water pumps
Six (6) Cooling Tower fans
Three (3) heating hot water pumps
Btu meters shall be installed on the following equipment:
Chilled water loop
Hot water loop
Gas meters shall be installed on the following equipment:
Hot water boilers main feed
Feed to domestic hot water boilers
Others will connect the new meters to the Building Automation System (BAS). All controls work shall be performed by others: this includes the following:
1. Programming of all sequences of operation.
2. Connection of the VFD BACnet cards to the Building Automation System.
3. Connection of the Veris meters to the Building Automation System (BAS).
Design and Project Documentation: GSA will provide the contractor with all available architectural, mechanical and electrical drawings showing existing conditions.
Working Conditions: Preparation work can be performed during normal working hours (6.00 AM to 6.00
PM), but the contractor shall perform the work such that HVAC equipment remain running and operational during normal working hours.
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 59
4.0 SPECIFICATIONS
4.1 GENERAL
4.1.1 SCOPE OF WORK
A. This is a design/build project. The Contractor shall be the engineer-of-record as well as the contractor of record and responsible for all required work.
B. Work Included:
1. Demolition; all old equipment that is replaced shall be removed from the site.
2. Rigging
3. New equipment
4. New and/or expanding existing concrete curbs and bases as required
5. Temporarily removing then repairing doors, wall, or roof sections for access as required
6. Seismic restraints
7. Electrical power wiring, disconnects, etc. for new equipment
8. Test and balance
9. Operator training
10. Overtime labor if required
11. All required permit fees
C. Work Excluded:
1. Controls. Control valves, sensors, controls programming, etc will be installed by a separate controls contractor at the same time as the motors, VFDs, etc are being installed. No controls work is required in this contract unless specifically identified. However, this contractor shall coordinate with the controls contractor so that work can be done simultaneously.
4.1.2 CONTRACTOR PROPOSALS
A. Contractor shall visit site prior to bid. Ascertain and check all conditions and take all measurements that may affect the work. Drawings provided are to be used at Contractor’s risk; drawings are schematic and may or may not be drawn accurately. No allowance shall subsequently be made for any additional expenses or claims due to the failure or neglect under this section to make such examination, including examination of restricted working conditions or such other difficulties that can be visually observed during site visit.
B. By submitting a price, Contractor guarantees that the proposal is complete and turn-key, except where specific exceptions are provided herein or clearly noted in the Contractor’s proposal.
C. Prior to bid, Contractor shall coordinate acceptable downtime periods (if required) with building management. Price shall include any overtime required for this project.
D. Proposals shall include:
1. Pricing using bid form attached.
a. Provide break-out prices indicated.
2. Description of rigging and installation plan for new motors and VFDs.
3. A preliminary schedule of installation including final date of completion for the project assuming all projects are implemented.
4. Do not exclude anything that is obviously required for the project; this is a turn-key project. Do not repeat exclusions that are already clearly listed in these specifications.
4.1.3 REFERENCE STANDARDS
A. Requirements of Regulatory Agencies:
1. Nothing in Drawings or Specifications shall be construed to permit Work not conforming to applicable laws, ordinances, rules, regulations.
2. When drawings or Specifications exceed requirements of applicable laws, ordinances, rules and regulations, comply with documents establishing the more stringent requirement.
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 60
3. Applicable codes include the current version of those listed below, in addition to others specified in individual sections:
a. IMC – International Mechanical Code
b. IPC - International Plumbing Code
c. NFPA – National Fire Protection Association
d. NEC – National Electrical Code
4. If any of above requirements is in conflict with one another, or with Specifications' requirements, the most stringent requirement shall govern. Where codes are silent on an issue, NFPA Standards shall apply.
B. Published specifications, standards, tests or recommended method of trade, industry or governmental organizations as listed below apply to all work in this Section:
1. AABC - Associated Air Balance Council
2. ADC - Air Diffuser Balance Council
3. AMCA - Air Moving and Conditioning Association
4. ANSI - American National Standards Institute
5. ARI - Air Conditioning and Refrigeration Institute
6. ASHRAE - American Society of Heating, Refrigeration and Air Conditioning Engineers
7. ASME - American Society of Mechanical Engineers
8. ASTM - American Society for Testing and Materials
9. ETL - Intertek Semko (Formerly Electrical Testing Laboratories)
10. IEEE - Institute of Electrical and Electronic Engineers
11. NEMA - National Electrical Manufacturer's Association
12. NFPA - National Fire Protection Association
13. NUSIG - National Uniform Seismic Installation Guidelines
14. SMACNA - Sheet Metal and Air Conditioning Contractors National Association
15. UL - Underwriters' Laboratories.
C. Industry standards and manufacturers' recommendations, diagrams or requirements shall be strictly adhered to for installation of materials and equipment.
4.1.4 QUALITY ASSURANCE
A. All equipment and accessories to be the product of a manufacturer regularly engaged in its manufacture.
B. All items of a given type shall be the products of same manufacturer.
C. Supply all equipment and accessories new and free from defects.
D. Supply all equipment and accessories in compliance with the applicable standards listed in
Paragraph 5.1.1.3 with all applicable national, state and local codes.
4.1.5 DEFINITIONS
A. Definitions of term used in Section 5 may differ from those given in general and supplementary conditions and take precedence over them.
B. “Provide": to supply, install and connect up complete and ready safe and regular operation of particular work referred to unless specifically noted.
C. "Install": to erect, mount and connect complete with related accessories.
D. "Supply": to purchase, procure, acquire and deliver complete with related accessories.
E. "Work": labor, materials, equipment, apparatus, controls, accessories, and other items required for proper and complete installation.
F. "Piping": pipe, tube, fittings, flanges, valves, controls, strainers, hangers, supports, unions, traps, drains, insulation, and related items.
G. "Wiring": raceway, fittings, wire, boxes and related items.
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 61
H. "Concealed": embedded in masonry or other construction, installed in furred spaces, within double partitions or hung ceilings, in trenches, in crawl spaces, or in enclosures.
I. "Exposed": not installed underground or "concealed" as defined above.
J. "Indicated," "shown" or "noted": as indicated, shown or noted on drawings or specifications.
K. "Similar" or "equal": of base bid manufacture, equal in materials, weight, size, design, and efficiency of specified product, conforming to PART 2 Materials.
L. "Reviewed," "satisfactory," or "directed": as reviewed, satisfactory, or directed by or to Architect.
M. "Motor Controllers": manual or magnetic starters (with or without switches), individual pushbuttons or hand-off-automatic (HOA) switches controlling the operation of motors.
N. "Control or Actuating Devices": automatic sensing and switching devices such as thermostats, pressure, float, electro-pneumatic switches and electrodes controlling operation of equipment.
4.1.6 DESIGN DOCUMENTS
A. An employee of the HVAC Contractor shall serve as Engineer-of-Record.
B. Design documents: All design drawings shall be created using AutoCAD, version 2000 or higher, or compatible format. Include, at minimum, the following:
1. Equipment schedules
2. See Section 3 for requirements by project
C. Contractor shall provide 50% CDs, 95% CDs and 100% CDs for review by Government.
D. It is expressly forbidden to email any drawings or submittals.
4.1.7 SUBMITTALS
A. Schedule:
1. Allow 10 working days for approval, unless Government agrees to accelerated schedule.
B. Submit drawings, product data, samples and certificates of compliance required as hereinafter specified in this Section.
C. Submission Procedure:
1. Initial submittal:
a. Submit two electronic copies of product data in word-searchable format such as Adobe pdf. Paper copies will not be accepted.
b. Submit five (5) copies of drawings in hard copy and one (1) copy in soft copy; in Autocad and pdf format.
b. Submittal will be reviewed and comments returned to Contractor
2. Resubmission:
a. Make any corrections or change in submittals as required
b. Resubmit for review in electronic format described above until no exceptions are taken
c. Resubmit for review two (2) copies of drawings and (1) soft copy; in Autocad and pdf format.
c. The cost of review of submittals after first resubmittal will be borne by Contractor at billing rates determined by Government.
3. Final approval: Once submission is accepted, Contactor shall print two bound sets of submittals for Owner and additional sets for coordination with other trades, as required by the General Contractor, and shall print two hard copies of drawings. Five (5) hard copies of final 100% CDs shall be provided.
D. Contents of Submittals
1. HVAC Equipment Submittals
a. Manufacturer's name and model number
b. All information required to completely describe materials and equipment and to indicate compliance with drawings and specifications, including, but not limited to:
Concept Design and Specifications
© 2010 Enovity, Inc. All Rights Reserved 62
1) A schedule, for all items of the same type shall be supplied. The schedule shall include the manufacturer, the model, size, specific information that makes that item unique, the service of the item, the system served by the item.
2) Physical Data, as applicable:
a) Dimensions
b) Weight
c) Finishes and colors
3) Performance Data, as applicable:
a) Rated capacities
b) Performance curves
c) Operating temperature and pressure
4) Electrical and plumbing requirements
5) Flow and wiring diagrams as applicable
6) Description of system operation
c. All other pertinent information requested in individual sections
2. Test, Adjust, and Balance (TAB) Submittal
a. All test and report forms that will be submitted for the final TAB report
b. A written description of the balance procedures
c. Submit at least 30 days prior to any TAB work.
E. Operating Instructions & Maintenance Manuals
1. Before requesting acceptance of work, submit two sets for review by Government.
2. After review and making corrections noted, furnish five (5) printed and bound sets. Assemble in chronological order following alphanumeric system used in specification, in heavy three-ring binder.
3. O&M manual shall include all submittal data submitted herein above, as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .