About this file
This solicitation document outlines requirements for reconstructing roads, signage improvements, and gate repairs at the Fort Scott National Cemetery in Kansas. The work includes general conditions, storm drainage improvements, pavement and curb repair, full depth pavement replacement, milling and overlaying, signage improvements, gate repair, and other tasks as shown in the contract documents. The contractor must provide all labor, equipment, materials, tools, and other resources to complete the work according to drawings, specifications, and manufacturer requirements. The performance period is 240 calendar days from notice to proceed. The contractor must follow all standards of conduct, employ qualified personnel, use dignified and reverent practices when working around burial services, and coordinate work to avoid interfering with cemetery functions. The contractor is responsible for safety, permits, disposal, cleanup, and restoring damaged areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78622B0018 Amendment 0001.pdf | ||
| BID SPECS.pdf | ||
| 36C78622B0018 _ Solicitation.pdf | ||
| Cost Estimate Worksheet.pdf | ||
| RFI Form.pdf | ||
| DOL Wage Determination _ Bourbon County.pdf | ||
| Past Performance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF
VETERANS AFFAIRS
BOURBON COUNTY
FORT SCOTT, KANSAS
RECONSTRUCT ROADS
PROJECT NUMBER: 893CM3017
BID DOCUMENTS
LOCATION MAP
N.T.S.
VICINITY MAP
N.T.S.
Know what'sbelow.
before you dig.Call
R
FORT SCOTT NATIONAL CEMETERY
PREPARED BY
NORTH
NORTH
COLORADO MISSOURI
PROJECT
LOCATION
NEBRASKA
OKLAHOMA
18TH STREET KANSAS ROAD
E NATIONAL AVENUE
RI
CH
AR
DS
R
OA
D
TI
ER
MA
N
RO
AD
S
MA
RG
RA
VE
S
TR
EE
T
7T
H
ST
RE
ET
GI001
COVER SHEET
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\G I00
1.D W
G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
PREPARED BY
Gordon - The LA Group Joint Venture, LLC Gordon 148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
DRAWING INDEX
SITE/CIVIL
1. GI001 COVER SHEET
2. GI002 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
3. VL101 OVERALL EXISTING CONDITIONS PLAN
4. GI101 OVERALL SITE DEVELOPMENT PLAN
5. GI200 CONSTRUCTION SEQUENCE PLAN
6. CD101 SITE DEMOLITION PLAN (BASE BID)
7. CD102 SITE DEMOLITION PLAN (BASE BID)
8. CD103 SITE DEMOLITION PLAN (BID OPTION #1)
9. GC101 EROSION AND SEDIMENT CONTROL PLAN
10. GC102 EROSION AND SEDIMENT CONTROL PLAN
11. GC500 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
12. CS101 SITE LAYOUT AND UTILITY PLAN AREA 1 (BASE BID)
13. CS102 SITE LAYOUT AND UTILITY PLAN AREA 2 (BASE BID)
14. CS103 SITE LAYOUT AND UTILITY PLAN AREA 2 (BID OPTION #1)
15. CU260 STORM PROFILES AND DETAILS
16. DT500 PAVING DETAILS
17. CI101 EXISTING SITE SIGNAGE INVENTORY
18. CI102 EXISTING SITE SIGNAGE PHOTOS
19. CI201 SITE SIGNAGE LAYOUT
20. CI501 SITE SIGNAGE DETAILS
21. CI502 SITE SIGNAGE DETAILS
22. CI503 SITE SIGNAGE DETAILS
23. DT510 GATE REPAIR NOTES
NO. DRAWING DRAWING TITLE
EXISTING PROPOSED
BOUNDARY/RIGHT-OF-WAY LINE
ADJACENT BOUNDARY LINE
EASEMENT LINE
ROAD CENTERLINE
HEADER CURB
CURB & GUTTER
EDGE OF PAVEMENT
CHAIN LINK FENCE
OVERHEAD UTILITY LINE
UNDERGROUND UTILITY LINE
WATER MAIN
BUILDINGS
SIDEWALK
SANITARY SEWER MAIN
STORM SEWER LINE
TREES/SHRUBS
LIMITS OF WORK
INDEX CONTOUR LINE
INTERMEDIATE CONTOUR LINE
SPOT ELEVATIONS
MISCELLANEOUS SIGNS
SITE LIGHT WITH POLE
DRIP LINE OF TREES
REVERSE CURB
543.6
TO BE
REMOVED
TO
REMAIN
BOARD FENCE
8" W/M8" W/M
8" PVC SAN. SEW.
15" HDPE
TRANS.CURB
SOIL BOUNDARY
HbB HgC
WIRE FENCE
EDGE OF GRAVEL
GUARDRAIL
CIVIL LEGEND:
EDGE OF CONCRETE
LP
SANITARY SEWER CLEAN-OUT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
STORM SEWER DROP INLET
STORM SEWER CURB INLET
STORM SEWER RIP-RAP
STORM SEWER END SECTION
FIRE HYDRANT
WATER VALVE
WATER METER
MAIL BOX
UTILITY POLE
FEATURE WALL
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS LINE
BUILDING MOUNTED LIGHT
UTILITY POLE GUY WIRE
SANITARY SEWER FORCE MAIN
8" PVC SAN. SEW.
15" HDPE
EX. CC RBF
CONCRETE MONUMENT/IRON REBAR
TBSCC-TBSIPF
UNDERGROUND GAS LINE
C3
CO
45 0
GS 45 0
TC 45 0
INV
EX.
EX.
X
CO
MB
MONVDH
EX. VDH
ABBREVIATIONS:
HEADSTONE FACE DIRECTION
BURIAL CRYPT PLOTS
GRAVESITE GRID MONUMENT
CONCRETE SECTION MARKER
DRAINAGE FLOW ARROW
DETAIL LABEL
KEYNOTE REFERENCE LABEL
GRANITE SECTION MARKER
F
PRE-PLACED CRYPTS
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
XX
LIMITS OF GRADING
LIMITS OF CLEARING
XX
XXXXX
WETLANDS
IN-GROUND CREMAIN SITES
FLAG SLEEVES
FLAG POLEF
DETAIL NO.
SHEET REFERENCE
DIRECTION OF TRAFFIC ARROWS
FEATURE WALL
33 32
TEST PIT LOCATION
A AREA OR ARC
AC ACRE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AGE ABOVE GROUND ELECTRIC
AGEC ABOVE GROUND ELECTRIC CONDUIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AST ABOVE-GROUND STORAGE TANK
ATS ACTIVE TREATMENT SYSTEM
AVE AVENUE
AWWA AMERICAN WATER WORKS ASSOCIATION
A/C AIR CONDITIONING
BC BOTTOM OF CURB
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK, BASELINE MARKER
BMP BEST MANAGEMENT PRACTICES
BOE BOTTOM OF EXCAVATION
BOV BLOW OFF VALVE
BRG BEARING
BRL BUILDING RESTRICTION LINE
BV BALL VALVE
BW BOTTOM OF WALL
C COEFFICIENT OF RUNOFF
CALC CALCULATE
CB CATCH BASIN OR CHORD BEARING
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS, CONTRACT DOCUMENTS OR CHECK DAM
CDW CHILLED DRINKING WATER
CDWR CHILLED DRINKING WATER RETURN
CDWS CHILLED DRINKING WATER SUPPLY
CE CONSTRUCTION ENTRANCE
CEM CEMENT OR CEMETERY
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND OR COMPOST FILTER SOCK
CG CURB AND GUTTER
CHD CHORD
CIP CAST IRON PIPE OR CULVERT INLET PROTECTION
CJ CONTRACTION JOINT
CL CENTERLINE, CLASS
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CN CURVE NUMBER
CND CONDUIT
CNR CORNER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDITION OR CONDENSER
CONF CONFERENCE
CONN CONNECTION
CON CONTAMINATED
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACT OR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
COV COVER OF CUT OFF VALVE
CPv CHANNEL PROTECTION VOLUME
CPPE CONSERVATION PRACTICE PHYSICAL EFFECTS
CPP CORRUGATED PLASTIC PIPE
CRN CROWN
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSS COMMITTAL SERVICE SHELTER
CSP CONCRETE SEWER PIPE
CT COURT
CTR CENTER OR CONTOUR
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CV CONTROL VALVE
CW CLOCKWISE OR CONCRETE WASHOUT
CWP COLD WATER PIPING
D DEPTH
DAT DATUM
DB DEED BOOK; DESIGN-BUILD; DRAIN BASIN
DBL DOUBLE
DD DIVERSION DIKE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESC DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIP DUCTILE IRON PIPE
DIST DISTANCE
DM DROP MANHOLE
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DRE DECOMPOSED ROCK ELEVATION
DS DOWNSPOUT
DWG DRAWING
D/W DRIVEWAY
D DELTA
EA EACH
EBL EAST BOUND LANE
EC EDGE OF CONCRETE
ECL EROSION CONTROL LOG
EG EDGE OF GUTTER
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
ENTR ENTRANCE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
E&S EROSION & SEDIMENT
ES END SECTION
ESMT EASEMENT
ETO EARLY TURNOVER
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EW END WALL
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FOUNTAIN DRAIN
FF FIRST FLOOR OR FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIN FINISHED
FLR FLOOR
FN FENCE
FP FLOOD PLAIN
FOC FACE OF CURB
FOTG FIELD OFFICE TECHNICAL GUIDE
FOY FOYER
FP FLAG POLE OR FIRE PROTECTION
FPS FEET PER SECOND
FR FROM
FS FILTER SOCK
FT FEET
FWS FLOWER WATERING STATION
G GAS
GAL GALLON
GDR GUARD RAIL
GEN GENERATOR
GFA GROSS FLOOR AREA
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GOVT GOVERNMENT
GR GRADE
GR GUARD RAIL
GS GROUND SHOT
H HORIZONTAL
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HLBC HOT LAID BITUMINOUS CONCRETE
HMA MOT-MIX ASPHALT
HP HIGH POINT OR HIGH PRESSURE
HR HAND RAIL
HT HEIGHT
HW HOT WATER
HWSR HOT WATER SUPPLY & RETURN
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
I RAINFALL INTENSITY
ID INSIDE DIAMETER
IGC IN-GROUND CRYPT
IN INCH
INV INVERT
IP IRON PIPE OR INLET PROTECTION
IPF IRON PIPE FOUND
IPS IRON PIPE SET
IRR IRRIGATION
IW IRRIGATION WATER
JB JUNCTION BOX
K ONE THOUSAND (KILO)
KWY KEYWAY
L LENGTH
LAT LATERAL
LF LINEAR FEET
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LP LOW POINT OR LOW PRESSURE
LT LIGHT OR LEFT
LL LOWER LEVEL
M MARKER
MAINT MAINTENANCE
MAT MATERIAL
MAX MAXIMUM
MB MAIL BOX
MECH MECHANICAL
MED MEDIUM
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MS MEDIAN STRIP
MSL MEAN SEA LEVEL
MTG MEETING
MTL MATERIAL
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
N/F NOW OR FORMERLY
NA MOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NBC NATIONAL BUILDING CODE
NBL NORTH BOUND LANE
NCA NATIONAL CEMETERY ADMINISTRATION
NCPS NATIONAL CONSERVATION PRACTICE STANDARDS
NCTCOG NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS
NE NOT EXCEEDING
NFA NET FLOOR AREA
NHCP NATIONAL HANDBOOK OF CONSERVATION PRACTICES
NIC NOT IN CONTRACT
NO NUMBER
NOI NOTICE OF INTENT
NOM NOMINAL
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
NRCP NON-REINFORCED CONCRETE PIPE
NRCS NATURAL RESOURCES CONSERVATION SERVICE
NTP NOT TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFB ORGANIC FILTER BERM
OFD OVERFLOW DRAIN
OFT ORGANIC FILTER TUBE
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHE OVERHEAD ELECTRIC
OP OUTLET PROTECTION
OS OVER-SIZED
OZ OUNCE
P PERIMETER, RAINFALL DEPTH
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVATURE
PCA PORTLAND CEMENT ASSOCIATION
PCC POINT OF COMPOUND CURVE
PCEP POINT OF CURVE, EDGE OF PAVEMENT
PCT PERCENT
PCTC POINT OF CURVE, TOP OF CURB
PERF PERFORATED
PED PEDESTAL
PG PAGE
PGL POINT OF GRADE LINE
PH PROFILE HOLE
PI POINT OF INTERSECTION
PIC PUBLIC INFORMATION CENTER
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
PP POLYPROPYLENE (PLASTIC)
PPC PRE-PLACED CRYPT
PRC POINT OF REVERSE CURVE
PRELIM PRELIMINARY
POTW PUBLICLY-OWNED TREATMENT WORKS
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POINT OF TANGENCY
PTS PASSIVE TREATMENT SYSTEM
PV PRIVATE VAULT
PVC POLY VINYL CHLORIDE (PLASTIC PIPE)
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
P&P PLAN AND PROFILE
Q FLOW, AMOUNT OF RUNOFF
Qf EXTREME FLOOD VOLUME Qp OVERBANK FLOOD PROTECTION VOLUME
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RISER, RADIUS
RAD RADIANS
RCN RUNOFF CURVE NUMBER
RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN
RD ROAD, ROOF DRAIN
RDC REDUCER
RE RESIDENT ENGINEER
REP REPAIR
REQ REQUIRED
REV REVISION
REv RECHARGE VOLUME
RGP ROUGH GRADING PLAN
RPA RESOURCE PROTECTION AREA
RR RAILROAD
RTE ROUTE
RT RIGHT
RV RELIEF VALVE
RW RETAINING WALL
R/W RIGHT-OF-WAY
SAN SANITARY
SB SPLASH BLOCK OR SEDIMENT BASIN
SBL SOUTH BOUND LANE
SCF SEDIMENT CONTROL FENCE
SCHED SCHEDULE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SEG SEGMENT
SEL SELECT
SEW SEWER
SF SQUARE FEET OR SILT FENCE
SSF SUPER SILT FENCE
SJ SCORED JOINT
SLV SLEEVE
SM SECTION MARKER
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP SITE PLAN
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SS SANITARY SEWER, STORM SEWER OR STEAM SUPPLY
ST STREET OR SEDIMENT TRAP
STA STATION
STD STANDARD
STE STEAM
STK STACK
STM STORM
SUPT SUPPORT
SURV SURVEY
SVC SERVICE
SWM STORMWATER MANAGEMENT
S/W SIDEWALK
SWPPP STORM WATER POLLUTION PREVENTION PLAN (SWP3)
SWG SEWAGE
Sx CROSS SLOPE
SYM SYMBOL
T TANGENT
T&M TIME AND MATERIALS
TB TEST BORE
TC TOP OF CURB
Tc TIME OF CONCENTRATION
TCEQ TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN
TELE TELEPHONE
TH TEST HOLE
TNL TUNNEL
TOB TOP OF BANK
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TP TEST PIT, TELEPHONE POLE, OR TREE PROTECTION
TPDES TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM
TW TOP OF WALL
TXDOT TEXAS DEPARTMENT OF TRANSPORTATION
TYP TYPICAL
UD UNDERDRAIN
U/G UNDERGROUND
UGC UNDERGROUND COMMUNICATIONS
UGE UNDERGROUND ELECTRIC
UFC UNIFORM FIRE CODE
UL UPPER LEVEL
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
USACE U.S. ARMY CORPS OF ENGINEERS
USDA U.S. DEPARTMENT OF AGRICULTURE
UTIL UTILITY
V VERTICAL
VA VETERANS ADMINISTRATION, VIRGINIA
VAR VARIES
VC VERTICAL CURVE
VEL VELOCITY
VERT VERTICAL
VF VERTICAL FOOT
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VOL VOLUME
W WATER, WEST OR WIDE
W/ WITH
W/O WITHOUT
WBL WEST BOUND LANE
WI WROUGHT IRON
WL WATER LINE
WM WATER MAIN OR WATER METER
WO WORK ORDER
WQv WATER QUALITY VOLUME
WSE WATER SURFACE ELEVATION
WT WATER TIGHT
WW WASTE WATER
X-ING CROSSING
YI YARD INLET
YR YEAR
Z SIDE SLOPES
GENERAL NOTES:
1. PROPOSED SITE IMPROVEMENTS FOR 'FORT SCOTT NATIONAL CEMETERY RECONSTRUCT ROADS' INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING
· FULL DEPTH ASPHALT PAVEMENT REPLACEMENT ON PORTIONS OF THE CEMETERY.
· MILL AND OVERLAY OF ASPHALT PAVEMENT OF PORTIONS OF THE CEMETERY.
· CONCRETE CURB & GUTTER REPLACEMENT.
· STORMDRAIN IMPROVEMENTS IN THE SOUTHERN PORTION OF THE CEMETERY.
· PROVIDE SIGNAGE IMPROVEMENTS THROUGHOUT THE ENTIRE CEMETERY.
· MISCELLANEOUS REPAIRS TO THE GATE ALONG 18TH STREET
THE PROJECT IS LOCATED IN FORT SCOTT, KANSAS
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS TWO (2) FOOT. TOPOGRAPHIC INFORMATION WAS COMPILED FROM AN ON -THE-GROUND FIELD SURVEY PREPARED BY CORNERSTONE REGIONAL SURVEYING, LLC, WITH A SURVEY DATE OF OCTOBER 20, 2021. HORIZONTAL DATUM REFERENCED TO THE KANSAS STATE PLANE, SOUTHERN ZONE
(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO (NAVD 88).
3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 20011C0329E DATED MARCH 16,2016. NO PORTION OF THIS PROPERTY IS LOCATED WITHIN THE 100-YEAR FLOODPLAIN
AREA (ZONE A). THE PROPERTY IS IN ZONE X.
4. SEE THIS SHEET FOR LEGEND OF SYMBOLS AND ABBREVIATIONS USED HEREIN.
5. BURIAL CEREMONIES WILL BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, WORK SHALL STOP, ESPECIALLY WHEN HEAVY EQUIPMENT
ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY MAY CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY.
COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.
6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE
FREQUENTLY AS REQUIRED.
7. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS.
8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE.
THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
9. CONTRACTOR SHALL KEEP AT LEAST ONE LANE OR PATH CLEAR THROUGH THE SITE TO FACILITATE CEMETERY OPERATIONS AT ALL TIMES.
CONSTRUCTION NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE CONSTRUCTION DOCUMENTS PRIOR TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS AND THE KANSAS STATE DEPARTMENT OF TRANSPORTATION CONSTRUCTION STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
3. THE CONTRACTOR SHALL CONTACT KANSAS ONE CALL SYSTEM, INC. AT 1-800-344-7233 OR 811 A MINIMUM OF SEVENTY-TWO (72) HOURS PRIOR TO ANY EXCAVATION, DEMOLITION OR OTHER EARTH DISTURBING ACTIVITIES WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE
PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
4. EXISTING UNDERGROUND UTILITIES SHOWN HEREIN HAVE BEEN LOCATED FROM VISIBLE EVIDENCE. THE UTILITIES SHOWN MAY OR MAY NOT REFLECT ALL UNDERGROUND UTILITIES IN SERVICE OR ABANDONED. UTILITIES SHOULD BE VERIFIED BY APPROPRIATE UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION. GORDON DOES NOT CERTIFY TO THE LOCATION OR THE EXISTENCE OF EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING CONSTRUCTION. IF CONDITIONS ARE FOUND IN THE FIELD WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER.
5. GORDON DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING CONSTRUCTION. THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY GORDON. SO THAT APPROPRIATE REVISIONS IF WARRANTED CAN BE MADE TO THE PLANS AT THE GOVERNMENT'S EXPENSE.
6. GORDON DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION. IF SINKHOLES ARE FOUND IN THE FIELD, REMEDIATION WILL BE REQUIRED AS SPECIFIED BY A QUALIFIED GEOTECHNICAL ENGINEERING FIRM.
7. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE CONTRACTOR.
8. ALL PROPOSED GRADES AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED ON THE PLAN.
9. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLANS FOR PHASING AND
DETAILS.
10. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED TO CONTROL EROSION
AND SEDIMENTATION.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE CONTRACTING OFFICER OF ANY CHANGES OR CONDITIONS ATTACHED TO PERMITS REQUIRED FOR
CONSTRUCTION.
12. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE
KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.
13. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE CONTRACTING OFFICER OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE
APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER ATTENTION FOR VERIFICATION PRIOR TO STAKEOUT.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. THE VA SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE WORK AREA AT ALL TIMES. TEMPORARY BARRICADES, ROAD CLOSURE SIGNAGE, FENCES AND OTHER WARNING DEVICES SHALL BE USED TO PREVENT PUBLIC ACCESS TO CONSTRUCTION WORK AREAS. VA MAINTENANCE OPERATIONS SHALL NOT BE UNDULY IMPEDED BY THE
CONTRACTOR'S OPERATIONS.
17. THE CONTRACTOR SHALL NOTIFY THE CEMETERY DIRECTOR AND THE CONTRACTING OFFICER TWO DAYS BEFORE ANY DEMOLITION WORK BEGINS. ANY PLANNED INTERRUPTIONS IN SERVICES SHALL BE COORDINATED WITH THE CONTRACTING OFFICER AT LEAST TWO DAYS IN ADVANCE.
18. THE CONTRACTOR SHALL CONFINE HIS EQUIPMENT AND OPERATIONS TO THE LIMITS OF CONSTRUCTION SHOWN. THE CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR THE
SAFETY AND SECURITY OF ALL MATERIALS AND EQUIPMENT ON SITE.
19. THE CONTRACTOR SHALL USE ONLY APPROVED ROADWAYS FOR CONSTRUCTION AND DELIVERY ACCESS. DAMAGE TO THE EXISTING ROADS SHALL BE REPAIRED AT NO COST
TO THE OWNER.
20. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR OF EXISTING CEMETERY GROUNDS DUE TO CONSTRUCTION ACTIVITY.
GI002
GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\G I00
2.D W
G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
894886
VL101
OVERALL EXISTING CONDITIONS
PLAN
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\V L1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
EXISTING CONDITIONS PLAN NOTES:
1. THE EXISTING CONDITIONS PLAN CONSISTS OF AN ORIGINAL SURVEY BY
CORNERSTONE REGIONAL SURVEYING,LLC, PITTSBURG, KS, DATED 10-20-2021 WITH
SUPPLEMENTARY INFORMATION PROVIDED FROM PREVIOUS CONSTRUCTION
DOCUMENTS. SURVEY BY CORNERSTONE REGIONAL SURVEYING WAS RESERVED TO
CEMETERY ROADWAYS AND WITHIN 10' OF BACK OF CURB/EDGE OF PAVEMENT. THE
SURVEY WAS COMPLETED IN THE KANSAS SPCS, NAD 83, AND WITH A VERTICAL DATUM
IN NAVD 88. THE TOPOGRAPHIC CONTOUR INTERVAL IS TWO (2) FEET.
2. THE BOUNDARY OF THIS PROPERTY WAS NOT SURVEYED IN CONJUNCTION WITH THE
EXISTING CONDITIONS SURVEYS. NO EFFORT HAS BEEN MADE TO RE-ESTABLISH OR
DEPICT PROPERTY LINES, RIGHTS-OF-WAY, EASEMENTS, OR OTHER MATTERS OF
SURVEY AT THIS SITE.
3. UNDERGROUND UTILITIES LOCATIONS HAVE BEEN SHOWN BASED ON SURFACE
FEATURES AND DESIGN DOCUMENTS PROVIDED BY THE VA. THE UTILITIES SHOWN MAY
NOT REFLECT ALL UNDERGROUND UTILITIES.
4. UTILITIES WITHIN THE LIMITS OF CONSTRUCTION SHALL BE VERIFIED BY THE
CONTRACTOR PRIOR TO ANY CONSTRUCTION. ACCEPTABLE METHOD OF VERIFICATION
IS A TEST PIT TO PHYSICALLY LOCATE THE UTILITIES VERTICAL AND HORIZONTAL
LOCATION.
5. IF CONDITIONS ARE FOUND IN THE FIELD WHICH ARE MATERIALLY DIFFERENT FROM THE
PLANS, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.
6. IRRIGATION LINES, GAS LINES, AND STORM UNDERDRAINS LOCATIONS ARE SHOWN PER
PREVIOUS CONSTRUCTION DOCUMENTS AND ARE APPROXIMATE AND MAY NOT
REFLECT THE ACTUAL LOCATION OF THE LINE.
7. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 20011C0329E DATED MARCH
16,2016. NO PORTION OF THIS PROPERTY IS LOCATED WITHIN THE 100-YEAR
FLOODPLAIN AREA (ZONE A). THE PROPERTY IS IN ZONE X.
GRAPHICAL SCALE: 1"=40'
40 20 0 40 80 120
894886
OHE
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
E
D
D
E
E
E
E
B
F
F
F
F
F
F F
C
C
EX.
" R
CP
" R
CP
A
A
E
G
G
D
C
C
GI101
OVERALL SITE DEVELOPMENT
PLAN
GRAPHICAL SCALE: 1"=40'
40 20 0 40 80 120
A
PAVEMENT MILL AND OVERLAY (BASE BID)B
C
D
CURB AND GUTTER REPLACEMENT (BASE BID)
FULL DEPTH PAVEMENT RECONSTRUCTION (BASE BID)
KEY NOTE LEGEND:
KEY NO. DESCRIPTION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\G I10
0.D W
G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
GRAPHIC LEGEND:
FULL DEPTH PAVEMENT
RECONSTRUCTION (BASE BID)
PAVEMENT MILL AND
OVERLAY (BASE BID)
E
G
H
STORM DRAIN INSTALLATION (BASE BID)
PAVEMENT MILL AND OVERLAY (BASE BID)
CURB AND GUTTER REPLACEMENT (BID OPTION #1)
PAVEMENT MILL AND OVERLAY (BID OPTION #1)
PAVEMENT MILL AND
OVERLAY (BID OPTION 1)
EX.
" R
CP
" R
CP
CONTRACTOR
STAGING/STORAGE
AREAS
1A
18TH STREET
CONTRACTOR
STAGING/STORAGE
AREAS
PRIMARY
CONSTRUCTION
ACCESS.
EAST NATIONAL AVENUE
27TH STREET
1A
1A
1B
1C
1C
1C
1D
1D
GI200
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\G I20
0.D W
G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
GRAPHIC LEGEND:
LIMITS OF WORK
CONTRACTOR PRIMARY
CONSTRUCTION ACCESS
AREA 1A
AREA 1B
AREA 1C
1A
GENERAL CONSTRUCTION REQUIREMENTS:
BEFORE ANY GENERAL CONSTRUCTION ACTIVITIES MAY COMMENCE, THE CONTRACTOR SHALL:
1. RETAIN A PRIVATE UNDERGROUND LOCATOR SERVICE AT THEIR COST AND HAVE THEM PERFORM THE TRACING AND MARKING OF ALL THE ONSITE BELOW GRADE IMPROVEMENTS WITHIN OR ADJOINING THE CONTRACTOR WORK AREAS FOR THE PROJECT, WALK THE CONSTRUCTION AREAS WITH THE RE/COR AND, IF REQUESTED BY THE RE/COR, ADJUST THE LOCATIONS OF THE NEW WORK AS REQUIRED TO AVOID CONFLICTS, DAMAGE, OR UNINTENDED INTERRUPTIONS OF THE SERVICES BEING PROVIDED BY THE UNDERGROUND FACILITIES. CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL PAINT MARKINGS UPON
COMPLETION OF WORK.
2. OBSERVE AND DOCUMENT THE FUNCTIONALITY OF THE IRRIGATION SYSTEM IN THE VICINITY OF THE CONSTRUCTION AREA. DAMAGED OR NONFUNCTIONAL IRRIGATION SYSTEM EQUIPMENT NOT IDENTIFIED AS BEING DAMAGED OR NON-FUNCTIONAL DURING THE PRE-CONSTRUCTION SURVEY SHALL BE FULLY REPAIRED AND MADE FUNCTIONAL IMMEDIATELY UPON DETECTION OF ANY DAMAGE, AT NO ADDED COST TO THE
OWNER.
3. COMPLETE INSTALLATION OF EROSION AND SEDIMENT CONTROL FOR THE WORK AREAS WHERE WORK WILL BE PERFORMED. INSTALL IMMEDIATELY PRIOR TO THE START OF THE WORK IN ACCORDANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. CONTROL TRUCK AND EQUIPMENT MOVEMENT SO THEY DO NOT TRANSIT BETWEEN ONGOING SERVICES AT THE COMMITTAL SERVICE SHELTERS OR CHAPEL.
4. THE CONTRACTOR MAY REQUEST USE OF EXISTING MAINTENANCE AREA AND OPEN SPACES THROUGHOUT THE CEMETERY FOR SECONDARY STAGING. USE OF SUCH OPEN AREAS MUST APPROVED BY THE RE/COR AND
MUST BE DETERMINED TO BE OUT OF THE WAY OF DAILY OPERATIONS.
5. COMPLETE ANY AND ALL OTHER CONTRACTUAL REQUIREMENTS AS IDENTIFIED ELSEWHERE IN THE
CONSTRUCTION DOCUMENTS.
6. ALL CONSTRUCTION ACTIVITIES WILL BE COORDINATED WITH THE FORT SCOTT NATIONAL CEMETERY
DIRECTOR AND THE RE/COR.
MAINTENANCE OF TRAFFIC
1. TEMPORARY SIGNAGE IS REQUIRED THROUGHOUT THE PROJECT TO FACILITATE PUBLIC
ACCESS TO THE CEMETERY AND ADVANCE NOTIFICATION OF CONSTRUCTION
ACTIVITIES.
2. CONTRACTOR SHALL USE THE PRIMARY CONSTRUCTION ACCESS IDENTIFIED IN THE
CONSTRUCTION DOCUMENTS UNLESS OTHERWISE AUTHORIZED IN ADVANCE BY THE
RE/COR.
3. EXISTING ROADWAYS SHALL REMAIN CLEAN AND FREE OF DEBRIS. ALL DEBRIS SHALL
BE REMOVED AS IT OCCURS.
4. CONTRACTOR SHALL MAINTAIN CEMETERY ROADS USED DURING CONSTRUCTION
ACTIVITIES THROUGH REGULAR STREET SWEEPING.
5. CONTROL TRUCK AND EQUIPMENT MOVEMENT SO THEY DO NOT TRANSIT BETWEEN
ONGOING SERVICES AT THE COMMITTAL SERVICE SHELTERS. CONTRACTOR SHALL
ENSURE THE NOISE FROM TRUCK AND EQUIPMENT TRAFFIC DOES NOT INTERFERE WITH
FUNERAL SERVICES AT THE COMMITTAL SERVICE SHELTERS.
SEQUENCE OF CONSTRUCTION:
1. CONTRACTOR TO KEEP ONE LANE/PATH CLEAR FOR CEMETERY OPERATIONS AT ALL TIMES.
2. CONFIRM ALL APPLICABLE LOCAL, STATE AND REGULATIVE AGENCY PERMITS.
3. INSTALL TEMPORARY CONSTRUCTION FENCING AND TEMPORARY SIGNAGE . PLACE CONSTRUCTION SIGN AND
SAFETY SIGN AS DIRECTED BY RE/COR. SEE DETAILS 4 & 5 ON SHEET CI501
4. COMPLETE INSTALLATION OF EROSION AND SEDIMENT CONTROLS FOR THE WORK AREAS WHERE WORK WILL BE PERFORMED. INSTALL IMMEDIATELY PRIOR TO THE START OF THE WORK IN ACCORDANCE WITH THE
APPROVED EROSION AND SEDIMENT CONTROL PLAN.
5. COMPLETE WORK IN AREAS IN THE FOLLOWING ORDER (LIST IS NOT INTENDED TO BE ALL INCLUSIVE):
5.1. FULL DEPTH PAVEMENT REPLACEMENT IN AREA 1A. PLACE ONLY BASE PAVING IN THIS PHASE. SURFACE
COURSE ASPHALT TO BE PLACED IN LATER PHASE.
5.2. CONSTRUCT STORM SEWER IMPROVEMENTS AND CURB IMPROVEMENTS IN AREA 1 B. PLACE ONLY BASE PAVING FOR STORM SEWER TRENCHES AND CURB AREAS IN THIS PHASE. SURFACE COURSE ASPHALT
TO BE PLACED IN LATER PHASE.
5.2.1. (IF BID OPTION #1 IS INCLUDED IN CONTRACT): CONSTRUCT CURB IMPROVEMENTS IN AREA 1D.
PLACE ONLY BASE PAVING FOR CURB AREAS IN THIS PHASE. SURFACE COURSE ASPHALT TO BE
PLACED IN LATER PHASE.
5.3. INSTALL SIGNAGE IMPROVEMENTS THROUGHOUT THE CEMETERY & PERFORM REPAIR ON SOUTH
ENTRANCE GATE.
5.4. MILL PAVEMENT IN AREAS 1B & 1C. PLACE OVERLAY IN MILLED AREAS & SURFACE COURSE ASPHALT IN FULL DEPTH PAVEMENT AREAS (1A, 1B & 1C) TO PROVIDE A CONSISTENT OVERALL PAVEMENT SURFACE.
5.4.1. (IF BID OPTION #1 IS INCLUDED IN CONTRACT): MILL PAVEMENT IN AREA 1D. PLACE OVERLAY IN
MILLED AREAS & SURFACE COURSE ASPHALT IN FULL DEPTH PAVEMENT AREAS TO PROVIDE A
CONSISTENT OVERALL PAVEMENT SURFACE.
5.5. STABILIZE ALL DISTURBED AREAS WITH SOD.
5.6. CLEAN PROJECT AREA. REMOVE ALL WASTE, TRASH, DEBRIS FROM PROJECT SITE AND DISPOSE OF
PROPERLY OFF OF CEMETERY PROPERTY.
AREA 1D
1B 1C 1D
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
CD101
SITE DEMOLITION PLAN (BASE BID)
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\C D1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
CUT INTO EXISTING STORM STRUCTURE FOR
CONNECTION TO NEW STORM LINE
KEY NOTE LEGEND:
KEY NO. DESCRIPTION
GRAPHIC LEGEND:
LIMITS OF WORK
PAVEMENT SAWCUT LINE
EXISTING ASPHALT PAVEMENT AND SUBGRADE TO BE
REMOVED TO TOTAL DEPTH OF NEW PAVING SECTION
(12.5")
EXISTING ASPHALT PAVEMENT TO BE MILLED 1.5"
MATCHLINE
SEE SHEET CD102
KEY MAP
(NOT TO SCALE)
SAW CUT AND REMOVE EXISTING CURB AND GUTTER.
CURB & GUTTER SHALL BE REMOVED ENTIRELY
BETWEEN CLOSEST JOINTS (I.E. JOINT-TO-JOINT)
EXISTING CURB AND GUTTER TO BE SAW CUT / REMOVED.
CURB & GUTTER SHALL BE REMOVED ENTIRELY BETWEEN
CLOSEST JOINTS (I.E. JOINT-TO-JOINT). ADJACENT 2' STRIP
OF EXISTING ASPHALT PAVEMENT AND SUBGRADE TO BE
SAWCUT & REMOVED TO TOTAL DEPTH OF NEW PAVING
SECTION (12.5")
FLORAL REGULATIONS SIGN TO BE REMOVED
TEST PIT & VERIFY INVERT. CUT STORM SEWER PIPE TO
ACCOMODATE CONSTRUCTION OF NEW STORM
MANHOLE
5 GRAVESITE LOCATOR SIGN TO BE REMOVED
6 STOP SIGN TO BE REMOVED
DEMOLITION NOTES:
1. CONTRACTOR TO REFER TO GEOTECHNICAL REPORT FOR
DEPTH OF EXISTING ASPHALT PAVEMENT
894886
CD102
SITE DEMOLITION PLAN (BASE BID)
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\C D1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
MATCHLINE
SEE SHEET CD101
MATCHLINE
SEE SHEET CD101
KEY MAP
(NOT TO SCALE)
CUT INTO EXISTING STORM STRUCTURE FOR
CONNECTION TO NEW STORM LINE
KEY NOTE LEGEND:
KEY NO. DESCRIPTION
GRAPHIC LEGEND:
LIMITS OF WORK
PAVEMENT SAWCUT LINE
EXISTING ASPHALT PAVEMENT AND SUBGRADE TO BE
REMOVED TO TOTAL DEPTH OF NEW PAVING SECTION
(12.5")
EXISTING ASPHALT PAVEMENT TO BE MILLED 1.5"
SAW CUT AND REMOVE EXISTING CURB AND GUTTER.
CURB & GUTTER SHALL BE REMOVED ENTIRELY
BETWEEN CLOSEST JOINTS (I.E. JOINT-TO-JOINT)
EXISTING CURB AND GUTTER TO BE SAW CUT / REMOVED.
CURB & GUTTER SHALL BE REMOVED ENTIRELY BETWEEN
CLOSEST JOINTS (I.E. JOINT-TO-JOINT). ADJACENT 2' STRIP
OF EXISTING ASPHALT PAVEMENT AND SUBGRADE TO BE
SAWCUT & REMOVED TO TOTAL DEPTH OF NEW PAVING
SECTION (12.5")
FLORAL REGULATIONS SIGN TO BE REMOVED
TEST PIT & VERIFY INVERT. CUT STORM SEWER PIPE TO
ACCOMODATE CONSTRUCTION OF NEW STORM
MANHOLE
5 GRAVESITE LOCATOR SIGN TO BE REMOVED
6 STOP SIGN TO BE REMOVED
DEMOLITION NOTES:
894886
CD103
SITE DEMOLITION PLAN (BID
OPTION #1)
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\C D1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
KEY MAP
(NOT TO SCALE)
KEY NOTE LEGEND:
KEY NO. DESCRIPTION
GRAPHIC LEGEND:
LIMITS OF WORK
SAW CUT AND REMOVE EXISTING CURB AND GUTTER.
CURB & GUTTER SHALL BE REMOVED ENTIRELY
BETWEEN CLOSEST JOINTS (I.E. JOINT-TO-JOINT)
PAVEMENT SAWCUT LINE
EXISTING ASPHALT PAVEMENT AND SUBGRADE TO BE
REMOVED TO TOTAL DEPTH OF NEW PAVING SECTION
(12.5")
EXISTING ASPHALT PAVEMENT TO BE MILLED 1.5"
EXISTING CURB AND GUTTER TO BE SAW CUT / REMOVED.
CURB & GUTTER SHALL BE REMOVED ENTIRELY BETWEEN
CLOSEST JOINTS (I.E. JOINT-TO-JOINT). ADJACENT 2' STRIP
OF EXISTING ASPHALT PAVEMENT AND SUBGRADE TO BE
SAWCUT & REMOVED TO TOTAL DEPTH OF NEW PAVING
SECTION (12.5")
DEMOLITION NOTES:
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
EROSION & SEDIMENT CONTROL NOTES:
1. ALL EARTH DISTURBANCE OUTSIDE PAVEMENT/HARDSCAPE
AREAS SHALL BE STABILIZED WITH SOD PER PROJECT
SPECIFICATIONS.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\G C1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
GC101
EROSION AND SEDIMENT
CONTROL PLAN
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
MATCHLINE
SEE SHEET GC102
E&S GRAPHIC LEGEND:
INLET PROTECTION
DETAIL/PGE&S GRAPHIC LEGEND: DETAIL/PG
KEY MAP
(NOT TO SCALE)
894886
EROSION & SEDIMENT CONTROL NOTES:
1. ALL EARTH DISTURBANCE OUTSIDE PAVEMENT/HARDSCAPE
AREAS SHALL BE STABILIZED WITH SOD PER PROJECT
SPECIFICATIONS.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\G C1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
GC102
EROSION AND SEDIMENT
CONTROL PLAN
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
MATCHLINE
SEE SHEET GC101
MATCHLINE
SEE SHEET GC101
E&S GRAPHIC LEGEND:
LIMITS OF WORK
INLET PROTECTION
DETAIL/PGE&S GRAPHIC LEGEND:
LIMITS OF WORK
DETAIL/PG
KEY MAP
(NOT TO SCALE)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\G C5
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
GC500
EROSION AND SEDIMENT CONTROL NOTES:
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS
SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED
DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES.
2. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED KANSAS 811 SHALL BE NOTIFIED AT 1-800-344-7233 FOR THE
LOCATION OF EXISTING UNDERGROUND UTILITIES.
3. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE
TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
4. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT
OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY
MARKED BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
5. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT
APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND
SEDIMENT POLLUTION.
6. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS
CLEAN FILL.
7. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMP'S SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMP'S
AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL
MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, AND REPLACEMENT. IF THE E&S BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR MODIFICATIONS OF THOSE INSTALLED WILL
BE REQUIRED.
8. A LOG SHOWING DATES THAT E&S BMP'S WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND
AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE
AVAILABLE AT THE TIME OF INSPECTION.
9. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE
CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY
ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
10. ALL SEDIMENT REMOVED FROM BMP'S SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON
THE PLAN DRAWINGS.
11. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE
WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED
METHOD.
12. E&S BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE
PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP
13. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF
ALL DISTURBED AREAS, THE RE/COR SHALL CONDUCT AN INSPECTION PRIOR TO
REMOVAL/CONVERSION OF THE E&S BMP'S.
NOT TO SCALE
INLET PROTECTION1
OHE
OHE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
D
CS101
SITE LAYOUT AND UTILITY PLAN
AREA 1 (BASE BID)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\C S1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
KEY MAP
(NOT TO SCALE)
MATCHLINE
SEE SHEET CS102
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
GRAPHIC LEGEND:
LIMITS OF WORK
FULL DEPTH PAVEMENT
RECONSTRUCTION
CONSTRUCT CURB AND GUTTER. WARP
GUTTER TO MEET STORM INLET GRATES.
PROVIDE EXPANSION JOINT WHERE
ABUTTING STRUCTURES.
PAVEMENT MILL AND OVERLAY
A
KDOT 72" TYPE II MANHOLE W/ HEAVY TYPE MANHOLE
FRAME & COVER CASTING (TEST PIT REQUIRED TO
VERIFY INVERT PRIOR TO FABRICATION)
B
C
D
CONNECT PROPOSED STORM PIPE TO EXISTING STORM
INLET
KDOT CONCRETE GUTTER INLET. FIELD ADJUST INLET
LOCATION IF NECESSARY TO LOW POINT. COR TO
APPROVE FINAL LOCATION PRIOR TO INSTALLATION.
ADJUST GRADE OF SURROUNDING PAVEMENT TO
PROVIDE POSITIVE DRAINAGE TO NEW INLET
KEY NOTE LEGEND:
KEY NO. DESCRIPTION DETAIL / PG
PROVIDE PAVEMENT WEDGE
894886
A
EX.
" R
CP
" R
CP
A
B
C
C
D
D
D
CS102
SITE LAYOUT AND UTILITY PLAN
AREA 2 (BASE BID)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\C S1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
KEY MAP
(NOT TO SCALE)
MATCHLINE
SEE SHEET CS102
MATCHLINE
SEE SHEET CS102
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
GRAPHIC LEGEND:
LIMITS OF WORK
FULL DEPTH PAVEMENT
RECONSTRUCTION
CONSTRUCT CURB AND GUTTER. WARP
GUTTER TO MEET STORM INLET GRATES.
PROVIDE EXPANSION JOINT WHERE
ABUTTING STRUCTURES.
PAVEMENT MILL AND OVERLAY
A
KDOT 72" TYPE II MANHOLE W/ HEAVY TYPE MANHOLE
FRAME & COVER CASTING (TEST PIT REQUIRED TO
VERIFY INVERT PRIOR TO FABRICATION)
B
C
D
CONNECT PROPOSED STORM PIPE TO EXISTING STORM
INLET
KDOT CONCRETE GUTTER INLET. FIELD ADJUST INLET
LOCATION IF NECESSARY TO LOW POINT. COR TO
APPROVE FINAL LOCATION PRIOR TO INSTALLATION.
ADJUST GRADE OF SURROUNDING PAVEMENT TO
PROVIDE POSITIVE DRAINAGE TO NEW INLET
KEY NOTE LEGEND:
KEY NO. DESCRIPTION DETAIL / PG
PROVIDE PAVEMENT WEDGE
894886
A
A
A
A
A
A
A
A
B
B
A
GRAPHIC LEGEND:
LIMITS OF WORK
FULL DEPTH PAVEMENT
RECONSTRUCTION
A
B
CURB AND
GUTTER REPLACEMENT
KEY NOTE LEGEND:
KEY NO. DESCRIPTION DETAIL / PG
PROVIDE PAVEMENT WEDGE
CS103
SITE LAYOUT AND UTILITY PLAN
AREA 2 (BID OPTION #1)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\C S1
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
KEY MAP
(NOT TO SCALE)
PAVEMENT MILL AND OVERLAY
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
CONSTRUCT CURB AND GUTTER. WARP
GUTTER TO MEET STORM INLET GRATES.
PROVIDE EXPANSION JOINT WHERE
ABUTTING STRUCTURES.
SCALE: 1"=50' H / 1"=5' V
STORM 3-4 PROFILE
TO
P=
6.3
TO
P=
7.0
+0
0=
KD
OT
" T
YP
E
II M
AN
HO
LE
IN
V.
O
UT
=8
.15
IN
V.
IN
=8
.90 (4
-1 5"
IN
V.
IN
=8
.15
+7
5.9 =K
DO
T
GU
TT
ER
IN
LE
T
IN
V.
O
UT
=8
.00 (3
-1 5"
75.9' - 15" RCP @ 2.77%
TE
ST
P
IT
R
EQ
UI
RE
D
CU
T
EX
. 3 6"
R
CP
T O
CO
NS
TR
UC
T
MH
SCALE: 1"=50' H / 1"=5' V
STORM 1-2 PROFILE
TO
P=
3.1
EX.
TO
P=
3.5
21.9' - 15" RCP @ 1.14%
+0
0= T
IE
T
O
EX
. S
TO
RM
IN
LE
T
IN
V.
O
UT
=8
.01 (3
6"
IN
V.
IN
=8
.25
(1 5"
+2 1.9
=K
DO
T
GU
TT
ER
IN
LE
T
IN
V.
O
UT
=8
.50
(1 -1
5"
CU260
STORM PROFILES AND DETAILS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\C U2
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
NOT TO SCALE
KDOT CONCRETE GUTTER INLET DETAIL1
KDOT PRECAST MANHOLES DETAIL2
24"
DT500
PAVING DETAILS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT SCOTT NATIONAL CEMETERY
RECONSTRUCT ROADS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
SC
OT
T
NC
R
OA
DS
\E
NG
IN
\P
LA
NS
\D T5
.D
W G
ARCHITECT/ENGINEER OF RECORD
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 Dwg. of 23
6"
NOT TO SCALE
TYPICAL CURB AND GUTTER3
NOTES:
1. SAW CUT EX. PAVEMENT. BOTTOM AND ALL SIDES OF SAW CUT TO BE PAINTED WITH BITUMINOUS MATERIAL PRIOR TO
PLACING PAVEMENT SURFACE.
2. CONTRACTOR SHALL ENSURE THAT NO WATER IS TRAPPED BETWEEN EXISTING AND PROPOSED PAVEMENT AFTER
THE CUTTING OPERATIONS HAVE BEEN PERFORMED.
2'
EX. PAVEMENT SURFACE COURSE TO
BE MILLED 1" AND OVERLAYED WITH
NEW SURFACE COURSE
EX. PAVEMENT BASE COURSE
EX. PAVEMENT SUBBASE COURSE
SUBBASE COURSE
BASE COURSE
SURFACE COURSE
NOT TO SCALE
ASPHALT PAVEMENT FULL DEPTH REPLACEMENT1 NOT TO SCALE
ASPHALT PAVEMENT MILL AND OVERLAY 2
2" CLASS A HOT MIX ASPHALT - COMMERCIAL
GRADE SM-9.5A SURFACE COURSE
EX. CURB & GUTTER TO REMAIN UNLESS NOTED ON PLAN.
NEW CURB & GUTTER TO MATCH EX. SECTION
6" KDOT TYPE AB-1 AGGREGATE BASE
4.5" CLASS A HOT MIX ASPHALT-COMMERCIAL
GRADE SM-19A CLASS A BASE COURSE
NOTES:
1. PAVING TO RETAIN EXISTING CROWN/CROSS-SLOPE.
NOT TO SCALE
PAVEMENT WEDGING DETAIL4
GEOTEXTILE FABRIC
COMPACTED SUBGRADE
CLEAN & SEAL ALL CRACKS IN EXISTING ASPHALT
PAVEMENT PRIOR TO OVERLAY
MILL 1.5" AND OVERLAY 1.5" CLASS A HOT MIX ASPHALT -
COMMERCIAL GRADE SM-9.5A SURFACE COURSE
EX. ASPHALT PAVEMENT
EX. SUBGRADE
4" 8" 8" 4"
3"
31"R
11"R
#4 SMOOTH DOWEL
BARS @ EXPANSION
JOINTS (TYP)
6" KDOT TYPE AB-1
AGGREGATE
NOTES:
1. CONCRETE SHALL BE 4,000 PSI.
2. ALL CURB JOINTS SHALL BE MADE BY ACCEPTABLE FORMING METHODS.
3. PROVIDE CONTRACTION JOINTS SPACED NO MORE THAN 10' APART. PROVIDE SEALANT PER THIS DETAIL.
4. PROVIDE EXPANSION JOINTS AT AN INTERVAL OF AT LEAST 50'; WHERE TANGENT AND RADIAL CURB MEET; WHERE NEW CURB MEETS
EXISTING CURB; AND WHERE CURB SURROUNDS OR ADJOINS A FIXED OBJECT SUCH AS A STORM INLET. PROVIDE SEALANT PER THIS DETAIL. THREE (3), #4 SMOOTH DOWELS SHALL BE USED AT EXPANSION JOINT LOCATIONS. THE DOWELS SHALL BE GREASED AND
WRAPPED OR CAPPED WITH PLASTIC EXPANSION TUBES AT ONE END.
1/4"
CONTRACTION JOINT EXPANSION JOINT
PREMOLDED JOINT
FILLER EXTENDING TO
BOTTOM SURFACE OF
CONCRETE.
3.5"
1/2"
JOINT SEALANT
1/4" R 1/4" R
1/8"
3/8" BACKER ROD 1.25"
3.5"
1/4" R
1.25"
JOINT SEALANT
5/8" BACKER ROD
NOT TO SCALE
DETAIL OF CURB REPLACEMENT AT STORM INLETS5
5.1 5.2 5.3 5.4
AREA OF CURB
REPLACEMENT AT
INLET
AREA OF CURB
REPLACEMENT AT
INLET
AREA OF CURB
REPLACEMENT AT
INLET
AREA OF CURB
REPLACEMENT AT
INLET
OHE
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
NOTICE
NO FIREARMS
FLORAL
REGULATIONS
SIGN
FROM "THE
BIVOUAC OF
THE DEAD
NO
TRESPASSING1
2 3
GRAVESITE
LOCATOR4 FLOWER WATERING
STATION 5
NATIONAL
REGISTER OF
HISTORIC
PLACES 6
FLOWER WATERING
STATION8
GRAVE LOCATOR9
"THE ULTIMATE
SACRIFICE"
A NATIONAL
CEMETERY SYSTEM 11
FORT SCOTT
NATIONAL
CEMETERY
GRAVE SITE
LOCATOR 13
NO
TRESPASSING 14
DONATION
RECOGNITION
PLAQUE 15
GRAVESITE
LOCATOR16
FLOWER
WATERING
STATION17
FLOWER WATERING
STATION 18
FLOWER
WATERING
STATION
UNITED STATES
NAVY
VETERANS20
FLOWER
WATERING
STATION21
TO HONOR ALL
COMBAT
INFANTRYMEN22
FLORAL
REGULATIONS 23
STOP
E NATIONAL AVENUE
18TH STREET
227TH STREET
CI101
EXISTING SITE SIGNAGE
INVENTORY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
21 4 5 6 7 8 9
FORT SCOTT, KANSAS
893CM3017
APRIL 15, 2022 RPP RJP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMPCONSU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .