This solicitation is for construction services to reconstruct roads at Fort Scott National Cemetery in Kansas. The contractor will provide management, supervision, labor, equipment, materials and tools to complete general conditions work, storm drainage improvements, pavement and curb repair, full depth pavement replacement, mill and overlay work, signage improvements, gate repairs, and all other work as shown in the contract documents. The performance period is 240 calendar days for base CLIN work, with an additional 60 days available for optional CLIN work. The contractor will be responsible for traffic control, complying with OSHA and other safety standards, using established roadways, protecting existing utilities and improvements, cleaning up the site, and disposing of all debris. The government will not provide utilities, storage, restrooms or other facilities for the contractor's use.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78622B0018 Amendment 0001.pdf | ||
| BID SPECS.pdf | ||
| 36C78622B0018 _ Solicitation.pdf | ||
| RECONSTRUCT ROADS BID PLANS.pdf | ||
| RFI Form.pdf | ||
| DOL Wage Determination _ Bourbon County.pdf | ||
| Past Performance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number:
Solicitation Number:
Project Title:
Division Unit of Measure # of Units Unit Cost $ Extended/Total
Cost $ Comments / Remarks Division 0 - Special Sections
General Conditions and Administration
JB 1
Division 01 - General Requirements
Mobilization JB 1
Division 02 - Existing Conditions
Site Investigation JB 1
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Reconstruct Roads, Ft Scott National Cemetery
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
IFB Contractor Cost Estimate Worksheet
893CM3017
36C78622B0018
Offeror shall use and edit to fit Task Order Project
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead ________ % $0.00
Profit ________ % $0.00
GRAND TOTALS $