Cost Estimate Worksheet.pdf

PDF 90 KB Posted

Attached to
Z1LB--893CM3017: Reconstruct Roads, Signage Improvements and Gate Fort Scott National Cemetery, Kansas
Solicitation number
36C78622B0018
Issued by

About this file

This solicitation is for construction services to reconstruct roads at Fort Scott National Cemetery in Kansas. The contractor will provide management, supervision, labor, equipment, materials and tools to complete general conditions work, storm drainage improvements, pavement and curb repair, full depth pavement replacement, mill and overlay work, signage improvements, gate repairs, and all other work as shown in the contract documents. The performance period is 240 calendar days for base CLIN work, with an additional 60 days available for optional CLIN work. The contractor will be responsible for traffic control, complying with OSHA and other safety standards, using established roadways, protecting existing utilities and improvements, cleaning up the site, and disposing of all debris. The government will not provide utilities, storage, restrooms or other facilities for the contractor's use.

View the file

Other files

File Type Posted
36C78622B0018 Amendment 0001.pdf PDF
BID SPECS.pdf PDF
36C78622B0018 _ Solicitation.pdf PDF
RECONSTRUCT ROADS BID PLANS.pdf PDF
RFI Form.pdf PDF
DOL Wage Determination _ Bourbon County.pdf PDF
Past Performance.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number:

Solicitation Number:

Project Title:

Division Unit of Measure # of Units Unit Cost $ Extended/Total

Cost $ Comments / Remarks Division 0 - Special Sections

General Conditions and Administration

JB 1

Division 01 - General Requirements

Mobilization JB 1

Division 02 - Existing Conditions

Site Investigation JB 1

Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastic, and Composites

Division 07 - Thermal and Moisture Protection

Division 08 - Openings (Doors, Windows, etc...)

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12- Furnishings

Division 13 - Special Construction

Division 14 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 25 - Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Reconstruct Roads, Ft Scott National Cemetery

Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.

If a Division is not being used put N/A in that field.

Additional lines/items can be added if needed or appropriate.

IFB Contractor Cost Estimate Worksheet

893CM3017

36C78622B0018

Offeror shall use and edit to fit Task Order Project

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Mechanical, Electrical, Plumbing Subtotal

General Construction Subtotal

Total Base Construction Cost

Insurance (if applicable)

Bonding (if applicable)

Overhead ________ % $0.00

Profit ________ % $0.00

GRAND TOTALS $

Sheet1