ReciprocalLimitationsAct (materials bid).pdf
PDF 487 KB Posted
- Attached to
- 23WHM SGL270 New Crew Build Elec
- Solicitation number
- 6100065835
- Issued by
- Mercer County, Pennsylvania
About this file
This file is a Reciprocal Limitations Act document related to a Pennsylvania Game Commission (PGC) construction project for a new Crew Headquarters building and storage facility. The project encompasses the construction of a 40' x 100' pole building for office space and tool/implement storage, and a 50' x 80' pole building for maintenance equipment storage. Both structures will include metal siding and roof panels, concrete floors, insulation, interior wall finishes, garage and man doors, windows, and related appurtenances. In accordance with the Separation Act (P.L. 155, May 1, 1913), the project is divided into four separate construction contracts: General, Mechanical, Plumbing, and Electrical. Electronic bids will be opened on Thursday, April 30, 2026 at 2:00 PM at the Division of Contracts and Procurement in Harrisburg, Pennsylvania. All quantities are estimated, and bidders must submit bids in dollars and cents with no fractions of a cent accepted. Technical questions regarding project specifications should be directed to Zachary Whitenight at the PGC Engineering Division at 717-787-4250 Ext. 73628 or zwhitenigh@pa.gov.
The Reciprocal Limitations Act document establishes restrictions on bidding eligibility and contract participation based on reciprocal agreements between states. This document ensures that bidders comply with Pennsylvania's requirements regarding fair competition and prevents entities from certain jurisdictions from bidding if their home states impose similar restrictions on Pennsylvania contractors. All pricing must be submitted as specified in the bid documents, with no deviations from the required format. No specific funding amounts, award dates, contract terms, or renewal options are detailed in this particular document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Storage Builidng Technical Specifications (1).pdf | ||
| 270-25-01 Crew Headquarters Drawings.pdf | ||
| Storage Builidng Technical Specifications.pdf | ||
| Bid Notice-SGL-270.doc | DOC document | |
| Worker Protection Form .docx | DOCX document | |
| Crew Headquarters Technical Specifications.pdf | ||
| 270-25-01 Storage Building Drawings.pdf | ||
| Contracts and Procurement.pdf | ||
| Addendum No 1-General.doc | DOC document | |
| Crew Headquarters Technical Specifications (1).pdf | ||
| Addendum No 2 (1).doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .