This is a Request for Bids issued by the State of Tennessee Department of Environment and Conservation, Facilities Management for repair work at Harrison Bay State Park located in Harrison, Tennessee. The project encompasses comprehensive repairs to the Recreation Hall, including flooring repair, sheetrock installation, insulation replacement, and French drain installation. The scope of work includes demolition of existing toilets, partitions, drains, damaged subflooring, water-damaged insulation and sheetrock, and non-functional doors. New work includes replacement of floor joists, subflooring, insulation, sheetrock, flooring in both restrooms with transitions and trim, new toilets with manual flush valves, solid plastic partitions, repaired entry doors with new hardware, a new double door with removable mullion at the loading ramp, and a continuous French drain system on multiple sides of the structure. Work must be performed between receipt of a signed contract and January 24, 2026. The contractor must possess an active BC-B SM, BC-B, or BC-C Tennessee Building Contractor license prior to bid submission, with all licenses verified through the Tennessee Commerce and Insurance database. All subcontractors must also maintain active Tennessee Building Contractor licenses. A pre-construction conference and final inspection are required before work commences and final payment is authorized.
The contract requires the contractor to furnish all materials, equipment, supplies, and labor with work performed during regular business hours, Monday through Friday, 8:00 a.m. to 4:30 p.m., unless alternate scheduling is approved by Facilities Management. The contractor is responsible for obtaining all permits and associated fees, determining utility locations, and protecting existing utilities from damage. Specific approved brands are mandated for flush valves (Zurn AquaVantage), partitions (Partition King HDPE in Desert Beige), door handles (BEST Model 7KC37ABDS3), lock cylinders (BEST Interchangeable Core), doors (Steelcraft L-18), exit devices (BEST S100 Series), and door closers (LCN). The contractor must submit invoices within ten days of project completion and acceptance to the specified Facilities Management contact. Workmanship is warranted for one year from final inspection, with materials warranted per manufacturer specifications. The contractor must maintain a Certificate of Insurance on file and be registered with the Tennessee Department of Revenue for sales tax collection. The State reserves the right to terminate the contract for convenience with thirty days' written notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Harrison_Bay_State_Park_Recreation_Hall_Repairs.pdf | ||
| PreBid__Memo.pdf | ||
| HBSP-REC_HALL_REPAIRS_T_C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rec Hall Repairs
Harrison Bay State Park 8411 Harrison Bay Rd.
Harrison, Tennessee 37341
This request for bids is for a Contract to furnish all material, equipment, supplies, and labor necessary to repair flooring, sheetrock, insulation, and install French drains.
General Conditions
1) On-Site work shall be performed between receipt of signed Contract or Purchase Order and January
24, 2026, unless granted a written exception by the Facilities Management Regional Manager.
2) For this project, the Contractor and applicable subcontractors shall possess an active BC-B sm, BC-B, or BC-C Tennessee Building Contractor license prior to submitting a bid. Failure of the Contractor and applicable subcontractors to provide copies of their appropriate license shall result in the disqualification of the bid. All licenses shall be verified via Tennessee Commerce and Insurance database before project award.
3) The Contractor shall not assign this Contract or enter into a subcontract for this project without prior written approval of Facilities Management. The Contractor’s bid shall include a Declaration of Intended Use of Subcontractor(s) form that clearly states the intent to use a subcontractor, along with their name and license number. Facilities Management reserves the right to reject a bid in whole or a subcontractor, based upon failure to possess an appropriate active TN builder’s license. After project award, any proposed substitution or addition of a subcontractor shall require written Facilities Management acceptance and approval before being allowed on-site or perform any work under this Contract. All subcontractors are required to have an active TN Building Contractor license for the applicable work to be performed before and throughout the project. Any proposed subcontractor failing to meet these requirements are not allowed to perform work on any portion of this project.
4) All work shall comply with State-approved versions of the IBC, standards, regulations, other applicable codes, manufacturer’s recommendation, and best practices. The Contractor is responsible for all permits and associated fees.
5) Only the Facilities Management Project Manager or Facilities Management Regional Manager can approve any alterations, modifications, and substitutions of the specifications or requirements of the project. No additional work shall be authorized unless pre-approved by either the Project Manager or Regional Manager in writing. Park/Hospitality management and staff are not authorized to make any changes, deletions, or additions to the project or accept any portion of the work. This Contract shall be modified only by a written agreement signed by all parties. Any work performed outside of the written scope with any written change orders will be the responsibility of the Contractor or others and not Facilities Management. All questions, directives, and acceptance shall come only from either the Facilities Management Regional Manager and/or Project Manager.
6) The Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner.
7) All color selections shall be provided to the Contractor by the Facilities Management Project Manager.
8) All material substitutions must be pre-approved prior to bid acceptance.
9) All materials shall be installed per manufacturer’s recommendation, industry best practice, and applicable code.
10) All dimensions listed are approximate. The Contractor is solely responsible for verifying actual dimensions prior to ordering any materials or bidding. No allowances shall be made due to a bidder neglecting to visit the site and verifying dimensions and conditions.
11) All work performance under this Contract shall be under the full-time direction of the Contractor. The Contractor shall be responsible for work and performance, and damages of any subcontractors and/or independent contractors or laborers hired in connection with the work under this Contract.
General Scope of Work
Description of Demolition or Associated Work All debris shall be removed from the park property and disposed of in accordance with all applicable regulations, unless specifically noted.
1) The Contractor shall remove all toilets in both Restrooms.
2) The Contractor shall remove partitions in both Restrooms.
3) The Contractor shall remove all drains and toilet drops in Basement.
4) The Contractor shall remove damaged sub-floor in Men’s Restroom.
5) The Contractor shall remove all flooring in the Women’s Restroom, and all sub-floor and any damaged floor joists.
6) The Contractor shall remove water damaged insulation and sheetrock in Basement.
7) The Contractor shall remove the solid side by side double doors at the end of the Loading
Ramp to add a double door with a center removable/lockable mullion.
New Work
1) The Contractor shall replace damaged floor joists to match existing.
2) The Contractor shall replace damaged subfloor to match existing.
3) The Contractor shall install new insulation in the Basement to match existing.
4) The Contractor shall install new sheetrock in the Basement and finish to match existing.
5) The Contractor shall install new flooring and transitions in both Restrooms to match the existing height and appearance and install trim for a finished look in the Restroom.
6) The Contractor shall repair the subfloor under the leaking toilet in the Men’s Restroom.
7) The Contractor shall install new PVC drains and new toilet drops. The drains shall be installed all the way back to the 90 degree fitting on the exterior wall.
8) The Contractor shall install new toilets in both restrooms with new wax rings, to include new manual flush valves; any damage to existing wall tiles from installation and removal of partitions and toilets must be repaired and appropriately trimmed with like materials.
9) The Contractor shall install new solid plastic partitions using existing layout in both Restrooms.
10) The Contractor shall replace any damaged wall tiles and patch any holes in wall that remain from old partitions to match existing tiles and wall finish.
11) The Contractor shall repair all entry doors to make them functional and replace all door handles and dead bolts. New equipment shall be able to accept BEST lock cylinders.
12) The Contractor shall install framing and solid header (if necessary), to add a double door with lockable/removable center mullion at the end of the Loading Ramp. The exterior door handles shall match other handles. BEST lock cylinders shall be used, and lock must be keyed to match other door locks.
13) The Contractor shall repair/trim wall surfaces around new door structure to match surrounding finish, inside and out.
14) The Contractor shall install a continuous French drain system on both sides and the upper side of the structure, taking care not to damage utilities. The upper side drain shall be in front of the landscape timbers. The drain shall be installed according to codes for building foundation drains and will be constructed of perforated rigid pipe contained in washed gravel that allows for percolation.
15) The Contractor shall tie the gutter downspouts and HVAC, using appropriate drain grates that are plumbed into the French drain system.
16) The Contractor shall not bury the new French drain system until inspected by the Park Staff and the Project Manager.
Approved Brands and Specifics (or Pre-approved Equal) Item Approved Brand or
Pre-Approved Equal Specific Requirements
Flush Valves Zurn AquaVantage 1.6gpf Manual Flush Valve
Partitions Partition King High-density polyethylene (HDPE) Solid Plastic Partition in Desert Beige color
Door Handles BEST Model # 7KC37ABDS3 interchangeable core cylindrical lever -Satin Chrome
Lock Cylinders BEST Interchangeable Core Cylinder: Cylindrical, SFIC, Chrome Mfr. Model 1C7A1626 all keyed alike.
Doors Steelcraft L-18 Rigid 1 -inch (25mm) Cell, 99 Pound Kraft Honeycomb Core that meets the requirements of ANSI A250.8-2014. Hardware preparations and reinforcements are in accordance with ANSI A250.6-2003
Exit Devices BEST S100 Series Rim Exit Device with Dogging Function in Satin Chrome to meet ANSI A156.3 Grade 1 Certification
Door Closers LCN Heavy duty cast-iron body with adjustable spring.
ANSI/BHMA A156.4 Grade 1 Rated
Additional Terms and Conditions
1) All aspects of this job shall be left in a finished condition: All finish work, interior and exterior walls and trim, finish painting, caulking and final cleanup are included in this Contract.
2) The Contractor shall be responsible for determining where all utilities are on the job site and care should be taken to protect the utilities from any damage caused by the demolition/construction. This shall include any underground utilities around the job site area.
If damage occurs, it shall be repaired within a 24-hour period from the time damage occurs.
3) The Contractor shall perform work on regular time and shall invoice work time and material not to exceed the quoted price. Any variance in quote shall be addressed only with a representative of the Facilities Management Regional Office before any additional work is undertaken or materials ordered.
4) Work shall be scheduled to avoid any interference with normal operation of the park as much as possible. During the construction period, coordinate construction schedules and operations with the Park Manager. Work shall be conducted during the normal business hours of Monday through Friday, 8:00 a.m. to 4:30 p.m., unless an alternate schedule is approved by Facilities Management.
5) The successful Contractor shall schedule and attend a pre-construction conference where a pre-construction form shall be signed by Facilities Management, Contractor and Park Manager or park representative before work can begin. The Contractor shall also schedule and attend a final inspection where a final inspection form shall be signed by Facilities Management, Contractor and Park Manager or park representative before final invoice shall be paid.
6) The Contractor shall protect areas adjacent to his work and shall be required to repair any damage they may cause. The Contractor shall protect work of other trades. The Contractor shall correct any painting related damage by cleaning, repairing, or replacing, and refinishing as directed by Facilities Management. The Contractor shall leave residences and other buildings in a habitable manner after hours by securing unfinished openings.
7) Workmanship shall be warrantied for not less than one year from date of final inspection.
Materials shall be warrantied as per manufacturer’s warranty.
8) Unless otherwise indicated, all materials, equipment, and supplies shall be new and in good condition, UL listed when applicable, and all work accomplished in a manner acceptable to Facilities Management.
9) Clean up of the project site shall be the responsibility of the Contractor. The Contractor shall assure that job site is clean of nails, debris, etc., at end of each day to ensure safety. The Contractor shall clean up and haul away all scrap when work is completed to an approved location off state property.
10) The Contractor, employees, and sub-contractors shall be licensed, certified, or registered as required. They shall be registered in the State of Tennessee Edison purchasing system.
11) The State of Tennessee shall not be held liable for any damage, loss of property, or injury of personnel resulting from actions of the Contractor and/or his/her sub-contractors or employees.
12) At all times, the Contractor shall have a copy of project specifications, permits, and Certificate of Insurance on-site.
13) Facilities Management may terminate this Contract for convenience without cause and for any reason. Facilities Management shall give the Contractor at least thirty (30) days written notice before the termination date. The Contractor shall be entitled to compensation for all conforming goods delivered and accepted by the Facilities Management or for satisfactory, authorized services completed as of the termination date. In no event shall the State be liable to the Contractor for compensation for any goods neither requested nor accepted by the Facilities Management or for any services neither requested by Facilities Management nor satisfactorily performed by the Contractor. In no event shall the State's exercise of its right to terminate this Contract for convenience relieve the Contractor of any liability to the State for any damages or claims arising under this Contract.
14) If the Contractor fails to properly perform its obligations under this Contract in a timely or proper manner, or if the Contractor materially violates any terms of this Contract, the State shall have the right to immediately terminate the Contract and withhold payments in excess of compensation for completed services or provided goods. Notwithstanding the above, the
Contractor shall not be relieved of liability to the State for damages sustained by virtue of any Breach Condition and the State may seek other remedies allowed at law or in equity for breach of this Contract.
15) Notwithstanding any use of the approved subcontractors, the Contractor shall be the prime contractor and responsible for compliance with all terms and conditions. The State reserves the right to request additional information or impose additional terms and conditions before approving an assignment of this Contract in whole or in part or the use of subcontractors in fulfilling the Contractor's obligations under this Contract.
16) The Contractors and all subcontractors are not authorized to day laborers or temporary labor on this project without the express written permission of Facilities Management.
17) The Contractor shall have a Certificate of Insurance on file with Facilities Management and in compliance with State regulations. The Contractor shall have insurance as shall protect the Contractor from claims which may arise out of or result from the Contractor’s operations under the Contract and for which the Contractor may be held legally liable, whether such operations be by the Contractor or by sub-contractor or by anyone directly or indirectly employed by any of them, or anyone associated with them for whose acts they may be liable.
Sub-contractors shall also be registered in the State of Tennessee Edison purchasing system, be listed on the bid application, submit copy of applicable license, and shall show proof of insurance and have workers compensation.
18) Note: Before the Contract resulting from this Invitation to Bid is signed, the apparent successful proposer shall be registered with the Department of Revenue for the collection of Tennessee sales and use tax. The State shall not approve a Contract unless the proposer provides proof of such registration. The foregoing is a mandatory requirement of an award of a Contract pursuant to this solicitation.
19) Invoice shall be submitted for payment not before project completion and final project acceptance but also no later than 10 days after project completion and acceptance. A copy of the invoice shall be submitted to: Deborah Quist, 160 State Circle, Rocky Top, TN 37769, 865- 606-0785, deborah.g.smith@tn.gov.
mailto:deborah.g.smith@tn.gov
20) Facilities Management Regional Contacts for this project are:
Regional Manager: Chad Young, 865-606-1551, chad.young@tn.gov
Project Manager: Chris Mayeaux, 865-340-3287, chris.mayeaux@tn.gov mailto:chad.young@tn.gov mailto:chris.mayeaux@tn.gov
| Rec Hall Repairs |
| General Conditions |
| General Scope of Work |
| Description of Demolition or Associated Work |
| All debris shall be removed from the park property and disposed of in accordance with all applicable regulations, unless specifically noted. |
| New Work |
| Approved Brands and Specifics (or Pre-approved Equal) |
| Additional Terms and Conditions |