RDT.pdf

PDF 96 KB Posted

Attached to
F/A-18 E-G, LTC, Flight Control Surfaces
Solicitation number
N0038326RT052
Issued by

About this file

Resource Distribution Table (RDT) - DRAFT Summary

This is a Resource Distribution Table (RDT) template for the F-18 Flight Control Surfaces (FCS) Repair Logistics Technical Contract. The document is a draft planning tool designed to capture contract and subcontract resource allocation information for Boeing as the prime contractor. The RDT serves as a comprehensive work breakdown structure (WBS) organizing all program elements from unit-level operations through depot-level maintenance activities, with specific focus on airframe components including ailerons (left and right), integrated leading-edge flaps (ILEF), horizontal stabilizers (HSTAB), trailing-edge flaps (TEF), and outer leading-edge flaps (OLEF), each identified by National Item Identification Numbers (NIIN).

The table establishes a hierarchical structure spanning five WBS levels and encompasses both sustaining support and systems engineering functions. Key operational areas include unit-level manpower and operations, maintenance consumables and repair parts, depot-level reparables (DLRs), propulsion support, obsolescence engineering, and intermediate/depot maintenance activities. Additional program management functions are incorporated, such as reliability and maintainability engineering, logistics engineering, safety/human systems integration, affordability engineering, supply chain management, configuration management, quality assurance, and transition to performance-based logistics (PBL). The document requires consistency between contract plan and program plan information, inclusion of assigned contract numbers for subcontracts, and reflection of current contract values including all modifications and contract line items (CLINs).

View the file

Other files

File Type Posted
CDRL Quantity Data Report.pdf PDF
Attachment 05 CSDR Plan.pdf PDF
Repair Tier Attachment.pdf PDF
FCS Statement of Work (SOW).pdf PDF
List of NIINs and Quantities.pdf PDF
CDRL FlexFile.pdf PDF
Packaging.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Resource Distribution Table (RDT) - DRAFT

Prime Contractor or Sub-Contractor Total In-House Total Sub Sub

Description F18 FCS Repair

LTC

Contractor/Organization Name Boeing

Contractor/Organization Location

Contract Number TBD

Total Program Office or Contract/Effort Value (Estimated), TY$M

Subtotal Software Contract Value (Estimated), TY$M

Government Organization or PARM

CSDR Direct Reporting per CWIPT (Yes/No)

SRDR Direct Reporting per CWIPT (Yes/No)

L1 L2 L3 L4 L5

1.0

1.1

1.2

1.3

1.3.1

1.3.2

1.3.2.1

1.3.2.1.1 NIIN 015622564 - LH AILERON and its members

1.3.2.1.2 NIIN 015622559 - RH AILERON and its members

1.3.2.1.3 NIIN 016191840 - LH ILEF and its members

1.3.2.1.4 NIIN 016191841 - RH ILEF and its members

1.3.2.1.5 NIIN 016183519 - HSTAB and its members

1.3.2.1.6 NIIN 015919728 - LH TEF and its members

1.3.2.1.7 NIIN 015919729 - RH TEF and its members

1.3.2.1.8 NIIN 016659591 - LH TEF R2 and its members

1.3.2.1.9 NIIN 016659592 - RH TEF R2 and its members

1.3.2.1.10 NIIN 016233649 - LH OLEF and its members

1.3.2.1.11 NIIN 016233679 - RH OLEF and its members

1.3.2.1.12 NIIN 016233680 - LH G Model OLEF and its members

1.3.2.1.13 NIIN 016233681 - RH G Model OLEF and its members

1.3.2.2

1.3.3

1.3.4

1.3.5

1.4

1.4.1

1.4.2

1.4.3

1.4.3.1

1.4.3.2

1.4.3.3

1.4.3.4

1.4.3.5

1.4.3.6

1.4.3.7

1.4.3.8

1.4.3.9

1.4.3.10

1.4.3.11

1.4.3.12

1.4.3.13

1.4.3.14

1.4.4

1.4.4.1

1.4.4.2

1.4.4.3

1.4.4.4

1.4.4.5

1.4.4.6

1.4.4.7

1.4.4.8

1.4.4.9

1.4.4.10

1.4.4.11

1.4.4.12

1.4.5

1.4.6

1.4.7

1.5

1.6

1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the

Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform to the applicable rules established for the Program Plan RDT

2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included.

Continuing System Improvements

Installation and Personnel Support

Packing, Handling, Shipping and Transportation

Travel

Commercial Asset Visibility (CAV) Reporting

CSDR Contract Data Requirements List (CDRL) Reporting

Information Systems

Data and Technical Publications

Simulator/Training Device Operations and Repair

Transition to Lead Service

Quality Assurance

Administrative Security

Transition to Performance Based Logistics (PBL)

Risk Mitigation

Contracts

Financial/Schedule Planning and Reporting

Availability Management

Product Engineering Support

Certification and Accreditation

Configuration Management

System Performance Analysis

Supply

Data Analysis

Physical Security

Program Management

Performance Based Logistics (PBL) Management

PBL Supply Management

Reliability and Maintainability Engineering

Logistics Engineering

Supply Analysis Efforts

Safety/Human Systems Integration Engineering

Affordability Engineering

Sustaining Support

System Specific Training

Support Equipment Replacement and Repair

WBS

NUMBERS

Sustaining/Systems Engineering

Prime Contractor

WBS Element Name

Subcontractors

F-18 Flight Control Surfaces (FCS) Repair LTC

Unit-Level Manpower (System Level Cost Only)

Unit Operations (System Level Cost Only)

Maintenance

Consumables and Repair Parts

Depot Level Reparables (DLRs) / Repair of Reparables (RoRs)

Airframe/Hull/Vehicle DLRs

Propulsion DLRs

Intermediate Maintenance

Obsolescence Engineering

Depot Maintenance

9/16/20268:29 AM Attachment 06 RDT RDT