Resource Distribution Table (RDT) - DRAFT Summary
This is a Resource Distribution Table (RDT) template for the F-18 Flight Control Surfaces (FCS) Repair Logistics Technical Contract. The document is a draft planning tool designed to capture contract and subcontract resource allocation information for Boeing as the prime contractor. The RDT serves as a comprehensive work breakdown structure (WBS) organizing all program elements from unit-level operations through depot-level maintenance activities, with specific focus on airframe components including ailerons (left and right), integrated leading-edge flaps (ILEF), horizontal stabilizers (HSTAB), trailing-edge flaps (TEF), and outer leading-edge flaps (OLEF), each identified by National Item Identification Numbers (NIIN).
The table establishes a hierarchical structure spanning five WBS levels and encompasses both sustaining support and systems engineering functions. Key operational areas include unit-level manpower and operations, maintenance consumables and repair parts, depot-level reparables (DLRs), propulsion support, obsolescence engineering, and intermediate/depot maintenance activities. Additional program management functions are incorporated, such as reliability and maintainability engineering, logistics engineering, safety/human systems integration, affordability engineering, supply chain management, configuration management, quality assurance, and transition to performance-based logistics (PBL). The document requires consistency between contract plan and program plan information, inclusion of assigned contract numbers for subcontracts, and reflection of current contract values including all modifications and contract line items (CLINs).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRL Quantity Data Report.pdf | ||
| Attachment 05 CSDR Plan.pdf | ||
| Repair Tier Attachment.pdf | ||
| FCS Statement of Work (SOW).pdf | ||
| List of NIINs and Quantities.pdf | ||
| CDRL FlexFile.pdf | ||
| Packaging.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Resource Distribution Table (RDT) - DRAFT
Prime Contractor or Sub-Contractor Total In-House Total Sub Sub
Description F18 FCS Repair
LTC
Contractor/Organization Name Boeing
Contractor/Organization Location
Contract Number TBD
Total Program Office or Contract/Effort Value (Estimated), TY$M
Subtotal Software Contract Value (Estimated), TY$M
Government Organization or PARM
CSDR Direct Reporting per CWIPT (Yes/No)
SRDR Direct Reporting per CWIPT (Yes/No)
L1 L2 L3 L4 L5
1.0
1.1
1.2
1.3
1.3.1
1.3.2
1.3.2.1
1.3.2.1.1 NIIN 015622564 - LH AILERON and its members
1.3.2.1.2 NIIN 015622559 - RH AILERON and its members
1.3.2.1.3 NIIN 016191840 - LH ILEF and its members
1.3.2.1.4 NIIN 016191841 - RH ILEF and its members
1.3.2.1.5 NIIN 016183519 - HSTAB and its members
1.3.2.1.6 NIIN 015919728 - LH TEF and its members
1.3.2.1.7 NIIN 015919729 - RH TEF and its members
1.3.2.1.8 NIIN 016659591 - LH TEF R2 and its members
1.3.2.1.9 NIIN 016659592 - RH TEF R2 and its members
1.3.2.1.10 NIIN 016233649 - LH OLEF and its members
1.3.2.1.11 NIIN 016233679 - RH OLEF and its members
1.3.2.1.12 NIIN 016233680 - LH G Model OLEF and its members
1.3.2.1.13 NIIN 016233681 - RH G Model OLEF and its members
1.3.2.2
1.3.3
1.3.4
1.3.5
1.4
1.4.1
1.4.2
1.4.3
1.4.3.1
1.4.3.2
1.4.3.3
1.4.3.4
1.4.3.5
1.4.3.6
1.4.3.7
1.4.3.8
1.4.3.9
1.4.3.10
1.4.3.11
1.4.3.12
1.4.3.13
1.4.3.14
1.4.4
1.4.4.1
1.4.4.2
1.4.4.3
1.4.4.4
1.4.4.5
1.4.4.6
1.4.4.7
1.4.4.8
1.4.4.9
1.4.4.10
1.4.4.11
1.4.4.12
1.4.5
1.4.6
1.4.7
1.5
1.6
1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the
Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform to the applicable rules established for the Program Plan RDT
2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included.
Continuing System Improvements
Installation and Personnel Support
Packing, Handling, Shipping and Transportation
Travel
Commercial Asset Visibility (CAV) Reporting
CSDR Contract Data Requirements List (CDRL) Reporting
Information Systems
Data and Technical Publications
Simulator/Training Device Operations and Repair
Transition to Lead Service
Quality Assurance
Administrative Security
Transition to Performance Based Logistics (PBL)
Risk Mitigation
Contracts
Financial/Schedule Planning and Reporting
Availability Management
Product Engineering Support
Certification and Accreditation
Configuration Management
System Performance Analysis
Supply
Data Analysis
Physical Security
Program Management
Performance Based Logistics (PBL) Management
PBL Supply Management
Reliability and Maintainability Engineering
Logistics Engineering
Supply Analysis Efforts
Safety/Human Systems Integration Engineering
Affordability Engineering
Sustaining Support
System Specific Training
Support Equipment Replacement and Repair
WBS
NUMBERS
Sustaining/Systems Engineering
Prime Contractor
WBS Element Name
Subcontractors
F-18 Flight Control Surfaces (FCS) Repair LTC
Unit-Level Manpower (System Level Cost Only)
Unit Operations (System Level Cost Only)
Maintenance
Consumables and Repair Parts
Depot Level Reparables (DLRs) / Repair of Reparables (RoRs)
Airframe/Hull/Vehicle DLRs
Propulsion DLRs
Intermediate Maintenance
Obsolescence Engineering
Depot Maintenance
9/16/20268:29 AM Attachment 06 RDT RDT
File details come from the government source that posted it. Updated .