DD FORM 2794 – Cost and Software Data Reporting Plan Summary

This document is a DD Form 2794 (May 2024), which establishes the Cost and Software Data Reporting (CSDR) plan for the F/A-18E/F Super Hornet Naval Strike Fighter program under Boeing Global Services. The plan covers the Operations & Sustainment (O&S) phase and is designated as ACAT I (MDAP). The prime mission product is Flight Control Surfaces (FCS) Repair Logistics & Technical Competency (LTC), with the contract reporting organization being The Boeing Company's Boeing Global Services division located in St. Louis, Missouri. The approved plan number is N-13-F-C44, funded through WCF (Working Capital Fund) appropriation. The plan requires reporting of at-completion costs for both standard functional categories and recurring/nonrecurring costs using the FlexFile format, with cost reports tracking actuals to date (ATD) and forecast at completion (FAC).

The comprehensive Work Breakdown Structure (WBS) includes detailed cost and technical data requirements across multiple functional categories, including unit-level manpower, operations, maintenance (consumables, repair parts, depot-level reparables), sustaining support (training, engineering, program management), and continuing system improvements. Specific hardware items tracked include flight control surfaces such as ailerons, leading edge flaps, horizontal stabilizers, trailing edge flaps, and outer leading edge flaps, identified by National Item Identification Numbers (NIINs). Submission requirements include four scheduled events: Annual Reports #1 (as of 09/30/2028, due 11/30/2028), #3 (as of 09/30/2030, due 11/30/2030), #4 (as of 09/30/2031, due 11/30/2031), and a Final Report (as of 03/31/2033, due 05/31/2033). The plan mandates a CSDR Readiness Review within 60 days of contract award or work start, unit/sublot reporting for discrete end items, and Resource Distribution Table submission seven days prior to the readiness review to identify subcontractor reporting requirements.

View the file

Other files

File Type Posted
CDRL Quantity Data Report.pdf PDF
Repair Tier Attachment.pdf PDF
FCS Statement of Work (SOW).pdf PDF
List of NIINs and Quantities.pdf PDF
CDRL FlexFile.pdf PDF
RDT.pdf PDF
Packaging.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 1 of 7

COST AND SOFTWARE DATA REPORTING PLAN OMB No. 0704-0671

The public reporting burden for this collection of information is estimated to average 57 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0671). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME F/A-18E/F - SUPER HORNET Naval Strike Fighter 1b. PHASE/MILESTONE (check all that apply)

Pre-A A B

C-LRIP

C-FRP

X O&S 1c. PRIME MISSION PRODUCT Flight Control Surfaces (FCS) Repair LTC 1d. ACQUISITION CATEGORY (ACAT)

Pre-ACAT

X ACAT I (MDAP)

ACAT IA (MAIS)

ACAT II

ACAT III

Other

2. COMMODITY TYPE

Aircraft System

3. PLAN ITERATION TYPE

X INITIAL

REVISION

4. CURRENT SUBMISSION DATE (YYYYMMDD)

20260202

5. LAST APPROVED PLAN DATE (YYYYMMDD)

6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)

Christina Foley 6b. ADDRESS (Include ZIP Code) 700 Robbins St Philadelphia, PA 19111 6c. TELEPHONE NUMBER (Include Area Code) N/A 6d. E-MAIL ADDRESS christina.m.foley5.civ@us.navy.mil

7. PLAN TYPE

GOVERNMENT

X CONTRACT (PRIME)

CONTRACT (SUB)

8. PLAN GOVERNMENT PREPARING ORGANIZATION

NAVSUP WSS

9a. CONTRACTOR NAME/ADDRESS

i. REPORTING ORGANIZATION NAME The Boeing Company

ii. DIVISION NAME Boeing Global Services

iii. LOCATION St Louis, MO

iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:

CBDR REQUIRED FOR THIS ORGANIZATION

9b. CONTRACT NUMBER (List all that apply, separated by commas)

TBD - (N-13-F-C44)

9c. APPROPRIATION (check all that apply)

RDT&E

PROCUREMENT

O&M

FMS

X WCF

OTHER

10a. APPROVED PLAN NUMBER N-13-F-C44 10b. APPROVED PLAN REVISION NUMBER

10c. APPROVED PLAN REQUIREMENTS X AT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy) X AT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)

TECHNICAL DATA REQUIRED

10d. COST REPORT TYPE

X FLEXFILE

LEGACY DD 1921 SERIES

DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 2 of 7

COST AND SOFTWARE DATA REPORTING PLAN

11. WORK BREAKDOWN STRUCTURE (WBS) 12. COST 13. TECHNICAL DATA

a. WBS

CODE

b. WBS LEVEL c. WBS ELEMENT NAME a. ACTUALS TO

DATE (ATD)

b. LEGACY

1921-1

c. LEGACY

1921-2

d. LEGACY

1921-5

e. EAC/FAC

(See item 10d)

a. QUANTITY

b. SRDR

FORMATS

c.

MAINT. &

REPAIR

PARTS

i. QUANTITY

DATA

ii. GFE

QUANTITY

1.0 1 F-18 Flight Control Surfaces (FCS) Repair LTC X

1.1 2 Unit-Level Manpower (System Level Cost Only) X X

1.2 2 Unit Operations (System Level Cost Only) X X

1.3 2 Maintenance X

1.3.1 3 Consumables and Repair Parts X X

1.3.2 3 Depot Level Reparables (DLRs) / Repair of Reparables (RoRs) X

1.3.2.1 4 Airframe/Hull/Vehicle DLRs X

1.3.2.1.1 5 NIIN 015622564 - LH AILERON and its members X X X

1.3.2.1.2 5 NIIN 015622559 - RH AILERON and its members X X X

1.3.2.1.3 5 NIIN 016191840 - LH ILEF and its members X X X

1.3.2.1.4 5 NIIN 016191841 - RH ILEF and its members X X X

1.3.2.1.5 5 NIIN 016183519 - HSTAB and its members X X X

1.3.2.1.6 5 NIIN 015919728 - LH TEF and its members X X X

1.3.2.1.7 5 NIIN 015919729 - RH TEF and its members X X X

1.3.2.1.8 5 NIIN 016659591 - LH TEF R2 and its members X X X

1.3.2.1.9 5 NIIN 016659592 - RH TEF R2 and its members X X X

1.3.2.1.10 5 NIIN 016233649 - LH OLEF and its members X X X

1.3.2.1.11 5 NIIN 016233679 - RH OLEF and its members X X X

1.3.2.1.12 5 NIIN 016233680 - LH G Model OLEF and its members X X X

1.3.2.1.13 5 NIIN 016233681 - RH G Model OLEF and its members X X X

1.3.2.2 4 Propulsion DLRs X X

1.3.3 3 Intermediate Maintenance X X

1.3.4 3 Depot Maintenance X X

1.3.5 3 Packing, Handling, Shipping and Transportation X X

1.4 2 Sustaining Support X

1.4.1 3 System Specific Training X X

1.4.2 3 Support Equipment Replacement and Repair X X

1.4.3 3 Sustaining/Systems Engineering X

1.4.3.1 4 Reliability And Maintainability Engineering X X

1.4.3.2 4 Logistics Engineering X X

1.4.3.3 4 Supply Analysis Efforts X X

1.4.3.4 4 Safety/Human Systems Integration Engineering X X

1.4.3.5 4 Affordability Engineering X X

1.4.3.6 4 Obsolescence Engineering X X

1.4.3.7 4 Availability Management X X

1.4.3.8 4 Product Engineering Support X X

1.4.3.9 4 Certification and Accreditation X X

1.4.3.10 4 Configuration Management X X

1.4.3.11 4 System Performance Analysis X X

1.4.3.12 4 Supply X X

1.4.3.13 4 Data Analysis X X

1.4.3.14 4 Physical Security X X

1.4.4 3 Program Management X

1.4.4.1 4 Performance Based Logistics (PBL) Management X X

1.4.4.2 4 PBL Supply Management X X

1.4.4.3 4 Financial/Schedule Planning and Reporting X X

1.4.4.4 4 Transition to Lead Service X X

1.4.4.5 4 Quality Assurance X X

1.4.4.6 4 Administrative Security X X

1.4.4.7 4 Transition to Performance Based Logistics (PBL) X X

1.4.4.8 4 Risk Mitigation X X

1.4.4.9 4 Contracts X X

1.4.4.10 4 Commercial Asset Visiblity (CAV) Reporting X X

1.4.4.11 4 Contract Data Requirements List (CDRL) Reporting X X

DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 3 of 7

11. WORK BREAKDOWN STRUCTURE (WBS) 12. COST 13. TECHNICAL DATA

a. WBS

CODE

b. WBS LEVEL c. WBS ELEMENT NAME a. ACTUALS TO

DATE (ATD)

b. LEGACY

1921-1

c. LEGACY

1921-2

d. LEGACY

1921-5

e. EAC/FAC

(See item 10d)

a. QUANTITY

b. SRDR

FORMATS

c.

MAINT. &

REPAIR

PARTS

i. QUANTITY

DATA

ii. GFE

QUANTITY

1.4.4.12 4 Travel X X

1.4.5 3 Information Systems X X

1.4.6 3 Data and Technical Publications X X

1.4.7 3 Simulator/Training Device Operations and Repair X X

1.5 2 Continuing System Improvements X X

1.6 2 Installation and Personnel Support X X

Subtotal Cost X X

Reporting Contractor G&A X X Reporting Contractor Undistributed Budget X X Reporting Contractor Management Reserve X X Reporting Contractor FCCM X X Total Cost X X

Reporting Contractor Profit/Loss or Fee X X

Total Price X X

DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 4 of 7

14. CSDR SUBMISSION EVENTS

a.

EVENT ID

b.

DATA REPORT(S)

c.

SUBMISSION EVENT NAME

d.

REPORT CYCLE

e. AS OF DATE f. DUE DATE

(YYYYMMDD) (YYYYMMDD)

1 Cost and Hour Report (FlexFile), Quantity Data Report F-18 FCS Repair LTC - Annual Report #1 Interim 20280930 20281130 2 Cost and Hour Report (FlexFile), Quantity Data Report F-18 FCS Repair LTC - Annual Report #3 Interim 20300930 20301130 3 Cost and Hour Report (FlexFile), Quantity Data Report F-18 FCS Repair LTC - Annual Report #4 Interim 20310930 20311130 4 Cost and Hour Report (FlexFile), Quantity Data Report F-18 FCS Repair LTC - Final Report Final 20330331 20330531

DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 5 of 7

15. REMARKS

In addition to the direction provided in the associated CSDR Data Item Descriptions (DIDs) and the CSDR Manual (DoDM 5000.04), the following instructions, requirements, and considerations found on this page/worksheet shall be utilized when collecting data and preparing CSDR submissions. This CSDR Contract plan is intended to capture costs associated with the contract number(s) listed in block 9.b, irrespective of contract type (e.g., firm-fixed price, cost-plus fixed fee) or CLIN structure, including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc.

a. CSDR PLAN REMARKS & PREPARATION INSTRUCTIONS

1. Costs reported against this CSDR plan shall be cumulative in nature (i.e., each submission shall report any and all costs incurred on and prior to the submission's "AS OF DATE" (block 14.e)).

i. WBS Element Names (block 11.c) Ending with "1...n (Contractor Shall Specify)": The contractor shall extend and specify (i.e., include additional WBS elements determined by the contractor) in order to provide additional insight into the contractor's technical approach or design. The additional WBS elements shall be developed in accordance with the WBS guidelines included in MIL-STD-881F (or latest version).

ii. The contractor may extend any WBS element in accordance with guidelines included in MIL-STD-881F (or latest version). Any changes to WBS, Order/Lot, End Item, and/or Period of Performance must be reported to the government prior to submission or immediately, with revised CSDR Plan, must be approved by the CSDR Plan approval authority.

b. SUBMISSION EVENTS & DATES

1. Deliverable Preparation Instructions by AS OF and DUE Dates: All CSDR deliverable "AS OF DATE[S]" and "DUE DATE[S]" listed in blocks 14.e and 14.f are identified for planning purposes only. Submission dates are subject to change and are determined in accordance with the event drivers as identified below:

i. All "DUE DATE" requirements are equal to the "AS OF DATE" plus 60 calendar days. If the calculated "DUE DATE" does not fall on a regular business day, the "DUE DATE" will be the next regular business day on the contractor's accounting calendar.

ii. "Final" Submission Events must meet both of the following two conditions: Condition 1: The final end item(s) has been delivered and accepted by the government (e.g., as evidenced by a completed DD-250) or higher tier contractor in the case of a subcontractor, and Condition 2: 95% or more of all ATD costs associated with the Subtotal, G&A and FCCOM have been incurred relative to all costs the reporting entity expects to incur for each and every Order/Lot (defined in Item 4 of Data Group B) associated with the contract Subtotal, G&A, FCCOM and UB.

iii. If the Contract period of performance is extended by more than six months, or if the scope of work is modified to include work not otherwise covered by the CSDR Plan, the government may modify the CSDR Plan to require additional submission events and add additional WBS elements in order to ensure the accurate and complete collection of cost data associated with the modified contract.

c. COST & HOUR REPORT (FLEXFILE)

1. The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794.

2. The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.

3. WBS Definitions & Remarks (Data Group C) must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The WBS Definitions & Remarks shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. WBS Definitions & Remarks shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.

4. The reporting entity must maintain and update WBS Definitions & Remarks throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the "As of Date" of the submitted FlexFile report and indicate the changes to the WBS Definitions.

5. For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in WBS Definitions & Remarks that "This CSDR WBS element is not associated with this contract's scope of work", and zero costs will be associated for ATD and FAC for these WBS elements.

6. Order/Lot: Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.

7. End Items: Block 17 of this CSDR Plan is meant to capture the discrete hardware end items that are DD-250'ed, ordered, procured, or exercised (as applicable) on the contract. If an End Item is DD-250'ed, ordered, procured, or exercised (as applicable) on the contract but is not listed in block 17, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the End Item utilized on the contract. The CSDR Plan will be updated to include the appropriate End Item name in block 17, after report submission, if required.

d. QUANTITY DATA REPORT

DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 6 of 7

1. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.

2. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for hardware-related content across the following WBS elements: Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.

e. RESOURCE DISTRIBUTION TABLE (RDT)

1. Submissions of the Resource Distribution Table (RDT) are required under the following conditions:

i. An RDT shall be delivered no later than seven calendar days before the "CSDR Readiness Review". Prepare this submission of the RDT, in accordance with the RDT Instructions on the CADE website, at FAC/EAC value and utilizing the instructions at Block15.a.4.i.This copy of the RDT will be used during the "CSDR Readiness Review" in order to identify which subcontractors will be required to provide CSDR reporting via electronic submission of deliverables directly to CADE and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.

ii. The contractor must notify the government program office immediately of the contractor identifying that a subcontractor who, at the time of initial subcontractor award, was not anticipated to qualify for direct subcontractor CSDR reporting via electronic submission of deliverables directly to CADE but is subsequently anticipated to meet the CSDR direct reporting subcontractor threshold value due to changes to scopes of work, end-item design, subcontractor/supplier, or subcontract price changes since initial contract award (unless the newly identified subcontractor has already been issued a subcontractor reporting waiver associated with this contract).

f. CSDR READINESS REVIEW

1. The contractor shall host a CSDR-RR at the contractor's facility where CSDRs are prepared with the Government's Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoD Manual 5000.04 (CSDR Manual). The purpose of the CSDR-RR is to review the contract's CSDR requirements and assess how the Contractor's accounting system satisfies the CSDR requirements found in DODM

5000.04 and this CSDR Plan. Reference the CADE website for instructions and additional information: https://cade.osd.mil/policy/csdr-timeline

2. The contractor and CWIPT will also review the initial submission of the "Resource Distribution Table (RDT)", in order to finalize which subcontractors will be required to provide CSDR reporting and electronic submission of deliverables directly to Cost Assessment Data Enterprise (CADE), and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.

3. The CSDR-RR shall be held within 60 days of contract award or the start of work meeting on a date mutually agreed to by the CWIPT and the contractor. This meeting has an anticipated duration of one business day.

g. CONTRACT-SPECIFIC REMARKS

1. The contractor shall identify the CLIN and Delivery Orders in the CLIN field by coding Delivery Order # underscore CLIN # on each Account to assist Delivery Order level visibility. For Example, N6AB1234_0001 where N6AB1234 is the Delivery Order Number and 0001 is the CLIN number. It is the Reporting Entity's responsibility to submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders.

DD FORM 2794, MAY 2024 PREVIOUS EDITION IS OBSOLETE Page 7 of 7

INTRA-CONTRACT SCOPE REPORTING DEFINITION

16. ORDERS/LOTS

a. ID b. NAME c. PHASE/MILESTONE

F18 FCS F18 FCS Repair LTC O&S

17. END ITEMS

a. ID b. NAME

F18 FCS F18 FCS Repair LTC

18. UNIT/SUBLOT REPORTING AND UNIT SEQUENCING REQUIREMENTS

a. ORDER/LOT ID b. END ITEM ID c. UNIT/SUBLOT REPORTING (X if applicable)

d. UNIT SEQUENCING (X if applicable)