This file contains architectural and engineering drawings dated January 9, 2025 for an interior renovation project at Rappahannock Community College's Warsaw Campus, commissioned through the Virginia Department of Engineering & Buildings (DEB Project Code 260-B4260-030). The project involves renovating existing office suites within the campus building located at 52 Campus Drive in Warsaw, Virginia, including modifications to Conference Room 182, Office 182B, and Office Suite areas 113-113C. The scope encompasses architectural modifications, mechanical/HVAC adjustments, fire suppression system updates, and electrical system renovations within the designated spaces.
The drawings detail specific requirements for lighting fixtures, power distribution, HVAC modifications, and sprinkler system adjustments. Key technical specifications include installation of 2x2 LED volumetric twin basket recessed troffers, vacancy sensors for lighting control, new ductwork and diffusers, and modifications to the existing fire suppression system. The mechanical systems must maintain operation during construction except for scheduled shutdowns. The project requires coordination between architectural, mechanical, electrical, and fire protection trades to ensure proper integration of all building systems within the renovated spaces.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B101a
DEPT.
ADD
GRID LINES
ROOM NUMBER
DOOR NO. ON PLAN
H.M. FRAME NO.
ON PLAN
REVISION: TYPE =
A.S.I/P.R./C.C.D./ADD.
CASEWORK
(FURNISHING PLANS ONLY)
ALUM. FRAME/WINDOW
TYPE
WALL TYPEA3ROOM NAME
B101a
SIM
SIM
A102 A103
SECTIONS
VIEW NUMBER
SHEET NUMBER WHERE VIEW IS DRAWN
DETAIL NUMBER
SHEET NUMBER
WHERE VIEW IS
DRAWN
DETAILS IN PLAN/SECTION
SHEET NUMBER WHERE VIEW IS TAKEN
SHEET NUMBER WHERE VIEW IS TAKEN
EARTH
GRAVEL
CONCRETE
CONCRETE MASONRY UNITS
SOLID CONCRETE
MASONRY UNITS
BRICK
WOOD-FINISHED
WOOD ROUGH
PLYWOOD
GYPSUM BOARD
ACOUSTIC TILE
STEEL - LARGE SCALE
ALL METALS - SMALL SCALE
GLASS - LARGE SCALE
BATT INSULATION
RIGID INSULATION
CERAMIC TILE
CARPET
Above finished floor AFF Acoustic ACST Acoustic Panel Ceiling APC Addendum ADD Alternate ALT Aluminum AL Angle L Approximate APPROX Architecture, ARCH architectural Asbestos ASB Asphalt ASPH Assistant ASST Association ASSN Automatic AUTO Average AVG Base plate BP Basement BSMT Beam BM Bearing BRG Bedroom BR Benchmark BM Board BD Boiler BLR Bottom BOT Brick BRK Building line BL Building BLDG Built-up-roof BUR Cabinet CAB Carpet CPT Catalog CAT Ceiling height CH Ceiling CLG Center CTR Centerline CL Ceramic Tile CT Ceramic CER Chalkboard CB Clear CLR Closet CLO Coated CTD Cold rolled CR Column COL Company CO Composition COMP Concrete Masonry Unit CMU Concrete CONC Construction joint CJ Construction CONSTR "Continue, Continuous" CONT Corridor CORR Countersink CSK Cubic CU Curve(d) CRV Dampproofing DP Degree DEG Department(al) DEPT Detail DET Diagonal DIAG Diameter DIA Dimension DIM Dishwasher DW Dispenser DISP Door DR Double DBL Double-hung DH Down DN Downspout DS Drain DR Drawing DWG Each EA East E Electric Water Cooler EWC "Electric, electrical" ELEC Elevation EL Elevator ELEV Engineer ENGR Entrance ENTR
Maximum MAX Mechanical MECH Membrane MEMB Men M Metal MET, MTL Mezzanine MEZZ Minimum MIN Mirror MIR Miscellaneous MISC Mounted MTD Mounting MTG Necessary NEC Noise-reduction NRC coefficient Nominal NOM Non Combustible NC, NONCOM North N Not in Contract NIC Not to scale NTS Not available NA Number NO Office OFF On center OC Opening OPNG Opposite OPP Outside diameter OD Overall OA Overhead OVHD Page P Painted PTD Pair PR Panel PNL Partition PTN Percent PCT Perforate(d) PERF Permanent PERM Perpendicular PERP Piece PC Plastic Laminate PLAM Plastic Laminate PLAS.LAM Plate PL Plumbing PLMB Plywood PLYWD Point PT Polyvinyl chloride PVC Precast PRCST Prefabricated PREFAB Preliminary PRELIM Preparation, prepare PREP Program PRGM Projection Screen PS Project PROJ Property PROP Public Address PA Quality control QC Quality QUAL Quantity QTY Quarry Tile QT Radius RAD Rain Leader RL Received RCVD Receptacle RCPT Receptionist RECPT Recess(ed) REC Refer, reference REF Refrigerate, refrigerator REFR Reinforce REINF Reinforced concrete RC Remove RMV Repair RPR Required REQD Revise, revision REV Right hand RH Road RD Roof Drain RD Roof RF Roofing RFG Room RM Rubber tile floor RTF
Rubber RBR Schedule SCHED Schematic SCHEM Section SECT Service SVCE "Sheet, sheeting" SHT Shower SH Siding SDG Similar SIM Slope SL Sound-transmission STC class South S Speaker SPKR Specification SPEC Sprinkler SPR Square SQ Stainless steel SS Standard STD Standpipe SP Steel STL Storage STOR Structural Glazed SGFT Facing Tile Structural, structure STRUCT Substitute SUBST Surface SURF Suspend(ed) SUSP Switch SW Symmetrical SYM System SYS Tackboard TB Tackstrip TS Telephone TEL Television TV Temporary TEMP Terrazzo TER Thick THK Through THRU Toilet T Tongue and groove T&G Top and bottom T&B Top chord TC Top of Masonry Parapet TMP Top of Bearing TOFB Top of Steel T.O.S.
Topping TOPG Total TOT Transformer XFMR Transom TR Transparent TRANS Tread TRD Threshold THRESH Typical TYP Underground UG Underwriters UL Laboratories Unfinished UNF Unit Ventilator UV Unless Otherwise Noted UON Urinal UR US Gypsum Company USG Verify in Field VIF Vertical VERT Vestibule VEST, V Vinyl Reducing Strip VRS Vinyl Composite Tile VCT Vinyl asbestos tile VAT Wardrobe WARD Water closet WC Waterproof WP Weight WT Welded WLD Welded Wire Mesh WWM With W/ Without W/O Women W Wood WD Wrought Iron WI
Equal EQ Equipment EQUIP Exhaust EXH Existing EXIST Existing to Remain ETR Expansion joint EXP JT Exposed EXP Exterior EXT Fabricate FAB Face of Stud F. OF S.
Fan Coil Unit FCU Fiberglass-reinforced FRP plastics Finish FIN Finished Floor FF Fire Extinguisher FE Fire Extinguisher & FEC Cabinet Fire Retardant Treated FRT Fireproof FPRF Fixture FXTR Flange FLG Flashing FL Floor FL Floor drain FD Flooring FLG Fluorescent FLUOR Footing FTG Foundation FDN Furnish(ed), furniture FURN Furring FURR Gage (gauge) GA Galvanize(d) GALV Galvanized Iron GALVI Glazed Wall Tile GWT Grab Bar GB Grade GR Gravel GVL Gypsum Wallboard GWB Gypsum GYP Handicapped HC Hardware HDW Heating ventilating and HVAC air conditioning Height HGT High Point HPT High Performance HP High Performance HPC Coating Hollow Metal HM Horizontal HORIZ Include(d), inclusive INCL Incorporated INC Information INFO Inside diameter ID Install(ed), installation INSTL Insulation INSUL Interior INT Janitor JAN Joint JT Joist J, JST Junction box JB Knock down KD Laboratory LAB Lavatory LAV Left Hand LH Left L Length LG Level LVL Light LT Machine MACH Maintenance MAINT Manager MGR Manual MNL Manufacturing MFG Markerboard MB Masonry opening MO Masonry MSNRY Master bedroom MBR Material MATL
123456789101112131415161718
123456789101112131415161718
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
K
L
M w w w .g ri m m a n d p a rk e r.
c o m
E a s t
M a in
S tr e e t n d F lo o r
C h a rl o tt e s v ill e
V A
T e l:
-2
-5
DEB #
260-B4260-030
TS01
TI
TL
E S
H E
E T
RC
C
-W
AR
SA
W
C
AM
PU
S
IN
TE
RI
OR
R
EN
OV
AT
IO
N
C am pu s D r, W ars aw
, V irg ini a
JANUARY 9, 2025
BID SET
GP #22006.16
LIST OF DRAWINGS
TS01 TITLE SHEET
ARCHITECTURAL
A001 CODE STUDY - FIRST FLOOR
A002 OVERALL FIRST FLOOR PLAN
A101 PARTIAL FLOOR PLAN
A102 PARTIAL FLOOR PLAN
A301 SCHEDULES & SIGNAGE
MECHANICAL
M000 LEGENDS, ABBREVIATIONS & GENERAL NOTES
MD101 PARTIAL FIRST FLOOR PLAN - DEMOLITION
M101 PARTIAL FIRST FLOOR PLAN - DUCTWORK
M501 DETAILS
M701 SCHEDULES & SPECIFICATIONS
FIRE SUPPRESSION
FX001 GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FX002
FX101 OVERALL FIRST FLOOR DEMOLITION PLAN
FX111 OVERALL FIRST FLOOR NEW WORK PLAN
ELECTRICAL
E000 LEGENDS, ABBREVIATIONS & GENERAL NOTES
ED101 PARTIAL FIRST FLOOR PLAN - DEMOLITION
E101 PARTIAL FIRST FLOOR PLAN - LIGHTING
E102 PARTIAL FIRST FLOOR PLAN - POWER AND SPECIAL SYSTEMS
E701 DETAILS, SCHEDULES & SPECIFICATIONS
APPROPRIATION ACT NUMBER
D E S I G N T E A M
DEB PROJECT CODE 260-B4260-030
RCC - WARSAW CAMPUS
INTERIOR RENOVATION
52 Campus Dr, Warsaw, Virginia
BID SET
JANUARY 9, 2025
DRAWING KEY
SYMBOLS OF MATERIALS
ABBREVIATIONS
VIRGINIA COMMUNITY COLLEGE SYSTEM
300 Arboretum Place, Suite 200 Richmond, Virginia 23236
OWNER
ARCHITECT MEP ENGINEER
GRIMM + PARKER ARCHITECTS
123 East Main St, Second Floor Charlottesville, Virginia 22902
2RW CONSULTANTS
100 10th St. NE, Suite 202 Charlottesville, Virginia 22902
VICINITY MAP LOCATION MAP
ASBESTOS DISCLOSURE STATEMENT
LEAD DISCLOSURE STATEMENT
AN ASBESTOS INSPECTION WAS PERFORMED AND ACM WAS FOUND GENERALLY IN THE AREA INDICATED. THE ASBESTOS INSPECTION REPORT IS INCLUDED AS AN APPENDIX TO THE PROJECT SPECIFICATIONS. THE OWNER SHALL SUBMIT AN APPLICATION FOR PERMIT TO HAVE THE ASBESTOS-CONTAINING MATERIALS ABATED BY A LICENSED ASBESTOS CONTRACTOR UNDER A SEPARATE CONTRACT USING APPROVED PROCEDURES PRIOR TO ISSUING A NOTICE TO PROCEED TO THE GENERAL CONTRACTOR. ANY ACM THAT IS TO REMAIN AND THE NEW NON ASBESTOS-CONTAINING MATERIAL SHALL BE LABELED ACCORDINGLY. THE ASBESTOS ABATEMENT CONTRACTOR SHALL MARK UP THE AS-BUILT DRAWINGS RESULTING FROM ITS WORK TO INCLUDE AREAS WHERE ASBESTOS WAS ABATED, AREAS WHERE ASBESTOS WAS ENCAPSULATED, AND AREAS WHERE ACM EXIST BUT WERE LEFT IN PLACE. THE GENERAL CONTRACTOR SHALL REVIEW AND CERTIFY THE LOCATIONS WHERE ACM WAS ABATED, AREAS WHERE ACM WAS ENCAPSULATED AND AREAS WHERE ACM WAS LEFT IN PLACE AS MARKED ON THE AS-BUILT
DRAWINGS AND WILL PROVIDE THE DRAWINGS TO THE ARCHITECT.
AN INSPECTION TO IDENTIFY LEAD CONTAINING OR COATED BUILDING COMPONENTS HAS BEEN CONDUCTED AND CAN BE FOUND IN THE PROJECT SPECIFICATIONS. THIS REPORT IS PROVIDED FOR THE CONTRACTOR’S USE AND MAY NOT BE ALL INCLUSIVE. IT IS THE CONTRACTOR’S RESPONSIBILITY TO COMPLY WITH ALL VIRGINIA OCCUPATIONAL SAFETY AND HEALTH (VOSH) REGULATIONS AS THEY PERTAIN TO EMPLOYEE EXPOSURES TO LEAD. ALL LEAD AND LEAD-COATED BUILDING COMPONENTS SHALL BE
RECYCLED TO THE EXTENT POSSIBLE.
DATE DESCRIPTION
HIGH PERFORMANCE BUILDNG ACT
IN ACCORD WITH THE HIGH PERFORMANCE BUILDINGS ACT, THE BUILDING IS EXEMPT FROM COMPLIANCE
BECAUSE THE RENOVATED BUILDING AREA IS NOT GREATER THAN 5,000 GROSS SQUARE FEET.
PROJECT NAME AND LOCATION
NAME RAPPAHANNOCK COMMUNITY COLLEGE - OFFICE RENOVATIONS
STREET ADDRESS 52 CAMPUS DRIVE
COUNTY RICHMOND COUNTY
CITY, STATE WARSAW, VA
PROJECT DESCRIPTION: RENOVATION OF EXISTING COMMUNITY COLLEGE OFFICE SUITES
APPLICABLE CODES
BUILDING CODE 2021 VIRGINIA EXISTING BUILDING CODE (VEBC)
2021 VIRGINIA CONSTRUCTION CODE (VCC)
VIRGINIA CONSTRUCTION & PROFESSIONAL SERVICES MANUAL, 2024 (CPSM), REV 1
ISSUED 10/10/24
ACCESSIBILITY ADA90-TITLE II (2010) ASAD CHAPTER 2 FOR SCOPING, ICC A117.1-2017 CHAPTERS 1 AND 3
THROUGH 11 FOR TECHNICAL REQUIREMENTS
BUILDING USE AND CONSTRUCTION CLASSIFICATION
VCC
USE GROUP: B, BUSINESS 304.1
A-3, ASSEMBLY 303.4
BUILDING AREA (PER VCC): 52,946 SF (92,000 SF ALLOWABLE)
PROPOSED CONSTRUCTION TYPE TYPE IIB (EXISTING)
ALLOWABLE BUILDING HEIGHT/STORIES: 75' (VCC TABLE 504.3), 3 STORIES (VCC TABLE 504.4)
ACTUAL BUILDING HEIGHT/STORIES: 20' MAXIMUM, 1 STORY
DESIGN OCCUPANT LOAD Total Occupants: 10 (See Occupant Load Calculation Schedule, A001)
BUILDING VOLUME: 1,103,160 CUBIC FEET (EXISTING)
APPLICABLE CODES AND TABULATIONS
EXISTING CLASSROOM BUILDING
RICHMOND ROAD
H W
Y
N/A
January 9, 2025
SPECIFICATIONS
OCCUPANCY LEGEND
ASSEMBLY
(UN-CONCENTRATED)
BUSINESS AREAS
AREA OF WORK
OFFICE SUITE 'B'
AREA OF WORK
1111 SF
OFFICE SUITE 'B'
MAX COMMON PATH OF
TRAVEL
146' - 6"
(300' MAX. ALLOWABLE)
MAX COMMON PATH OF
TRAVEL
109' - 11"
(300' MAX. ALLOWABLE)
187 SF
CONFERENCE ROOM
13141 SF
OFFICE SUITE 'A'
EGRESS WIDTH
VCC
Egress width at doors and corridors .15"/OCC. (1005.3.2, Exception 1)
PROJECT NAME AND LOCATION
NAME RAPPAHANNOCK COMMUNITY COLLEGE - OFFICE
RENOVATIONS
STREET ADDRESS
COUNTY
CITY, STATE
PROJECT DESCRIPTION: RENOVATION OF EXISTING COMMUNITY COLLEGE OFFICE SUITES
APPLICABLE CODES
Building Code:
Accessibility:
BUILDING USE AND CONSTRUCTION CLASSIFICATIONS
VCCMIXED SEPARATION:
Use Group:
Accessory Use Group:
B A-3
BUSINESS
ASSEMBLY
304.1 303.4
Building Area: First Floor 52,946 SF
Total
NOTES:
MAXIMUM DEAD END DISTANCES
REMOTENESS OF EXITS
VCC 1007.1.1 Exception 2 - 1/4 the Length of Maximum Room Diagonal (Credit for Sprinklered Building)
NUMBER OF REMOTE EXITS REQUIRED
VCC
1 Exit (Table 1006.2.1) 2 Exits (1006.2.1) 3 Exits (1006.2.1.1) 4 Exits (1006.2.1.1)
FIRE RATING REQUIREMENTS- STRUCTURAL ELEMENTS/ EGRESS COMPONENTS
Rating Required VCC
EMERGENCY LIGHTING REQUIREMENTS
ALL MEANS OF EGRESS 1008
MINIMUM CORRIDOR WIDTH REQUIREMENTS
Width VCC
EXIT CORRIDOR 1020.3 (Non-classroom)
TRAVEL DISTANCE TO EXITS
VCC
Maximum Length of Travel in Fully Sprinklered Building 300' (TABLE 1017.2) Maximum Length Common Path of Travel in Fully Sprinklered Building
100' (TABLE 1006.2.1)
Spaces with One Means of Egress, Maximum Travel Distance to an Exit Access Door
100' (TABLE 1006.2.1)
INTERIOR FINISH REQUIREMENTS
Per VCC Table 803.13
OCCUPANCY LOADS AND EGRESS REQUIREMENTS
Location Calculated Area in Sq. Ft.
Sq. Ft. per Person
Occupa nt Load
Egress Width
Required
Egress Width
Provided
Number Exits
Required
Number Exits
Provided
OFFICE SUITE 'A' 141 150 GSF 1 32" 34" 1
OFFICE SUITE 'B'
CONFERENCE ROOM
32" 32"
34" 34"
FIRE PROTECTION SYSTEM REQUIREMENTS
System VCC
Automatic Sprinklers YES Fire Alarm System YES 907.2.2 Smoke Detection System NO -- Partial Smoke Detection YES --
Location DOORS WITH HOLD
OPEN DEVICES
1. Mixed use separation walls must have 45 minute rated opening protectives.
2. All fire partitions must comply with Section 708.4 of the VCC Code. They must extend from the top of the fire resistance rated floor/ ceiling assembly below to the underside of the floor or roof slab or deck above and must be securely attached thereto.
3. Refer to 1/8" plans & coord. w/ MEP drawings for chases thru floor. Enclosure walls around these floor openings must be
(1) hour rated & must extend from floor tight to deck above - pack w/ safing insulation. Rating to be as follows: 6" CMU- U.L. #U906 Gyp. Bd. - Gypsum Assoc. assembly WP1110
4. Refer to sheet A301 for wall termination details at rated walls.
5. Refer to the Door Schedule for doors with closers required.
6. All rated walls and partitions must be permanently identified with signs or stenciling as follows:
SYMBOL KEY
ALLOWABLE # OCC.
REQ'D WIDTH
ACTUAL # OCC.
ACTUAL WIDTH
2 HOUR RATING
1 HOUR RATING
By Room
Rooms Less Than 51 Occupants Rooms with 51 - 500 Occupants Rooms with 501 - 1000 Occupants Rooms with More than 1000 Occupants
VCC
2 Exits (Table 1006.3.2) 3 Exits (Table 1006.3.2) 4 Exits (Table 1006.3.2)
By Story
1 - 500 Occupants 501 - 1000 Occupants More than 1000 Occupants
33"
32" 16590 a. Identification markings must be located in accessible concealed floor, floor-ceiling and attic spaces.
b. Identification markings must be located within 15'-0" of the end of each wall and at intervals not exceeding 30'-0" measured horizontally along the wall or partiion.
c. Lettering must not be less than 3" in height with a minimum 3/8" stroke in contrasting color incorporating the following wording: "FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS".
CODE REVIEW
44 IN. / 72 IN.,
50 FT. (1020.4) Exception 2
52 CAMPUS DRIVE, WARSAW, VA 22572
RICHMOND COUNTY
WARSAW, VA
2021 VIRGINIA CONSTRUCTION CODE (VCC)
2021 VIRGINIA EXISTING BUILDING CODE (LEVEL 2 ALTERATION) (VEBC)
VIRGINIA CONSTRUCTION & PROFESSIONAL SERVICES MANUAL, 2024 (CPSM), REV
1 ISSUED 10/10/24
ADA90-TITLE II (2010) ASAD CHAPTER 2 FOR SCOPING, ICCA117.1-2017 CHAPTERS 1
AND 3 THROUGH 11 FOR TECHNICAL REQUIREMENTS
52,946 SF
150 GSF
15 NSF
CPSM
4.1.2.1 #2b (Classroom)
CPSM
4.1.2.1 #3
*No change in Occupancy Classification or Occupancy Load
Existing Type of Construction: TYPE IIB
Existing Fire Protection: NFPA 13
Allowable Building Height: 75' (VCC TABLE 504.3), 4 Stories (VCC TABLE 504.4)
Actual Building Height: 20' MAXIMUM
Allowable Building Area: 92,000 SF 506.2 (B, S1, Type IIB)
903.2.11.6
Primary Structural Frame 0 TABLE 601 Exterior Bearing Walls 0 TABLE 601, SECTION 704.10, TABLE 705.5 Exterior Non-Bearing Walls 0 TABLE 705.5 Interior Bearing Walls 0 TABLE 601 Floor / Ceiling Assemblies 0 TABLE 601 Roof / Ceiling Assemblies 0 TABLE 601 Columns 0 TABLE 601 Beams 0 TABLE 601 Egress Corridors 0 TABLE 1020.2 Corridor Doors 0 716.1(2) Smoke Barrier 1 709.3 Smoke Partitions 0 710.3 Smoke Barrier Doors 20 MIN. 710.5.2, 716.2.2.1 Mixed Use Separation N/A 508, TABLE 508.4
141 SF
OFFICE SUITE 'A'
MAX COMMON PATH OF
TRAVEL
21' - 1"
(100' MAX COMMON PATH
OF TRAVEL ALLOWED)
CONFERENCE
OFFICE
182B
187 SF
CONFERENCE ROOM
1111 SF
OFFICE SUITE 'B'
EXISTING OFFCE
(NOT IN PROJECT SCOPE)
EXISTING OFFCE
(NOT IN PROJECT SCOPE)
EXISTING OFFCE
(NOT IN PROJECT SCOPE)
MAX COMMON PATH OF
TRAVEL
60' - 7"
OFFICE
113C
OFFICE
113B
OFFICE
113A
WAITING
EXISTING OFFICE CUBICLE CONFIGURATION
NOTE THERE IS NO OCCUPANCY COUNT
CHANGE WITH THE NEW CONSTRUCTION
710 SF
EXISTING
OFFICE
SUITE
EXISTING OFFCE
(NOT IN PROJECT
SCOPE)
EXISTING OFFCE
(NOT IN PROJECT
SCOPE)
EXISTING OFFCE
(NOT IN PROJECT
SCOPE)
329 SF
MEETING
EXISTING ROOM CONFIGURATION
123456789101112131415161718
123456789101112131415161718
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
K
L
M w w w .g ri m m a n d p a rk e r.
c o m
E a s t
M a in
S tr e e t n d F lo o r
C h a rl o tt e s v ill e
V A l:
-2
-5
DEB #
260-B4260-030
A001
C O
D E
S
TU
D Y
FI
R S
T
FL
O O
R
RC
C
-W
AR
SA
W
C
AM
PU
S
IN
TE
RI
OR
R
EN
OV
AT
IO
N
C am pu s D r, W ars aw
, V irg ini a
JANUARY 9, 2025
BID SET
GP #22006.16
1/16" = 1'-0"F18
CODE STUDY PLAN - FIRST FLOOR
1/4" = 1'-0"C11
ENLARGED CODE STUDY PLAN - AREA A
1/4" = 1'-0"A18
ENLARGED CODE STUDY PLAN - AREA B
EXISTING PLAN AT AREA A
1/8" = 1'-0"
EXISTING PLAN AT AREA B
1/8" = 1'-0"
AREA NOT IN PROJECT SCOPE - BUSINESS
DATE DESCRIPTION
OCCUPANT LOAD CALCULATIONS (AREAS)
AREA NAME
AREA
(SF)
AREA PER
OCCUPANT (SF)
GROSS OR
NET
OCCUPANCY
LOAD
EGRESS WIDTH
REQ'D
ASSEMBLY (UN-CONCENTRATED)
CONFERENCE
ROOM
187 SF 15 SF NET 13 2.5
BUSINESS AREAS
OFFICE SUITE 'B' 1111 SF 150 SF GROSS 8 1.5
OFFICE SUITE 'A' 141 SF 150 SF GROSS 1 0.2
AREA NOT IN PROJECT SCOPE - ASSEMBLY
GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED, NOTED
OR OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND
BINDING TO ALL OTHER SECTIONS AND DETAILS FOR IDENTICAL OR SIMILAR CONDITIONS.
1. ALL CONSTRUCTION AND WORK REPRESENTED IN THE COMPLETE SET OF DOCUMENTS IS
ASSUMED TO BE NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS
OTHERWISE NOTED.
2. THE DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY
ONE IS REQUIRED BY ALL. NO DRAWING SHALL HAVE PRECEDENCE ONE OVER THE OTHER,
NOR SHALL DRAWINGS OR SPECIFICATIONS HAVE PRECEDENCE ONE OVER THE OTHER. IN
THE EVENT OF A CONFLICT IN THE DOCUMENTS, THE CONTRACTOR SHALL SEEK THE
INTERPRETATION OF THE ARCHITECT. THE CONTRACTOR SHALL NOT PROCEED WITH
WORK UNTIL SUCH INTERPRETATION IS OBTAINED. IF THE CONTRACTOR PROCEEDS
WITHOUT CLARIFICATION, THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE AND
REPLACE ANY WORK NOT CONFORMANT TO THE ARCHITECT'S DIRECTION WITHOUT
ADDITIONAL COST TO THE OWNER.
3. IF A CONFLICT EXISTS BETWEEN DRAWINGS OF DIFFERENT SCALES, CONSULT THE
ARCHITECT FOR CLARIFICATION.
4. IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER
MEASUREMENT, CONSULT THE ARCHITECT FOR CLARIFICATION.
5. IF AN AREA OR SPACE IS SHOWN, BUT IS NOT CLEARLY DEFINED OR INDICATED BY NOTES, PROVIDE THE SAME MATERIALS AND FINISHES AS SCHEDULED OR DETAILED FOR AREAS
OF SIMILAR USE ELSEWHERE IN THE BUILDING,
6. SECTIONS INDICATED ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE
REFERENCED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR
SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN.
THE MOST SIMILAR SECTIONS TO BE ADAPTED TO ANY SECTIONS NOT DETAILED. ANY
SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE
ABOVE SHOULD BE DIRECTED TO THE ARCHITECT DURING THE BIDDING.
7. TYPICAL DETAILS THROUGHOUT THE DRAWING SET TO APPLY FOR ALL APPLICABLE
CONDITIONS EVEN IF NOT SPECIFICALLY SHOWN OR REFERENCED.
8. AT ALL OUTSIDE CORNERS OF INTERIOR CMU WALLS, COLUMN ENCLOSURES, PIPE CHASES
OR OTHER WALL PROJECTIONS, PROVIDE MASONRY UNITS WITH BULLNOSED (ROUNDED)
EDGES WITH 1" RADIUS, UNLESS OTHERWISE NOTED OR WHERE SCHEDULED TO RECEIVE
CERAMIC TILE. WHERE MASONRY CORNERS ALIGN WITH BULKHEADS, TRANSITION FROM
BULLNOSE CORNER UNITS TO SQUARE CORNER UNITS.
9. UNLESS SPECIFICALLY NOTED OTHERWISE, ENCLOSE ALL VERTICAL MECHANICAL PIPES,
RAIN LEADERS, ETC. WITH 4" CMU OR GYPSUM BOARD TO MATCH SURROUNDING FINISHES.
10. IF A CONFLICT EXISTS BETWEEN JOINT LOCATIONS SHOWN ON THE ELEVATIONS AND
PLANS, CONSULT THE ARCHITECT FOR CLARIFICATION PRIOR TO CONSTRUCTION. REFER
TO FLOOR PLANS FOR LOCATIONS OF CONTROL JOINTS (C.J.) IN INTERIOR MASONRY
WALLS.
11. ALL EXTERIOR CAVITY WALLS TO HAVE CONTINUOUS FLEXIBLE FLASHING AT THE BOTTOM
OF THE CAVITY WITH WEEP VENTS TO THE OUTSIDE. ALL FLASHING BUILT INTO WALLS TO
BE LAPPED AND SEALED. REFER TO FLASHING DETAILS INDICATED.
12. INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS AND
SIMILAR ENCLOSURES AS PART OF WALL AND CEILING FINISHES AS SCHEDULED.
13. ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, DUCTS,
WINDOWS, LOUVERS, GRILLES, MECHANICAL WORK, ETC. TO FIT TIGHT AND BE
THOROUGHLY SEALED AROUND PERIMETERS. WORK AT EXTERIOR WALLS TO BE FLASHED
OR OTHERWISE WATERPROOF SEALED.
14. FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF
CABINETS, COUNTERS, LOCKERS, DOORS, WINDOWS, FIXTURES, SHELVING, GATES AND
OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE FILLER
STRIPS, SCRIBE STRIPS, BASES, CLOSURE FINISHES AND TRIM FOR A COMPLETE
INSTALLATION.
15. PROVIDE APPROPRIATE TRANSITION STRIPS AT CHANGES IN FLOOR ELEVATIONS.
16. EACH CONTRACTOR MUST REFER TO ALL DRAWINGS AND BE RESPONSIBLE FOR WORK
PERTAINING TO THEIR PARTICULAR TRADE. ALL CONTRACTORS MUST COORDINATE THE
WORK OF ALL TRADES AND FIELD CHECK AGAINST ANY CONFLICTS BETWEEN DRAWINGS.
REPORT CONFLICTS TO THE ARCHITECT FOR CLARIFICATION.
17. ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE
DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS ARE
SHOWN THROUGHOUT THE DRAWINGS. PROVIDE NECESSARY LINTELS, SUPPORT AND
ANCHORAGE. SEE STRUCTURAL NOTES FOR LINTEL REQUIREMENTS.
18. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR LOCATIONS OF
CONCRETE PADS TO BE PROVIDED BELOW OR AROUND EQUIPMENT.
19. INSTALL ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS,
FLAGPOLE HOLDERS AND OTHER WALL-MOUNTED ACCESSORIES IN LOCATIONS WHICH
ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, DISPLAY BOARDS, FIXTURES,
SHELVING OR OTHER FURNISHINGS OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON
DRAWINGS. THESE DEVICES MAY BE SHOWN ON THE ARCHITECTURAL DRAWINGS TO
ALERT OTHER SUB-CONTRACTORS OF THEIR PRESENCE. COORDINATE INSTALLATION
WITH THE ELECTRICAL DRAWINGS. ADVISE THE ARCHITECT OF CONFLICTS IN LOCATION OR
TYPES OF DEVICES SHOWN PRIOR TO INSTALLATION. DO NOT INSTALL WALL-MOUNTED
ITEMS ON, THROUGH OR INTO ANY EQUIPMENT UNLESS INDICATED.
20. MOUNT ELECTRIC SWITCHES, THERMOSTATS AND OTHER ELECTRONIC CONTROLS
LOCATED IN THE SAME VICINITY AT THE SAME HEIGHT ABOVE FINISHED FLOOR IN A
UNIFORM, ORDERLY FASHION UNLESS NOTED OTHERWISE.
21. FOR THE PURPOSES OF BIDDING (UNLESS OTHERWISE NOTED), ALL SYMBOLS (LABELED /
TAGGED OR UNLABELED/UNTAGGED) WHICH ARE LOCATED ON THE
FURNISHING/EQUIPMENT PLANS TO BE CONSIDERED AS IN CONTRACT WORK TO BE
PROVIDED BY THE CONTRACTOR. ALL SYMBOLS LOCATED ON THE PLANS DENOTE EITHER
FURNITURE, EQUIPMENT, CASEWORK OR MILLWORK. WHERE A SYMBOL IS LOCATED ON
THE PLANS BUT IS NOT LABELED OR TAGGED TO A SCHEDULE, THE CONTRACTOR MUST
SEEK CLARIFICATION FROM THE OWNER OR ARCHITECT BEFORE PROCEEDING. FOR
PURPOSES OF BIDDING ONLY, IF CLARIFICATION CANNOT BE OBTAINED FROM THE OWNER
OR ARCHITECT THROUGH ADDENDUM PRIOR TO THE BID DATE, THE CONTRACTOR MUST
NEVERTHELESS INCLUDE THE ITEM IN QUESTION IN THEIR BID, CONSIDERING IT THE SAME
AS THE TAGGED SYMBOL MOST NEARLY RESEMBLING THE UNTAGGED SYMBOL BASED ON
ITS SHAPE, SIZE, LINEWEIGHT(S), LOCATION, AND SCHEDULED USAGE IN SPACES OF
SIMILAR FUNCTION. THE CONTRACTOR MUST OBTAIN CLARIFICATION FROM THE
ARCHITECT PRIOR TO PROCEEDING WITH SHOP DRAWINGS.
GENERAL NOTES
KEY PLAN
AREA A
AREA B
WAITING
OFFICE
113A
OFFICE
113B
OFFICE
113C
OFFICE
182B
F16
A002 A102
CONFERENCE
F9
A002 A102
AREA NOT INCLUDED IN PROJECT SCOPE
EXISTING RATED PARTITIONS
123456789101112131415161718
123456789101112131415161718
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
K
L
M w w w .g ri m m a n d p a rk e r.
c o m
E a s t
M a in
S tr e e t n d F lo o r
C h a rl o tt e s v ill e
V A l:
-2
-5
DEB #
260-B4260-030
A002
O V
E R
A
LL
F
IR
S T
FL
O
O R
P
LA
N
RC
C
-W
AR
SA
W
C
AM
PU
S
IN
TE
RI
OR
R
EN
OV
AT
IO
N
C am pu s D r, W ars aw
, V irg ini a
JANUARY 9, 2025
BID SET
GP #22006.16
1/16" = 1'-0"A002
C16 OVERALL FIRST FLOOR PLAN
DATE DESCRIPTION
1. REFER TO SHEET A301 FOR WALL TYPES AS REFERENCED ON PLANS WITH THE DIAMOND SYMBOL.
2. TYPICAL GYPSUM BOARD / STUD WALL PARTITION TO BE TYPE K1 UNLESS INDICATED OTHERWISE BY WALL TYPE
SYMBOLS, WALL SECTIONS OR OTHER DETAILS.
3. UNLESS NOTED OTHERWISE, WALLS MUST EXTEND TO THE ROOF OR FLOOR DECK ABOVE AND BE SEALED IN
ACCORDANCE WITH THE WALL TERMINATION DETAILS.
4. DIMENSIONS ON PLANS ARE FROM FACE OF MASONRY TO FACE OF MASONRY, FACE OF MASONRY TO FACE OF
GYPSUM BOARD OR FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.
5. COLUMN GRID LINES ARE FOR REFERENCE ONLY, REFER TO STRUCTURAL DRAWINGS FOR COLUMN LOCATIONS.
6. FEC - INDICATES A FIRE EXTINGUISHER WITH A RECESSED CABINET. FE - INDICATES A FIRE EXTINGUISHER WITH
A WALL MOUNTING BRACKET.
7. UNLESS SPECIFICALLY INDICATED OTHERWISE, THE SAME WALL TYPE NEXT TO A DOOR OR OPENING TO
CONTINUE OVER THE DOOR OR OPENING.
8. PLAN LOCATION OF DOORS AND FRAMES RELATIVE TO THE PLANE OF THE WALL IS DIAGRAMMATIC ONLY. REFER
TO THE REFERENCED JAMB AND HEAD CONDITION DETAILS TO DETERMINE ACTUAL PLACEMENT OF DOOR AND
FRAME.
9. SIGNAGE N.I.C. PROVIDED BY OWNER.
GENERAL PLAN NOTES
10 11 12
M
136 SF
OFFICE
182B
182B
10' - 1"
K1
CONFERENCE
FURNITURE N.I.C.
5"
K10
A101A101
EXIST. 1-HR RATED PARTITION
KEY PLAN
AREA A
AREA B
10 11 12
M
REMOVE PORTION OF
WALL FOR NEW OPENING.
CAREFULLY REMOVE
EXISTING MASONRY SO
NEW MASONRY CAN BE
TOOTHED IN.
5"
10 11 12
M
OFFICE
182B
CONFERENCE
1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES TO BE REMOVED.
THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE MECHANICAL, ELECTRICAL, &
PLUMBING ITEMS.
2. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN IF ACTUAL CONDITIONS DIFFER FROM THESE SHOWN ON THE DRAWINGS.
3. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR ADDITIONAL INFORMATION
RELATED TO EXTENT OF DEMOLITION.
4. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT NOTED ON THE
DEMOLITION PLANS.
5. THE OWNER HAS FIRST RIGHT OF REFUSAL OF ALL SALVAGE ITEMS. THE CONTRACTOR SHALL PROPERLY
DISPOSE OF ALL CONSTRUCTION DEBRIS. DO NOT STOCKPILE DEBRIS ON SITE.
6. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING ALL ANCHORS, HANGERS, FASTENERS, ADHESIVES, SEALANTS, PIPES, CONDUITS, DUCTS, ETC. UNLESS OTHERWISE INDICATED TO BE ABANDONED IN PLACE, OR WHERE SUCH PIPES, CONDUITS, DUCTS OR WIRING ARE TO REMAIN FOR CONNECTION TO NEW EQUIPMENT TO BE INSTALLED IN THE SAME LOCATION (SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION).
FINISHES TO REMAIN SHALL BE PATCHED, PAINTED, AND REPAIRED TO MATCH EXISITNG ADJACENT FINISHES.
7. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED, AND CLEANED TO PROVIDE SURFACE
SUITABLE FOR NEW FINISHES.
8. PARTITIONS SHOWN TO BE REMOVED SHALL BE CONFIRMED BY THE CONTRACTOR AS TO TYPE OF PARTITION AND EXACT LOCATION. COMPLETELY REMOVE PARTITIONS FROM FLOOR TO STRUCTURE ABOVE INCLUDING
BASE, ALL FASTENERS, GROUTS, SEAL ANTS, ETC., UNLESS NOTED OTHERWISE.
9. REMOVE, PATCH AND REPAIR PORTIONS OF WALL PARTITIONS WHICH CONFLICT WITH NEW WORK TO BE
INSTALLED, EVEN IF NOT SPECIFICALLY NOTED TO BE DEMOLISHED ON PLANS.
10. WALLS TO BE REMOVED FROM INTERSECTING WALLS SHALL INCLUDE TOOTHED IN REPLACEMENT OF DAMAGED MASONRY ON WALL TO REMAIN AND REMOVAL OF TIES PROJECTING FROM WALLS. SEE DETAILS FOR ADDITIONAL
CONDITIONS.
11. WALLS TO BE PARTIALLY REMOVED SHALL BE TERMINATED WITH FINISHED MASONRY ENDS BY TOOTHING IN NEW MASONRY UNITS, TO MATCH ADJACENT MASONRY. SEE DETAILS FOR OTHER CONDITIONS. NO WALLS SHALL BE
TERMINATED WITH EXPOSED OPEN CELLS OR DAMAGED MASONRY UNITS.
12. WHERE NEW OPENINGS ARE SHOWN IN EXISTING WALLS, CAREFULLY REMOVE MASONRY TO NEAREST JOINT LINE WITHOUT DISTURBING ADJACENT WORK SO THAT NEW WORK CAN BE PATCHED IN TO MATCH. ALL NEW
MASONRY WORK SHALL BE TOOTHED IN.
13. ALL EXISTING STRUCTURE SHALL REMAIN, UNLESS NOTED OTHERWISE.
14. TEMPORARILY SUPPORT ALL BEAMS, LINTELS, PORTIONS OF WALLS ETC., TO BE DISTURBED BY DEMOLITION
WORK, UNTIL THEY ARE RE-SUPPORTED BY NEW WORK.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF EXISTING BUILDING ELEMENTS TO
REMAIN THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL BE RESTORED TO NEW WORK CONDITION AT NO ADDITIONAL COST TO THE OWNER.
16. WHERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE ANY GROUT, ADHESIVES, FASTENERS, AND ALL OTHER ITEMS USED TO ATTACH THE FINISHES TO THE SURFACES THAT THEY COVER.
17. ANY FLOOR AREAS DAMAGED BY THE DEMOLITION CONTRACTOR SHALL BE PATCHED TO MATCH EXISTING.
18. WHERE CEILINGS ARE TO BE REMOVED, REMOVE ALL CEILINGS SYSTEMS COMPLETE INCLUDING GRID, TRIM
HANGER, CLIPS, ETC. REUSE SALVAGED COMPONENTS WHERE INDICATED. WHERE NEW CEILINGS ARE SPECIFIED, NO DOUBLE CEILINGS PERMITTED. REMOVE ALL ORIGINAL CONCEALED CEILINGS WHERE
ENCOUNTERED.
19. ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED, PATCHED IF DAMAGED AND CLEANED PRIOR TO
APPLICATION OF FINISHES.
20. CONTRACTOR TO PROTECT ALL EQUIPMENT AND OTHER ELEMENTS IN AREA OF NEW OR DEMOLITION WORK.
21. REMOVE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS AS NOTED ON MECHANICAL, ELECTRICAL AND
PLUMBING PLANS. COORDINATE WITH CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING, FOR ADDITIONAL DEMOLITION NOTES. REMOVAL WORK IS INTENDED TO INCLUDE ALL ASSOCIATED ITEMS SUCH AS ELECTRICAL OUTLETS, SWITCHES, CONDUITS, CONTROLS, PIPING, MOUNTING BLOCKS, ETC., AS NOTED. THE CONTRACTOR SHALL REFER TO ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND SPECIFICATIONS FOR PROCEDURES CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE DEMOLITION.
REPAIR AND PATCH ANY AREAS DAMAGED DURING REMOVAL WORK.
GENERAL DEMOLITION NOTES
10 11 12
M
REMOVE AND REINSTALL CEILING
PANELS IN NEW GRID. REMOVE
CEILING GRID AND ASSOC.
SUPPORT MEMBERS.
REMOVE LIGHT
FIXTURES, TYP.
GYP. BOARD CEILING ETR
RECESSED LIGHT FIXTURES ETC, TYP.
2X2 CEILING SYSTEM. SEE FINISH
SCHEDULE
2X4 CEILING SYSTEM. SEE FINISH
SCHEDULE
GYPSUM BOARD CEILING
NOTE: SPOT ELEVATION SUFFIX "C.H." INDICATES FLAT CEILING HEIGHT ABOVE FINISH FLOOR. SUFFIX "L.P."
AND "H.P." INDICATE LOW POINT AND HIGH POINT OF SLOPED CEILING. WHERE ADJACENT, TRANSITION BETWEEN FLAT AND SLOPED CEILINGS SHALL UTILIZE APPROVED PRE-FINISHED ALUMINUM TRANSITION
STRIP. REFER TO SPECIFICATIONS.
RCP LEGEND
RECESSED DOWNLIGHT - SEE ELEC
1'X4' RECESSED LIGHT FIXTURE - SEE ELEC
2'X2' RECESSED LIGHT FIXTURE - SEE ELEC
1'X4' LIGHT FIXTURE - SEE ELEC
SUPPLY DIFFUSER, REGISTER, OR GRILL
- SEE MECH
RETURN DIFFUSER, REGISTER, OR GRILL
- SEE MECH
EXISTING CEILING
SYSTEM - DEMO
8" OR 12" WIDE X 8" DEEP
PRECAST LINTEL OR CMU
BOND BEAM WITH (2) #4
BOTTOM.
PROVIDE MIN. 8" BEARING ON
EACH SIDE OF OPENING
8" OR 12" CMU
123456789101112131415161718
123456789101112131415161718
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
K
L
M w w w .g ri m m a n d p a rk e r.
c o m
E a s t
M a in
S tr e e t n d F lo o r
C h a rl o tt e s v ill e
V A l:
-2
-5
DEB #
260-B4260-030
A101
P A
R
TI
A L
FL
O
O R
P
LA
N
RC
C
-W
AR
SA
W
C
AM
PU
S
IN
TE
RI
OR
R
EN
OV
AT
IO
N
C am pu s D r, W ars aw
, V irg ini a
JANUARY 9, 2025
BID SET
GP #22006.16
0 4' 8'2'
1/4" = 1'-0"A101
F10 PARTIAL FLOOR PLAN - AREA A NEW CONSTRUCTION
1/4" = 1'-0"A101
B10 PARTIAL FLOOR PLAN - AREA A DEMO
1/4" = 1'-0"A101
F16 PARTIAL REFLECTED CEILING PLAN - AREA A NEW CONSTRUCTION
1/4" = 1'-0"A101
B16 PARTIAL REFLECTED CEILING PLAN - AREA A DEMO
DATE DESCRIPTION
1 1/2" = 1'-0"A101A101
K10 LINTEL DETAIL
B
C
D
E
9' - 4" 9' - 4" 9' - 3 5/8"
WAITING
113 36' - 9 1/4" 3 5/8"
OFFICE
113A
OFFICE
113B
OFFICE
113C
113A 113B 113C
10' - 4 5/8" 10' - 4 7/8" 14' - 7 7/8"
K1
K1
K1
ROOM NOT IN SCOPEROOM NOT IN SCOPEROOM NOT IN SCOPE
FURNITURE N.I.C.
KEY PLAN
AREA A
AREA B
B
C
D
OFFICE
113A
OFFICE
113B
OFFICE
113C
WAITING
7' - 5 1/8"
B
C
D
WAITING
REMOVE EXISTING CUBICLES, TYP.
ROOM NOT IN SCOPEROOM NOT IN SCOPEROOM NOT IN SCOPE
B
C
D
REMOVE LIGHTING FIXTURES, TYP.
REMOVE AND SALVAGE
CEILING PANELS FOR
REUSE IN NEW GRID.
REMOVE CEILING GRID AND
ASSOC. SUPPORT
MEMBERS.
2X2 CEILING SYSTEM. SEE FINISH
SCHEDULE
2X4 CEILING SYSTEM. SEE FINISH
SCHEDULE
GYPSUM BOARD CEILING
NOTE: SPOT ELEVATION SUFFIX "C.H." INDICATES FLAT CEILING HEIGHT ABOVE FINISH FLOOR. SUFFIX "L.P."
AND "H.P." INDICATE LOW POINT AND HIGH POINT OF SLOPED CEILING. WHERE ADJACENT, TRANSITION BETWEEN FLAT AND SLOPED CEILINGS SHALL UTILIZE APPROVED PRE-FINISHED ALUMINUM TRANSITION
STRIP. REFER TO SPECIFICATIONS.
RCP LEGEND
RECESSED DOWNLIGHT - SEE ELEC
1'X4' RECESSED LIGHT FIXTURE - SEE ELEC
2'X2' RECESSED LIGHT FIXTURE - SEE ELEC
1'X4' LIGHT FIXTURE - SEE ELEC
SUPPLY DIFFUSER, REGISTER, OR GRILL
- SEE MECH
RETURN DIFFUSER, REGISTER, OR GRILL
- SEE MECH
EXISTING CEILING
SYSTEM - DEMO
123456789101112131415161718
123456789101112131415161718
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
K
L
M w w w .g ri m m a n d p a rk e r.
c o m
E a s t
M a in
S tr e e t n d F lo o r
C h a rl o tt e s v ill e
V A l:
-2
-5
DEB #
260-B4260-030
A102
P A
R
TI
A L
FL
O
O R
P
LA
N
RC
C
-W
AR
SA
W
C
AM
PU
S
IN
TE
RI
OR
R
EN
OV
AT
IO
N
C am pu s D r, W ars aw
, V irg ini a
JANUARY 9, 2025
BID SET
GP #22006.16
1/4" = 1'-0"A102A002
F9 PARTIAL FLOOR PLAN - AREA B NEW CONSTRUCTION1/4" = 1'-0"A102A002
F16 PARTIAL REFLECTED CEILING PLAN - AREA B NEW CONSTRUCTION
1/4" = 1'-0"A102
A9 PARTIAL FLOOR PLAN - AREA B DEMOLITION
1/4" = 1'-0"A102
A16 PARTIAL REFLECTED CEILING PLAN - AREA B DEMOLITION
1. ROOM SIGNAGE IS BEING PROVIDED UNDER SEPARATE CONTRACT BY OWNER.
CONTRACTOR TO COORDINATE DIRECTLY WITH OWNER TO ENSURE TEMPORARY AND
PERMANENT SIGNAGE IS COMPLETED PRIOR TO SUBSTANTIAL COMPLETION.
2. COORDINATE AND PROVIDE HARDWARE AS DETAILED IN THE SPECIFICATIONS OR, IF NOT
SPECIFIED, PROVIDE HARDWARE (OF EQUAL QUALITY TO THAT SPECIFIED, AND MOST
SIMILAR IN FUNCTION TO TYPE OF DOOR) REQUIRED FOR DOORS TO OPERATE AND APPEAR
AS INTENDED ON DRAWINGS.
3. PROVIDE EXPOSED HARDWARE WITH BRUSHED-IN FINISH AND "SILVER" METALLIC IN COLOR
(ALUMINUM, CHROME, OR STEEL) TO MATCH EXISTING.
4. IF CONFLICT EXISTS BETWEEN DOOR RATING AS SCHEDULED AND WALL/PARTITION TYPE
FIRE RATING AS SHOWN ON PLANS, PROVIDE DOOR(S) WITH THE GREATER FIRE RATING OF
THE TWO.
5. VERIFY ALL DIMENSIONS AND CLEARANCES, AND COORDINATE UNDERCUTTING REQUIRED
TO CLEAR ADJACENT FLOOR MATERIALS.
6. IF A DISCREPANCY EXISTS BETWEEN THE DOOR SCHEDULE REMARKS AND THE HARDWARE
SCHEDULE IN THE SPECIFICATIONS, PROVIDE THE HARDWARE NEEDED TO MEET THE MORE
STRINGENT OF THE REQUIREMENTS.
7. SEE SPECIFICATIONS FOR SCHEDULED HARDWARE SETS.
DOORS NOT LISTED ON THE SCHEDULE TO HAVE THE TYPICAL FINISHES LISTED BELOW:
DOOR: FRAME:
WIDTH: 3'-0" MATERIAL: HM
HEIGHT: 7'-0" TYPE: 1
THICKNESS: 1-3/4" JAMB: J1
TYPE: HG HEAD: H1
MATERIAL: SCWD SILL: NONE
DOOR LABEL: NONE
TYPICAL DETAILS
TYPICAL DOOR NOTES
NOTE: NOT ALL NOTES MAY BE USED ON THIS PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL
DOOR INFORMATION. REFERENCE SPECIFICATIONS FOR DETAILED HARDWARE REQUIREMENTS.
1. PROVIDE HARDWARE WITH PRIVACY SET.
NOTES FOR REMARKS COLUMN
PROVIDE THE FOLLOWING UNDERCUTS AT ALL DOORS:
• DOOR WITH AUTOMATIC DOOR BOTTOMS: AMOUNT REQUIRED BY DOOR BOTTOM MFR
• DOORS WITH THRESHOLD AND AUTOMATIC DOOR BOTTOM: HEIGHT OF THRESHOLD AND
AMOUNT REQUIRED BY DOOR BOTTOM MFR
• ALL OTHER DOORS: 5/8" ABOVE FINISH FLOOR
DOOR UNDERCUTS
HG
NOTE: (UNLESS OTHERWISE NOTED)
ALL GLASS IN INTERIOR DOORS TO BE G-1
DOOR TYPES
A S
S C
H E
D
AS SCHED.
VERIFY DIMS IN
FIELD TO MATCH
EXISTING DOORS
T.
O
. G
LA
S S
S
TO
P
3'
6" M
A X
8"
6" 6"
S E
E D
O O
R S
C H
E D
U
LE
4"
SEE DOOR SCHEDULE
2"2"
WALL THICKNESS
COORD W/
9/16" 9/16"
2" 5/
8"
1 15/16"1 15/16"
METAL STUD TRACK
SCHEDULED GYP BD WALL
SEALANT TYP. BOTH
SIDES FULL PERIMETER
HOLLOW METAL FRAME
FILL FRAME WITH MINERAL
WOOL INSULATION
W A
LL
T
H
IC
K N
E S
S
C O
O R
D W
9/
9/
UON
4"
2" 5/8"
/1 6"
/1 6"
WALL WHERE SHOWN IN PLAN
HOLLOW METAL FRAME
FILL FRAME WITH MINERAL WOOL
INSULATION
SCHEDULED DOOR WHERE
INDICATED ON PLANS
JAMB ANCHOR
SCHEDULED GYP BD WALL
SEALANT TYP. BOTH SIDES
FULL PERIMETER
K1 ABUSE RESISTANT GYP. BD. WALL (AS SHOWN), STC 49
3-5/8" METAL STUDS @
16" O.C.
3-1/2" SOUND
ATTENUATING BATT
INSULATION
5/8" ABUSE RESISTANT
GYP. BD ON EACH SIDE
NOTES:
1. STAGGER HORIZ. AND VERT. GYP.
BD. JOINTS.
2. OFFSET OPPOSING PENETRATIONS
MIN. ONE STUD BAY
ACOUSTIC SEALANT
(BOTH SIDES, TYP.)
SCHEDULED CEILING
1. REFER TO FLOOR PLANS, CEILING PLANS, INTERIOR ELEVATIONS, SECTIONS AND DETAILS
FOR ADDITIONAL INFORMATION AND EXTENT OF EACH FINISH WHEN MORE THAN ONE
FINISH IS INDICATED FOR ANY SPACE.
2. SEE CEILING PLANS FOR HEIGHTS OF CEILINGS AND LOCATIONS AND HEIGHTS OF
BULKHEADS, SOFFITS, ETC.
3. PAINT ALL EXPOSED STEEL LADDERS, LINTELS, HUNG PLATES, HAND AND GUARD RAILS,
STAIRS AND STRINGERS.
4. PAINT ALL EXPOSED STEEL COLUMNS, TRUSSES, JOISTS, BEAMS, DECK, AND
MISCELLANEOUS BRIDGING, ANGLES, PLATES, ETC.
5. INSTALL CERAMIC/PORCELAIN TILE COVE BASE FLUSH WITH FLOOR TILE AND FLUSH WITH
CERAMIC/PORCELAIN WALL TILE.
6. FIELD PAINT ALL EXPOSED, NON-FACTORY FINISHED STRUCTURAL AND MEP COMPONENTS.
7. PROVIDE SEALANT AT INTERSECTIONS OF DISSIMILAR MATERIALS, COMPLYING WITH
SPECIFICATIONS.
8. REFER TO INTERIOR ELEVATIONS AND SECTIONS FOR ADDITIONAL FINISH INFORMATION.
PROVIDE ALL FINISH MATERIALS SHOWN IN PLANS, ELEVATIONS OR SECTIONS AS NOTED
OR DEPICTED ON THE DRAWINGS AND SPECIFICATIONS.
9. BRING CONFLICTS TO THE ARCHITECTS ATTENTION DURING THE BIDDING PERIOD FOR
CLARIFICATION.
10. WALL AND CEILING FINISHES TO INCLUDE ALL PROJECTIONS, BEAM ENCLOSURES,
RECESSES, BULKHEADS, MATERIAL CHANGES, OR OTHER ENCLOSURES.
11. ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS OR OTHER DEVICES SHOWN ON THE
ARCHITECTURAL DRAWINGS SERVE TO CALL ATTENTION TO THE PRESENCE OF SUCH
DEVICES. NOT ALL DEVICES MAY BE SHOWN ON ARCHITECTURAL DRAWINGS. CONSULT
THE OTHER DRAWINGS FOR FURTHER INFORMATION AND ADVISE ARCHITECT OF ANY
CONFLICT OF LOCATION OR TYPE OF DEVICES SHOWN. COORDINATE ALL WORK, FINISHES
AND DEVICES.
12. PROVIDE MOISTURE RESISTANT GYPSUM BOARD AT TOILET ROOMS, & SERVICE CLOSETS
FOR WALLS DESIGNATED AS GYPSUM BOARD WALL TYPES. PROVIDE TILE BACKER BOARD
AT WALLS DESIGNATED AS GYPSUM BOARD WALL TYPES WITH TILE FINISH.
13. FIELD PAINT ELECTRICAL PANELS EXCEPT PANELS LOCATED IN ELECTRICAL CLOSETS AND
MECHANICAL ROOMS.
14. BRING CONFLICTS BETWEEN THE FINISH SCHEDULE AND MATERIALS SHOWN ON OTHER
DRAWINGS (AND/OR SPECIFICATIONS) TO THE ATTENTION OF THE ARCHITECT
IMMEDIATELY. IF A CONFLICT EXISTS IN/BETWEEN DRAWINGS (AND/OR SPECIFICATIONS),
THE MORE STRINGENT AND MORE COSTLY REQUIREMENT TO APPLY.
15. PAINT COLUMN COVERS TO MATCH ADJACENT WALL PATTERN AND COLOR REGARDLESS
OF MATERIAL.
SPACES NOT LISTED ON THE SCHEDULE TO HAVE THE TYPICAL FINISHES LISTED BELOW:
FLOORS: CPT
BASE: RST
WALLS: PTD
CEILING: APC2
GYP. BD. ABOVE H.M. FRAMES AS INDICATED ON SECTIONS. DETAILS TO RECEIVE SAME TOP
COATS AS ADJACENT WALLS UNLESS OTHERWISE NOTED.
CONC1 CONCRETE WITH HARDENER
CONC2 CONCRETE WITH TRAFFIC COATING
CPT CARPET
CT CERAMIC TILE
PT PORCELAIN TILE
QT QUARRY TILE
RES RESINOUS FLOORING W/ INTEGRAL BASE
RBR RUBBER FLOORING, TREADS, RISERS,
SKIRTINGS
SPORT RUBBER SPORTS FLOOR
VCT VINYL COMPOSITION TILE
WD WOOD FLOOR
HRF1 HYBRID RESILIENT FLOORING, TILE
HRF2 HYBRID RESILIENT FLOORING, SHEET
TYPICAL FINISHES
FINISH MATERIALS
FLOORS
APC1 ACOUSTIC PANEL CLG. - 2'X4'
APC2 ACOUSTIC PANEL CLG. - 2'X2'
EXP EXPOSED CONSTRUCTION - PAINTED
GFC GLASS FIBER SANITARY CEILING
GYP GYPSUM BOARD CEILING - PAINTED
WS WOOD SLAT CEILING
CEILINGS
BASES
NONE NO BASE
CT CERAMIC TILE
PT PORCELAIN TILE
QT QUARRY TILE
RES RESINOUS BASE
RST RESILIENT BASE
VRB VENTED RUBBER BASE
WALLS
CT CERAMIC TILE
PT PORCELAIN TILE
PTD PAINTED
HPC HIGH PERFORMANCE
COATING
WALL KEY
WALLS ON FINISH SCHEDULE ARE DENOTED THUS:
AXXX
A
C
D B
TYPICAL UNLESS OTHERWISE NOTED.
TYPICAL NOTES
/1 6"
/1 6"
1/ 2"
1/ 2"
TYPICAL FRAME
NOTE: 9/16" RETURN DIMENSION
INDICATED ON PLANS IS FROM FACE
OF FRAME TO FACE OF WALL
1 15/16"
COORD. W/ WALL THICKNESS
1 15/16"
9/16"9/16"
5/ 8"
S E
E F
R A
M E
T Y
P
E SOLID PRE-ENGINEERED LINTEL
SEALANT TYP. BOTH SIDES,
FULL PERIMETER
FILL FRAME WITH MINERAL
WOOL INSULATION
HOLLOW METAL FRAME
/1 6"
W A
LL
T
H
IC
K N
E S
S
C O
O R
D . W
/1 6"
2" MIN. UON
2"
5/8"
9/
9/
WALL WHERE SHOWN IN PLAN
SEALANT TYP. BOTH SIDES,
FULL PERIMETER
JAMB ANCHOR
HOLLOW METAL FRAME
FILL FRAME WITH MINERAL
WOOL INSULATION
SOLID GROUT AT JAMBS.
123456789101112131415161718
123456789101112131415161718
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
K
L
M w w w .g ri m m a n d p a rk e r.
c o m
E a s t
M a in
S tr e e t n d F lo o r
C h a rl o tt e s v ill e
V A l:
-2
-5
DEB #
260-B4260-030
A301
S C
H E
D U
LE
S
S
IG
N
A G
E
RC
C
-W
AR
SA
W
C
AM
PU
S
IN
TE
RI
OR
R
EN
OV
AT
IO
N
C am pu s D r, W ars aw
, V irg ini a
JANUARY 9, 2025
BID SET
GP #22006.16
DOOR SCHEDULE
DOOR NO.
DOOR FRAME DOOR
LABEL
FIRE
RATING HARDWARE SET REMARKS
NOMINAL SIZE
TYPE MATL MATL TYPE
SECTIONS
WIDTH HEIGHT THK. JAMB HEAD SILL
113A 3' - 0" 7' - 0" 1 3/4" HG SCWD HM 1 J1 H1 - - 1
113B 3' - 0" 7' - 0" 1 3/4" HG SCWD HM 1 J1 H1 - - 1
113C 3' - 0" 7' - 0" 1 3/4" HG SCWD HM 1 J1 H1 - - 1
182B 3' - 0" 7' - 0" 1 3/4" HG SCWD HM 1 J1 H1 - - 1
H1 - HEAD DETAIL J1 - JAMB DETAIL
NON-RATED PARTITIONS
FINISH SCHEDULE
RM. NO. NAME
COLOR
SCHEME FLOOR BASE
WALLS CLG.
MATL. REMARKSA B C D
113 WAITING ETR RST/ETR PTD PTD PTD PTD APC2
113A OFFICE ETR RST/ETR PTD PTD PTD PTD APC2
113B OFFICE ETR RST/ETR PTD PTD PTD PTD APC2
113C OFFICE ETR RST/ETR PTD PTD PTD PTD APC2
182 CONFERENCE ETR RST/ETR PTD PTD PTD PTD APC2/ GYP
ETR
182B OFFICE ETR RST/ETR PTD PTD PTD PTD APC2/ GYP
ETR
DATE DESCRIPTION
TYPICAL HOLLOW METAL FRAME
PROFILE
HOLLOW METAL FRAME TYPES
H2 - HEAD DETAIL J2 - JAMB DETAIL
X
DESIGN CODES/STANDARDS
CODE/STANDARD YEAR/VERSION
VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC) 2021
VIRGINIA EXISTING BUILDING CODE (VEBC) 2021
VIRGINIA MECHANICAL CODE (VMC) 2021
VIRGINIA PLUMBING CODE (VPC) 2021
VIRGINIA ENERGY CONSERVATION CODE (VECC) 2021
NATIONAL ELECTRICAL CODE (NEC) 2020
NFPA 13 2019
NFPA 72 2019
NOTES:
1. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THE
CURRENTLY ENFORCED BUILDING CODES.
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH CODES
INDICATED.
2. PROVIDE SINGLE THICKNESS, 1.1/2 INCHES SPACED, TURNING
VANES IN ALL MITERED DUCTWORK ELBOWS AND BULL HEAD DUCT
TEES.
3. COORDINATE LOCATIONS OF ALL DEVICES, ACCESS PANELS,
DIFFUSERS, GRILLES, & LOUVERS WITH ARCHITECTURAL
REFLECTED CEILING PLANS, INTERIOR & EXTERIOR ELEVATIONS.
4. ALL DUCTWORK DIMENSIONS CITED ARE THE INSIDE CLEAR
DIMENSIONS. CONTRACTOR SHALL MAKE ALLOWANCE FOR DOUBLE
WALL AND DUCT LINER.
5. ALL PIPING AND CONTROL WIRING SHALL BE CONCEALED IN WALLS
OR ABOVE CEILINGS OF FINISHED SPACES, UNLESS NOTED
OTHERWISE. IN FINISHED SPACES WITH EXPOSED STRUCTURE
CEILINGS, CONTRACTOR SHALL CLOSELY COORDINATE ROUTING
WITH OTHER TRADES.
6. CONTRACTOR SHALL COORDINATE LOCATION OF ALL EQUIPMENT,
PIPING AND DUCTWORK WITH OTHER TRADES. MAINTAIN REQUIRED
SERVICE ACCESS.
7. PAINT ALL EXPOSED DUCTWORK, PIPING AND ASSOCIATED
COMPONENTS (EXCLUDING MECHANICAL AND STORAGE SPACES)
PER DIVISION 9.
8. AIRFLOW QUANTITIES INDICATED ON THE PLANS ARE FOR
OCCUPIED OPERATING MODE, UNO.
9. UNLESS OTHERWISE NOTED, ALL DUCT & PIPING MAINS SHALL BE
INSTALLED AS HIGH AS POSSIBLE TO UNDERSIDE OF STRUCTURE.
ROUTE DUCTS BETWEEN AND/OR THROUGH STRUCTURE WHERE
INDICATED. VERIFY ROUTING OF DUCTS WITH CEILING HEIGHTS,
STRUCTURAL SYSTEMS AND OTHER TRADES PRIOR TO DUCT
FABRICATION. INSTALL PIPING BELOW DUCTWORK, UNO.
10. HVAC CONTRACTOR(S) SHALL COORDINATE THEIR WORK WITH ALL
OTHER TRADES PRIOR TO FABRICATIONS OF SYSTEMS AND
COMMENCEMENT OF INSTALLATION. IT SHALL BE THE
RESPONSIBILITY OF EACH CONTRACTOR TO REVIEW THE WORK OF
OTHER TRADES (INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL,
CIVIL, ELECTRICAL, EQUIPMENT, FIRE PROTECTION, FIRE ALARM,
PLUMBING, AND STRUCTURAL) AS IT AFFECTS THEIR WORK, AND AS
THEIR WORK AFFECTS OTHER TRADES, TO INSURE THAT THE
CONSTRUCTION DOCUMENTS ARE CLOSELY FOLLOWED. WHERE
DISCREPANCIES ARISE, THEY SHALL BE REFERRED TO THE A/E FOR
RESOLUTION BEFORE PROCEEDING WITH THE WORK.
11. FLEX-DUCT RUNS SHALL BE 3' MINIMUM AND 5' MAXIMUM LENGTH.
PROVIDE STAINLESS STEEL ADJUSTABLE BANDS TO FASTEN FLEX
TO DUCTWORK COLLAR AND EQUIPMENT SERVED. PLASTIC TIES
ARE UNACCEPTABLE.
12. PROVIDE MANUAL BALANCING DAMPERS IN EACH BRANCH OF
SUPPLY, RETURN, VENTILATION, AND EXHAUST DUCTWORK.
13. COORDINATE WORK PRIOR TO INSTALLATION OF ARCHITECTURAL
FINISHES AS REQUIRED.
14. INSTALL ALL DUCTWORK TERMINATING WITH WWM ABOVE FINISHED
CEILING, UNO. TERMINATE DUCT COMPLETE WITH ELBOW
DIRECTED TOWARDS UNDERSIDE OF ROOF DECK, UNO.
15. CONTRACTOR SHALL PROVIDE COORDINATED 3-D SHOP DRAWINGS
OF DIVISION 23 SYSTEMS. SHOP DRAWINGS SHALL BE PREPARED IN
ELECTRONIC FORMAT AND SUBMITTED IN PRINTED FORM.
16. INSTALL ALL HVAC WALL MOUNTED SENSORS 48" AFF, MEASURED
FROM TOP OF OUTLET BOX, UNO.
17. NOMENCLATURE FOR FINAL ROOM NAMES AND NUMBERS MAY
VARY FROM THE CONSTRUCTION DOCUMENTS. FINAL NAMES AND
NUMBERS USED IN THE SHOP DRAWINGS, EQUIPMENT TAGS, BAS
LABELING AND CLOSEOUT DOCUMENTATION SHALL BE
COORDINATED WITH FINAL ROOM NAMES AND NUMBERS ASSIGNED
BY THE OWNER AND ARCHITECT.
1. DOCUMENTATION OF EXISTING SYSTEMS IS BASED ON AVAILABLE
RECORD DRAWINGS AND CASUAL FIELD OBSERVATION. MAJOR
DISCREPANCIES SHALL BE REFERRED TO THE A/E FOR
RESOLUTION PRIOR TO PROCEEDING WITH THE WORK.
2. PRIOR TO BIDDING, THE CONTRACTOR SHALL VISIT THE SITE TO
BECOME FAMILIAR WITH EXISTING CONDITIONS, AND TO VERIFY
LOCATION, SIZE AND QUANTITY OF ITEMS TO BE REMOVED.
SUBMITTAL OF A BID SHALL SIGNIFY WILLINGNESS TO COMPLY
WITH THE DESIGN AND ACCEPTANCE OF ON-SITE CONDITIONS AS
THEY EXIST.
3. CONTRACTOR SHALL COORDINATE DEMOLITION OF MECHANICAL
SYSTEMS WITH OTHER TRADES PRIOR TO REMOVAL.
4. WHERE QUESTIONS OR DISCREPANCIES ARISE, THE A/E SHALL BE
NOTIFIED IMMEDIATELY FOR RESOLUTION PRIOR TO PROCEEDING
WIITH THE WORK.
5. THE CONTRACTOR SHALL AVOID DISRUPTION OF THE ACTIVITIES
OF THE ADJACENT SPACES. COORDINATE NEW WORK
REQUIREMENTS WITH OTHER TRADES TO ACCOMPLISH THE
WORK WHILE THE FACILITY REMAINS IN OPERATION. SCHEDULE
ANY DISRUPTIONS TO THE SPACE ADJACENT TO THE PROJECT
AREA WITH THE PROJECT MANAGER.
6. PRE-TAB ALL EXISTING SYSTEMS INCLUDING BUT NOT LIMITED TO,
AIRSIDE AND WATERSIDE COMPONENTS INSIDE AREA OF SCOPE.
NEW WORK EQUIPMENT SUBMITTALS WILL NOT BE APPROVED
UNTIL PRE-TAB HAS BEEN SUBMITTED TO THE A/E.
A AMPERE
ABV ABOVE
A/E ARCHITECT/ENGINEER
ACT ACOUSTICAL CEILING TILE
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MONITORING STATION
AFR ABOVE FINISHED ROOF
AHU AIR HANDLING UNIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APD AIR PRESSURE DROP
APPROX APPROXIMATELY
ARCH ARCHITECT
ARCH'L ARCHITECTURAL
ARI AMERICAN REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING AND
REFRIGERATION AND AIR-CONDITIONING ENGINEERS
ATU AIR TERMINAL UNIT
AUX AUXILIARY
BAS BUILDING AUTOMATION SYSTEM
BC BLOWER COIL
BLDG BUILDING
BTUH BRITISH THERMAL UNITS PER HOUR
CD CEILING DIFFUSER, CONDENSATE DRAIN
CEG CEILING EXHAUST GRILLE
CFM CUBIC FEET PER MINUTE
CKT CIRCUIT
CLG CEILING
CO2 CARBON DIOXIDE
CONC CONCRETE
COND CONDENSATE
CRG CEILING RETURN GRILLE
CV CONSTANT VOLUME
dB DECIBELS
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DP DIFFERENTIAL PRESSURE
EA EXHAUST AIR
EAD EXHAUST AIR DUCT
EAL EXHAUST AIR LOUVER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EQPT EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
F DEGREE FAHRENHEIT
FC FAN COIL
FLA FULL LOAD AMPS
FLR FLOOR
FPI FINS PER INCH
FPM FEET PER MINUTE
FT FEET OR FOOT
GAL GALLON
GALV GALVANIZED
GPM GALLONS PER MINUTE
HP HORSEPOWER
HVAC HEATING, VENTILATION & AIR CONDITIONING
IN INCH, INCHES
LAT LEAVING AIR TEMPERATURE
LBS, # POUNDS
LBS/HR POUNDS PER HOUR
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAX MAXIMUM
MBH THOUSAND BTUH
MCA MINIMUM CIRCUIT AMPS
MFR MANUFACTURE
MTD MOUNTED
NTS NOT TO SCALE
OA OUTDOOR AIR
OAU OUTSIDE AIR UNIT
OAD OUTSIDE AIR DUCT
OAL OUTSIDE AIR LOUVER
OBD OPPOSED BLADE DAMPER
OED OPEN END DUCT W/ 1/2" WIRE MESH
NOM NOMINAL
NPT NATIONAL PIPE THREAD
PD PRESSURE DROP
PSI POUNDS PER SQUARE INCH
RTU ROOFTOP UNIT
RA RETURN AIR
RAD RETURN AIR DUCT
RCP REFLECTED CEILING PLAN
RG RETURN GRILLE
SA SUPPLY AIR
SAD SUPPLY AIR DUCT
SENS SENSIBLE
SIM SIMILAR
SP STATIC PRESSURE
SWRG SIDEWALL RETURN GRILLE
SWSG SIDEWALL SUPPLY GRILLE
SWTG SIDEWALL TRANSFER GRILLE
TOD TOP OF DUCT
TRNS TRANSITION
TTL TOTAL
TU TERMINAL UNIT
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V-PH VOLTAGE-PHASE
VFD VARIABLE FREQUENCY DRIVE
W WATT
WB WET BULB
WC WATER COLUMN
WWM WOVEN WIRE MESH, 1/2" UNO
VAV VARIABLE AIR VOLUME TERMINAL UNIT
TH
SP
T
SP
TH
X
AD
TEMPERATURE & HUMIDITY SENSOR WITH SET
POINT CONTROL, 48" AFF. COORDINATE EXACT
LOCATION WITH A/E PRIOR TO ROUGH-IN.
TEMPERATURE SENSOR WITH SET POINT
CONTROL, 48" AFF. COORDINATE EXACT
LOCATION WITH A/E PRIOR TO ROUGH-IN.
TEMPERATURE & HUMIDITY SENSOR WITHOUT
SET POINT CONTROL, 48" AFF. COORDINATE
EXACT LOCATION WITH A/E PRIOR TO ROUGH-
IN.
EXISTING TO BE REMOVED
EXISTING TO REMAIN
POINT OF CONNECTION, NEW-TO-EXISTING
POINT OF DISCONNECTION FOR DEMOLITION
X/X
X"Ø
DUCTWORK
RECTANGULAR DUCT, FIRST DIMENSION
IS SIDE SHOWN. DIMENSION IN INCHES
ROUND DUCT, DIMENSION IN INCHES
FLEXIBLE CONNECTION
TRANSITION, SLOPE NOT TO EXCEED
4-TO-1. FOT = FLAT ON TOP, FOB = FLAT
ON BOTTOM
CHANGE OF ELEVATION IN DIRECTION OF
AIR FLOW (R = RISE, D = DROP)
TURNING VANES
STANDARD BRANCH, SUPPLY OR
RETURN, NO SPLITTER
MANUAL VOLUME DAMPER
DUCT ACCESS DOOR
RECTANGULAR DUCT SECTION
(SUPPLY)
RECTANGULAR DUCT SECTION
(RETURN)
RECTANGULAR DUCT SECTION
(EXHAUST)
RECTANGULAR ELBOW TURNING UP
(SUPPLY)
RECTANGULAR ELBOW TURNING UP
(RETURN)
RECTANGULAR ELBOW TURNING UP
(EXHAUST)
RECTANGULAR ELBOW TURNING DOWN
(SUPPLY)
RECTANGULAR ELBOW TURNING DOWN
(RETURN)
RECTANGULAR ELBOW TURNING DOWN
(EXHAUST)
ROUND DUCT SECTION (SUPPLY)
ROUND DUCT SECTION (RETURN)
ROUND DUCT SECTION (EXHAUST)
ROUND ELBOW TURNING UP
(SUPPLY)
ROUND ELBOW TURNING UP
(RETURN)
ROUND ELBOW TURNING UP
(EXHAUST)
ROUND ELBOW TURNING DOWN
(SUPPLY)
ROUND ELBOW TURNING DOWN
(RETURN)
ROUND ELBOW TURNING DOWN
(EXHAUST)
RETURN GRILLE, TYPE AS INDICATED
EXHAUST GRILLE, TYPE AS INDICATED
RECTANGULAR CEILING SUPPLY DIFFUSER,
ROUND CONNECTION, TYPE AS INDICATED
FLEXIBLE DUCT
FABRIC DUCT
1. THE DESIGN IS BASED ON MANUFACTURERS AND MODELS
INDICATED, AND IS INTENDED TO SHOW THE GENERAL SIZE,
CONFIGURATION, LOCATION, CONNECTIONS AND/OR SUPPORT FOR
EQUIPMENT OR SYSTEM OR SYSTEMS SPECIFIED WITH RELATION
TO THE OTHER BUILDING/SYSTEMS. SEE SPECIFICATION SECTIONS
FOR TECHNICAL REQUIREMENTS.
NO. 51922
MATTHEW R. LEWISC
O
M M
O
N W
EALTH OF V
IR
G
IN
IA
P R
O
F
ESS I O N A L E N G
I N
E R
E
123456789101112131415161718
123456789101112131415161718
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
K
L
M w w w .g ri m m a n d p a rk e r.
c o m
E a s t
M a in
S tr e e t n d F lo o r
C h a rl o tt e s v ill e
V A l:
-2
-5
DEB #
260-B4260-030
M000
LE
G
E N
D S
, A B
B R
E V
IA
TI
O N
S
G E
N E
R A
L N
O
TE
S
RC
C
-W
AR
SA
W
C
AM
PU
S
IN
TE
RI
OR
R
EN
OV
AT
IO
N
W ars aw , V irg ini a
JANUARY 9, 2025
BID SET
GP #22006.15/ 20166.02
1/9/2025
GENERAL NOTES (NEW WORK)GENERAL NOTES (DEMO)ABBREVIATIONSMECHANICAL LEGENDBASIS OF DESIGN
SHEET LIST - MECHANICAL
SHEET NO SHEET NAME
M000 LEGENDS, ABBREVIATIONS & GENERAL NOTES
MD101 PARTIAL FIRST FLOOR PLAN - DEMOLITION
M101 PARTIAL FIRST FLOOR PLAN - DUCTWORK
M501 DETAILS
M701 SCHEDULES & SPECIFICATIONS
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
H
J
K
L
M
10/12
10"Ø
10"Ø
.300 CFM
CD-E
.300 CFM
CD-E
.355 CFM
CD-1
12"Ø
VAV-9N10/12
32/16
VAV-14B
/1
30/16
40/12
10/10 8/8
"Ø
8" Ø
/1
14/12
10"Ø8"Ø 6/10
16/8
/8
20/8
20/8 8"Ø
12/10
6"Ø
8" Ø
12/12 10/1010"Ø
/1
VAV-6B
VAV-5B
.140 CFM
CD-1
.140 CFM
CD-1
.140 CFM
CD-1
.140 CFM
CD-1
.620 CFM
CRG-1
.245 CFM
CRG-1
CRG-E
530 CFM
.220 CFM
CD-1
.155 CFM
CD-1
.160 CFM
CD-1
.70 CFM
CD-1
OFFICE
OFFICE
OFFICE
EXISTING
OFFICE SUITE
MEETING
T
SP
T
SP
NO.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .