RBI-HUA-19-13599.pdf
PDF 7 MB Posted
- Attached to
- Repair Bridge 13599 Federal contract opportunity
- Solicitation number
- W9124A22R00200003
About this file
This is a solicitation for repair work on Bridge 13599 located at Fort Huachuca in Arizona. The solicitation seeks offers to perform repairs including a load rating analysis, upgrading traffic safety features, monitoring crack growth, cleaning and patching exposed rebar, and installing countermeasures to address scour and erosion. Offerors are required to submit pricing and acknowledge all amendments electronically or via PDF scanned signature. The solicitation is issued by the Department of the Army Materiel Command Army Contracting Command located at Aberdeen Proving Ground. Repair work must be completed in accordance with Cochise County standards and specifications. Reference documents including previous load rating analyses and inspection reports are provided for informational purposes. The closing date for offers was not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RBI-HUA-09-13599.pdf | ||
| 2 Pages from Road Design and Construction Standards and Specifications for Public Improvements 2017 -cochise county.pdf | ||
| B08 Solicitation Amendment 0003 Conform Repair Bridge Final.pdf | ||
| RBI-HUA-11-13599.pdf | ||
| RBI-HUA-17-13599.pdf | ||
| LR-HUA-20-13599 FINAL 4-15-2021_Approved.pdf | ||
| Questions-Answer-Repair Bridge-13599-19-AUGUST-2022.docx | DOCX document | |
| B08 Solicitation Amendment 0003 Repair Bridge Final.pdf | ||
| RBI-HUA-21-13599_Draft.pdf | ||
| RBI-HUA-15-13599.pdf | ||
| RBI-HUA-13-13599.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RBI-HUA-19-13599
Routine Bridge Inspection Report
Facility Number: 13599
NBI Structure No.: DAPTRAHUA013599
Ft. Huachuca, AZ
Luis A. De Jesús Díaz, PE
Inspection Date: 26 February 2019
Report Date: June 2019
Requests for this document shall be referred to the Commander USAG Fort Huachuca, ATTN: DPW, Bldg.
22422, 3040 Butler Road, Fort Huachuca, AZ, 85613 or to the HQ IMCOM, G4 Public Works Division, Facilities Management Branch, 2405 Gun Shed Rd, Fort Sam Houston, TX 78234-1223.
DISCLAIMER: The contents of this report are not to be used for advertising, publication, or promotional purposes.
Citation of trade names does not constitute an official endorsement or approval of the use of such commercial products.
All product names and trademarks cited are the property of their respective owners. The findings of this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.
PREFACE
This report presents a routine inspection for facility number 13599 at Fort Huachuca, Arizona and satisfies requirements for routine inspection as specified in Army
Regulation (AR) 420-1 “Army Facility Management”, Chapter 7 “Transportation
Infrastructure and Dams.”
The Army Bridge Inspection Program is sponsored by the Army Transportation
Infrastructure Inspection Program (ATIIP) of the Headquarters Installation
Management Command (IMCOM), San Antonio, TX. The IMCOM provided funding for this investigation. Questions shall be directed to Michael R. Andres, IMCOM ATIIP
Program Manager, michael.r.andres.civ@mail.mil.
Personnel of the U.S. Army Engineer Research and Development Center (ERDC), Geotechnical and Structures Laboratory (GSL), Vicksburg, MS, prepared this publication. The required field inspection was conducted in February 2019. The evaluation team consisted of Edgardo Ruiz, Team Leader, Henry Diaz-Alvarez, and Luis
A. De Jesús Díaz, Structural Engineering Branch (StEB), GSL. Mr. Edgardo Ruiz, StEB, GSL, was the Project Lead.
The Installation POC is Jose A. Jimenez, (520) 533-1865, jose.a.jimenez182.civ@mail.mil
The numbering convention for reporting purposes is from left to right looking from upstream to downstream or from the north and the west. All units of measure in this report are in U.S. (English) units unless noted otherwise.
Inspection Team Leader:
Edgardo Ruiz, PE, (601) 634-2549, edgardo.ruiz@usace.army.mil
Report Reviewer:
Edgardo Ruiz, PE, (601) 634-2549, edgardo.ruiz@usace.army.mil
Report Approver:
Gerardo I. Velazquez, (601) 634-3265, gerardo.i.velazquez@usace.army.mil
Table of Contents
EXECUTIVE SUMMARY ........................................................................................................ 13599-1
BRIDGE ID & DESCRIPTION ................................................................................................ 13599-2
SKETCHES ............................................................................................................................... 13599-8
SUMMARY OF FINDINGS ..................................................................................................... 13599-9
STRUCTURE INVENTORY & APPRAISAL FORM ............................................................ 13599-27
INSPECTION RECORD ........................................................................................................ 13599-31
RBI-HUA-19-13599-1
EXECUTIVE SUMMARY
A routine inspection was performed at structure number 13599 on 26 February 2019 in accordance with the Code of Federal Regulations, Title 23, Part 650, Subpart C -
National Bridge Inspection Standards (NBIS) and the requirements for routine inspection as specified in Army Regulation (AR) 420-1 “Army Facility Management”, Chapter 7 “Transportation Infrastructure and Dams.” The previous NBIS inspection was performed on 28 July 2017. Subsequent routine NBIS safety inspections should be performed at regular intervals not to exceed twenty-four months in accordance with the
NBIS.
Bridge 13599 is in poor condition overall (NBI Rating = 4). This condition has not changed significantly since the previous inspection. Following is a list of the most significant findings.
• No load rating document of the structure.
• Deficient traffic safety features.
• Shear and flexure cracking and exposed rebar on T-beams.
• Spall with exposed rebar in the deck underside.
• Scour around abutments (degradation and aggradation).
• Large scour hole with undermining in channel upstream from the structure.
• Erosion and undercutting of the downstream channel banks.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
None of the deficiencies at this bridge are considered critical, so no immediate corrective actions are needed. Current repair/maintenance recommendations include the following (described in more detail in Table 1 & 2):
Perform and document a load rating.
Upgrade traffic safety features to state requirements.
Monitor crack growth in concrete T-beams.
Clean and patch exposed rebar areas.
Install countermeasures to address scour and erosion.
The bridge is currently not posted for weight restrictions. The bridge requires a load rating to be performed and documented, and civilian posting signs installed if necessary.
RBI-HUA-19-13599-2
BRIDGE ID & DESCRIPTION
Main Span Material: Concrete
No. of Main Spans: 1
Main Span Type: Tee Beam
No. of Approach Spans: 0 No. of Beams, Main Span: 4
Max. Span Length: 27.83 ft Structure Total Length: 27.83 ft
Deck Type: Concrete Cast-in-Place
Deck Width: 24.54 ft Curb to Curb Width: 23.83 ft
Wearing Surface: Bituminous Skew Angle: 0 °
Abut. Foundations: Spread Footing
Pier Foundation(s): N/A
Abutment / Pier Mat'l: Concrete
Year Built: 1960 Year Reconstructed: N/A
Fracture Critical: No
Underwater Inspection: No Date of previous UW Inspection: N/A
Special Inspection (SI): No Date of previous SI: N/A
Structure Repair History: 2010- he end treatments were replaced and an erosion hole filled. 2014- Aggradation under the bridge was removed
LOCATION
Installation: Ft. Huachuca State: Arizona
Facility Carried: Canelo Road Feature Intersected: Slaughterhouse Wash
Latitude: 31°34'01.88" N Longitude: 110°23'44.92" W
RBI-HUA-19-13599-3
BRIDGE LOCATION MAP
NOT TO SCALE
SATELLITE VIEW
RBI-HUA-19-13599-4
Figure 1. Elevation View Looking Northeast
Figure 2. Elevation View Looking Southwest
RBI-HUA-19-13599-5
Figure 3. Approach Looking Northwest
Figure 4. Approach Looking Southeast
RBI-HUA-19-13599-6
Figure 5. Upstream View
Figure 6. Downstream View
RBI-HUA-19-13599-7
Figure 7. Underside View looking to the abutment
RBI-HUA-19-13599-8
SKETCHES
RBI-HUA-19-13599-9
SUMMARY OF FINDINGS
Critical Findings / Sustainment Deficiencies and Recommendations:
Table 1 shows all critical findings that require immediate attention. Table 2 shows the deficiencies and recommendations for the bridge that should be completed over the next two years, or for larger rehabilitation or replacement projects where planning and design should begin. The estimated costs in Tables 1 and 2 are approximate costs based on the cost of material and labor required to complete the recommended repair, in U.S. dollars. All cost data is based on current bid tabulations from contract cost data reported by the California Department of Transportation. These approximate cost estimates should only be used as a reference and for project planning purposes. Although they represent the costs for individual repair activities, they may not represent the total cost of a complete repair/rehabilitation project. Costs such as
Engineers’ Office, Submittal Reviews, Mobilization and Demobilization, Maintenance of
Traffic, Stream Diversion, Contractor's bond etc. would have to be added to the costs provided to develop a complete project cost.
R B
I-H U
A -19
-13
-10
Table 1: Critical Findings
YEAR
DEFICIENCY
NO.
PHOTO DEFICIENCY RECOMMENDATION
REPAIR
TIMEFRAME
(MONTHS)
PLAN OF
ACTION
REQUIRED
(Y/N)
INSPECTION
FREQUENCY
(MONTHS)
QTY
AMOUNT
($K)
N/A N/A N/A N/A N/A N/A N/A N/A N/A $0.0
TOTAL: $0.0
Table 2: Deficiencies & Recommendations
YEAR
DEFICIENCY
NO.
PHOTO DEFICIENCY RECOMMENDATION
REPAIR
TIMEFRAME
(MONTHS)
PLAN OF
ACTION
REQUIRED
(Y/N)
INSPECTION
FREQUENCY
(MONTHS)
QTY
AMOUNT
($K)
2015 1 N/A No load rating documentation.
Perform and document a load rating analysis
24 N 24 1EA $5.0
2015 2 1
Collision damage to hazard marker located at approach 2 in the upstream side.
Replace hazard marker. 24 N 24 1EA $0.5
2009 3 2 Space posting of bridge rail are inadequate.
Replace bridge rails, install approach rails with end treatments.
24 N 12 LS $32.0
2011 4 1, 2 No end treatment at upstream side of approach 2.
2009 5 N/A Loose upstream bridge rail due to collision damage.
2009 6 2 No approach rails
2011 7 3, 4
Many rail postings are heavily oxidized with one perforated and another having erosion issues.
2011 8 5 Longitudinal and transverse cracks on wearing surface.
Ft. Huachuca DPW has to monitor during maintenance inspection for crack widening and growth.
N/A N 12 0 $0.0
2011 9 6 Wing-walls have several cracks.
2009 10 7 Underside of deck have cracks with efflorescence.
2009 11 8, 9 Beams have shear and flexure cracks.
B
I-H U
A -19
-13
-11
YEAR
DEFICIENCY
NO.
PHOTO DEFICIENCY RECOMMENDATION
REPAIR
TIMEFRAME
(MONTHS)
PLAN OF
ACTION
REQUIRED
(Y/N)
INSPECTION
FREQUENCY
(MONTHS)
QTY
AMOUNT
($K)
2009 12 10, 11
The underside of the deck has honeycombing with exposed rebar at several locations. Patch with suitable repair material. 24 N 24
8SF $2.0
2011 13 12 Beam 3 has honeycombing with exposed rebar.
2SF $0.5
2011 14 13 Scour hole at downstream side of Abutment 2.
Re-grade and add rip-rap material. 24 N 24 4CY $1.2
2011 15 14 Aggradation next to abutment
1.
Remove aggradation material. 24 N 24 5CY $0.5
2017 16 15, 16
Scour hole and undermining occurring at upstream side of the channel.
Re-grade channel.
24 N 24
15CY $2.0
Add rip-rap material for erosion protection.
6CY $2.2
2017 17 17 Aggradation at downstream side of channel.
Remove material from channel. 15CY $1.5
2017 18 18
Erosion and undercutting of the downstream channel embankments.
Re-grade channel embankments. 7CY $1.0
Add rip-rap material for protection of the embankments
4CY $1.3
TOTAL: $49.7
RBI-HUA-19-13599-12
PHOTO #1
PHOTO #2
RBI-HUA-19-13599-13
PHOTO #3
PHOTO #4
RBI-HUA-19-13599-14
PHOTO #5
PHOTO #6
RBI-HUA-19-13599-15
PHOTO #7
PHOTO #8
RBI-HUA-19-13599-16
PHOTO #9
PHOTO #10
RBI-HUA-19-13599-17
PHOTO #11
PHOTO #12
RBI-HUA-19-13599-18
PHOTO #13
PHOTO #14
RBI-HUA-19-13599-19
PHOTO #15
PHOTO #16
RBI-HUA-19-13599-20
PHOTO #17
PHOTO #18
RBI-HUA-19-13599-21
Table 3: Completed Repairs since Last Inspection
Deficiency Resolution
Critical
Finding
(Y/N)
Date
Multiple deficiencies None N/A N/A
Structure Capacity: There is no Load Rating Document for this structure. The Load Rating
Document provides the required posting signs, if needed. The following NBI items are assigned for this structure:
NBI Item Description Code
(31) Design Load Unkown 0
(41) Structure Open/Posted/Closed to Traffic Open A
(63) Operating Rating Method
(65) Inventory Rating Method
No rating analysis or evaluation performed
(64) Operating Rating XX RF / tons XX.X
(66) Inventory Rating XX RF / tons XX.X
(70) Bridge Posting Equal to or above legal loads 5
RBI-HUA-19-13599-22
Table 4: Civilian Capacity
Currently
Posted
(Y/N)
Legal Load /
Posted Limit
Supporting Load
Rating Document LR Date
LR Calculation
Valid (Y/N)
LR Calculation
Revised
(Y/N/NA)
N N/A N/A None N/A N/A N/A
Design Load : Unknown Load Capacity Remains (Y/N) : N/A
Date of Previous Load Rating : N/A Load Capacity Reduced (Y/N) : N/A
Date of Current Load Rating : N/A Revised or New Load Posting (Y/N) : N/A
Specify Load Rating Methodology 1 : No load rating as of this report’s date
AASHTO LOADINGS
Load
Rating
Type
Load Type Weight
(tons)
RF
RT
(tons)
Safe Posting
Load Limit
(tons)
D e s ig n
L o a d ti n g
HL-93 2
Inventory 36.00 Unk Unk
Operating 36.00 Unk Unk
L e g a l L o a d
R a ti
Routine
Commercial
Vehicles
Type 3 25.00 Unk Unk Unk
Type 3-S2 36.00 Unk Unk Unk
Type 3-3 40.00 Unk Unk Unk
Specialized
Hauling Vehicles
NRL 40.00 Unk Unk
SU4 27.00 Unk Unk Unk
SU5 31.00 Unk Unk Unk
SU6 34.75 Unk Unk Unk
SU7 38.75 Unk Unk Unk
F a s t
A c t
L o d ti
Emergency
Vehicles
Type EV2 28.75 Unk Unk Unk
Type EV3 43.00 Unk Unk Unk
1. Enter ASR for Allowable Stress Rating, LFR for Load Factor Rating, LRFR for Load and Resistance Factor Rating or EJ for
Engineering Judgment.
2. HL-93 Design Vehicle applies only to LRFD/LRFR methodology. When multiplying 36 tons by the rating factor obtained from the
HL-93 to report tonnage, this value shall be taken as a fictitious or "pseudo" load rating since HL-93 is a notional vehicle consisting of a truck or a tandem plus a lane loading. This operation is done for the sole purpose of reporting a value to the NBI.
RBI-HUA-19-13599-23
Table 5: Military Load Classification
Posted
MLC
1-way
Wheel
Calc
MLC
1-way
Wheel
Posted
MLC
2-way
Wheel
Calc
MLC
2-way
Wheel
Posted
MLC
1-way Track
Calc
MLC
1-way Track
Posted
MLC
2-way Track
Calc
MLC
2-way Track
None Unknown None Unknown None Unknown None Unknown
Recommended MLC Posting
Unknown - no MLC calculated as of this report
Channel Scour: Even though the structure is not considered to be scour critical, it has severe scour and undermining issues that should be addressed.
Table 6: Channel Scour
Scour
Screening
(Level 1/2)
Low Risk
(Y/N)
Priority
(Low/High) Document
Document
Date
(MM/YY)
Channel
Profile
Change >3ft
(Y/N)
Profile
Base
Year
1 N Low RBI-HUA-19-13599 06/19 N 2009
Traffic Safety: The traffic safety features of structure do not meet current standards.
Table 7: Traffic Safety
NBI Item 36A
Bridge Rails
NBI Item 36B
Transition
NBI Item 36C
Approach Rails
NBI Item 36D
End Treatments
0 N 0 0
Prior Report: The 2017 Inspection Report was on file and consulted or reviewed for comparison purposes.
RBI-HUA-19-13599-24
Inspection Frequency: The structure is scheduled for routine inspection every 24 months.
Structure was inspected within the required NTE 24 months.
Fracture Critical: Structure does not have fracture critical elements.
Special Inspection Requirements: Structure does not require a special inspection.
RBI-HUA-19-13599-25
Installation Status Report (ISR): Recommended ISR values for structure.
Table 8a: ISR Mission Functional
Green Amber Red N/A
CAPACITY (10pts)
- Bridge capacity is sufficient for current mobilization requirements based on a valid load rating or engineering judgment document.
- Bridge can be strengthened to meet current mobilization requirements with minimal rehabilitation.
- Bridge capacity is insufficient or unable to be rehabilitated to meet current requirements.
0 [ X ]
BRIDGE RESTRICTIONS (10pts)
- Bridge has sufficient width, horizontal and vertical clearance for current mobilization requirements.
10 - N/A [No Amber Condition] 0
- Bridge width or clearances are insufficient or unable to be rehabilitated to meet current requirements.
0 [ ]
BRIDGE SAFETY FEATURES (10pts)
- All features of Federal Highway
Administration (FHWA) NBI Item #36 rated 1 or N (Bridge rail, transitions, approach guardrails, and end treatments)
- Any feature of FHWA Item
#36 rated 0 but there is a valid project shown during the inspection that addresses deficiencies and is being scheduled.
- Any feature of FHWA Item
#36 rated 0, with no upgrade actions planned.
10 [ ]
INSPECTION FREQUENCY (10pts)
- Inspections are conducted within the required frequency (routine: 24 month, maintenance: 12 months).
- Routine bridge inspection over 24 month old or maintenance inspections are over 12 months old.
- No routine or special inspections have been conducted.
0 [ ]
MILITARY LOAD CLASSIFICATION (MLC) (10pts)
- Complete MLC signs posted on both ends of the bridge if required.
- Incomplete MLC signs or missing at one end.
- MLC is not posted, if required.
0 [ X ]
BRIDGE RECORDS (10pts)
- Complete bridge records are maintained. Items required are:
*Inventory/Routine/Special/Fracture
Critical/Underwater Inspections.
*Drawings.
*Load Ratings.
*Scour Evaluations.
*Plan of Actions (for scour, critical findings, repairs, etc.)
*Maintenance & Repair Records
(DD1354, DA4283, DD1391)
*Opening/Closures of structures.
*Accidents & ADT data.
*ISR data.
*ACOMs reviews.
0 - Partial records maintained. 10 - No records are available. 0 [ ]
BRIDGE MARKINGS (10pts)
- Bridge and underpass is marked for weight limit, overhead clearances, speed, traffic markers, and width restrictions if needed..
- Bridge is marked for civilian weight limit, overhead clearance, speed, traffic markers, and width restrictions.
- No bridge or underpass markings
10 [ ]
PEDESTRIANS (6pts)
- Bridge has a separated pedestrian walkway where required
- Roadway is used by pedestrians; walkway could be built to accommodate pedestrians
- Roadway is used by pedestrians; walkway cannot be built to accommodate pedestrians
0 [ X ]
RBI-HUA-19-13599-26
Table 8b: ISR Quality
Green Amber Red N/A
BRIDGE DECK (10pts)
- Federal Highway
Administration (FHWA) NBI
Item # 58 condition rating is good or better at 7, 8, 9, for this element.
- FHWA Item # 58 is in fair condition with an inspection rating of 5, or 6.
-If BRIDGE CONDITION is RED but there is a project shown during the inspection that addresses the deficiencies with funding being requested, then rate the element Amber.
- FHWA Item # 58 is in poor condition with an inspection rating of 0, 1, 2, 3, or 4.
10 [ ]
BRIDGE SUPERSTRUCTURE (10pts)
- Federal Highway
Administration (FHWA) NBI
Item #59 condition rating is good or better at 7, 8, 9, for this element.
- FHWA Item # 59 condition rating of fair with an inspection rating of 5, or 6.
-If BRIDGE CONDITION is RED but there is a project shown during the inspection that addresses the deficiencies with funding being requested, then rate the element Amber.
- FHWA Item # 59 condition rating of poor with an inspection rating of 0, 1, 2, 3, or 4.
0 [ ]
BRIDGE SUBSTRUCUTRE (10pts)
- Federal Highway
Administration (FHWA) NBI
Item #60 condition rating is good or better at 7, 8, 9, for this element.
- FHWA NBI Item #60 condition rating of fair with an inspection rating of 5, or 6.
-If BRIDGE CONDITION is RED but there is a project shown during the inspection that addresses the deficiencies with funding being requested, then rate the element Amber.
- FHWA NBI Item #60 condition rating of poor with an inspection rating of 0, 1, 2, 3, or 4.
0 [ ]
CULVERT (10pts)
- Federal Highway
Administration (FHWA) NBI
Item #62 condition rating is good or better at 7, 8, 9, for this element.
- FHWA NBI Item #62 condition rating of fair with an inspection rating of 5, or 6.
-If BRIDGE CONDITION is RED but there is a project shown during the inspection that addresses the deficiencies with funding being requested, then rate the element Amber.
- FHWA NBI Item #62 condition rating of poor with an inspection rating of 0, 1, 2, 3, or 4.
0 [ X ]
BRIDGE CHANNEL (10pts)
- Federal Highway
Administration (FHWA) NBI
Item #61 condition rating is good or better at 7, 8, 9, for this element.
- FHWA NBI Item #61 condition rating of fair with an inspection rating of 5, or 6.
-If BRIDGE CONDITION is RED but there is a project shown during the inspection that addresses the deficiencies with funding being requested, then rate the element Amber.
- FHWA NBI Item #61 condition rating of poor with an inspection rating of 0, 1, 2, 3, or 4.
10 [ ]
APPROACH ROADWAY (6pts)
- Federal Highway
Administration (FHWA) NBI
Item #72 condition rating is good or better at 7, 8, 9, for this element.
- FHWA NBI Item #72 condition rating of fair with an inspection rating of 5, or 6.
-If BRIDGE CONDITION is RED but there is a project shown during the inspection that addresses the deficiencies with funding being requested, then rate the element Amber.
- FHWA NBI Item #72 condition rating of poor with an inspection rating of 0, 1, 2, 3, or 4.
10 [ ]
RBI-HUA-19-13599-27
STRUCTURE INVENTORY & APPRAISAL FORM
NBI Field Standard Value Federal (Metric)
Value
NBI 1: State Code 049 049
NBI 2: Highway Agency District 00 00
NBI 3: County (Parish) Code 003 003
NBI 4: Place Code 66820 66820
NBI 5A: Inventory Route: Record Type 1 1
NBI 5B: Inventory Route: Route Signing Prefix 8 8
NBI 5C: Inventory Route: Designated Level of Service 0 0
NBI 5D: Inventory Route: Route Number 00000 00000
NBI 5E: Inventory Route: Direction Suffix 0 0
NBI 6A: Feature Intersected
SLAUGHTERHOUSE
WASH
SLAUGHTERHOUSE
WASH
NBI 7: Facility Carried by Structure CANELO RD CANELO RD
NBI 8: Structure Number DAPTRAHUA013599 DAPTRAHUA013599
NBI 9: Location DEAD MANS CURVE DEAD MANS CURVE
NBI 10: Minimum Vertical Clearance 99.99 9999
NBI 11: Kilometerpoint 0.000 0000000
NBI 12: Base Highway Network 0 0
NBI 13A: Linear Reference System (LRS) - Inventory Route
NBI 13B: Linear Reference System (LRS) - Subroute Number
NBI 16: Latitude 31.56719 31340188
NBI 17: Longitude -110.3958 110234488
NBI 19: Bypass Detour Length 1 002
NBI 20: Toll 3 3
NBI 21: Maintenance Responsibility 74 74
NBI 22: Owner 74 74
NBI 26: Functional Classification of Inventory Route 09 09
NBI 27: Year Built 1960 1960
NBI 28A: Lanes on the Structure 02 02
NBI 28B: Lanes under the Structure 00 00
NBI 29: Average Daily Traffic (ADT) 001000 001000
NBI 30: Year of Average Daily Traffic 2015 2015
NBI 31: Design Load 0 0
NBI 32: Approach Roadway Width 23.8 0073
NBI 33: Bridge Median 0 0
NBI 34: Skew 00 00
NBI 35: Structure Flared 0 0
NBI 36A: Traffic Safety Features: Bridge Railings 0 0
NBI 36B: Traffic Safety Features: Transitions N N
NBI 36C: Traffic Safety Features: Approach Guardrail 0 0
NBI 36D: Traffic Safety Features: Approach Guardrail Ends 0 0
RBI-HUA-19-13599-28
NBI 37: Historical Significance 5 5
NBI 38: Navigation Control 0 0
NBI 39: Navigation Vertical Clearance 0.0 0000
NBI 40: Navigation Horizontal Clearance 0.0 00000
NBI 41: Structure Open, Posted, or Closed to Traffic A A
NBI 42A: Type of Service: ON Bridge 1 1
NBI 42B: Type of Service: UNDER Bridge 5 5
NBI 43A: Structure Type, Main: Kind of Material/Design 1 1
NBI 43B: Structure Type, Main: Type of Design/Construction 04 04
NBI 44A: Structure Type, Approach Spans: Kind of
Material/Design 0 0
NBI 44B: Structure Type, Approach Spans: Type of
Design/Construction 00 00
NBI 45: Number of Spans in Main Unit 001 001
NBI 46: Number of Approach Spans 0000 0000
NBI 47: Inventory Route, Total Horizontal Clearance 23.8 073
NBI 48: Length of Maximum Span 27.8 00085
NBI 49: Structure Length 27.8 000085
NBI 50A: Curb or Sidewalk Width: Left Side 0.0 000
NBI 50B: Curb or Sidewalk Width: Right Side 0.0 000
NBI 51: Bridge Roadway Width, Curb-To-Curb 23.8 0073
NBI 52: Deck Width, Out-To-Out 24.5 0075
NBI 53: Minimum Vertical Clearance OVER Bridge Roadway 99.99 9999
NBI 54A: Minimum Vertical Underclearance: Reference
Feature N N
NBI 54B: Minimum Vertical Underclearance 0.00 0000
NBI 55A: Minimum Lateral Underclearance on Right:
Reference Feature N N
NBI 55B: Minimum Lateral Underclearance on Right 99.9 999
NBI 56: Minimum Lateral Underclearance on Left 0.0 000
NBI 58: Deck 4 4
NBI 59: Superstructure 5 5
NBI 60: Substructure 5 5
NBI 61: Channel and Channel Protection 4 4
NBI 62: Culverts N N
NBI 63: Method Used to Determine Operating Rating 5 5
NBI 64: Operating Rating
NBI 65: Method Used to Determine Inventory Rating 5 5
NBI 66: Inventory Rating
NBI 67: Structural Evaluation 3 3
NBI 68: Deck Geometry 4 4
NBI 69: Underclearances, Vertical and Horizontal N N
NBI 70: Bridge Posting 5 5
RBI-HUA-19-13599-29
NBI 71: Waterway Adequacy 7 7
NBI 72: Approach Roadway Alignment 3 3
NBI 75A: Type of Work: Type of Work Proposed 38 38
NBI 75B: Type of Work: Work Done by 1 1
NBI 76: Length of Structure Improvement 49.5 000151
NBI 90: Inspection Date 02/26/2019 0219
NBI 91: Designated Inspection Frequency 24 24
NBI 92A: Critical Features: Fracture Critical Details N N
NBI 92B: Critical Features: Underwater Inspection N N
NBI 92C: Critical Features: Special Inspection N N
NBI 93A: Critical Feature Inspection Date: Fracture Critical
Details
NBI 93B: Critical Feature Inspection Date: Underwater
Inspection
NBI 93C: Critical Feature Inspection Date: Special Inspection
NBI 94: Bridge Improvement Cost 000017 000017
NBI 95: Roadway Improvement Cost 000033 000033
NBI 96: Total Project Cost 000050 000050
NBI 97: Year of Improvement Cost Estimate 2019 2019
NBI 98A: Border Bridge: Neighboring State Code
NBI 98B: Border Bridge: Percent Responsibility
NBI 99: Border Bridge Structure Number
NBI 100: STRAHNET Highway Designation 0 0
NBI 101: Parallel Structure Designation N N
NBI 102: Direction of Traffic 2 2
NBI 103: Temporary Structure Designation
NBI 104: Highway System of the Inventory Route 0 0
NBI 105: Federal Lands Highway 0 0
NBI 106: Year Reconstructed 0000 0000
NBI 107: Deck Structure Type 1 1
NBI 108A: Type of Wearing Surface 6 6
NBI 108B: Type of Membrane 8 8
NBI 108C: Deck Protection 8 8
NBI 109: Average Daily Truck Traffic 10 10
NBI 110: Designated National Network 0 0
NBI 111: Pier or Abutment Protection
NBI 112: NBIS Bridge Length Y Y
NBI 113: Scour Critical Bridges 5 5
NBI 114: Future Average Daily Traffic 001000 001000
NBI 115: Year of Future Average Daily Traffic 2037 2037
NBI 116: Minimum Navigation Vertical Clearance, Vertical
Lift Bridge
RBI-HUA-19-13599-30
Miscellaneous
202 - ABI Structure Number: DAPTRAHUA013599
203 - Inspection Office: ERDC
204 – Inspector: L. DE JESUS DIAZ
205 - Inspection Cost: 003000
206 - Coopers Loading
208 - Station Number
209 - Recommended Speed Limit MPH
210 - Posted Speed Limit MPH
211 – ISD: TRA-TRADOC
212 - Installation Name: Fort Huachuca
223 - MLC 1-Way Wheel:
224 - MLC 1-Way Track:
225 - MLC 2-Way Wheel:
226 - MLC 2-Way Track:
RBI-HUA-19-13599-31
INSPECTION RECORD
ITEM # 72: APPROACH FEATURES
Rating Guidelines
CODE DESCRIPTION
8 Speed reduction is NOT required.
6 A VERY MINOR speed reduction is required.
3 A SUBSTANTIAL speed reduction is required.
Components Rating
Rating Component Remarks
3 1. Horizontal Alignment The structure is located on a sharp curve.
3 2. Vertical Alignment The approaches have significant gradient at both sides.
3 General Appraisal Rating (NBI ITEM #72)
RBI-HUA-19-13599-32
ITEM # 72: APPROACH FEATURES (CONTINUED)
Code Description
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION: No problems noted.
7 GOOD CONDITION: Some minor problems.
6 SATISFACTORY CONDITION: Structural elements show some minor deterioration.
FAIR CONDITION: All primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
4 POOR CONDITION: Advanced section loss, deterioration, spalling or scour.
SERIOUS CONDITION: Loss of section, deterioration, spalling or scour has seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION: Advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the bridge until corrective action is taken.
IMMINENT FAILURE CONDITION: Major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Bridge is closed to traffic but corrective action may put back in light service.
0 FAILED CONDITION: Out of service – beyond corrective action.
Rating Component Unit Amt Remarks
N 1. Relief Joints LF 0 None
N
2. Approach:
a) Guardrail LF 0 None
7 b) Pavement SF 1380 The approach pavements have longitudinal and transverse cracks and some map cracking.
7 c) Embankment EA 4 None
N 3. Load Posting Sign EA 0 None
6 4. Hazard Markers EA 4 The hazard marker at approach 2 in the upstream side has collision damage.
RBI-HUA-19-13599-33
ITEM #36: TRAFFIC SAFETY FEATURES
CODE DESCRIPTION
1 Inspected feature MEETS currently acceptable standards.
Inspected feature DOES NOT currently meet acceptable standards or a safety feature is required and NONE
IS PROVIDED.
0 1. Bridge Rails LF 106 The post spacings are inadequate.
N 2. Transition EA 0 None
0 3. Approach Rails LF 0 No approach rails installed but required for the structure.
0 4. End Treatments EA 3 Approach 2 at the upstream side does not have an end treatment.
RBI-HUA-19-13599-34
ITEM #58: DECK FEATURES
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION: No problems noted.
7 GOOD CONDITION: Some minor problems.
6 SATISFACTORY CONDITION: Structural elements show some minor deterioration.
5 FAIR CONDITION: All primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
4 POOR CONDITION: Advanced section loss, deterioration, spalling or scour.
SERIOUS CONDITION: Loss of section, deterioration, spalling or scour has seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION: Advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the bridge until corrective action is taken.
IMMINENT FAILURE CONDITION: Major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Bridge is closed to traffic but corrective action may put back in light service.
6 1. Wearing Surface SF 664 The surface has longitudinal and transverse cracks along with some map cracking.
2. Deck Structural
Condition
SF 684
Bay 2- Exposed rebar caused by a 2ft X 2ft honeycombed area with a 2 in. depth. There is also a full-length longitudinal crack with efflorescence at the center of the bay.
Bay 3-This bay has an exposed rebar caused by a 1ft. X 3 ft.
honeycombed area.
The downstream overhang has several spalls with one being 2 ft X 2 ft in area with exposed rebars.
N 3. Curbs LF 0 None
N 4. Median SF 0 None
N 5. Sidewalk SF 0 None
N 6. Parapet LF 0 None
4 7. Railing LF 106
The upstream rail is loose due to collision damage. Many rail posts have heavy oxidation and one of them is perforated. One rail post space blocker is twisted. The posting holding the end treatment at Approach 1 on the upstream side has erosion occurring.
N 8. Drains EA N None
N 9. Lighting EA N None
7 10. Utilities EA 2 The downstream utility pipes hold debris.
N 11. Expansion Joints LF 0 None
4 General Condition Rating (NBI ITEM # 58)
RBI-HUA-19-13599-35
ITEM # 59: SUPERSTRUCTURE FEATURES
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION: No problems noted.
7 GOOD CONDITION: Some minor problems.
6 SATISFACTORY CONDITION: Structural elements show some minor deterioration.
5 FAIR CONDITION: All primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
4 POOR CONDITION: Advanced section loss, deterioration, spalling or scour.
SERIOUS CONDITION: Loss of section, deterioration, spalling or scour has seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION: Advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the bridge until corrective action is taken.
IMMINENT FAILURE CONDITION: Major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Bridge is closed to traffic but corrective action may put back in
N 1. Bearing Devices EA 0 None
2. Girders/Beams
A. General
LF 112
All the beams have shear cracks of ~0.016 in wide at their ends.
There are also stress cracks of ~0.13 in wide at their mid-span and propagating towards the abutments. There is honeycombing with exposed rebar near abutment 1 and a flexural crack at mid-span of beam 3.
N B. Cross Frame EA 0 None
N C. Bracing EA 0 None
N 3. Floor Beams EA 0 None
N
4. Arch
a) Barrel LF 0 None
N
b) Spandrel Wall
/Columns SF 0 None
N 5. Paint LF 0 None
5 General Condition Rating (NBI ITEM # 59)
RBI-HUA-19-13599-36
ITEM #60: SUBSTRUCTURE FEATURES
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION: No problems noted.
GOOD CONDITION: Some minor problems. Channel Profile has naturally balanced itself, a change less than 1 ft. is apparent (∆ < 1ft)
6 SATISFACTORY CONDITION: Structural elements show some minor deterioration.
FAIR CONDITION: All primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel Profile have change more than 1 ft. less than 3 ft. (1ft < ∆ < 3ft)
4 POOR CONDITION: Advanced section loss, deterioration, spalling or scour.
SERIOUS CONDITION: Loss of section, deterioration, spalling or scour has seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present. Channel
Profile has change more than 3 ft. (∆ > 3ft).
CRITICAL CONDITION: Advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the bridge until corrective action is taken.
IMMINENT FAILURE CONDITION: Major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Bridge is closed to traffic but corrective action may put back in
1. Abutments
a) Wings SF Unk
The wing-backwall interface has a vertical crack at the upstream side. The wingwall 2 at the upstream side has a diagonal crack.
Both downstream wingwalls have minor cracking.
N b) Backwall SF Unk Not visible.
N c) Bearing Seats EA 2 Not visible.
d) Breast Wall /
Bulkhead
SF 240
Breast Wall 1 has efflorescence throughout the bottom. Both breast walls have honeycombing. Abutment 2 has high water marks about 3ft from the footing.
N e) Footing SF 0 None
N f) Piles EA 0 None
N g) Bracing LF 0 None
5 h) Scour / Erosion
All wing-walls have aggradation of embankment material in front of them. There is a scour hole ~20in. at the downstream side of abutment 2, exposing the toe. Abutment 1 has aggradation
7 i) Streambed Change Changes in the streambed are <1ft.
7 j) Settlement None
RBI-HUA-19-13599-37
ITEM #60: SUBSTRUCTURE FEATURES (CONTINUED)
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION: No problems noted.
GOOD CONDITION: Some minor problems. Channel Profile has naturally balanced itself, a change less than 1 ft. is apparent (∆ < 1ft)
6 SATISFACTORY CONDITION: Structural elements show some minor deterioration.
FAIR CONDITION: All primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel Profile have change more than 1 ft. less than 3 ft. (1ft < ∆ < 3ft)
4 POOR CONDITION: Advanced section loss, deterioration, spalling or scour.
SERIOUS CONDITION: Loss of section, deterioration, spalling or scour has seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present. Channel
Profile has change more than 3 ft. (∆ > 3ft).
CRITICAL CONDITION: Advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the bridge until corrective action is taken.
IMMINENT FAILURE CONDITION: Major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Bridge is closed to traffic but corrective action may put back in
N
2. Piers / Bents / Piles
a) Caps EA 0 None
N b) Bearing Seats EA 0 None
N c) Column, Stem, Wall SF 0 None
N d) Footing SF 0 None
N e) Piles EA 0 None
N f) Bracing EA 0 None
N g) Scour / Erosion None
N h) Streambed Change None
N i) Settlement None
5 General Condition Rating (NBI ITEM # 60)
RBI-HUA-19-13599-38
ITEM # 61: CHANNEL / CHANNEL PROTECTION
N Not applicable. Use when bridge is not over a waterway (channel).
9 EXCELLENT CONDITION: There are no noticeable or noteworthy deficiencies, which affect the condition.
VERY GOOD CONDITION: Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.
GOOD CONDITION: Some minor problems. Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.
SATISFACTORY CONDITION: Elements show some minor deterioration. Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor streambed movement evident. Debris is restricting the channel slightly.
FAIR CONDITION: Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel.
POOR CONDITION: Advanced deterioration. Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel.
SERIOUS CONDITION: Bank protection has failed. River control devices destroyed. Streambed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway.
CRITICAL CONDITION: Advanced deterioration. Unless closely monitored it may be necessary to close the bridge until corrective action is taken. The channel has changed to the extent the bridge is near a state of collapse.
IMMINENT FAILURE CONDITION: Major deterioration. Bridge closed to traffic because of channel failure. Corrective action may put back in light service.
0 FAILED CONDITION: Bridge closed because of channel failure. Replacement necessary.
Rating Component Remarks
4 1. Channel Scour
The upstream side has a 4ft deep scour hole where the concrete lining ends, about 15’ from deck edge. There is ~ 2 ft of undermining at the edge of this lining.
5 2. Embankment Erosion
The downstream embankment 1 has undercutting happening about
30 ft. from deck edge. Embankment 2 at downstream has undercutting occurring throughout the bank.
6 3. Waterway Obstructions Three (3) tree trunks constrict the channel from embankment 1 to the middle of the channel.
7 4. Vegetation A tree is growing on embankment 1 at the downstream side.
N 5. Channel Protection None
7 6. Adequacy of Opening
(NBI Item #71) None
4 General Condition Rating (NBI ITEM #61)
RBI-HUA-19-13599-39
ITEM # 113: SCOUR CRITICAL BRIDGES
N Bridge not over waterway.
U
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from a bridge failure during and immediately after a flood event. (see HEC 23).
T
Bridge over "tidal" waters that have not been evaluated for scour, but considered low risk. Bridge will be monitored with regular inspection cycle and with appropriate underwater inspections until an evaluation is performed. ("Unknown" foundations in "tidal" waters should be coded U.)
9 Bridge foundations (including piles) on dry land well above flood water elevations.
Bridge foundations determined to be stable for the assessed or calculated scour condition: Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (see HEC 23).
8P Bridge is a culvert-type structure with paved bottom.
8L Bridge has been evaluated / assessed as a low risk structure and no further study is required.
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event.
Scour calculation/evaluation has not been made. (Use only to describe case where bridge has not yet been evaluated for scour potential.)
6R Bridge is scheduled for major rehabilitation or replacement within the next 5 years; the scour study is deferred to the location/design phase of the bridge project. Periodic monitoring may be necessary.
6U
Bridge foundations are unknown. The bridge site conditions have been evaluated / assessed with cursory study in the field and office, and the risk of potential damage from scour is judged to be moderate or mild.
Structure has no history of scour problems. Further evaluation is deferred. If the risk of damage from potential or actual scour damage is judged to be severe, additional scour studies will be undertaken including borings or others means of subsurface exploration to ascertain foundation and supporting soil conditions.
Bridge foundations determined to be stable for assessed or calculated scour condition: Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (see HEC 23).
RBI-HUA-19-13599-40
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (see HEC 23).
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions:
- Scour within limits of footing or piles.
- Scour below spread-footing base or pile tips.
3M
Bridge is rated as scour critical on the basis of an evaluation and/or analysis; the potential risk is judged to be mild or moderate, and no actions are planned other than monitoring during routine inspections and after flood events.
3C
Bridge is rated as scour critical on the basis of an evaluation and/or analysis; the potential risk is judged to be severe and scour countermeasures are planned. Monitoring is to be performed until scour countermeasures are in place.
Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations, which are determined to be unstable by:
- a comparison of calculated scour and observed scour during the bridge inspection, or
- an engineering evaluation of the observed scour condition reported by the bridge inspector in Item 60.
Bridge is scour critical; field review indicates that failure of piers/abutments is imminent. Bridge is closed to traffic. Failure is imminent based on:
- a comparison of calculated and observed scour during the bridge inspection, or
- an engineering evaluation of the observed scour condition reported by the bridge inspector in Item 60.
0 Bridge is scour critical. Bridge has failed and is closed to traffic.
Component Rating
Rating Component
POA
In place
(Y/N/NA)
Remarks
5 NBI ITEM # 113 NA
The structure is assessed as stable, however desktop evaluation indicates potential for scour.
* If Item 113= 0, 1, 2, 3, or U POA is required.
RBI-HUA-19-13599-41
CHANNEL PROFILE
| 2019-08-14T21:47:06-0500 | |
| VELAZQUEZ.GERARDO.I.1232173013 |
File details come from the government source that posted it. Updated .