RA_Statement_of_Work.pdf
PDF 142 KB Posted
- Attached to
- Moorage - Port Call Kodiak Alasaka
- Solicitation number
- 1333MK26Q0032
About this file
This is a Statement of Work for moorage services for NOAA Ship Rainier in Kodiak, Alaska. The vessel requires pier berthing at a single, stable location during three scheduled in-port periods: August 4-8, 2026; August 27-September 1, 2026; and September 14-18, 2026, with an overall timeframe spanning August 1 through September 30, 2026.
The facility must accommodate a vessel 231 feet in total length with a 20-foot draft at Mean Lower Low Water (MLLW). The berth must provide consistent moorage without requiring the vessel to shift to an alternative location during any single moored period. Required services include moorage for the 231-foot vessel, potable water at 2,000 gallons per day, garbage disposal with a 10 cubic yard trash dumpster, sewage disposal, and shore power billable to Marine Operations Center Pacific. The facility must also allow for use of security contract 1305M222FNMAN0014. The in-port periods support stores provisioning, bunkering, oily waste pump-off operations, and various loading operations to ensure the ship is mission-ready, with these ancillary services handled through separate contracts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1333MK26Q0032_Amd_0002.pdf | ||
| FA_SOW_Kodiak_2026_rev1_0001.docx | DOCX document | |
| Sol_1333MK26Q0032_Amd_0001.pdf | ||
| SON_SH_MooringKodiak.docx | DOCX document | |
| 15-5687.txt | TXT text file | |
| Attachment_4-Past_Performance_Questionnaire.pdf | ||
| SCA_Poster_Required_for_all_Service_Contracts.pdf | ||
| FA_SOW_Kodiak_2026.docx | DOCX document | |
| Sol_1333MK26Q0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
MOORAGE IN KODIAK, AK – NOAA SHIP RAINIER
PURPOSE:
NOAA Ship Rainier is requesting pier berthing in Kodiak, AK for three scheduled in port periods from August 1, 2026 to September 30, 2026.
Rainier is seeking berthing at a location in the Kodiak locality that is able to reliably provide the array of services anticipated to be required. The berth itself should have confirmed availability and be a singular berth providing consistent and stable moorage through each in port period without the need to shift to alternative berth or location in the midst of a particular period in port.
TECHNICAL SPECIFICATIONS:
NOAA Ship Rainier requires a berth to accommodate 231 feet total length, 20 foot draft at Mean Lower Low Water (MLLW). Berthing for specific periods must be in a single location with no requirement to move or shift the vessel to another slip or location during a single moored period. Facility must allow for use of security contract 1305M222FNMAN0014. Shore power must be billable to Marine Operations Center Pacific.
Moorage service periods:
(1) Arrive 08/04/2026 - Depart 08/08/2026
(2) Arrive 08/27/2026 - Depart 09/01/2026
(3) Arrive 09/14/2026 - Depart 09/18/2026
The following services are required:
- Moorage (231’)
- Potable Water - 2,000 gallons per day
- Garbage Disposal - 10 cubic yard trash dumpster
- Sewage Disposal
- Shore Power
This in port period entails stores provisioning, bunkering and oily waste pump off operations through separate contracts, and various loading operations to ensure ship is mission ready.
STATEMENT OF WORK
File details come from the government source that posted it. Updated .