(x)
R17PS00430
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
04/18/2017000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/16/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Gerri Voto-Braun
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project Title: Shade Hill Dam Service Spillway Stilling Basin Concrete Repairs, Pick-Sloan Missouri Basin Project, South Dakota
See attachment for changes incorporated by this amendment:
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Description of Changes:
Solicitation No. Rl7PS00430 Amendment No. 0003
Page 2 of2
1. In Part IV--Evaluation Factors for Award, Section M-- Remove pages M-1 through M-4 in its entirety and substitute therefor with the attached Revised pages M-1 through M-4.
For convenience, essential changes on the revised solicitation pages are indicated by a vertical line within the margin, whereby the lines or paragraphs are changed from the previous version. However, all portions of the revised solicitation pages shall apply whether changes thereon have or have not been indicated.
Acknowledgement: See Block 11 above regarding acknowledgment by offerors to this amendment.
The Government requires acknowledgment of this amendment at the place designated for receipt of bids.
(Please See Block IO of the Standard Form 1442).
Receipt of Proposals: The hour and date for receipt of proposals remains 3:00 PM (Mountain Daylight Time), April 20, 2017.
Third Party: If you have provided a copy of this solicitation to another company or person, please forward this amendment accordingly.
Missouri River Basin Project Grand Division Shadehill Unit South Dakota Solicitation No. RI 7PS00430
1. Project names, locations, and dates of assignment.
2. Description of duties and responsibilities for each position assigned.
3. Professional registrations, licenses, certifications, accomplishments, or other pertinent information that demonstrates their suitability for the work assigned to them.
If an offeror intends to subcontract any of the major components of the specified work, the key personnel information shall be submitted for those individuals.
The offeror shall provide a written statement of assurance indicating the proposed key personnel will be assigned to work on this project if awarded the contract.
4. Safety- Provide a detailed Job Hazard Analysis (JHA) which addresses the primary phases of the project. The JHA will be used to determine the offeror's understanding of the occupational safety and health issues associated with the project. A general company safety program with references to regulations and/or general references to meeting the safety requirements in the specifications is not acceptable and will result in a lower rating.
5. Past performance-Offeror's will be evaluated on the degree to which they have completed similar projects on schedule and without performance problems. Information submitted regarding adverse performance problems will be considered, as well as mitigating circumstances detailed in the proposal for any performance problems identified.
a. Offerors shall have a Past Performance Questionnaire (PPQ), contained in Section J, completed by at least three (3) of the offeror's previous clients/owners. Offeror's are strongly encouraged to inform previous clients of the importance of the questionnaires as it is a determining factor in rating the proposal. It is the offeror's responsibility to ensure that the government receives the requested questionnaires by the time and date specified in the solicitation for the receipt of proposals.
b. If an offeror intends on utilizing subcontractors to perform any of the work beyond supplying materials, the same information relative to past performance must be provided for each subcontractor.
You are reminded, the Government intends on awarding this contract without conducting negotiations, therefore failure to submit anv of the information addressed above/or each of the/actors and/or sub/actors may result in a lower technical rating.
(e) The relative importance of the factors listed in paragraph (d) of this provision is as follows:
l. Technical Plan for Construction.
a. Work Plan and Schedule
b. Concrete Surface Preparation and Removal Plan
c. Silica-Fume Concrete Overlay Plan
2. Company Experience
3. Key Personnel
4. Past Performance
5. Safety
6. Price
Factor 1 is significantly more important than Factors 2 through 5. Subfactor I a, I b and le are all relatively equal to each other. Factors 2 through 4 are relatively equal to each other. Factors 2 through 4 are slightly more important than Factor 5. All technical factors (Factors 1-5), when combined, are significantly more important than price (Factor 6).