Solicitation Number R17PS00266 Shoshone Powerplant Roof Replacement Buffalo Bill Dam Modifications Pick-Sloan Missouri Basin Program, Wyoming

View the file

Other files

File Type Posted
R17PS00266_Amendmend_0004_(1).pdf PDF
R17PS00266_A0003.pdf PDF
R17PS00266_SF_1442_amend_2.pdf PDF
R17PS00266_Amendment_1.pdf PDF
PSN_Description_-_Shoshone_roof_replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Bureau of Reclamation Great Plains Regional Office Billings, Montana

March 2017

SOLICITATION No. R17PS00266

Specification No. 60-C0641

Shoshone Powerplant Roof Replacement Request for Proposal Firm Fixed Price Restricted to Women Owned Small Business (WOSB)

Shoshone Project Buffalo Bill Dam Modifications Pick-Sloan Missouri Basin Program Wyoming

This page intentionally left blank

SHOSHONE POWERPLANT

ROOF REPLACEMENT

Buffalo Bill Dam Modifications Pick-Sloan Missouri Basin Program

Wyoming

FOREWORD

Work is located at Shoshone Powerplant, in Park County, Wyoming approximately 4.5 miles west of Cody, Wyoming. The power plant is located near the base of the Buffalo Bill Dam along a Government-owned restricted access road adjacent to North Fork Highway (State Route 14, 16 and 20) in the Shoshone River Gorge, reference Section 52 00 00 – Drawings, Drawing No.

1458-600-60001, Location Map.

The principal components of work to be performed under these specifications include the following:

1) Removal of existing roof ballast, haul to off-site location, stockpile and grade;

2) Removal of existing asbestos-cement underdrain pipes and asbestos weatherproofing materials from roof deck;

3) Clean and prepare the roof deck to receive new roofing system;

4) Install new roof deck drainage system including the replacement of perforated underdrain pipes, removal and replacement of drain well structures and cleaning of catch basins;

5) Furnish all materials and perform all work to install new roof waterproofing system across entire roof deck; including all roof accessory elements;

6) Install new EPS Geofoam and ballast system on roof deck;

7) Provide manufacturer’s warranty of workmanship and materials for all components of the roofing system.

POINT OF CONTACT:

The point of contract is the Contract Officer, Mr. Paris Everson. All questions and correspondence concerning this solicitation will be directed to him via email at peverson@usbr.gov no later than April 19, 2017, 1600 hrs. MDT. This will ensure offerors have time to react to the Governments response via an amendment. Phone calls will not be accepted to ensure all communication will be properly documented for record purposes.

PROPOSAL CLOSING DATE:

See Section “A”: "SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442” immediately following the “TABLE OF CONTENTS”.

METHOD OF SUBMISSION OF PROPOSALS

See Section L of this Solicitation

TYPE OF CONTRACT:

This requirement is solicited as a “Request For Proposal" (RFP) using the Federal Acquisition Regulation Sub Part 15, Contract by Negotiation Procedures. Results from this solicitation will be an anticipated award of a Firm Fixed Price contract.

COMPETITION REQUIREMENTS:

This acquisition is restricted to Women Owned Small Business (WOSB). No other small business socio-economic category will be accepted.

RECLAMATION SAFETY AND HEALTH STANDARDS (2014 EDITION):

For information regarding Bureau of Reclamation's publication "RECLAMATION SAFETY AND HEALTH STANDARDS" (2014 Edition at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause at "WBR 1452.223-81 SAFETY AND HEALTH."

A PRE-PROPOSAL SITE VISIT: The site visit will be held on April 11 2017, at the Bureau of Reclamation’s Wyoming Area Office located approximately 4.5 miles west of Cody, Wyoming, beginning at 9:00 am MT. Prospective offerors should make arrangements by contacting Mr.

Kenneth Karstoft at (307) 261-5680. Note: All questions during the site visit will be submitted in writing to the Contract Officer via email. Attendees are to provide and wear safety boots, hard hats and safety vests.

NOTICE TO PROCEED: For planning purposes, the anticipated Notice to Proceed date will be on or about June 7, 2017.

SYSTEM FOR AWARD MANAGEMENT (SAM):

Effective July 29, 2012 all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database prior to an award or agreement. Note: Registering in “SAM” does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is centralized database for consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS).

Additionally, the contractors “DUNS and BRADSTREET” and banking information are required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220.

INVOICE PROCESSING PLATFORM (IPP):

Payment requests for the anticipated contract or agreement must be submitted electronically through the U.S. Department of Treasury’s “Invoice Processing Platform” (IPP) System via the IPP website at https://www.ipp.gov. Contractors are required to use the IPP website to access and use IPP for submitting request for payment. Registration assistance can be obtained by contacting the “IPP Production Helpdesk” via email ippgroup@bos.fbr.org or phone 1-866-973- 3131. If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor can submit a waiver request in writing to the Contractor Officer with its proposal. Note: Waivers will be on a case by case basis and not automatically granted as determined by the Contract Officer.

TOC-1

TABLE OF CONTENT

PART 1 – THE SCHEDULE

SECTION A – Solicitation, Offer and Award, Standard Form 1442

SECTION B – Schedule

SECTION C -- Description / Specifications

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 02 – EXISTING CONDITIONS

02 82 20 Removal and Disposal of Asbestos Containing Materials 02 89 30 Removal and Disposal of Coal Tar Roofing

DIVISION 03 – CONCRETE

03 21 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 80 00 Concrete Removal

DIVISION 04 through DIVISION 06 – NOT USED

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 53 23 Ethylene Propylene Diene Monomer (EPDM) Roof Membrane System

DIVISION 08 through DIVISION 30 – NOT USED

TOC-2

DIVISION 31 – EARTHWORK

31 23 23 Expanded Polystyrene Geofoam 31 23 90 Disposal of Excavated Materials

DIVISION 32 – NOT USED

DIVISION 33 – UTILITIES

33 46 10 Roof Drainage System

DIVISION 34 through DIVISION 50 – NOT USED

DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 01 14 Photo Log 51 02 82 Test Result for Asbestos Containing Materials

DIVISION 52 – DRAWINGS

52 00 00 Drawings

DIVISION 53 – NOT USED

SECTION D – Not used

SECTION E -- INSPECTION AND ACCEPTANCE

E.1 52.236-05 Material and Workmanship E.2 52.246-12 Inspection of Construction E.3 52.246-21 Warranty of Construction

SECTION F – DELIVERIES OR PERFORMANCE

F.1 52.211-10 Commencement, Prosecution, and Completion Of

Work F.2 52.211-18 Variation in Estimated Quantity F.3 52.242-14 Suspension of Work

SECTION G -- CONTRACT ADMINISTRATION DATA

G.1 1452.201-70 Authorities and Delegations G.2 DOI-AAAP-0028 Electronic Invoicing and Payment Requirements –

Invoice Processing Platform (IPP) G.3 DOI-AAAP-00050 Notice to Contractors – Contractor Performance Reporting Assessment

Reporting System

SECTION H -- SPECIAL PURCHASE ORDER REQUIREMENTS

H.1 GP-7 Site Security

TOC-3

PART II – THE CLAUSES

SECTION I – CONTRACT CLAUSES

I.1 52.252-02 Clauses Incorporated by Reference (See Table) I.2 52.230-99 Prohibition on Contracting With Entities That Require Certain

Internal Confidentiality Agreements (Deviation) I.3 52.204-18 Commercial and Government Entity Code Maintenance I.4 52.215-08 Order of Precedence – Uniform Contract Format I.5 52.222-55 Minimum Wages under Executive Order 13658 I.6 52.223-09 Estimate of Percentage of Recovered Material Content For EPA

Designated Items I.7 52.225-09 Buy American–Construction Materials I.8 52.228-01 Bid Guarantee I.9 52.228-15 Performance and Payment Bonds – Construction I.10 52.232-05 Payments under Fixed-Price Construction Contracts I.11 52.232-27 Prompt Payment for Construction Contracts I.12 52.236-02 Differing Site Conditions I.13 52.236-13 Accident Prevention I.14 52.236-14 Availability and use of Utility Services I.15 52.236-15 Schedules for Construction Contracts I.16 52.236-21 Alt II Specification and Drawings For Construction – Alternate II I.17 52.243-04 Changes I.18 52.252-6 Authorized Deviations in Clauses I.19 1452.203-70 Restriction on Endorsements--Department of the Interior I.20 1452.204-70 Release of Claims--Department of the Interior I.21 1452.228-70 Liability Insurance -- Department of the Interior I.22 WBR 1452.223-81 Safety and Health -- Bureau of Reclamation I.23 WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to

Tobacco Smoke in the Federal Workplace – Bureau of Reclamation

I.24 WBR 1452.228-84 Certification of Representatives for Corporate Sureties – Bureau of Reclamation

I.25 WBR 1452.231-81 Equipment Ownership and Operating Expense – Bureau of Reclamation

I.26 WBR 1452.232-81 Payment for Mobilization and Preparatory Work I.27 WBR 1452.232-83 Payment for Technical Data I.28 WBR 1452.233-81 Claims Accounting -- Bureau of Reclamation I.29 WBR 1452.236-84 Preservation of Cultural Resources - Bureau of Reclamation I.30 WBR 1452.237-80 Security Requirements Bureau of Reclamation Alternate III

ALT III

I.31 WBR 1452.243-80 Modification Proposals - Bureau of Reclamation

ALT IV

TOC-4

PART III – DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

ATTACHMENT NUMBER 0001 Department of Labor General Decision Number ATTACHMENT NUMBER 0002 Standard Form 24 – Bid Bond ATTACHMENT NUMBER 0003 Company Experience Reference List ATTACHMENT NUMBER 0004 Past Performance Questionnaire ATTACHMENT NUMBER 0005 Department of Interior Limitations on Subcontracting

PART IV – REPRESENTATION AND INSTRUCTIONS

SECTION K -- REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

K.1 52.203-98 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements—Representation

K.2 52.204-08 Annual Representations and Certifications K.3 52.204-19 Incorporation by Reference of Representation and Certifications K.4 52.209-07 Information Regarding Responsibility Matters

SECTION L -- INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

L.1 52.204-07 System for Award Management (SAM) L.2 52.204-16 Commercial and Government Entity Code Reporting L.3 52.211-01 Availability of Specifications Listed in the GSA Index of Federal

Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29

L.4 52.211-02 Availability of Specifications, Standards, and Data Item Descriptions List in the Acquisition Streamlining and Standardization Information System (ASSIST)

L.5 52.214-34 Submission of Offers in the English Language L.6 52.214-35 Submission of Offers in U.S. Currency L.7 52.215-01 Instructions to Offerors – Competitive Acquisition L.8 52.216-01 Type of Contract L.9 52.222-05 Construction Wage Rate Requirements –

Secondary Site of the Work L.10 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal

Employment Opportunity for Construction L.11 52.225-10 Notice of by American Requirement – Construction Materials L.12 52.233-02 Service of Protest – Department of the Interior (Jul 1996)

(Deviation) L.13 52.236-27-Alt I Site Visit (Construction) – Alternate I L.14 52.236-28 Preparation of Proposals – Construction L.15 52.252-05 Authorized Deviations in Provisions L.16 1452.215-71 Use and Disclosure of Proposal Information – Department of

Interior L.17 WBR 1452.211-80 Notice of Intent to Acquire Metric Products and Services –

Bureau of Reclamation

TOC-5

L.18 WBR 1452.215-80 Source Evaluation and Selection Procedures – Bureau of Reclamation

L.19 WBR 1452.215-81 General Proposal Instructions – Bureau of Reclamation L.20 WBR 1452.215-82 Technical Proposal Instructions – Bureau of Reclamation L.21 WBR 1452.215-83 Pricing Proposal Instructions – Bureau of Reclamation L.22 WBR 1452.233-82 Notice of Proposed Partnering – Bureau of Reclamation L.23 WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line

Item – Bureau of Reclamation L.24 ET 02-20 Authorized Workers Notice to Potential Bureau of Reclamation

Contractors

SECTION M -- EVALUATION FACTORS FOR AWARD

M.1 WBR 1452.215-85 Evaluation Factors For Award – Quality Predominance –

Bureau of Reclamation M.2 WBR 1452.225-82 Notice of World Trade Organization Government Procurement

Agreement Evaluations – Bureau of Reclamation

END OF CONTENTS

Shoshone Powerplant Roof Replacement, Wyoming Specification No. 60-C0641

Table of Contents 00 01 10 - 6

This page intentionally left blank.

Shoshone Powerplant Roof Replacement Buffalo Bill Dam Modifications Pick-Sloan Missouri Basin Program, Wyoming

PART I

THE SCHEDULE

Buffalo Bill Dam Modifications Pick-Sloan Missouri Basin, Wyoming

SECTION A

SOLICITATION, OFFER AND AWARD,

STANDARD FORM 1442

Buffalo Bill Dam Modifications Pick-Sloan Missouri Basin, Wyoming

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040315441

Bureau of Reclamation

Great Plains Regional Office

2021 4th Ave. N.

GP-5000

R60

Billings MT 59101

Bureau of Reclamation, Great Plains Region

GP-5000

2021 4th Avenue North Billings, Montana 59101

Paris Everson 406-247-7817

1x 03/27/2017

R17PS00266

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

A. Work is located at Shoshone Powerplant, in Park County, Wyoming approximately 4.5 miles west of Cody, Wyoming. The power plant is located near the base of the

Buffalo Bill Dam along a Government-owned restricted access road adjacent to North

Fork Highway (State Route 14, 16 and 20) in the Shoshone River Gorge.

B. Estimated Price Range is $500,000 to $1,000,000

C. North American Classification Code is 237990

D. This is a Women Owned Small Business Set-Aside and the Small Business size is

$36.5M

E. Tax Payer Identification:_____________________

F. Data Universal Numbering System: ____________________

G. Commercial and Government Entity Code: ___________________

H. Proposal Closing Date and time are listed in Block 13 of this Form.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 180 calendar days and complete it within ________________ ________________ calendar days after receiving

See Section F.1

04/26/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Paris Everson

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

X

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R17PS00266

00010 Shoshone Powerplant Roof Replacement

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

1 AU $____________________________

See Continuation of Section B (CLINS 1- 10)

SECTION B

PRICE/SCHEDULE

Price Schedule B - 1

CONTINUATION of

SECTION B – SUPPLIES OR SERVICES AND PRICES

SHOSHONE POWERPLANT

ROOF REPLACEMENT

Shoshone Project Buffalo Bill Dam Modifications

Pick-Sloan Missouri Basin Program Wyoming

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(d) Quantities in the Price Schedules are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(e) Definitions:

(1) CLIN – Contract Line Item Number

PRICE SCHEDULE

CLIN Section Supplies or Services Pricing Method Amount

Quantity and Unit

Unit Price

1 WBR

1452.232-81

Mobilization and Preparatory Work For the lump sum of $

2 02 82 20 Removal and Disposal of Asbestos Containing Materials

For the lump sum of $

3 03 30 00 Cast-In-Place Concrete 15 yd3 $ $

Price Schedule B - 2

PRICE SCHEDULE

CLIN Section Supplies or Services Pricing Method Amount

Quantity and Unit

Unit Price

4 07 53 23 Prepare, Furnish and Install Roof Membrane System

5,100 ft2 $ $

5 07 53 23 Provide 20 Year Manufacture’s Warranty For the lump sum of $

6 31 23 23 Furnish and Install New Geofoam System above Roof Membrane System

5,100 ft2 $ $

7 31 23 90 Removal and Disposal of Existing Non-Hazardous Roof Materials

For the lump sum of $

8 33 46 10 Roof Drainage System For the lump sum of $

9 33 46 10 Video Inspection of Piping Systems For the lump sum of $

10 33 46 10 Drain Wells For the lump sum of $

TOTAL FOR PRICE SCHEDULE $_________________

END OF SECTION

SECTION C

DESCRIPTION / SPECIFICATIONS

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located at Shoshone Powerplant, in Park County, Wyoming approximately 4.5 miles west of Cody, Wyoming. The power plant is located near the base of the Buffalo Bill Dam along a Government-owned restricted access road adjacent to North Fork Highway (State Route 14, 16 and 20) in Shoshone River Gorge, reference Section 52 00 00 – Drawings, Drawing No. 1458-600-60001, Location Map.

1.02 PRINCIPAL COMPONENTS OF WORK

A. The principal components of work to be performed under these specifications include the following:

1. Removal of existing roof ballast, haul to off-site location, stockpile and grade;

2. Removal of existing asbestos-cement underdrain pipes and asbestos weatherproofing materials from roof deck;

3. Clean and prepare the roof deck to receive new roofing system;

4. Install new roof deck drainage system including the replacement of perforated underdrain pipes, removal and replacement of drain well structures and cleaning of catch basins;

5. Furnish all materials and perform all work to install new roof waterproofing system across entire roof deck; including all roof accessory elements;

6. Install new EPS Geofoam and ballast system on roof deck;

7. Provide manufacturer’s warranty of workmanship and materials for all components of the roofing system.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

Summary of Work 01 11 00 - 2

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 53:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. USBR Cleaning Manual Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2010 Edition Available online at: http://www.usbr.gov/mussels/prevention

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:

1. For each Contractor use site on Government land.

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

2) Parking areas, temporary roads, and haul routes.

3) Storage / Staging areas.

4) Job trailer.

5) Utilities including air, power, and water lines; fire hydrants; and compressor station.

6) First-aid and medical facilities.

7) Areas for processing, storing, and disposing of waste materials from construction operations.

8) Temporary fences.

http://www.usbr.gov/mussels/prevention

Use of Site 01 14 10 - 2

b. Describe methods to preserve, protect, and repair if damaged, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to the jobsite, which are not to be removed and which do not interfere with the work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.

d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

2. Submit as-built drawings of changes in use of Government land made during the construction stage or after use of Government land is in operation.

1.04 PROJECT CONDITIONS

A. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

B. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of the COR.

C. Housing for construction personnel will not be permitted on Government land.

D. Access to the Shoshone Powerplant is Restricted and is also by way of a Restricted Access road that follows the course of the Shoshone River in the Shoshone River Gorge.

Significant spatial limitations exist for equipment access; reference Section 01 55 00 – Vehicular Access and Parking, Section 51 01 14 – Photo Log and Section 52 00 00 – Drawings, Drawing No. 1458-600-60003.

E. Materials and equipment storage/staging areas will be as represented on Drawing No 1458-600-60003, and subject to approval by COR.

F. See Section 31 23 90 for permanent disposal of existing roof ballast.

G. Shoshone Powerplant employee work hours are 7:00 a.m. – 5:30 p.m., Monday through Thursday. Construction work schedules outside of work hours identified must be coordinated and approved by the COR.

PART 2 PRODUCTS

Use of Site 01 14 10 - 3

PART 3 EXECUTION

3.01 CLEANING

A. Construction equipment:

1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.

2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in USBR Cleaning Manual.

3. The COR will inspect construction equipment following procedures described in USBR Cleaning Manual, immediately outside of restricted access area, before allowing the equipment onsite.

B. Existing Concrete Roof Deck:

1. See Sections 01 74 00 and 07 53 23.

3.02 RESTORATION

A. Restore Contractor use areas to pre-construction condition. These areas would include, but not be limited to, any staging, storage, parking or surface work areas.

B. Restore temporary construction roads to original contours and make impassable to vehicular traffic when no longer required.

C. After completion of work, re-grade and scarify Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate re-vegetation, provide proper drainage, and prevent erosion.

Use of Site 01 14 10 - 4

Submittals 01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME Y14.1-2005(2010) Decimal Inch Drawing Sheet Size and Format

B. National Institute of Building Sciences (NIBS)

1. NIBS NCS-2011 United States National CAD Standards, Version 5

1.03 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

C. Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236- 21, Specifications and Drawings for Construction.

1.04 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

B. General:

1. Prepare in English.

2. Label with contract number and title, and RSN.

3. Measurement units: US Customary Units.

C. Drawings:

1. Minimum identification in title block:

a. Contract number and title.

b. Contractor’s or supplier’s title and drawing number.

Submittals 01 33 00 - 2

c. Date.

2. Provide space next to title block for review stamps.

3. Size: D size (22 inches by 34 inches).

4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.

a. Lettering shall be neat when drawing preparation with drafting equipment is allowed.

5. Government Format drawings:

a. Prepare drawings designated as “Government Format” in the specifications as follows:

1) Title block and sheet format:

a) As shown on Drawing 40-D-7102.

b) Government will provide specific title block information to be used.

2) Drawing format:

a) AUTOCAD, Version 2007 or later.

b) In accordance with NIBS NCS.

3) Size: D-size (22-inch by 34-inch) as defined by ASME Y14.1.

4) Government will provide an electronic AutoCAD template.

6. Final drawings:

a. Drawing format: AUTOCAD, Version 2007 or later.

b. Show as-built changes, including revision dates, made during installation.

Indicate changes by clouding.

c. Electronic files: On CD or DVD discs.

d. Original plots: D size (22 inches by 34 inches).

e. Government will provide an electronic AutoCAD template.

D. Product Data:

1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.

a. Identify manufacturer's name, type, model, size, and characteristics.

b. Illustrate that product or equipment meets requirements of specifications.

c. Mark items to be furnished in a manner that will photocopy (no highlighter).

d. Strike through items that do not apply.

Submittals 01 33 00 - 3

E. Certifications:

1. Certifications by a registered professional: Signed and sealed by registered professional.

2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.

1.05 SUBMITTALS PROCEDURES

A. Submit only checked submittals. Submittals without evidence of Contractor's review and approval will be returned for resubmission.

B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.

C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of Submittals.

1. Electronic submittals:

a. In Portable Document Format (PDF).

b. Include RSN transmittal letter.

c. Do not include Personally Identifiable Information (PII) in electronic submittals.

2. Submit electronic submittals via email or CD/DVD based on size:

a. The Government can receive e-mails up to 15 MB. However, e-mails over 10 MB should be considered extra large. E-mailing of electronic submittals exceeding 10 MB should only occur after transmittal of larger size e-mail has been verified.

b. Address e-mail of electronic submittals less than extra large size to:

1) kkarstoft@usbr.gov

c. Include electronic submittals that are too large to e-mail with paper copy of submittal. These electronic submittals shall be on CD or DVD.

D. Include the following information in transmittal letters:

1. Contract number and title.

2. RSN for attached submittal.

3. Responsible code.

4. Number of sets for each RSN.

5. Identify submittal as initial or resubmittal.

E. Resubmittal of submittals not approved:

Submittals 01 33 00 - 4

1. Mark changes such that they are readily identifiable and show revision date.

2. Describe reasons for significant changes in transmittal letter.

3. Resubmit returned submittals within 28 days after receiving the comments, unless otherwise directed.

4. Requirements for initial submittals apply to resubmittals.

F. Each submittal shall be submitted under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned to the Contractor for resubmittal.

1.06 REVIEW OF SUBMITTALS

A. Time Required:

1. Submittal review will require 21 days for review of each submittal or resubmittal, unless otherwise specified.

2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.

B. Time in Excess of Specified:

1. The CO may extend the contract completion date to allow additional time for completing work affected by excess review time.

a. The time extension will be to the extent that excess review time caused delay to the contract completion date.

b. The time extension will not exceed the time used in excess of the specified number of days for review of submittals or resubmittals.

c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending the contract completion date.

2. No time extension will be allowed if the Contractor fails to make complete action submittals in sequence and within time periods specified.

3. Adjustment for delay will be made only to the extent that:

a. Approval was required under the contract, and

b. Requests for approval were properly and timely submitted and were approved.

4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work, however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.

C. Submittal Response:

Submittals 01 33 00 - 5

1. A response letter from the COR for each submittal will be sent to the Contractor indicating if the submittal is either approved, approved subject to identified changes, or not approved.

a. Revise and resubmit submittals not approved.

b. Do not change designs without approval of the COR after drawings, documentation, and technical data have been approved.

1.07 TRANSMITTAL

A. Addresses for codes listed in Table 01 33 00A - List of Submittals:

1. Where the recipient is the Contracting Officer, address the transmittal letter to Bureau of Reclamation, Attention: GP-5000, P.O. Box 36900, Billings, MT 59107-6900. Physical address is 2021 4th Avenue North, Billings, MT 59101.

2. Where the recipient is the Contracting Officer’s Representative, address the transmittal letter to Bureau of Reclamation, Attention: WY-6600, P.O. Box 1630, Mills, WY 82644. Physical address is 705 Pendell Blvd, Mills, WY 82644.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, and COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Responsible code

Sets to be sent: **

CO COR

1 Bonds 52.228-15

Performance and Payment Bonds

Within 10 calendar days after award

CO 1 paper 0

2 Additional Bond Security 52.228-2

Additional Bond Security

Within 10 calendar days of contract modification or value exceeds amount award

CO 1 paper 0

3 Insurance-work on a Government Installation 1452.228-70

1) Written certification that the required insurance has been obtained

2) Current certification of insurance for each subcontractor

Before commencing onsite work

CO 1 paper

1 paper

Submittals 01 33 00 - 6

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, and COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Responsible code

Sets to be sent: **

CO COR

4 Liability Insurance 1452.228-70

Acceptable Certificate of Liability Insurance

Prior to commencement of work under the contract

CO 1 paper 0

5 Equal Opportunity 52.222-26

Information required by Executive Order

112246 (SF-100)

Within 30 days following award

CO 1 paper 0

6 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10

Certification that executive compensation and subcontract awards were reported

Within 10 days of each report being submitted

CO 1 paper 0

7 Release of Claims 1452.204-70

Release of Claims (DI-137) against the Government

After completion of the work and prior to final payment

CO 1 paper 0

8 Site Security

GP-7

List of all contractor and subcontractor employees

At least 10 days prior to arriving at worksite

COR 0 2 paper

9 Site Security

GP-7

List of all vehicles and equipment to be brought onsite

At least 10 days prior to arriving at worksite

COR 0 2 paper

10 Labor Standards Data 52.222-11

1) List of subcontractors

2) Statement and acknowledgement Form (SF-1413) for each subcontract

Within 14 days after award of contract

COR 1 paper

1 paper

1 paper + 1 electronic

1 paper + 1 electronic

11 Payrolls 52.222-08

Copies of all payrolls Weekly for each week of contract performance

COR 1 paper 2 paper

12 Schedules for Construction Contracts 52.236-

Practicable schedule Within 5 days after work commences on the contract or another period of time as determined by Contracting Officer

COR 1 paper 1 paper + 1 electronic

13 Schedules for Construction Contracts 52.236-

Updated schedule showing actual progress

Monthly or as directed by the Contracting Officer

COR 1 paper 1 paper + 1 electronic

Division 01 – General 01 14 10-1 Use of Site Land Use and

Landscape Rehabilitation Plan

At least 28 days before use of Government land

COR 0 1 paper + 1 electronic

Submittals 01 33 00 - 7

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, and COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Responsible code

Sets to be sent: **

CO COR

01 35 10-1 Safety Data Sheets

Complete LHM and

SDS

At least 21 days before hazardous materials are delivered to jobsite

COR 0 1 paper + 1 electronic

01 35 10-2 Safety Data Sheets

Updated LHM and

SDS

At least 21 days before jobsite delivery of hazardous material not previously listed

COR 0 1 paper + 1 electronic

01 35 20-1 Safety and Health Safety Program Submitted and accepted before commencing onsite work. See section 3 of RSHS

COR 0 1 paper + 1 electronic

01 35 20-2 Safety and Health Monthly Accident Summary Report

First day of each month. See paragraph

3.8 of RSHS

COR 0 1 paper + 1 electronic

01 35 20-3 Safety and Health Respirator User Documentation

At least 21 days before arriving at worksite

COR 0 2 paper

01 35 20-4 Safety and Health Crane Training Certificates

At least 21 days before arriving at worksite

COR 0 2 paper

01 35 20-5 Safety and Health Other Training Certificates

At least 21 days before arriving at worksite

COR 0 2 paper

01 35 30-1 Contractor’s Onsite Safety and Health Personnel

Qualifications At least 21 days before beginning onsite work

COR 0 2 paper

01 35 30-2 Contractor’s Onsite Safety and Health Personnel

Accredited Asbestos Abatement Project Designer Reports

At least once each week

COR 0 1 paper + 1 electronic

01 35 30-3 Contractor’s Onsite Safety and Health Personnel

Safety Inspection Reports

At least once each week

COR 0 1 paper + 1 electronic

01 46 00-1 Quality Procedures

Contractor Quality Control Program

Within 21 days of Notice to Proceed

COR 0 1 paper + 1 electronic

01 46 00-2 Quality Procedures

Contractor’s Daily Reports

Weekly COR 0 1 paper + 1 electronic

01 46 00-3 Quality Procedures

Quality Control Supervisor

Within 21 days of Notice to Proceed

COR 0 1 paper + 1 electronic

01 46 00-4 Quality Procedures

Contractor Quality Testing Plan

Within 21 days of Notice to Proceed

COR 0 1 paper + 1 electronic

01 46 00-5 Quality Procedures

Summary Monthly Test Results

Monthly COR 0 1 paper + 1 electronic

01 46 20-1 Testing Agency Services

Testing Agency Services Plan

At the time of the Preconstruction conference

COR 0 1 paper + 1 electronic

01 46 20-2 Testing Agency Services

Contractor Quality Testing Results

Within 3 days of results COR 0 1 paper + 1 electronic

01 55 20-1 Traffic Control Traffic Control Plan At least 35 days before affecting public traffic

COR 0 1 paper + 1 electronic

Submittals 01 33 00 - 8

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, and COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Responsible code

Sets to be sent: **

CO COR

01 56 10-1 Protection of Existing Installations

Plan for Protecting Existing Installations

At least 28 days before initiation of Construction activities on roof

COR 0 1 paper + 1 electronic

01 56 10-2 Protection of Existing Installations

Plan for Large Boulder Breakup

At least 28 days before initiation of Construction activities on roof

COR 0 1 paper + 1 electronic

01 57 20-1 Environmental Controls

Copy of Applicable Air Quality Permit

At least 30 days before starting onsite construction

COR 0 1 paper

1 electronic 01 57 30-1 Water Pollution

Control Water Management Plan

At least 28 days before commencing onsite construction work

COR 0 1 paper + 1 electronic

01 57 30-2 Water Pollution Control

Spill Prevention Control and Countermeasure (SPCC) Plan

At least 28 days before delivery or storage of oil

COR 0 1 paper + 1 electronic

01 74 00-1 Cleaning and Waste Management

Waste Production and Disposal Plan

Within 7 days of waste disposal

COR 0 1 paper + 1 electronic

01 74 00-2 Cleaning and Waste Management

Waste Production and Disposal Records

Within 7 days of waste disposal

COR 0 1 paper + 1 electronic

01 74 00-3 Cleaning and Waste Management

Environmental Consultant Resume

At least 21 days before beginning environmental assessment

COR 0 2 paper

01 74 00-4 Cleaning and Waste Management

Environmental Site Assessment

Within 14 days of completion of work

COR 0 1 paper + 1 electronic

01 78 30-1 Project Record Documents

Progress As-Built Drawings

Within 14 days of completion of work

COR 0 2 paper

1 electronic 01 78 30-2 Project Record

Documents Final As-Built Drawings

Within 14 days of completion of work

COR 0 2 paper

1 electronic 01 78 30-3 Project Record

Documents As-Built Record of Materials

Within 14 days of completion of work

COR 0 2 paper

1 electronic 01 78 30-4 Project Record

Documents Warranties Within 14 days of completion of work COR 0 2 paper

1 electronic

Division 02 – Existing Conditions

Submittals 01 33 00 - 9

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, and COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Responsible code

Sets to be sent: **

CO COR

02 82 20-1 Removal and Disposal of Asbestos Containing Materials

Contractor and Asbestos Abatement Sub-contractor’s History

At least 40 days before asbestos removal starts

COR 0 1 paper + 1 electronic

02 82 20-2 Removal and Disposal of Asbestos Containing Materials

Resumes, Certificates, and Qualifications

At least 40 days before asbestos removal starts

COR 0 1 paper

02 82 20-3 Removal and Disposal of Asbestos Containing Materials

Asbestos Hazard Abatement Plan

At least 40 days before asbestos removal starts

COR 0 1 paper + 1 electronic

02 82 20-4 Removal and Disposal of Asbestos Containing Materials

Working Level Test Results

Within 2 days after tests completion

COR 0 1 paper + 1 electronic

02 82 20-5 Removal and Disposal of Asbestos Containing Materials

Certificate of Disposal Within 14 days after disposal

COR 0 1 paper + 1 electronic

02 89 30-1 Removal and Disposal of Coal Tar Roofing

Resumes, Certificates and Qualifications

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 89 30-2 Removal and Disposal of Coal Tar Roofing

Written Compliance Program for Worker Protection

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 89 30-3 Removal and Disposal of Coal Tar Roofing

Plans At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 89 30-4 Removal and Disposal of Coal Tar Roofing

Pre-Construction Test Results

At least 14 days before beginning onsite work

COR 0 1 paper + 1 electronic

02 89 30-5 Removal and Disposal of Coal Tar Roofing

Exposure Assessment Within 14 days after completion of testing

COR 0 1 paper + 1 electronic

02 89 30-6 Removal and Disposal of Coal Tar Roofing

Post-Construction Test Results

Within 14 days after completion of testing

COR 0 1 paper + 1 electronic

Division 03 – Concrete 03 21 00-1 Concrete

Reinforcing Reinforcement Diagrams and Lists

At least 21 days before starting onsite construction

COR 0 1 paper

Submittals 01 33 00 - 10

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, and COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Responsible code

Sets to be sent: **

CO COR

03 30 00-1 Cast-In-Place Concrete

Concrete Curb Installation Plan

At least 21 days before starting onsite construction

COR 0 1 paper

1 electronic 03 30 00-2 Cast-In-Place

Concrete Approval Data At least 21 days before starting onsite construction

COR 0 1 paper

1 electronic 03 30 00-3 Cast-In-Place

Concrete Cementitious Materials Certifications and Test Reports

At least 21 days before starting onsite construction

COR 0 1 paper

1 electronic

03 30 00-4 Cast-In-Place Concrete

Instructions At least 21 days before starting onsite construction

COR 0 1 paper

1 electronic Division 07 – Thermal and Moisture Protection 07 53 23-1 Ethylene

Propylene Diene Monomer (EPDM) Roof Membrane System

Shop Drawings At least 28 days before starting onsite construction

COR 0 1 paper

1 electronic

07 53 23-2 Ethylene Propylene Diene Monomer (EPDM) Roof Membrane System

Product Data At least 21 days before material procurement

COR 0 1 paper

1 electronic

07 53 23-3 Ethylene Propylene Diene Monomer (EPDM) Roof Membrane System

Manufacturer’s Installation Instructions

At least 28 days before starting onsite construction

COR 0 1 paper

1 electronic

07 53 23-4 Ethylene Propylene Diene Monomer (EPDM) Roof Membrane System

Manufacturer’s Certification

At least 28 days before starting onsite construction

COR 0 1 paper

1 electronic

07 53 23-5 Ethylene Propylene Diene Monomer (EPDM) Roof Membrane System

Qualifications At least 28 days before starting onsite construction

COR 0 1 paper

Submittals 01 33 00 - 11

Table 01 33 00A - List of Submittals ** CO indicates Contracting Officer, and COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Responsible code

Sets to be sent: **

CO COR

07 53 23-6 Ethylene Propylene Diene Monomer (EPDM) Roof Membrane System

Warranties Within 14 days of completion of work

COR 0 1 paper + 1 electronic

07 53 23-7 Ethylene Propylene Diene Monomer (EPDM) Roof Membrane System

Notification of Pre-installation Meeting

At least 10 days before planned meeting

COR 0 1 paper

1 electronic

Division 31 – Earthwork 31 23 23-1 Expanded

Polystyrene Geofoam

Approval Data At least 21 days before starting onsite construction

COR 0 1 paper

1 electronic 31 23 23-2 Expanded

Polystyrene Geofoam

Shop Drawings At least 21 days before starting onsite construction

COR 0 1 paper

1 electronic 31 23 23-3 Expanded

Polystyrene Geofoam

Quality Assurance At least 21 days before starting onsite construction

COR 0 1 paper

1 electronic 31 23 90-1 Disposal of

Excavated Materials

Ballast Removal Plan Within 28 days of completion of work

COR 0 1 paper

1 electronic 31 23 90-2 Disposal of

Excavated Materials

Ballast Stockpile Distribution Plan

At least 21 days before starting on-site work

COR 0 1 paper

1 electronic Division 33 – Utilities 33 46 10-1 Roof Drainage

System Certification At least 28 days before starting onsite construction

COR 0 1 paper

1 electronic 33 46 10-2 Roof Drainage

System Shop Drawings At least 28 days before starting onsite construction

COR 0 1 paper

1 electronic 33 46 10-3 Roof Drainage

System Product Data At least 28 days before starting onsite construction

COR 0 1 paper

1 electronic 33 46 10-4 Roof Drainage

System Video Inspection Records

Within 7 days of completion of work

COR 0 1 electronic

2 DVD

Submittals 01 33 00 - 12

Safety Data Sheets 01 35 10 - 1

SECTION 01 35 10

SAFETY DATA SHEETS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 DEFINITIONS

A. LHM: List of Hazardous Materials

B. SDS: Safety Data Sheet.

1. Referred to as Material Safety Data Sheets in the clause at FAR 52.223-3, Hazardous Material Identifications and Material Safety Data - Alternate 1.

1.03 APPLICATION

A. For the purposes of this contract, “delivered under this contract” in paragraph (b) of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1, includes:

1. Materials delivered to the Government.

2. Materials incorporated into the work.

3. Materials used by the Contractor during contract performance at the jobsite.

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 10-1, Complete LHM and SDS.

C. RSN 01 35 10-2, Updated LHM and SDS:

1. Comply with paragraph (e) of clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1.

1.05 DELIVERY

A. Do not deliver hazardous materials to jobsite which are not included on the original or previously updated LHM and SDS before receipt of updated LHM and SDS by the Contracting Officer’s Representative.

Safety Data Sheets 01 35 10 - 2

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Safety and Health 01 35 20 - 1

SECTION 01 35 20

SAFETY AND HEALTH

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include the incidental cost of complying with this section in the prices offered on Price…