R16PS00041

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

05/25/2016001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/03/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Cle Elum Dam Fish Passage Facility, Juvenile Facility - Secant Pile Shaft, Yakima Project, Washington

See attached Amendment No. 001 instructions and replacement pages

Delivery: 900 Days After Notice to Proceed

FOB: Destination

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susan E. Kramer

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation No. R16PS00041 Cle Elum Dam Fish Passage Facility, Juvenile Facility – Secant Pile Shaft

Yakima Project, Washington Amendment 001

A. The time and date for receipt of offers REMAINS 2:00 p.m., local time, June 16, 2016.

B. Acknowledgment: See block 11 above regarding how to acknowledge this amendment. The acknowledgment must be received at the place designated for receipt of offers (see block 8 of "Solicitation, Offer and Award” Standard Form 1442).

C. Offer Modification: See block 11 above if you have submitted your offer and now desire to modify or withdraw it.

D. Third Party: If you have given your copy of the solicitation to someone else, please forward this amendment accordingly.

E. A list of attendees at the site visit on May 20, 2016, is attached.

F. A second site visit is scheduled for 10:00 a.m., local time, June 2, 2016. See provision L.23. for instructions for the site visit.

G. NOTE: The following changes are hereby incorporated into the solicitation. Single-sided replacement pages are provided following this Standard Form 30 and changes are shown with left side bar or shaded text.

H. The original solicitation posted to www.fedconnect.net and www.fbo.gov, contained 2 specification sections with the same title. The section that was duplicated is section 53 10 00, Geotechnical Baseline Conditions. The second section with this title, beginning on page 401 of the pdf document posted to FBO and Fedconnect, and ending on page 409 of the pdf document, is deleted.

I. In the Table of Contents, the following pages are deleted and the attached revised pages are substituted therefore:

Remove Pages Insert Revised Pages i-x i-xi

J. In Section B, Description/Specifications/Statement of Work, the following pages are deleted and the attached revised pages are substituted therefore:

Remove Pages Insert Revised Pages OF-336 (Page 3 of 4, and OF-336 (Page 3 of 3) and B-1 through B-3 Page 4 of 4)

K. In Section C, Description/Specifications/Statement of Work, the following pages are deleted and the attached revised pages are substituted therefore:

Remove Pages Insert Revised Pages 01 11 00-1 and 01 11 00-2 01 11 00-1 and 01 11 00-2 01 33 00-15 01 33 00-15 None Insert new 01 33 00-15a Division 10 through 30-Not Used Division 10 through 25-Not Used http://www.fedconnect.net/ http://www.fbo.gov/

Cle Elum Dam Fish Passage Facility, Juvenile Facility – Secant Pile Shaft

Yakima Project, Washington Amendment 001

Remove Pages Insert Revised Pages None Division 26 - Electrical None Insert new 26 05 02-1 through 26 05 02-3 None Insert new 26 05 22-1 through 26 05 22-6 None Insert new 26 05 26-1 through 26 05 26-5 None Insert new 26 05 33-1 through 26 05 33-7 None Insert new 26 13 01-1 through 26 13 01-8 None Insert new Division 27 through 30-Not Used 31 09 21-1 through 31 09 21-2 31 09 21-1 31 11 00-2 31 11 00-2 and 31 11 00-3 31 13 13-1 through 31 13 13-3 31 13 13-1 through 31 13 13-3 31 14 10-1 and 31 14 10-2 31 14 1-1 and 31 14 10-2 31 23 11-2 31 23 11-2 None Insert new 31 23 18-1 and 31 23 18-2 31 56 20-7 31 56 20-7 32 15 10-1 and 32 15 10-2 32 15 10-1 and 32 15 10-2 32 92 20-1 and 32 92 20-2 32 92 20-1 and 32 92 20-2 52 00 00-2 through 52 00 00-4 52 00 00-2 through 52 00 00-5

Drawings:

Remove Pages Insert Revised Pages

Sheet 2 (33-D-60055) Sheet 2 (33-D-60055) Sheet 5 (33-D-60742) Sheet 5 (33-D-60742) Sheet 19 (33-D-60773) Sheet 19 (33-D-60773) Sheet 20 (33-D-60774) Sheet 20 (33-D-60774) None Insert new Sheet 20A (33-D-60808) None Insert new Sheet 20B (33-D-60809) None Insert new Sheet 20C (33-D-60810) None Insert new Sheet 20D (33-D-60829) None Insert new Sheet 20E (33-D-60003) None Insert new Sheet 20F (33-D-60008) None Insert new Sheet 20G (33-D-60030) None Insert new Sheet 20H (33-D-60031) None Insert new Sheet 20I (33-D-60032) None Insert new Sheet 20J (33-D-60034) None Insert new Sheet 20K (33-D-60035) None Insert new Sheet 21A (40-D-4334) None Insert new Sheet 21B (40-D-6234) None Insert new Sheet 24A (104-D-253)

Attachments

Cle Elum Dam Fish Passage Facility - Juvenile Facility-Secant Pile Shaft

Amendment No. 001 i

PART I THE SCHEDULE

SECTION A SOLICITATION/CONTRACT FORM ..................................................................... A-1

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ...................................................B-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ........................... C-1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions 01 14 20 Reservoir Operations and Conditions 01 31 13 Project Coordination 01 31 19 Project Management 01 32 10 Construction Program 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 21 Removal from Work 01 35 22 First Aid 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Existing Fences 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 57 90 Preservation of Historical and Archeological Data 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents

Amendment No. 001 ii (revised)

DIVISION 02 - EXISTING CONDITIONS

02 41 07 Removal and Reinstallation of Existing Log Boom Anchor

DIVISION 03 - CONCRETE

03 11 10 Concrete Forming 03 20 00 Concrete Reinforcing 03 20 30 Grouted Anchor Bars 03 30 00 Cast-In-Place Concrete

DIVISION 09 - FINISHES

09 96 31 Coating for Concrete Secant Piles

DIVISION 26 – ELECTRICAL

26 05 02 Basic Electrical Materials and Methods 26 05 22 Medium Voltage Power Cable 26 05 26 Grounding and Bonding 26 05 33 Raceway and Boxes 26 13 01 Padmount Air Insulated Switchgear

DIVISION 31 - EARTHWORK

31 02 10 Dust Abatement 31 03 23 Cofferdam Construction 31 03 33 Removal and Control of Water

31 09 21 DELETED

31 11 00 Clearing and Grubbing 31 13 13 Salvage Trees 31 14 10 Stripping 31 23 02 Compacting Earth Materials 31 23 11 Earthwork 31 23 18 Earthwork for Electrical Trenches 31 23 39 Disposal of Excavated Materials 31 24 18 Compacted Backfill 31 32 32 Geotextile 31 32 36 Geomembrane 31 37 00 Riprap 31 56 20 Secant Pile Shaft

Amendment No. 001 iii (revised)

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 15 10 Gravel Surfacing 32 31 10 Chain Link Fence 32 92 20 Seeding

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 10 10 Final Environmental Impact Statement 51 10 20 Hydrographs, Exceedance Curves, and Reservoir Time History 51 10 40 Cle Elum Dam Annual and Seasonal Diversion Hydrographs 51 10 50 Cle Elum Dam Permits

DIVISION 52 - DRAWINGS

52 00 00 Drawings

DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS

53 10 00 Geotechnical Baseline Conditions 53 10 01 Geotechnical Supporting Documentation 53 20 00 Geologic Investigations 53 30 00 Records of Geologic and Subsurface Investigations

SECTION D PACKAGING AND MARKING ................................................................................. D-1

SECTION E INSPECTION AND ACCEPTANCE ..........................................................................E-1 E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) ........................................ E-1 E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)...................................... E-1

E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) - ALTERNATE I

APR 1984) ....................................................................................................................... E-3

SECTION F DELIVERIES OR PERFORMANCE ......................................................................... F-1

F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) ......................................................................................................... F-1 F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ................... F-1 F.3. 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) ........................... F-1 F.4. 52.242-14 SUSPENSION OF WORK (APR 1984) ........................................................ F-1

SECTION G CONTRACT ADMINISTRATION DATA ................................................................ G-1

G.1. GOVERNMENT POINT OF CONTACT--BUREAU OF RECLAMATION--PN

REGION (OCT 2010) ..................................................................................................... G-1

Amendment No. 001 iv (revised)

G.2. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF THE

INTERIOR (MAY 2010) ................................................................................................ G-1

G.3. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE

PROCESSING PLATFORM (IPP) (APRIL 2013) ........................................................ G-2

SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................................. H-1

H.1. KEY PERSONNEL REQUIREMENTS--BUREAU OF RECLAMATION--PN

REGION (FEB 1995) ..................................................................................................... H-1

H.2. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF

RECLAMATION CONTRACTORS (SEP 2002).......................................................... H-1

H.3. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(DEC 2015) ..................................................................................................................... H-3

PART II CONTRACT CLAUSES

SECTION I CONTRACT CLAUSES ................................................................................................ I-1 I.1. 52.202-1 DEFINITIONS (NOV 2013) ............................................................................. I-1 I.2. 52.203-3 GRATUITIES (APR 1984) ............................................................................... I-1 I.3. 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)........................ I-2

I.4. 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT (SEPT 2006)......................................................................................... I-2 I.5. 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) .......................................... I-2

I.6. 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS

FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) ........................................... I-4

I.7. 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014) .................................................................................................. I-5

I.8. 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (OCT 2010) .................................................................... I-6

I.9. 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT

(MAR 2016) .................................................................................................................... I-10 I.10. 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015) .................................... I-14

I.11. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND

REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (APR 2014) ...................................................................................................... I-15

I.12. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT OF THE

INTERIOR (JUL 1996) .................................................................................................. I-15

I.13. 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT

REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS

(MAR 2015) .................................................................................................................... I-15

I.14. 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER

FIBER CONTENT PAPER (MAY 2011) ...................................................................... I-16

I.15. 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011) ............................................................................................. I-16

Amendment No. 001 v (revised)

I.16. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (OCT 2015) .................................................................... I-17

I.17. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER

MAINTENANCE (DEC 2012)....................................................................................... I-20

I.18. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL

2013) ............................................................................................................................... I-21

I.19. 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (JAN 2014) ..... I-23

I.20. 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (JUL 2015) ........................................................................................ I-24

I.21. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE INTERIOR

(JUL 1996) ...................................................................................................................... I-25

I.22. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014) .......................................................................... I-25

I.23. 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,

OR PROPOSED FOR DEBARMENT (OCT 2015) ...................................................... I-25

I.24. 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS (JUL 2013) ......................................... I-26

I.25. 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS (NOV 2015) ............................................................... I-27

I.26. 52.210-1 MARKET RESEARCH (APR 2011) .............................................................. I-28 I.27. 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010) ............................. I-28

I.28. 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT

(OCT 1997) ..................................................................................................................... I-30

I.29. 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF

THE INTERIOR (AUG 1996) (DEVIATION) ............................................................... I-30

I.30. 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA

AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—

MODIFICATIONS (OCT 2010) .................................................................................... I-31

I.31. CONTRACTOR'S TECHNICAL PROPOSAL INCORPORATED INTO

CONTRACT - BUREAU OF RECLAMATION - PN REGION (MAR 2001) ............. I-32

I.32. 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE

SMALL BUSINESS CONCERNS (OCT 2014) ............................................................ I-32

I.33. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014) ............ I-34

I.34. 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2015)

ALTERNATE II (OCT 2001) ......................................................................................... I-36

I.35. 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN

1999) ............................................................................................................................... I-46

I.36. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION (JUL 2013) ............................................................................. I-46 I.37. 52.222-3 CONVICT LABOR (JUNE 2003) .................................................................. I-48

Amendment No. 001 vi (revised)

I.38. 52.222-4 CONTRACT WORK HOURS AND SAFETY

STANDARDS -OVERTIME COMPENSATION (MAY 2014) ................................... I-49

I.39. 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014) ............ I-50

I.40. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) .................................................. I-52 I.41. 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) ..................................... I-53 I.42. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005) .......................................... I-54

I.43. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB

1988) ............................................................................................................................... I-56 I.44. 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) ....................... I-56 I.45. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) ................... I-57

I.46. 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE

REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) .......................... I-58

I.47. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) .............. I-58 I.48. 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) .................................... I-58 I.49. 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015).................. I-58 I.50. 52.222-26 EQUAL OPPORTUNITY (APR 2015) ........................................................ I-59

I.51. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR

CONSTRUCTION (APR 2015) ..................................................................................... I-61 I.52. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015).......................... I-66

I.53. 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES

(JUL 2014) ...................................................................................................................... I-67 I.54. 52.222-37 EMPLOYMENT REPORTS VETERANS (FEB 2016) ............................... I-67

I.55. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE

NATIONAL LABOR RELATIONS ACT (DEC 2010) ................................................ I-68 I.56. 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ...................... I-70 I.57. 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015) ................. I-77

I.58. 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC

2015) ............................................................................................................................... I-80

I.59. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL

SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995) ........................................... I-84

I.60. 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW

INFORMATION (MAY 2011)....................................................................................... I-86 I.61. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) ................................................... I-86

I.62. 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL

CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) ....................................... I-88

I.63. 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS

IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008) .......................... I-89

I.64. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (AUG 2011) ............................................................ I-89

I.65. WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF

RECLAMATION (OCT 1992) ....................................................................................... I-90

Amendment No. 001 vii (revised)

I.66. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION

(JUNE 2015) ................................................................................................................... I-90

I.67. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE

PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL

WORKPLACE–BUREAU OF RECLAMATION (DEC 2009) .................................... I-91

I.68. 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (FEB 2016) ........................................................................... I-91

I.69. 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE

2008) ............................................................................................................................... I-96

I.70. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) ...................................... I-97

I.71. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (DEC 2007) .............................................................. I-97

I.72. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC

2007) ............................................................................................................................... I-97 I.73. 52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007) ................................ I-98 I.74. 52.228-1 BID GUARANTEE (SEP 1996) ..................................................................... I-99 I.75. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) ......................................... I-100

I.76. 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION

(JAN 1997).................................................................................................................... I-100 I.77. 52.228-11 PLEDGE OF ASSETS (JAN 2012) ............................................................ I-101

I.78. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS

(MAY 2014).................................................................................................................. I-101 I.79. 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014) .............................. I-101

I.80. 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION

(OCT 2010) ................................................................................................................... I-105

I.81. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE INTERIOR

(JUL 1996) .................................................................................................................... I-106

I.82. WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR

CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996) ................ I-107

I.83. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) ............................ I-107

I.84. WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE

-- BUREAU OF RECLAMATION (JUL 1998) ........................................................... I-109

I.85. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (MAY 2014) ......................................................................................... I-111 I.86. 52.232-17 INTEREST (MAY 2014) ............................................................................ I-114 I.87. 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) ............................................... I-115

I.88. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY 2014) ..... I-115

I.89. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR

AWARD MANAGEMENT (JUL 2013) ...................................................................... I-124

I.90. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS

(JUN 2013).................................................................................................................... I-125

Amendment No. 001 viii (revised)

I.91. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL

BUSINESS SUBCONTRACTORS (DEC 2013) ......................................................... I-126

I.92. WBR 1452.232-80 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) --

BUREAU OF RECLAMATION (SEPT 2003) ............................................................ I-126

I.93. WBR 1452.232-81 PAYMENT FOR MOBILIZATION AND PREPARATORY

WORK --BUREAU OF RECLAMATION (MAY 2000) ALTERNATE I (MAY

2000) ............................................................................................................................. I-128

I.94. WBR 1452.232-82 OTHER INVOICE REQUIREMENTS -- BUREAU OF

RECLAMATION (DEC 2002) ..................................................................................... I-130

I.95. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991) ............................... I-130 I.96. 52.233-3 PROTEST AFTER AWARD (AUG 1996) ................................................... I-132

I.97. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT

2004) ............................................................................................................................. I-133 I.98. 52.236-2 DIFFERING SITE CONDITIONS (APR 1984) ........................................... I-133

I.99. 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE

WORK (APR 1984) ...................................................................................................... I-133 I.100. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) ................. I-134 I.101. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) ................................... I-134 I.102. 52.236-8 OTHER CONTRACTS (APR 1984) ............................................................. I-134

I.103. 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984) ........................... I-134 I.104. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) ............................. I-135 I.105. 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984) ......... I-135 I.106. 52.236-12 CLEANING UP (APR 1984) ...................................................................... I-136

I.107. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV

1991) ............................................................................................................................. I-136 I.108. 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984) ....... I-137 I.109. 52.236-16 QUANTITY SURVEYS (APR 1984) - ALTERNATE I (APR 1984) ....... I-137 I.110. 52.236-17 LAYOUT OF WORK (APR 1984) ............................................................. I-138

I.111. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB

1997)- ALTERNATE I (APR 1984)............................................................................. I-138 I.112. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995) ................................ I-139

I.113. WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES –

BUREAU OF RECLAMATION (FEB 2000) .............................................................. I-139

I.114. WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF

RECLAMATION (FEBRUARY 2011) ....................................................................... I-141 I.115. 52.242-13 BANKRUPTCY (JUL 1995)....................................................................... I-152 I.116. 52.243-4 CHANGES (JUNE 2007) .............................................................................. I-152

I.117. WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF

RECLAMATION (DEC 2001) ALTERNATE III (JUL 1998) .................................... I-153 I.118. 52.244-2 SUBCONTRACTS (OCT 2010) ................................................................... I-154 I.119. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (FEB 2016) .................. I-156

Amendment No. 001 ix (revised)

I.120. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2015) -

ALTERNATE I (APR 1984) ........................................................................................ I-158

I.121. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996) ........................................ I-161

I.122. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)................... I-164 I.123. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ........................ I-165 I.124. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) ...................................... I-166

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J LIST OF ATTACHMENTS ......................................................................................... J-1

PART IV REPRESENTATIONS AND INSTRUCTIONS

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS ....................................................................... K-1

K.1. 52.203-98, PROHIBITION ON CONTRACTING WITH ENTITIES THAT

REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS—

REPRESENTATION (FEB 2015) - DEVIATION ........................................................ K-1

K.2. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB

2016) ............................................................................................................................... K-1

K.3. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL

2013) ............................................................................................................................... K-5

K.4. NOTICE TO HUBZONE SMALL BUSINESS CONCERNS REGARDING

WAIVER OF PRICE EVALUATION PREFERENCE ADJUSTMENT -

BUREAU OF RECLAMATION - PN REGION (APR 2001) ....................................... K-6

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS ............................................................................................................L-1

L.1. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) ................................ L-1

L.2. 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING (JUL 2015)................................................................................................ L-3

L.3. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) ............. L-4

L.4. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) .................................................. L-4

L.5. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ........................... L-4

L.6. WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC PRODUCTS

AND SERVICES - BUREAU OF RECLAMATION (MAR 1993) ............................... L-5

L.7. 52.215-1 INSTRUCTIONS TO OFFERORSBCOMPETITIVE ACQUISITION

(JAN 2004)....................................................................................................................... L-6

Amendment No. 001 x (revised)

L.8. 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR

INFORMATION OTHER THAN CERTIFIED COST OR PRICING DATA

(OCT 2010) .................................................................................................................... L-10

L.9. 1452.215-71 USE AND DISCLOSURE OF PROPOSAL

INFORMATION--DEPARTMENT OF THE INTERIOR (APR 1984) ....................... L-11

L.10. WBR 1452.215-80 SOURCE EVALUATION AND SELECTION

PROCEDURES--BUREAU OF RECLAMATION (MAY 2005) ................................ L-13

L.11. WBR 1452.215-81 GENERAL PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (JAN 1998) ...................................................................................... L-15

L.12. WBR 1452.215-82 TECHNICAL PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (APR 2001) ...................................................................................... L-17

L.13. WBR 1452.215-83 PRICING PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (JAN 1998) ...................................................................................... L-19

L.14. FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS, MODIFICATIONS

TO OFFERS, AND WITHDRAWALS OF OFFERS-BUREAU OF

RECLAMATION--PN REGION (APR 2007) .............................................................. L-19

L.15. NOTICE OF INTENT TO INCORPORATE CONTRACTOR'S TECHNICAL

PROPOSAL - BUREAU OF RECLAMATION - PN REGION (MAR 2001) ............. L-20

L.16. 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................. L-20

L.17. NOTICE TO HUBZONE SMALL BUSINESS CONCERN OF A PRICE

EVALUATION ADJUSTMENT - BUREAU OF RECLAMATION - PN

REGION (APR 2001) .................................................................................................... L-21

L.18. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY

SITE OF THE WORK (MAY 2014) ............................................................................. L-21

L.19. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)..................................................................................................................... L-21

L.20. NON-DISCRIMINATION NOTICE TO U.S. DEPARTMENT OF THE

INTERIOR CONTRACTORS, SUBCONTRACTORS, AND LESSORS --

BUREAU OF RECLAMATION -- PN REGION (JAN 2000) ..................................... L-22

L.21. 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY

2014) .............................................................................................................................. L-23

L.22. 52.233-2 SERVICE OF PROTEST – DEPARTMENT OF THE INTERIOR

(SEPT 2006) (DEVIATION) ......................................................................................... L-24

L.23. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995) .............................................................................................................................. L-24

L.24. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997) ....... L-24

L.25. WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION AND

PREPARATORY WORK SCHEDULE LINE ITEM -- BUREAU OF

RECLAMATION (MAY 2000) .................................................................................... L-25

L.26. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) ................... L-25

Amendment No. 001 xi

SECTION M EVALUATION FACTORS FOR AWARD .............................................................. M-1

M.1. WBR 1452.215-85 EVALUATION FACTORS FOR AWARD - QUALITY

PREDOMINANCE--BUREAU OF RECLAMATION (MAY 2005) ........................... M-1

M.2. WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION

GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--

BUREAU OF RECLAMATION (MAY 2005) .............................................................. M-2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

00010

SECTION B Supplies or Services and Prices

Cle Elum Dam Fish Passage Facility Juvenile Facility - Secant Pile Shaft Cle Elum Dam Yakima Project, Washington

Price Schedule CLINS 1-16 See following continuation pages

Cle Elum Dam Fish Passage Facility, Juvenile Facility - Secant Pile Shaft

Amendment 001

(Revised) B - 1

CONTINUATION OF

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLE ELUM DAM FISH PASSAGE FACILITY

JUVENILE FACILITY - SECANT PILE SHAFT

CLE ELUM DAM

YAKIMA PROJECT, WASHINGTON

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Definitions:

(1) CLIN - Contract Line Item Number.

Amendment No. 001

(Revised) B - 2

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1 WBR

1452.232

-81

Mobilization and Preparatory Work

For the lump sum of $

2 02 41 07 Removal and Reinstallation of Existing Log Boom Anchor

For the lump sum of $

3 03 30 00 Reinforced Concrete Walers, Intake Brace, and Capping Beam

For the lump sum of $

4 03 30 00 Secant Pile Guide Wall For the lump sum of $

5 09 96 31 Coating for Concrete Secant Piles

For the lump sum of $

5A 26 05 02 Complete Electrical System For the lump sum of $

6 31 03 23 Cofferdam Construction For the lump sum of $

7 31 03 33 Removal and Control of Water

For the lump sum of $

8 31 11 00 Clearing and Grubbing 16 acres $ $

9 31 13 13 Salvage Trees For the lump sum of $

10 31 23 11 Earthwork for Access Road For the lump sum of $

11 31 23 11 Earthwork for Juvenile Structure Platform to El.

2244.0

For the lump sum of $

12 31 23 11 Earthwork for Interior of Secant Pile Shaft

For the lump sum of $

13 31 56 20 Primary Secant Piles 10,000 lin ft

14 31 56 20 Secondary Secant Piles 10,000 lin ft

15 32 31 10 Chain Link Fence For the lump sum of $

Amendment No. 001

(Revised) B - 3

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

16 32 92 20 Seeding 10 acres $ $

TOTAL FOR PRICE SCHEDULE $________________

END OF SUPPLIES OR SERVICES AND PRICES

Amendment No. 001

(Revised) 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located at Cle Elum Dam, approximately 8 miles northwest of Cle Elum, Washington, in Kittitas County.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Secant Pile Shaft:

1. Elliptical Secant Pile Shaft.

2. Reinforced Concrete.

3. Coating.

4. Earthwork.

B. Cofferdam.

C. Access Road.

D. Chain Link Fence.

E. Electrical:

1. Trench Earthwork.

2. Conduit, Cable, and Switchgear.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

Amendment No. 001

(Revised) 01 11 00 - 2

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 53:

1. CO: Contracting Officer.

2. COR: Contracting Officer’s Representative.

3. Reclamation: United States Bureau of Reclamation.

4. USBR: United States Bureau of Reclamation.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

Amendment No. 001

(Revised) 01 33 00 - 15

* Submittal types: A - Action, I - Information.

**Y indicates the submittal shall be shown on the Construction Schedule. Refer to Section 01 32 10 - Construction Program ***CO indicates Contracting Officer, COR indicates Contracting Officers Representative, and TSC indicates Technical Service

Center.

Submittal procedures: SharePoint indicates electronic submittal, numeral indicates number of required hard copy sets.

RSN Clause or Section Title

Submittals required

Due date or delivery time

Responsible code ***

Type

CP

No. of sets to be sent to: **

CO COR TSC

03 30 00-3 Cast-In-Place Concrete

Concrete Placement Schedule

At least 28 days before placing concrete

86-68530 A Y SharePoint

03 30 00-4 Cast-In-Place Concrete

Certifications At least 28 days before placing concrete

86-68530 I SharePoint

03 30 00-5 Cast-In-Place Concrete

Cementitious Materials Certification and Test Reports

At least 28 days before placing concrete

86-68530 I SharePoint

03 30 00-6 Cast-In-Place Concrete

Pre-Placement Inspection Pour Cards

Prior to each placement

COR I SharePoint

03 30 00-7 Cast-In-Place Concrete

Test Reports Within 24 hours of completing tests

COR A SharePoint

09 96 31-1 Coating for Concrete Secant Piles

Approval Data At least 56 days before coating

86-68540 A Y SharePoint

09 96 31-2 Coating for Concrete Secant Piles

Final Approval Data

At least 28 days before coating

86-68540 A Y SharePoint

09 96 31-3 Coating for Concrete Secant Piles

Documentation At least 28 days before coating

86-68540 I SharePoint

26 05 22-1 Basic Electrical Materials and Methods

Approval drawings and data

At least 28 days before furnishing or procuring

86-68312 A SharePoint

26 05 22-2 Basic Electrical Materials and Methods

Factory test reports

Within 7 days of completing tests

86-68312 A SharePoint

26 05 22-3 Basic Electrical Materials and Methods

Field test reports and wire termination sheets

Within 14 days of completing installation

86-68312 A SharePoint

26 05 26-1 Grounding and Bonding

As-built drawings Within 14 days of completing installation

86-68312 A SharePoint

Amendment No. 001

(Revised) 01 33 00 - 15a

* Submittal types: A - Action, I - Information.

**Y indicates the submittal shall be shown on the Construction Schedule. Refer to Section 01 32 10 - Construction Program ***CO indicates Contracting Officer, COR indicates Contracting Officers Representative, and TSC indicates Technical Service

Center.

Submittal procedures: SharePoint indicates electronic submittal, numeral indicates number of required hard copy sets.

RSN Clause or Section Title

Submittals required

Due date or delivery time

Responsible code ***

Type

CP

No. of sets to be sent to: **

CO COR TSC

26 05 26-2 Grounding and Bonding

Test reports Within 14 days of completing installation

86-68312 A SharePoint

26 05 33-1 Raceway and Boxes

Approval drawings and data

At least 28 days before furnishing or procuring

86-68312 A SharePoint

26 05 33-2 Raceway and Boxes

Approval drawings for locations and bends

At least 21 days before furnishing or procuring

86-68312 A SharePoint

26 05 33-3 Raceway and Boxes

As-built drawings and data

Within 14 days of completing installation

86-68312 A SharePoint

26 13 01-1 Padmount air insulated Switchgear

Approval drawings and data

Within 14 days of completing installation

86-68312 A SharePoint

26 13 01-2 Padmount air insulated Switchgear

Factory test report

Within 7 days of completing tests

86-68312 A SharePoint

26 13 01-3 Padmount air insulated Switchgear

Field test report Within 7 days of completing tests

86-68312 A SharePoint

26 13 01-4 Padmount air insulated Switchgear

Final drawings Within 14 days of completing installation

86-68312 A SharePoint

26 13 01-5 Padmount air insulated Switchgear

Operation and Maintenance Instruction Book

Within 14 days of completing installation

86-68312 A SharePoint

31 02 10-1 Dust Abatement Dust Abatement Plan

Within 28 days after Notice to Proceed

COR A SharePoint

31 03 23-1 Cofferdam Construction

Cofferdam Construction Plan

At least 28 days before beginning Cofferdam Construction

86-68312 A Y SharePoint

DIVISION 10 THROUGH 25 - NOT USED

DIVISION 26 - ELECTRICAL

Amendment No. 001

Basic Electrical Materials and Methods 26 05 02 - 1

SECTION 26 05 02

BASIC ELECTRICAL MATERIALS AND METHODS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Complete Electrical System:

1. Payment: Lump sum price offered in the Price Schedule.

1.02 REFERENCE STANDARDS

A. ASTM International (ASTM)

1. ASTM A123/A123M-2013 Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

2. ASTM A153/A153M-2009 Zinc Coatings (Hot-Dip) on Iron and Steel Hardware

B. Institute of Electrical and Electronics Engineers (IEEE)

1. IEEE C2-2012 National Electrical Safety Code (NESC)

C. National Fire Protection Association (NFPA)

1. NFPA 70-2014 National Electrical Code (NEC)

1.03 SYSTEM DESCRIPTION

A. Provide electrical distribution from the point of interconnect with Puget Sound Energy at Lake Cle Elum Dam Road, down to Padmount switchgear DA2, shown on drawing 33-D- 60829.

B. Provide raceway from the point of interconnect with Puget Sound Energy at Lake Cle Elum Dam Road through to the termination of the South Access Road, as shown on drawings 33-D-60808 and 33-D-60809.

C. Puget Sound Energy Interconnect:

1. Provide electrical interconnect into Puget Sound Energy electrical vault, including installation of raceway and cable into the vault.

1.04 MAINTENANCE

A. Provide special tools and accessories required for installation or normal operation and maintenance of equipment and installations. Studs, bolts, or nuts other than United States

Amendment No. 001

Basic Electrical Materials and Methods 26 05 02 - 2

Standard provided anywhere in the equipment or installation will be considered as requiring special tools.

B. Deliver special tools and spare parts for equipment to a location as directed by COR.

Provide shipments with item list(s).

C. Special tools spare parts must be onsite prior to installation of equipment.

PART 2 PRODUCTS

2.01 MATERIALS AND EQUIPMENT

A. Conform to NFPA 70, IEEE C2, and Section 01 60 00 - Product Requirements.

B. Galvanize mounting brackets, bolts, nuts, and washers for major items of electrical equipment in accordance with ASTM A123 and A153.

C. Provide galvanized steel or non-corrosive metal for mounting bolts, nuts, and washers for minor items of electrical equipment and lighter weight items. Do not use cadmium-plated mounting hardware.

D. Change designs as required where Contractor-furnished electrical equipment and materials differ in size, type, ratings, or other physical properties from designs in these specifications. CO will approve changes at Contractor’s expense, unless Contractor can demonstrate that changes are necessary regardless of manufacturer.

E. Provide special tools and appliances furnished by manufacturer for maintenance and adjustment of manufacturer’s electrical equipment.

F. Make available copies of all standards referenced in this Section at the suppliers manufacturing plant, as outlined in Section 01 42 10 - Reference Standards.

PART 3 EXECUTION

3.01 INSTALLATION

A. Do not install electrical equipment until approval drawings and data for associated equipment have been approved by Government.

B. Electrical Installations, Assembly Operations, and Adjustments: Comply with NFPA 70 and IEEE C2.

C. Make electrical installations complete and ready for service.

D. Install electrical equipment in accordance with directions furnished by manufacturer’s instruction books.

Amendment No. 001

Basic Electrical Materials and Methods 26 05 02 - 3

E. Drill holes in bolted steel structures and provide fastenings required for mounting or installing electrical equipment and materials.

F. Do not drill holes in tubular steel structures. Fasten to tubular steel structures by means of properly drilled and tapped pads or brackets welded to tubular members.

G. Installation of electrical equipment includes:

1. Leveling channel bases.

2. Drilling holes, furnishing hardware, and assembling components to each other.

3. Furnishing materials for and making all connections correctly in accordance with final wiring diagrams.

4. Tagging wires and cables at each end.

H. Grout electrical equipment installed on concrete foundations in place to provide full and even bearing.

I. Puget Sound Energy Interconnect:

1. Coordinate with Puget Sound Energy prior to installation of any electrical components to verify utility interconnection, including location and interconnection details.

3.02 REPAIR

A. Repair damaged painted surfaces of equipment to match original finish.

3.03 FIELD QUALITY ASSURANCE

A. Government will inspect electrical equipment during construction. Acceptance of equipment will be made after equipment is operational.

B. All equipment field tests to be…