R16PS00041
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100
R10
Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation
05/25/2016001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/03/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Cle Elum Dam Fish Passage Facility, Juvenile Facility - Secant Pile Shaft, Yakima Project, Washington
See attached Amendment No. 001 instructions and replacement pages
Delivery: 900 Days After Notice to Proceed
FOB: Destination
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Susan E. Kramer
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No. R16PS00041 Cle Elum Dam Fish Passage Facility, Juvenile Facility – Secant Pile Shaft
Yakima Project, Washington Amendment 001
A. The time and date for receipt of offers REMAINS 2:00 p.m., local time, June 16, 2016.
B. Acknowledgment: See block 11 above regarding how to acknowledge this amendment. The acknowledgment must be received at the place designated for receipt of offers (see block 8 of "Solicitation, Offer and Award” Standard Form 1442).
C. Offer Modification: See block 11 above if you have submitted your offer and now desire to modify or withdraw it.
D. Third Party: If you have given your copy of the solicitation to someone else, please forward this amendment accordingly.
E. A list of attendees at the site visit on May 20, 2016, is attached.
F. A second site visit is scheduled for 10:00 a.m., local time, June 2, 2016. See provision L.23. for instructions for the site visit.
G. NOTE: The following changes are hereby incorporated into the solicitation. Single-sided replacement pages are provided following this Standard Form 30 and changes are shown with left side bar or shaded text.
H. The original solicitation posted to www.fedconnect.net and www.fbo.gov, contained 2 specification sections with the same title. The section that was duplicated is section 53 10 00, Geotechnical Baseline Conditions. The second section with this title, beginning on page 401 of the pdf document posted to FBO and Fedconnect, and ending on page 409 of the pdf document, is deleted.
I. In the Table of Contents, the following pages are deleted and the attached revised pages are substituted therefore:
Remove Pages Insert Revised Pages i-x i-xi
J. In Section B, Description/Specifications/Statement of Work, the following pages are deleted and the attached revised pages are substituted therefore:
Remove Pages Insert Revised Pages OF-336 (Page 3 of 4, and OF-336 (Page 3 of 3) and B-1 through B-3 Page 4 of 4)
K. In Section C, Description/Specifications/Statement of Work, the following pages are deleted and the attached revised pages are substituted therefore:
Remove Pages Insert Revised Pages 01 11 00-1 and 01 11 00-2 01 11 00-1 and 01 11 00-2 01 33 00-15 01 33 00-15 None Insert new 01 33 00-15a Division 10 through 30-Not Used Division 10 through 25-Not Used http://www.fedconnect.net/ http://www.fbo.gov/
Cle Elum Dam Fish Passage Facility, Juvenile Facility – Secant Pile Shaft
Yakima Project, Washington Amendment 001
Remove Pages Insert Revised Pages None Division 26 - Electrical None Insert new 26 05 02-1 through 26 05 02-3 None Insert new 26 05 22-1 through 26 05 22-6 None Insert new 26 05 26-1 through 26 05 26-5 None Insert new 26 05 33-1 through 26 05 33-7 None Insert new 26 13 01-1 through 26 13 01-8 None Insert new Division 27 through 30-Not Used 31 09 21-1 through 31 09 21-2 31 09 21-1 31 11 00-2 31 11 00-2 and 31 11 00-3 31 13 13-1 through 31 13 13-3 31 13 13-1 through 31 13 13-3 31 14 10-1 and 31 14 10-2 31 14 1-1 and 31 14 10-2 31 23 11-2 31 23 11-2 None Insert new 31 23 18-1 and 31 23 18-2 31 56 20-7 31 56 20-7 32 15 10-1 and 32 15 10-2 32 15 10-1 and 32 15 10-2 32 92 20-1 and 32 92 20-2 32 92 20-1 and 32 92 20-2 52 00 00-2 through 52 00 00-4 52 00 00-2 through 52 00 00-5
Drawings:
Remove Pages Insert Revised Pages
Sheet 2 (33-D-60055) Sheet 2 (33-D-60055) Sheet 5 (33-D-60742) Sheet 5 (33-D-60742) Sheet 19 (33-D-60773) Sheet 19 (33-D-60773) Sheet 20 (33-D-60774) Sheet 20 (33-D-60774) None Insert new Sheet 20A (33-D-60808) None Insert new Sheet 20B (33-D-60809) None Insert new Sheet 20C (33-D-60810) None Insert new Sheet 20D (33-D-60829) None Insert new Sheet 20E (33-D-60003) None Insert new Sheet 20F (33-D-60008) None Insert new Sheet 20G (33-D-60030) None Insert new Sheet 20H (33-D-60031) None Insert new Sheet 20I (33-D-60032) None Insert new Sheet 20J (33-D-60034) None Insert new Sheet 20K (33-D-60035) None Insert new Sheet 21A (40-D-4334) None Insert new Sheet 21B (40-D-6234) None Insert new Sheet 24A (104-D-253)
Attachments
Cle Elum Dam Fish Passage Facility - Juvenile Facility-Secant Pile Shaft
Amendment No. 001 i
PART I THE SCHEDULE
SECTION A SOLICITATION/CONTRACT FORM ..................................................................... A-1
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ...................................................B-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ........................... C-1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions 01 14 20 Reservoir Operations and Conditions 01 31 13 Project Coordination 01 31 19 Project Management 01 32 10 Construction Program 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 21 Removal from Work 01 35 22 First Aid 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Existing Fences 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 57 90 Preservation of Historical and Archeological Data 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents
Amendment No. 001 ii (revised)
DIVISION 02 - EXISTING CONDITIONS
02 41 07 Removal and Reinstallation of Existing Log Boom Anchor
DIVISION 03 - CONCRETE
03 11 10 Concrete Forming 03 20 00 Concrete Reinforcing 03 20 30 Grouted Anchor Bars 03 30 00 Cast-In-Place Concrete
DIVISION 09 - FINISHES
09 96 31 Coating for Concrete Secant Piles
DIVISION 26 – ELECTRICAL
26 05 02 Basic Electrical Materials and Methods 26 05 22 Medium Voltage Power Cable 26 05 26 Grounding and Bonding 26 05 33 Raceway and Boxes 26 13 01 Padmount Air Insulated Switchgear
DIVISION 31 - EARTHWORK
31 02 10 Dust Abatement 31 03 23 Cofferdam Construction 31 03 33 Removal and Control of Water
31 09 21 DELETED
31 11 00 Clearing and Grubbing 31 13 13 Salvage Trees 31 14 10 Stripping 31 23 02 Compacting Earth Materials 31 23 11 Earthwork 31 23 18 Earthwork for Electrical Trenches 31 23 39 Disposal of Excavated Materials 31 24 18 Compacted Backfill 31 32 32 Geotextile 31 32 36 Geomembrane 31 37 00 Riprap 31 56 20 Secant Pile Shaft
Amendment No. 001 iii (revised)
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 15 10 Gravel Surfacing 32 31 10 Chain Link Fence 32 92 20 Seeding
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 10 10 Final Environmental Impact Statement 51 10 20 Hydrographs, Exceedance Curves, and Reservoir Time History 51 10 40 Cle Elum Dam Annual and Seasonal Diversion Hydrographs 51 10 50 Cle Elum Dam Permits
DIVISION 52 - DRAWINGS
52 00 00 Drawings
DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS
53 10 00 Geotechnical Baseline Conditions 53 10 01 Geotechnical Supporting Documentation 53 20 00 Geologic Investigations 53 30 00 Records of Geologic and Subsurface Investigations
SECTION D PACKAGING AND MARKING ................................................................................. D-1
SECTION E INSPECTION AND ACCEPTANCE ..........................................................................E-1 E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) ........................................ E-1 E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)...................................... E-1
E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) - ALTERNATE I
APR 1984) ....................................................................................................................... E-3
SECTION F DELIVERIES OR PERFORMANCE ......................................................................... F-1
F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ......................................................................................................... F-1 F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ................... F-1 F.3. 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) ........................... F-1 F.4. 52.242-14 SUSPENSION OF WORK (APR 1984) ........................................................ F-1
SECTION G CONTRACT ADMINISTRATION DATA ................................................................ G-1
G.1. GOVERNMENT POINT OF CONTACT--BUREAU OF RECLAMATION--PN
REGION (OCT 2010) ..................................................................................................... G-1
Amendment No. 001 iv (revised)
G.2. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF THE
INTERIOR (MAY 2010) ................................................................................................ G-1
G.3. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE
PROCESSING PLATFORM (IPP) (APRIL 2013) ........................................................ G-2
SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................................. H-1
H.1. KEY PERSONNEL REQUIREMENTS--BUREAU OF RECLAMATION--PN
REGION (FEB 1995) ..................................................................................................... H-1
H.2. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF
RECLAMATION CONTRACTORS (SEP 2002).......................................................... H-1
H.3. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
(DEC 2015) ..................................................................................................................... H-3
PART II CONTRACT CLAUSES
SECTION I CONTRACT CLAUSES ................................................................................................ I-1 I.1. 52.202-1 DEFINITIONS (NOV 2013) ............................................................................. I-1 I.2. 52.203-3 GRATUITIES (APR 1984) ............................................................................... I-1 I.3. 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)........................ I-2
I.4. 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT (SEPT 2006)......................................................................................... I-2 I.5. 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) .......................................... I-2
I.6. 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS
FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) ........................................... I-4
I.7. 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014) .................................................................................................. I-5
I.8. 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (OCT 2010) .................................................................... I-6
I.9. 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT
(MAR 2016) .................................................................................................................... I-10 I.10. 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015) .................................... I-14
I.11. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS (APR 2014) ...................................................................................................... I-15
I.12. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT OF THE
INTERIOR (JUL 1996) .................................................................................................. I-15
I.13. 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS
(MAR 2015) .................................................................................................................... I-15
I.14. 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER
FIBER CONTENT PAPER (MAY 2011) ...................................................................... I-16
I.15. 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (JAN 2011) ............................................................................................. I-16
Amendment No. 001 v (revised)
I.16. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2015) .................................................................... I-17
I.17. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER
MAINTENANCE (DEC 2012)....................................................................................... I-20
I.18. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL
2013) ............................................................................................................................... I-21
I.19. 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (JAN 2014) ..... I-23
I.20. 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE
MAINTENANCE (JUL 2015) ........................................................................................ I-24
I.21. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE INTERIOR
(JUL 1996) ...................................................................................................................... I-25
I.22. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS
AND CERTIFICATIONS (DEC 2014) .......................................................................... I-25
I.23. 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,
OR PROPOSED FOR DEBARMENT (OCT 2015) ...................................................... I-25
I.24. 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION
REGARDING RESPONSIBILITY MATTERS (JUL 2013) ......................................... I-26
I.25. 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED
DOMESTIC CORPORATIONS (NOV 2015) ............................................................... I-27
I.26. 52.210-1 MARKET RESEARCH (APR 2011) .............................................................. I-28 I.27. 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010) ............................. I-28
I.28. 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT
(OCT 1997) ..................................................................................................................... I-30
I.29. 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF
THE INTERIOR (AUG 1996) (DEVIATION) ............................................................... I-30
I.30. 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA
AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—
MODIFICATIONS (OCT 2010) .................................................................................... I-31
I.31. CONTRACTOR'S TECHNICAL PROPOSAL INCORPORATED INTO
CONTRACT - BUREAU OF RECLAMATION - PN REGION (MAR 2001) ............. I-32
I.32. 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE
SMALL BUSINESS CONCERNS (OCT 2014) ............................................................ I-32
I.33. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014) ............ I-34
I.34. 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2015)
ALTERNATE II (OCT 2001) ......................................................................................... I-36
I.35. 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN
1999) ............................................................................................................................... I-46
I.36. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (JUL 2013) ............................................................................. I-46 I.37. 52.222-3 CONVICT LABOR (JUNE 2003) .................................................................. I-48
Amendment No. 001 vi (revised)
I.38. 52.222-4 CONTRACT WORK HOURS AND SAFETY
STANDARDS -OVERTIME COMPENSATION (MAY 2014) ................................... I-49
I.39. 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014) ............ I-50
I.40. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) .................................................. I-52 I.41. 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) ..................................... I-53 I.42. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005) .......................................... I-54
I.43. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB
1988) ............................................................................................................................... I-56 I.44. 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) ....................... I-56 I.45. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) ................... I-57
I.46. 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE
REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) .......................... I-58
I.47. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) .............. I-58 I.48. 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) .................................... I-58 I.49. 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015).................. I-58 I.50. 52.222-26 EQUAL OPPORTUNITY (APR 2015) ........................................................ I-59
I.51. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION (APR 2015) ..................................................................................... I-61 I.52. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015).......................... I-66
I.53. 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES
(JUL 2014) ...................................................................................................................... I-67 I.54. 52.222-37 EMPLOYMENT REPORTS VETERANS (FEB 2016) ............................... I-67
I.55. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE
NATIONAL LABOR RELATIONS ACT (DEC 2010) ................................................ I-68 I.56. 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ...................... I-70 I.57. 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015) ................. I-77
I.58. 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC
2015) ............................................................................................................................... I-80
I.59. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL
SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995) ........................................... I-84
I.60. 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW
INFORMATION (MAY 2011)....................................................................................... I-86 I.61. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) ................................................... I-86
I.62. 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL
CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) ....................................... I-88
I.63. 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS
IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008) .......................... I-89
I.64. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING (AUG 2011) ............................................................ I-89
I.65. WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF
RECLAMATION (OCT 1992) ....................................................................................... I-90
Amendment No. 001 vii (revised)
I.66. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION
(JUNE 2015) ................................................................................................................... I-90
I.67. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE
PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL
WORKPLACE–BUREAU OF RECLAMATION (DEC 2009) .................................... I-91
I.68. 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (FEB 2016) ........................................................................... I-91
I.69. 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE
2008) ............................................................................................................................... I-96
I.70. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) ...................................... I-97
I.71. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT (DEC 2007) .............................................................. I-97
I.72. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC
2007) ............................................................................................................................... I-97 I.73. 52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007) ................................ I-98 I.74. 52.228-1 BID GUARANTEE (SEP 1996) ..................................................................... I-99 I.75. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) ......................................... I-100
I.76. 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION
(JAN 1997).................................................................................................................... I-100 I.77. 52.228-11 PLEDGE OF ASSETS (JAN 2012) ............................................................ I-101
I.78. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS
(MAY 2014).................................................................................................................. I-101 I.79. 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014) .............................. I-101
I.80. 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION
(OCT 2010) ................................................................................................................... I-105
I.81. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE INTERIOR
(JUL 1996) .................................................................................................................... I-106
I.82. WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR
CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996) ................ I-107
I.83. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) ............................ I-107
I.84. WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
-- BUREAU OF RECLAMATION (JUL 1998) ........................................................... I-109
I.85. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (MAY 2014) ......................................................................................... I-111 I.86. 52.232-17 INTEREST (MAY 2014) ............................................................................ I-114 I.87. 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) ............................................... I-115
I.88. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY 2014) ..... I-115
I.89. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR
AWARD MANAGEMENT (JUL 2013) ...................................................................... I-124
I.90. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS
(JUN 2013).................................................................................................................... I-125
Amendment No. 001 viii (revised)
I.91. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL
BUSINESS SUBCONTRACTORS (DEC 2013) ......................................................... I-126
I.92. WBR 1452.232-80 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) --
BUREAU OF RECLAMATION (SEPT 2003) ............................................................ I-126
I.93. WBR 1452.232-81 PAYMENT FOR MOBILIZATION AND PREPARATORY
WORK --BUREAU OF RECLAMATION (MAY 2000) ALTERNATE I (MAY
2000) ............................................................................................................................. I-128
I.94. WBR 1452.232-82 OTHER INVOICE REQUIREMENTS -- BUREAU OF
RECLAMATION (DEC 2002) ..................................................................................... I-130
I.95. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991) ............................... I-130 I.96. 52.233-3 PROTEST AFTER AWARD (AUG 1996) ................................................... I-132
I.97. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT
2004) ............................................................................................................................. I-133 I.98. 52.236-2 DIFFERING SITE CONDITIONS (APR 1984) ........................................... I-133
I.99. 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE
WORK (APR 1984) ...................................................................................................... I-133 I.100. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) ................. I-134 I.101. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) ................................... I-134 I.102. 52.236-8 OTHER CONTRACTS (APR 1984) ............................................................. I-134
I.103. 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984) ........................... I-134 I.104. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) ............................. I-135 I.105. 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984) ......... I-135 I.106. 52.236-12 CLEANING UP (APR 1984) ...................................................................... I-136
I.107. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV
1991) ............................................................................................................................. I-136 I.108. 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984) ....... I-137 I.109. 52.236-16 QUANTITY SURVEYS (APR 1984) - ALTERNATE I (APR 1984) ....... I-137 I.110. 52.236-17 LAYOUT OF WORK (APR 1984) ............................................................. I-138
I.111. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB
1997)- ALTERNATE I (APR 1984)............................................................................. I-138 I.112. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995) ................................ I-139
I.113. WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES –
BUREAU OF RECLAMATION (FEB 2000) .............................................................. I-139
I.114. WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF
RECLAMATION (FEBRUARY 2011) ....................................................................... I-141 I.115. 52.242-13 BANKRUPTCY (JUL 1995)....................................................................... I-152 I.116. 52.243-4 CHANGES (JUNE 2007) .............................................................................. I-152
I.117. WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF
RECLAMATION (DEC 2001) ALTERNATE III (JUL 1998) .................................... I-153 I.118. 52.244-2 SUBCONTRACTS (OCT 2010) ................................................................... I-154 I.119. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (FEB 2016) .................. I-156
Amendment No. 001 ix (revised)
I.120. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2015) -
ALTERNATE I (APR 1984) ........................................................................................ I-158
I.121. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996) ........................................ I-161
I.122. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)................... I-164 I.123. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ........................ I-165 I.124. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) ...................................... I-166
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J LIST OF ATTACHMENTS ......................................................................................... J-1
PART IV REPRESENTATIONS AND INSTRUCTIONS
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS ....................................................................... K-1
K.1. 52.203-98, PROHIBITION ON CONTRACTING WITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS—
REPRESENTATION (FEB 2015) - DEVIATION ........................................................ K-1
K.2. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB
2016) ............................................................................................................................... K-1
K.3. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL
2013) ............................................................................................................................... K-5
K.4. NOTICE TO HUBZONE SMALL BUSINESS CONCERNS REGARDING
WAIVER OF PRICE EVALUATION PREFERENCE ADJUSTMENT -
BUREAU OF RECLAMATION - PN REGION (APR 2001) ....................................... K-6
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS ............................................................................................................L-1
L.1. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) ................................ L-1
L.2. 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE
REPORTING (JUL 2015)................................................................................................ L-3
L.3. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA
INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) ............. L-4
L.4. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA
INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) .................................................. L-4
L.5. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ........................... L-4
L.6. WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC PRODUCTS
AND SERVICES - BUREAU OF RECLAMATION (MAR 1993) ............................... L-5
L.7. 52.215-1 INSTRUCTIONS TO OFFERORSBCOMPETITIVE ACQUISITION
(JAN 2004)....................................................................................................................... L-6
Amendment No. 001 x (revised)
L.8. 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR
INFORMATION OTHER THAN CERTIFIED COST OR PRICING DATA
(OCT 2010) .................................................................................................................... L-10
L.9. 1452.215-71 USE AND DISCLOSURE OF PROPOSAL
INFORMATION--DEPARTMENT OF THE INTERIOR (APR 1984) ....................... L-11
L.10. WBR 1452.215-80 SOURCE EVALUATION AND SELECTION
PROCEDURES--BUREAU OF RECLAMATION (MAY 2005) ................................ L-13
L.11. WBR 1452.215-81 GENERAL PROPOSAL INSTRUCTIONS--BUREAU OF
RECLAMATION (JAN 1998) ...................................................................................... L-15
L.12. WBR 1452.215-82 TECHNICAL PROPOSAL INSTRUCTIONS--BUREAU OF
RECLAMATION (APR 2001) ...................................................................................... L-17
L.13. WBR 1452.215-83 PRICING PROPOSAL INSTRUCTIONS--BUREAU OF
RECLAMATION (JAN 1998) ...................................................................................... L-19
L.14. FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS, MODIFICATIONS
TO OFFERS, AND WITHDRAWALS OF OFFERS-BUREAU OF
RECLAMATION--PN REGION (APR 2007) .............................................................. L-19
L.15. NOTICE OF INTENT TO INCORPORATE CONTRACTOR'S TECHNICAL
PROPOSAL - BUREAU OF RECLAMATION - PN REGION (MAR 2001) ............. L-20
L.16. 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................. L-20
L.17. NOTICE TO HUBZONE SMALL BUSINESS CONCERN OF A PRICE
EVALUATION ADJUSTMENT - BUREAU OF RECLAMATION - PN
REGION (APR 2001) .................................................................................................... L-21
L.18. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY
SITE OF THE WORK (MAY 2014) ............................................................................. L-21
L.19. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)..................................................................................................................... L-21
L.20. NON-DISCRIMINATION NOTICE TO U.S. DEPARTMENT OF THE
INTERIOR CONTRACTORS, SUBCONTRACTORS, AND LESSORS --
BUREAU OF RECLAMATION -- PN REGION (JAN 2000) ..................................... L-22
L.21. 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY
2014) .............................................................................................................................. L-23
L.22. 52.233-2 SERVICE OF PROTEST – DEPARTMENT OF THE INTERIOR
(SEPT 2006) (DEVIATION) ......................................................................................... L-24
L.23. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB
1995) .............................................................................................................................. L-24
L.24. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997) ....... L-24
L.25. WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION AND
PREPARATORY WORK SCHEDULE LINE ITEM -- BUREAU OF
RECLAMATION (MAY 2000) .................................................................................... L-25
L.26. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) ................... L-25
Amendment No. 001 xi
SECTION M EVALUATION FACTORS FOR AWARD .............................................................. M-1
M.1. WBR 1452.215-85 EVALUATION FACTORS FOR AWARD - QUALITY
PREDOMINANCE--BUREAU OF RECLAMATION (MAY 2005) ........................... M-1
M.2. WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION
GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--
BUREAU OF RECLAMATION (MAY 2005) .............................................................. M-2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
00010
SECTION B Supplies or Services and Prices
Cle Elum Dam Fish Passage Facility Juvenile Facility - Secant Pile Shaft Cle Elum Dam Yakima Project, Washington
Price Schedule CLINS 1-16 See following continuation pages
Cle Elum Dam Fish Passage Facility, Juvenile Facility - Secant Pile Shaft
Amendment 001
(Revised) B - 1
CONTINUATION OF
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLE ELUM DAM FISH PASSAGE FACILITY
JUVENILE FACILITY - SECANT PILE SHAFT
CLE ELUM DAM
YAKIMA PROJECT, WASHINGTON
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN - Contract Line Item Number.
Amendment No. 001
(Revised) B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232
-81
Mobilization and Preparatory Work
For the lump sum of $
2 02 41 07 Removal and Reinstallation of Existing Log Boom Anchor
For the lump sum of $
3 03 30 00 Reinforced Concrete Walers, Intake Brace, and Capping Beam
For the lump sum of $
4 03 30 00 Secant Pile Guide Wall For the lump sum of $
5 09 96 31 Coating for Concrete Secant Piles
For the lump sum of $
5A 26 05 02 Complete Electrical System For the lump sum of $
6 31 03 23 Cofferdam Construction For the lump sum of $
7 31 03 33 Removal and Control of Water
For the lump sum of $
8 31 11 00 Clearing and Grubbing 16 acres $ $
9 31 13 13 Salvage Trees For the lump sum of $
10 31 23 11 Earthwork for Access Road For the lump sum of $
11 31 23 11 Earthwork for Juvenile Structure Platform to El.
2244.0
For the lump sum of $
12 31 23 11 Earthwork for Interior of Secant Pile Shaft
For the lump sum of $
13 31 56 20 Primary Secant Piles 10,000 lin ft
14 31 56 20 Secondary Secant Piles 10,000 lin ft
15 32 31 10 Chain Link Fence For the lump sum of $
Amendment No. 001
(Revised) B - 3
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
16 32 92 20 Seeding 10 acres $ $
TOTAL FOR PRICE SCHEDULE $________________
END OF SUPPLIES OR SERVICES AND PRICES
Amendment No. 001
(Revised) 01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located at Cle Elum Dam, approximately 8 miles northwest of Cle Elum, Washington, in Kittitas County.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Secant Pile Shaft:
1. Elliptical Secant Pile Shaft.
2. Reinforced Concrete.
3. Coating.
4. Earthwork.
B. Cofferdam.
C. Access Road.
D. Chain Link Fence.
E. Electrical:
1. Trench Earthwork.
2. Conduit, Cable, and Switchgear.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.
1.04 DEFINITIONS
A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.
Amendment No. 001
(Revised) 01 11 00 - 2
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 53:
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
3. Reclamation: United States Bureau of Reclamation.
4. USBR: United States Bureau of Reclamation.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Amendment No. 001
(Revised) 01 33 00 - 15
* Submittal types: A - Action, I - Information.
**Y indicates the submittal shall be shown on the Construction Schedule. Refer to Section 01 32 10 - Construction Program ***CO indicates Contracting Officer, COR indicates Contracting Officers Representative, and TSC indicates Technical Service
Center.
Submittal procedures: SharePoint indicates electronic submittal, numeral indicates number of required hard copy sets.
RSN Clause or Section Title
Submittals required
Due date or delivery time
Responsible code ***
Type
CP
No. of sets to be sent to: **
CO COR TSC
03 30 00-3 Cast-In-Place Concrete
Concrete Placement Schedule
At least 28 days before placing concrete
86-68530 A Y SharePoint
03 30 00-4 Cast-In-Place Concrete
Certifications At least 28 days before placing concrete
86-68530 I SharePoint
03 30 00-5 Cast-In-Place Concrete
Cementitious Materials Certification and Test Reports
At least 28 days before placing concrete
86-68530 I SharePoint
03 30 00-6 Cast-In-Place Concrete
Pre-Placement Inspection Pour Cards
Prior to each placement
COR I SharePoint
03 30 00-7 Cast-In-Place Concrete
Test Reports Within 24 hours of completing tests
COR A SharePoint
09 96 31-1 Coating for Concrete Secant Piles
Approval Data At least 56 days before coating
86-68540 A Y SharePoint
09 96 31-2 Coating for Concrete Secant Piles
Final Approval Data
At least 28 days before coating
86-68540 A Y SharePoint
09 96 31-3 Coating for Concrete Secant Piles
Documentation At least 28 days before coating
86-68540 I SharePoint
26 05 22-1 Basic Electrical Materials and Methods
Approval drawings and data
At least 28 days before furnishing or procuring
86-68312 A SharePoint
26 05 22-2 Basic Electrical Materials and Methods
Factory test reports
Within 7 days of completing tests
86-68312 A SharePoint
26 05 22-3 Basic Electrical Materials and Methods
Field test reports and wire termination sheets
Within 14 days of completing installation
86-68312 A SharePoint
26 05 26-1 Grounding and Bonding
As-built drawings Within 14 days of completing installation
86-68312 A SharePoint
Amendment No. 001
(Revised) 01 33 00 - 15a
* Submittal types: A - Action, I - Information.
**Y indicates the submittal shall be shown on the Construction Schedule. Refer to Section 01 32 10 - Construction Program ***CO indicates Contracting Officer, COR indicates Contracting Officers Representative, and TSC indicates Technical Service
Center.
Submittal procedures: SharePoint indicates electronic submittal, numeral indicates number of required hard copy sets.
RSN Clause or Section Title
Submittals required
Due date or delivery time
Responsible code ***
Type
CP
No. of sets to be sent to: **
CO COR TSC
26 05 26-2 Grounding and Bonding
Test reports Within 14 days of completing installation
86-68312 A SharePoint
26 05 33-1 Raceway and Boxes
Approval drawings and data
At least 28 days before furnishing or procuring
86-68312 A SharePoint
26 05 33-2 Raceway and Boxes
Approval drawings for locations and bends
At least 21 days before furnishing or procuring
86-68312 A SharePoint
26 05 33-3 Raceway and Boxes
As-built drawings and data
Within 14 days of completing installation
86-68312 A SharePoint
26 13 01-1 Padmount air insulated Switchgear
Approval drawings and data
Within 14 days of completing installation
86-68312 A SharePoint
26 13 01-2 Padmount air insulated Switchgear
Factory test report
Within 7 days of completing tests
86-68312 A SharePoint
26 13 01-3 Padmount air insulated Switchgear
Field test report Within 7 days of completing tests
86-68312 A SharePoint
26 13 01-4 Padmount air insulated Switchgear
Final drawings Within 14 days of completing installation
86-68312 A SharePoint
26 13 01-5 Padmount air insulated Switchgear
Operation and Maintenance Instruction Book
Within 14 days of completing installation
86-68312 A SharePoint
31 02 10-1 Dust Abatement Dust Abatement Plan
Within 28 days after Notice to Proceed
COR A SharePoint
31 03 23-1 Cofferdam Construction
Cofferdam Construction Plan
At least 28 days before beginning Cofferdam Construction
86-68312 A Y SharePoint
DIVISION 10 THROUGH 25 - NOT USED
DIVISION 26 - ELECTRICAL
Amendment No. 001
Basic Electrical Materials and Methods 26 05 02 - 1
SECTION 26 05 02
BASIC ELECTRICAL MATERIALS AND METHODS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Complete Electrical System:
1. Payment: Lump sum price offered in the Price Schedule.
1.02 REFERENCE STANDARDS
A. ASTM International (ASTM)
1. ASTM A123/A123M-2013 Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
2. ASTM A153/A153M-2009 Zinc Coatings (Hot-Dip) on Iron and Steel Hardware
B. Institute of Electrical and Electronics Engineers (IEEE)
1. IEEE C2-2012 National Electrical Safety Code (NESC)
C. National Fire Protection Association (NFPA)
1. NFPA 70-2014 National Electrical Code (NEC)
1.03 SYSTEM DESCRIPTION
A. Provide electrical distribution from the point of interconnect with Puget Sound Energy at Lake Cle Elum Dam Road, down to Padmount switchgear DA2, shown on drawing 33-D- 60829.
B. Provide raceway from the point of interconnect with Puget Sound Energy at Lake Cle Elum Dam Road through to the termination of the South Access Road, as shown on drawings 33-D-60808 and 33-D-60809.
C. Puget Sound Energy Interconnect:
1. Provide electrical interconnect into Puget Sound Energy electrical vault, including installation of raceway and cable into the vault.
1.04 MAINTENANCE
A. Provide special tools and accessories required for installation or normal operation and maintenance of equipment and installations. Studs, bolts, or nuts other than United States
Amendment No. 001
Basic Electrical Materials and Methods 26 05 02 - 2
Standard provided anywhere in the equipment or installation will be considered as requiring special tools.
B. Deliver special tools and spare parts for equipment to a location as directed by COR.
Provide shipments with item list(s).
C. Special tools spare parts must be onsite prior to installation of equipment.
PART 2 PRODUCTS
2.01 MATERIALS AND EQUIPMENT
A. Conform to NFPA 70, IEEE C2, and Section 01 60 00 - Product Requirements.
B. Galvanize mounting brackets, bolts, nuts, and washers for major items of electrical equipment in accordance with ASTM A123 and A153.
C. Provide galvanized steel or non-corrosive metal for mounting bolts, nuts, and washers for minor items of electrical equipment and lighter weight items. Do not use cadmium-plated mounting hardware.
D. Change designs as required where Contractor-furnished electrical equipment and materials differ in size, type, ratings, or other physical properties from designs in these specifications. CO will approve changes at Contractor’s expense, unless Contractor can demonstrate that changes are necessary regardless of manufacturer.
E. Provide special tools and appliances furnished by manufacturer for maintenance and adjustment of manufacturer’s electrical equipment.
F. Make available copies of all standards referenced in this Section at the suppliers manufacturing plant, as outlined in Section 01 42 10 - Reference Standards.
PART 3 EXECUTION
3.01 INSTALLATION
A. Do not install electrical equipment until approval drawings and data for associated equipment have been approved by Government.
B. Electrical Installations, Assembly Operations, and Adjustments: Comply with NFPA 70 and IEEE C2.
C. Make electrical installations complete and ready for service.
D. Install electrical equipment in accordance with directions furnished by manufacturer’s instruction books.
Amendment No. 001
Basic Electrical Materials and Methods 26 05 02 - 3
E. Drill holes in bolted steel structures and provide fastenings required for mounting or installing electrical equipment and materials.
F. Do not drill holes in tubular steel structures. Fasten to tubular steel structures by means of properly drilled and tapped pads or brackets welded to tubular members.
G. Installation of electrical equipment includes:
1. Leveling channel bases.
2. Drilling holes, furnishing hardware, and assembling components to each other.
3. Furnishing materials for and making all connections correctly in accordance with final wiring diagrams.
4. Tagging wires and cables at each end.
H. Grout electrical equipment installed on concrete foundations in place to provide full and even bearing.
I. Puget Sound Energy Interconnect:
1. Coordinate with Puget Sound Energy prior to installation of any electrical components to verify utility interconnection, including location and interconnection details.
3.02 REPAIR
A. Repair damaged painted surfaces of equipment to match original finish.
3.03 FIELD QUALITY ASSURANCE
A. Government will inspect electrical equipment during construction. Acceptance of equipment will be made after equipment is operational.
B. All equipment field tests to be…