This document is a set of Questions and Answers related to a federal contract opportunity for the Montgomery Meadow Fuels Reduction project managed by the Department of Agriculture Forest Service.

The key details are:

  • The solicitation calls for using a rubber tire excavator, which is an Archaeologist requirement, not a typo.
  • Existing stumps over 12 inches high need to be lowered.
  • The period of performance may be extended from 7 to 14 calendar days if needed.
  • The solicitation requires sub-meter GPS accuracy and accepts the use of Avenza, even though it may not be the most accurate option.
  • The overall project entails hand felling and machine/hand piling of standing dead and down conifers outside of Montgomery Meadows for the Stanislaus National Forest, as detailed in the attached Request for Quote.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

1) The solicitation states using a rubber tire excavator. Was this a typo? Shouldn't it read rubber track excavator? No this is not a typo. This is an Archaeologist requirement.

2) There are many existing stumps that are over 12" high. Do these need to be lowered? Yes

3) Can the period of performance be extended to 14 calendar days instead of 7? This can be extended if needed.

4) The solicitation states that the GPS must be sub meter accuracy and it recommends to using Avenza. Avenza is typically not that accurate. Is Avenza still acceptable? Avenza is acceptable.