This document is a Questions and Answers file for a Department of Homeland Security (DHS) mechanical retrofit project (Solicitation 26-444DHS-MENTH-B-49254) involving cooler and freezer equipment replacement. The project requires retrofitting multiple coolers (specifically Coolers 3-7) with new mechanical systems, including compressor packs, evaporators, and thermostats, with a mandatory completion date of 6/30/26. A pre-submission conference was held to address vendor inquiries, covering technical specifications such as refrigerant requirements (404 or 428), single-point electrical connections, and concrete pad extensions. The project involves providing temporary 52-foot refrigerator and freezer trucks during installation, with the existing freezer remaining operational throughout the project.

Key project logistics include vendor responsibilities for fuel supply for trailers, employee background checks, and maintaining continuous cold storage capabilities. The facility will provide supporting documentation like blueprint images and a 55-gallon transfer tank. Specific technical requirements include installing mechanical thermostats, using existing or creating new pipe penetrations, accommodating four 30-minute defrost cycles per 24-hour period, and ensuring equipment meets or exceeds Cold Zone specifications. The awarded vendor must submit a comprehensive employee list for site access, and all submitted projects will undergo a responsiveness review against the minimum specifications outlined in Section 1.2 of the solicitation documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/23/25 Pre-submission Conference Meeting Questions/Answers

26-444DHS-MENTH-B-49254

FY26 PIF Cooler Mechanical Retrofit

Q1:Is there room for separate condensers?
A1:No separate condensers, as there is not room. Per section 1.2.10.5, only One compressor pack.
Q2:Is the electricity fed out of an emergency panel?
A2:No, electricity is not fed out of emergency panel. Electricity is fed from AB Mechanical room closest to Dietary. The building is fed from a generator when power goes out.
Q3:How are thermostats to be installed?
A3:Per Section 1.2.10.5, Vendor to install mechanical thermostats on evaporators.
Q4:The bid mentioned concrete work, what does this entail?
A4:Outside concrete pad needs to be extended per Section 1.2.3, if the new unit doesn’t fit on the existing pad.
Q5:Single-point connection?
A5:Yes
Q6:Will there be a submittal review?
A6:All submitted projects will be reviewed for responsiveness in meeting minimum required specifications as located in Section 1.2.
Q7:Refrigerant required?
A7:Facility wants 404 refrigerant, as per section 1.2.10.3. If 404A is not available, then 428 refrigerant will be acceptable.
Q8:Does the facility want all new drain piping?
A8:New drain piping only required in places where existing drain lines are removed in completion of the project.

Additional Notes that were discussed during the Pre-submission Conference

· Freezer will remain active when the coolers are being replaced.

· Vendor is responsible for fuel supply for trailers. Must be fuel fed, as there is no place to run electrical power.

· The facility will supply a 55 gallon barrel running on a 12 volt for transfer tank.

· Project completion date is required by 6/30/26.

· Awarded vendor must submit a complete list of employees that will work on site. Facility will complete a background check on all onsite employees.

· Shelves inside cooler are permanent.

· Facility will supply padlocks for trailers.

· Coolers 3 – 7 will be completed first. Any prep work that can be completed prior to the shut down of these coolers should be done.

· There are four, 30-minute defrost cycles in a 24 hour period.

· Freezer 2 requires a heat trace.

· The use of the existing holes for existing outside pipes will be easier, but new holes can be used for new pipe, if needed.

· All evaporators are fed out of the electrical room except the freezer.

· Awarded vendor will supply one 52-foot refrigerator truck and one 52-foot freezer truck for temporary use while project is executed.

· “Cold Zone” equipment not required but must be equal or equivalent to Cold Zone.

· The facility will provide pictures of the blueprint to be attached to the bid.