Engineering Blueprints.pdf

PDF 4 MB Posted

Attached to
TDF - FY26 PIF Cooler Mechanical Retrofit
Solicitation number
26-444DHS-MENTH-B-49254
Issued by
Shelby County, Illinois

About this file

The provided document is a detailed engineering and electrical wiring diagram for a refrigeration system, specifically for the Illinois Youth Center project (Job Number: 118421). The technical drawings include a comprehensive equipment summary from Coldzone Engineering, showing power supply specifications, electrical defrost wiring diagrams, outline drawings, and system wiring schematics. The documents cover multiple system configurations (Systems A through G), detailing electrical connections, condenser fans, and refrigeration line setups.

The technical specifications outline precise electrical requirements, including a 460V/3PH/60HZ power supply, transformer details, and specific wiring configurations for various refrigeration components. The drawings provide detailed instructions for installation, including clearance requirements, fan motor connections, and drainage line specifications. The document appears to be a complete technical package for a complex refrigeration system installation, with meticulous attention to electrical, mechanical, and structural details necessary for proper system deployment at the Illinois Youth Center facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMG_1855.pdf

IMG_1856.pdf
IMG_1857.pdf
IMG_1858.pdf
Cold Zone blueprint.pdf

File details come from the government source that posted it. Updated .