This document contains the questions and answers from the pre-bid conference for the TDF PIF Gym Floor Resurfacing IFB (Invitation for Bids) issued by the state of Illinois. The IFB is seeking bids for the removal and disposal of approximately 12,000 sq ft of existing gym carpet flooring and the installation of new Gerflor Taraflex Sport M Plus flooring or equivalent. The pre-bid conference allowed vendors to ask questions about the project, including details on the existing flooring, site access, power sources, timeline, and permissible alternates. The IFB states that all work must be completed by June 30, 2023, and that only SBSA (Small Business Set-Aside) vendors may submit bids. The facility has stated a preference for a grey wall base and that no trim should be included in the bids.

Regarding pricing, the IFB indicates that alternate flooring products may be bid, but they must meet the same safety rating as the specified Gerflor flooring. Vendors were also informed that no background checks will be required for their employees, and that a forklift will be available to assist with removing and disposing of the existing carpet.

View the file

Other files

File Type Posted
ipg-active-registered-vendor-disclosure-v.23.1.docx DOCX document
B-34773 Notice of Award Form.pdf PDF
RMO50-B-34773.docx DOCX document
Floor Plan.PDF PDF
DHS IFB TDF Gym Floor Resurfacing-B-34773.docx DOCX document
Printed copy of Pre-Submission Conference Sign-in Sheet.pdf PDF
Mandatory Onsite Visit Guidance for Vendors-B-34773.docx DOCX document
Notice of Electronic Submission Only v.22.1~67.pdf PDF
COVID Notice~9.docx DOCX document
Sample 2.jpg JPG image
Sample 1.jpg JPG image
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-34773 TDF PIF Gym Floor Resurfacing IFB Pre-bid Conference Questions

Vinyl trim, nor any other trim, does not currently exist in the gyms and the facility does not want any trim installed, do not quote in bids submitted.

Wall base will be grey. Work will be performed M-F 7am – 3pm. The entrance to the gyms is a door that is 32x80. You will enter the facility through the Sally Port and use the back entrance of the gyms. The flooring we are requesting is the same flooring in the gym at the Rushville Community Center.

1. What is currently on the floor? Any asbestos?

A. Carpet. No.

2. When was the building built? Is the carpet original to the build?

A. 2002. Yes.

3. Can they look at the community center gym?

A. Vendors were allowed to look at the gym during the pre-bid meeting.

4. Can carts be brought in?

A. Yes, but if they are left at the facility, they must be locked up overnight. All tools and materials must be in a locked up gang box if left overnight as well.

5. Can a trailer be left on site? Can tools be left in it?

A. Yes and yes, but it must be locked up overnight. Also, all vehicles on property should be locked and no keys left inside while on grounds.

6. Can the color selection of the flooring be confirmed?

A. Yes – a color sample was shown to the group and attached to bid amendment. Please see attachments titled “Sample 1” and “Sample 2” for details.

7. What power sources are available?

A. 110 outlets, 10 amp breakers

8. Any lines on the court other than basketball, like pickleball or volleyball?

A. No

9. How many courts in each gym?

A. 1

10. Will items be removed from the gym?

A. Yes, all weight equipment will be removed

11. What will be on the new floor? Mats?

A. All weight equipment is currently on mats. We are aware that if a weight is dropped on it and damages the floor, it voids the warranty

12. What is the thickness of the concrete under the carpet?

A. Not exactly sure but believe it to be 8 inches

13. Is a floor plan available?

A. Vendors attending the meeting were allowed to take pictures of the floor. Floor plan also available on bid amendment. Please see attachment titled “Floor Plan” for details.

14. Are there bleachers or any other furniture?

A. No

15. What about a dumpster?

A. The closest we will be able to get it will be about 100 yards away. The facility has a forklift and is willing to let you stack the carpet being removed on it and use that to take to the dumpster by facility staff.

16. Will background checks be completed on vendor employees?

A. It is not common practice for us to conduct background checks. Please refer to 4.15 in the IFB though.

17. Since there is no trim, how would the facility like to see the trim that butts up to the wall?

A. Caulk

18. Any subflooring under the carpet?

A. No, just concrete

19. Last day to submit questions?

A. 5pm on February 17

20. Alternate flooring accepted to be bid? For example, a flooring that may be more suitable for weights to be on it?

A. Yes, the bid says or equivalent, but you cannot bid, as an example, rubber poured flooring when everyone else will be bidding the flooring requested

21. If an alternate flooring is bid, does the safety rating need to match what is requested in the bid, ASTM F2772 Standards?

A. Yes

22. What is the work timeline?

A. You cannot begin work until you receive the fully executed contract, and all work must be completed by June 30, 2023.