Questions and Answers-B-33745.docx
DOCX document 14 KB Posted
- Attached to
- IFB-FY23 Wall Coverings for Residential Units
- Solicitation number
- 23-444DHS-DEVDI-B-33745
- Issued by
- Lasalle County, Illinois
About this file
This document is a Questions and Answers sheet related to an Invitation for Bid (IFB) from the Illinois Department of Human Services for wall coverings in two of the seven residential buildings at the Jack Mabley Developmental Center. The IFB requires providing and installing protective wall coverings, with all work to be completed by June 30, 2023. The document addresses questions about the epoxy application process, material specifications, and availability of floor plans. It confirms that offsite epoxy application is required and that detailed specifications can be found in the IFB document.
The contract opportunity is limited to Small Business Set-Aside (SBSA) vendors only. The IFB requires electronic submission through the BidBuy procurement platform, and no paper responses will be accepted. Pricing terms, funding sources, and award details are not provided in this Questions and Answers sheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RMO50-B-33745.docx | DOCX document | |
| Mandatory Onsite Visit Guidance for Vendors-B-33745.docx | DOCX document | |
| DHS IFB-Mabley Center Wall Protective Coverings-B-33745.docx | DOCX document | |
| Forms B~92.docx | DOCX document | |
| COVID Notice~19.docx | DOCX document | |
| Notice of Electronic Submission Only v.22.1~58.pdf | ||
| A5 Floor and Roof Plan- Res Unit.pdf | ||
| B-33745 Notice of Award Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB-FY23 Wall Coverings for Residential Units B-33745 Questions and Answers
Q1. Is there an area on site to apply the epoxy, or do we finish the panels off site and transport them to the site?
A1. We do not maintain adequate workspace for the epoxy process. The panels will need the epoxy applied offsite and only arrive once they are completed.
Q2. Do you have MSDS sheets for the Epoxy?
A2. No.
Q3. Do you have detailed Specs (flake size, classifications for fire ratings and smoke ratings) for the epoxy?
A3. All specs can be found in Section 1.2 of the IFB document.
Q4. Can you provide floor plans.
A4. A separate attachment titled “A5 Floor & Roof Plan-Res Unit” has been attached in BidBuy
Q5. When do you require the installation.
A5. All work must be completed by June 30, 2023.