This is a Questions and Answers document related to a fuel tank repair project issued by the Commonwealth of Pennsylvania Department of Transportation for work in Potter County. The document addresses bidder inquiries regarding a 15,000-gallon above-ground diesel fuel tank located at 7 W Locust Street, Coudersport, Pennsylvania. Key specifications clarified include external tank dimensions of 10 feet 6 inches round by 26 feet 8 inches long, with a 13-inch manway opening located at the top center. The scope of work requires cleaning and removing residual liquid and sludge, sandblasting the interior to manufacturer specifications, applying a Bar Rust 236 coating at 5-6 mil finish, performing quality checks and repairs, and reinstalling the manway. The document confirms that sandblasting is the required cleaning method and cannot be substituted with alternative approaches. Tank drawings were unavailable at the time of this response, though personnel were continuing search efforts. An optional site inspection is available by contacting Brittany Ianson or Andi Fourness at 814-274-9181 during Monday-Friday business hours, 7:00 a.m. to 2:00 p.m. Questions were due October 21, 2026 at 1:00 p.m. EST, with bids due October 23, 2026 at 11:00 a.m. EST via the PA Supplier Portal.
All work must be completed by June 30, 2027, with contractors required to comply with prevailing wage rates and file weekly payroll certifications. The contractor must obtain all required permits, inspections, and environmental sampling and testing, and must employ a Pennsylvania-certified Technical Level person on-site for the entire operation as required by the State Department of Environmental Protection. A minimum one-year limited warranty on work performed and parts installed is required. Insurance requirements mandate Worker's Compensation and Public Liability and Property Damage Insurance with minimum coverage of $250,000 per person and $1,000,000 per occurrence, naming the Commonwealth as additional insured. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must register in the Commonwealth's Vendor Master file and submit electronically completed documentation including the IFB, BOP-2201 Worker Protection and Investment Certification Form, Certificate of Insurance, Domestic Workforce Utilization Form, Trade Secrets/Confidential Proprietary Information Notice Form, and GSPUR-89 Reciprocal Limitations Form. Pennsylvania resident bidders may claim preference status under the Reciprocal Limitations Act with appropriate documentation of bona fide business establishment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Terms and Conditions.pdf | ||
| Prevailing Wage Determination.aspx.pdf | ||
| ReciprocalLimitationsActPreferencesList.doc | DOC document | |
| OS-34 - Addendum 1 - RFx 6100066803.docx | DOCX document | |
| Trade Secret Confidential Proprietary Information Notice.pdf | ||
| OS-34 - Addendum 2 - RFx6100066803 - QandA.docx | DOCX document | |
| Domestic Workforce Utilization Certification Form.doc | DOC document | |
| Worker Protection and Investment Certification Form (BOP 2201).docx | DOCX document | |
| Statement Of Work - Potter County PennDOT Fuel Tank Repair - SBR.docx | DOCX document | |
| Statement Of Work - Potter County PennDOT Fuel Tank Repair.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
There some questions that were asked:
1. Current photos of the tank
• Answer: see pictures below
2. Tank Dimensions
• Answer: External dimensions are 10ft 6 in round tank X 26ft 8in long
3. Dimensions and locations of the manway and any other access openings
• Answer: Manway top center of tank 13” opening
4. Any available tank drawings
• Answer: Sorry we are unable to find any. We still have people looking. If they are found they will be added.
5. Would we consider a different way to clean the tank other than sand blasting?
• Answer: No. It was bid for sand blasting. We can not change the
Statement Of Work now.
Pictures of the outside of the tank:
Pictures from inside the tank (the best we could do):