Quantico Tower RFP - Attachment 7 - Construction Cost Breakdown.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Observation Tower Quantico - Request for Proposal Federal contract opportunity
Solicitation number
N6426722R0014
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This solicitation requests proposals for the construction of two observation towers at Marine Corps Base Quantico. Offerors must submit electronic PDF proposals to justin.porter3@navy.mil by the response date in the posting. The Naval Surface Warfare Center Corona Division will award a firm-fixed-price contract to the responsible offeror whose conforming proposal is most advantageous based on the evaluation criteria. The anticipated contract type is firm-fixed-price for an all-or-none requirement, with the Department of the Navy Naval Sea Systems Command as the contracting agency. Offerors must be registered in SAM and inspect the work site prior to proposing. Amendments will be posted on the website, so offerors should check for updates frequently.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Option 0001

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Option 0002

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

BACK

INSTRUCTIONS FOR COMPLETING

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.

Col 2 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 3).

Col 3 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB).

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for the item listed in column 1.

Col 6 and 7 Labor Costs. Enter in col 6 the average rate per manhour or manday and in col 7 the total cost needed to perform the work listed in column 1.

Col 8 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 9 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total plus overhead and profit will be shown on the last page as follows.

TOTAL MATERIAL COSTS$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEAD%$0.00
PROFIT%$0.00
SUBTOTAL$0.00
BOND%$0.00
TOTAL PROJECT COST$0.00

DATE FIRM NAME

TITLEBY
(Signature)

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .