Quantico Tower RFP - QA(006).xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Observation Tower Quantico - Request for Proposal Federal contract opportunity
Solicitation number
N6426722R0014
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains questions and answers related to a solicitation for the construction of two observation towers at Marine Corps Base Quantico in Virginia. The Naval Surface Warfare Center Corona Division requires firms to provide all labor, materials, equipment and supervision to build two aluminum observation towers, including prefabricated steel containers, stairs, handrails, roof canopies and exterior coatings. Proposals are due by May 24, 2022. The period of performance is 180 calendar days from notice to proceed. The government will award a firm-fixed-price contract to the responsible offeror with the most advantageous proposal based on evaluation criteria for experience, past performance, and price. This requirement is set aside for certified HUBZone small businesses only.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions

Observation Tower Quantico
Notice ID: N626722R0014's/ Dept. Navy / NAVSEA /CONTRACTOR QUESTIONSDOCUMENT REFERENCEAnswer
1I’m contacting you regarding opportunity N6426722R0014. The SAM.gov listing states Norco, CA as the place of performance for this solicitation. However, the RFP states work will be performed at Marine Corps Base Quantico, in Quantico, VA. Could you provide quick clarification on this? (Also firms may be filtering by SAM place of performance, so a lot of HUBZone firms may miss this listing in its current state)
The mistake has been fixed. The place of performance is Quantico VA.
2I am planning to attend the site visit next week for the NAVFAC Observation Tower Quantico - N6426722R0014. DBIDS required the name, phone number and e-mail address for the sponsor. The POC is listed as Angela Gavalas with a phone number listed, but no e-mail. If you are able to provide this information, it would be greatly appreciated. I did try to reach out directly to Angela, but have not yet heard back from her.Section L, FAR 52.236-27The email address for Angela Gavalas-Fields’ email will be added to the 1442 today through an amendment.

Angela’s email address is angela.fields@usmc.mil.

3We have just received notice from SAM on the posting of this RFP, on initial review of all the documents we were excited to participate and started preparing… One thing we notices was on the SAM site it has one statement “Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)” but then the solicitation does not identify this set-aside… If in deed the Set-Aside is HUBZone, we will be unable to participate… Can you please provide clarity on the actual Set-Aside?FAR 19.13This requirement is set-aside for only certified HUBZone contractors to make an offer.
4What is the last date for submitting RFIs?Section L, Para 1.1All RFI’s must be submitted by May 19th, 2022 at 12:00 pm PST.
5a) Can we submit under a HUBZone Joint Venture?

b) If so, for HUBZone Joint Venture Offerors, will relevant past performance performed by either Partner be rated as Acceptable?

FAR 19.1303We will accept proposals from Offerors in accordance with FAR 19.1303.
6Please clarify if the 1 to 3 past performance narratives refer to the offeror AND the proposed subcontractors combined? Or if we need to provide 1 to 3 each for the offeror and the proposed subcontractors?Section L, Para 4.3.1Section L, Para 4.3.1 of the solicitation states that offerors shall provide at least one (1) and no more than three (3) Past Performance Narratives with their proposal. This includes subcontractors.
7Please advise what are the dates within which the relevant experience must be performed. Since the Government fiscal year runs from October 1 to September 30, is the period for performance of relevant experience from October 1, 2019 to September 30, 2021? If this is not the case, please provide the dates between which relevant experience must have been performed.Section L, Para 4.3.1Relevant experienced should be work conducted no earlier than Government fiscal year 2019.
8a) Is it the Government’s intent that Offeror’s provide a narrative that demonstrates their understanding of the requirements and explains how they plan to fulfill them?

b) If the Government wants Offerors to demonstrate their capability, what data should the Offerors provide to demonstrate capability other than citing past projects and verifiable project evaluations for past relevant work?

c) Please clarify what the requirements are for this section.

Section L, Para 3.1Yes. Offerors shall provide a narrative in 20 pages or less on the steps and procedures they will take to accomplished the outlined requirements in section C.
9Are Offerors required to demonstrate their understanding of the requirements and provide a description of any engineering, design, technical, and logistics support required?Engineering details and designs are included as attachments to the RFP on SAM.gov. Offerors do not need to include their own.
10Typically, we provide a copy of certificate of insurance after contract award. Please advise.Section C, Para 4.3.2Per Section C 4.3.2, a Certificate of Insurance meeting the requirements at C-228-H002 must be provided within 15 calendar days after award.
11Please advise what actions the Government will take to alleviate the problem of

offerors’ guaranteeing pricing validity for 120 calendar days in the current inflationary environment. At present, subcontractors (and suppliers) are only guaranteeing their prices for 10 to 30 days maximum. In 2021 the Federal Reserve Producer Price Index for Construction Materials increased over 30%. Steel increased over 100% in the past year. The length of time from submission of the contractor’s guaranteed bid to contract award often exceeds the validity of the subcontractor’s guaranteed price.

Please include escalation in your proposal to account for these projected costs.
12Coating system call for polyuria VF-50 DM. Would the Contracting Officer consider a 2 or 3 part coating system similar to a Military fuel tank application to prevent corrosion? This would provide a far more uniformed appearance and cost effective than a 40 mil VF-50DM coating.
Section C, Para. 6.4.1The Government approved equivalent may be used in accordance with the Section C,. The MSDS and product specification sheets must submitted to the Government for review and approval for the substitution.
13If Polyuria VF-50 DM is required to be used does this apply to the undercarriage of the containers?Section C, Para. 6.4.1Yes, coating the undercarriage of the structure is required by the contract.
14Please confirm that the onsite staff requirement is 1x Superintendent/SSHO and 1xQC?Section C, Para. 4.3.1/4.12.1The project Superintendent/SSHO may also perform as the QC Manager. One (1) person may perform all three (3) roles on this contract.
15180 Calendar days with current lead times and a reasonable submittal approval period prior towards fabrication may not be enough time. Would contracting officer consider adding 60 days for a precon period for submittals and fabrication releases?Section C, Para 4.2.2No, the delivery date will remain at 180 calendar days from Notice to Proceed unless there are unforeseen circumstances.
16Would facility allow extended hours and or weekend access to aid in complying with 4.13.1 "minimizing impact to operations"Section C, Para, 4.13.1Yes, the contractor may submit a request to extend the core working hours as defined in section 4.2.3(f) of the Section C,.
17Would the contractor have any major cause for concern for UXO's? If so please provide UXO protocol.Section C, Para, 4.14.1The project has been granted site approval and a CATEX which identify potential UXO risks. Currently the risk of UXOs impacting this project is low.
18For spreading of excess soils as directed MCBQ will the contractor be responsible for providing State ENS required cover such as Seed, straw, mulch ext? Or is the intent of MCBQ for this soil to remain untreated?Section C, Para 4.15/4.14.2The contract does not require ground cover on areas where excess soils are spread.
19Will GPRS be allowed onsite as means for 3rd party locating of for existing utilities? If not please define allowed methodsSection C, Para. 5.1Yes, the use of GPRS is allowed on the project site.
20Will the contractor be responsible for Geotechnical borings to ensure soil for tower pad is stable and current design is suitable?Section C, Para. 5.1No, soil investigations are required by the contract. The Government will inspect the compacted subgrade to ensure that it is suitable and meets the intent of the design.
21Since this project was designed by the Navy was a bench mark identified?Section C, Para 5.2.2Project site benchmarks/ control points are identified in sheets C-101 of the associated design drawings.
22If no geo-technical borings were done for a 3 story facilities foundation, how do we know if the subgrade is suitable to place the structure?Section C, Para 5.2.4The project design is based off historical data and professional judgement. The design also accounts for anticipated loading, risk category and structure use classification. The Government will inspect the compacted subgrade to ensure that it is suitable and meets the intent of the design. If the soils are determined to be not suitable for the foundation, a contract modification will be executed to account for existing conditions.
23As a reference to question 1, section 6.4.4 asks for a 40Mil Thick layer of nonslip VF-50-DM Polyuria or approved equal to cover the reflective surface. Would it be assumed that an approved equal may be used for the exterior coatings of the containers?Section C, Para 6.4.1A Government approved equivalent may be used in accordance with the Section C,.
24The safety railing design is defined in the drawings. Has this design been calculated/tested to know if it can withstand a 500lb concentrated load?Section C, Para 6.4.5No, the designed hand rail has not been tested or certified.
25Is the Polyurea coating defined in section 6.4.5 specifically required or is an approved equal acceptable?Section C, Para 6.4.5A Government approved equivalent may be used in accordance with the Section C,.
26Section 6.6 states that the electrical shall comply with NFPA 70/780. It is assumed that the only electrical as stated is lightning protection and Grounding. Please confirm that further electrical design is not forth coming or that it is not the intent of the GOV to have the contractor provide an energized building with panels, transformers and outlets?Section C, Para 6.6No other electrical scope will be included in the contract.
27Is there a Bidder questions/RFI deadline?Section L, Para 1.1.All RFI’s must be submitted by May 19th, 2022 at 12:00 pm PST.
28Will the contractor be responsible for building permits?Section I- Clauses Incorporated by Reference.Refer to FAR 52.236-7 cited by reference in section I
29Is there a preferred vendor for the containers? Must the containers be brand new?Section I, FAR 52.236-5The container must meet all specifications and standards outlined in the 1442 and attachments. In accordance with FAR 52.236-5, "All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract."
30Is there any specs (ISO code) we can use to get the right containers?Design drawingsNo specific ISO code is applicable. Containers must be pre-fabricated to meet the requirements identified in the Section C, and construction documents.
31Will the contractor need to provide escorts?Section C, Para 4.2.4(f)The Contractor is not required to provide escorts at the project site. Range control may assign military personnel to escort Contractor employees as necessary at no additional cost to the Contractor.
32Would private/non-government work qualify for past performance?Section M, Para 1.2Past performance will be evaluated in accordance with FAR 15.305(a)(2) and FAR 42.1502(g).
33UXO signs were present at the range sites. Have areas been verified clear of unexploded ordinance?Section C, Para 4.14.1The project has been granted site approval and a CATEX which identify potential UXO risks and hazards. At this point there are no known existing UXOs.
34Tree branches were overhanging access roads to range sites. Will these be trimmed back to allow clear access for crane delivery?If tree trimming is required, the contractor will have to coordinate with MCBQ in advance. The Government will cover the costs and scheduling for the tree trimming. Due to environmental impact, tree trimming can only be completed after September 15.
35Are only citizens allowed to enter and work in the facility? Are permanent residents allowed?Section C, Para 4.2.3(a)Applicable access requirements are defined in Section C, section 4.2.3(a). Contractors must contact the MCBQ Visitor Control Center for additional specific information.
36Can we get a one week extension on the bid due date?At this time the Government does not intend to extend the bid due date.
37Can arrangements be made for contractors who missed the scheduled site visit to view the site before offers are due.No further accommodations for viewing the construction site can be made at this time.
38Are all the hand railings including on the roof made of aluminum material?General Sheet Note 9 on sheets A-201 and A-301. Sheets S-504, S-505, S-506, S-507, S-508 and S-509The contract requires the stairs, landing and handrails associated with the stair system to be constructed with aluminum. The material for the roof level handrail is primarily HSS tubing.
39On-site welding is not allowed for the stairs and roof canopy work. Is on-site welding allowed for the container structure?On-site welding is not allowed for any work activity.
40A discrepancy exits between the Section C, and the bid drawings, Section C, calls for polyurea on all exterior surfaces, bid drawings call for polyurea on the roof only. Does the government want all exterior surfaces coated with the polyurea, to include the stairs and canopy. (Section C, 6.4.1 Exterior Coatings vs A-201 Notes 1 & 2)General Sheet Note 6 on sheets A-201 and A-301There is no discrepancy in the contract documents. Please reference General Sheet Note 6 on sheets A-201 and A-301 for clarification.

The requirement is for all exterior surfaces to be coated with polyurea.

41 The drawings call for the stairs and awning to be constructed of Aluminum, but the details show much of it as HSS (high strength steel tubes). The Aluminum construction is possible but would be pricey. Our question is Aluminum or Steel construction, and coated with polyurea or paint. (A-301 Note 7 vs S-508) Sheets S-521, S-522, and S-523. The contract requires the stairs, landing and handrails to be constructed out of Aluminum. Stair system is not required to be painted. Please reference General Sheet Note 9 on sheets A-201 and A-301 for clarification.

Roof Canopy requirements are defined in sheets S-521, S-522 and S-523.

Sheet S-508 only identifies requirements for the handrail system located on the roof level of the structure.

42180 days period of performance is tight. I would request 240 days to give us some wiggle room on the site work, weather, and other work that may be in house when the order lets.The Government currently has no plans to extend the period of performance.
434.3.1 states "The Superintendent may serve as the Site Safety and Health Officer".

4.12.2 states :The Superintendent may serve as the QC Manager on this project".

With these two statements we would like to clarify that one person may serve as SSHO, QC and Superintendent.SOW, para 4.31 and 4.12.2.Yes, one person may serve as SSHO, QC, and superintendent.
44Is there any specs/detail for the open cell moisture barrier?The open cell moisture barrier requirements identified on sheets S-504, S-505 and S-506 are no longer applicable and have been removed from the 100% design drawings and Issue for Construction set of drawings.
45Can both observation towers be built concurrently?Yes.
46Drawings provided are 100% - Not issued for installation. Is this a design build project and are to use the 100% drawings for reference? Or is this a design-bid-build and we are to build off the 100% drawings provided?Proposals shall be based on the drawings provided.
47Since both towers will be on ranges, will the Government provide UXO monitoring?Please see answers to questions 17 & 33.
48Confirm that the Government will allow proposers a minimum of seven (7) days to respond to the RFP starting from the date that the Government responds to 100% of the RFIs received.The final draft of the Q&A will be posted on Friday 5/20. Proposals are due on Tuesday 5/24.
49The Solicitation is silent regarding the extent to which offerors may use the experience and past performance of affiliated entities. It only refers to predecessors, key personnel, and subcontractors, while providing no justification for any implied limitation. The GAO has found solicitations that restrict the ability of an offeror to provide the experience and past performance of its affiliates, even where those affiliates will participate meaningfully in contract performance, to be unduly restrictive of competition. Accordingly, we respectfully request that the Government amend the solicitation to expressly permit the submission of experience and past performance projects completed by parent companies, affiliated entities, and subsidiaries in support of the Experience and Past Performance requirements.Please see the answer to question 32. Past performance will be evaluated in accordance with the FAR and supplements. If there is a class deviation or ruling that deviates from the FAR, please advise. Also, this solicitation is being extended but not for this reason.
50Section 4.3 page 59 states: The narratives shall reflect recent (work performed within the previous three (3) Government fiscal years) and relevant experience. The efforts identified should be relevant in that they are of similar scope, size, and complexity to the effort in this solicitation and provide the most context and ability to measure whether the Offeror will successfully satisfy the current requirement. Please indicate if this is contractor fiscal year or from the date of the release of the RFP. Also please designate the fiscal year to start with (2022 or 2021).See answer to question 7.

&"Arial,Bold"FA8903-21-F-XXX Repair Fuel Tanks 483, 484, 1272, 1273, 2203, 2204 and 2205 March ARB, CA Combined Questions and Answers