Quantico Tower RFP - Attachment 4 - R7 Design Drawings.pdf
PDF 9 MB Posted
- Attached to
- Observation Tower Quantico - Request for Proposal Federal contract opportunity
- Solicitation number
- N6426722R0014
About this file
This is a solicitation for construction services to build two observation towers at Marine Corps Base Quantico. The Naval Surface Warfare Center Corona Division seeks a firm-fixed-price contract for the project. Offerors must visit the site and submit electronic PDF proposals by the response date listed. Proposals will be evaluated on criteria in Sections L and M of the solicitation. The government will award a single contract to the responsible offeror whose proposal is most advantageous based on evaluation. Offerors must register in SAM and all responsible sources may submit. Any amendments will be posted on the website, so offerors should check for updates.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISSUE DATE:
MARCORSYSCOM - PM TRASYS
MARINE CORPS BASE QUANTICO, VA
RANGE 7
OBSERVATION TOWER
100% DESIGN PLAN SET - NOT ISSUED FOR INSTALLATION
02-NOV-2021
WARFARE CENTERS
CORONA
M . P
IE
R
C E
M . P
IE
R
C E
G . M
AR
TI
N
EZ
D . G
AR
D
N
ER
C O
VE
R
S H
EE
T
G-001
D
ES
C R
IP
TI
O N
A
M
AR
K D
AT
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
N
AV
AL
S
U R
FA
C
E W
AR
FA
R E
C
EN
TE
R
C O
R O
N A
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E: C
AG
E:
D
IS
TR
IB
U
TI
O N
C : L
IM
IT
ED
T
O T
H E
D
EP
AR
TM
EN
T
O F
D
EF
EN
SE
A G
EN
C
IE
S
AN
D
T H
EI
R
C O
N
TR
AC
TO
R S.
O
TH
ER
R
EQ
U
ES
TS
F O
R T
H
IS
D O
C U
M
EN
T
SH
AL
L
BE
R
EF
ER
R
ED
T O
D
EV
EL
O
PM
EN
T
EN
G
IN
EE
R
IN
G
D
IV
IS
IO
N (R
S3 0)
AT
N
AV
AL
S U
R
FA
C E
W
AR
FA
R
E C
EN
TE
R , C
O R
O N
A.
PE
R D oD I 5
0.
F
O R
C O
N
TR
O
LL
ED
U
N C
LA
SS
IF
IE
D
IN
FO
R
M
AT
IO
N
(C U
I).
WARFARE CENTERS
CORONA
UNCLASSIFIED - CUI
UNCLASSIFIED - CUI
D
EV
EL
O
PM
EN
T
EN
G
IN
EE
R
IN
G
(R S3
0) P.
O . B
O X
C O
R O
N A, C A
8-
AN
SI
D
6D D
TE
M
PL
AT
E
VE
R
SI
O N
.0
JU
LY
D . G
AR
D
N
ER
N
O V
M
AR
IN
E
C O
R
PS
B
AS
E Q
U
AN
TI
C
O , V
A R
AN
G
E
O
BS
ER
VA
TI
O
N T
O W
ER
100% DESIGN PLAN SET - NOT FOR CONSTRUCTIONPlotted: 01-Nov-2021 18:14MCBQ-R7-G-001.DWG
SITE LOCATION PROJECT SITE
R7 OBSERVATION TOWER
R7 OBSERVATION TOWER
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 GENERAL INFORMATION
G-003 GENERAL NOTES
G-004 GENERAL NOTES
G-005 GENERAL NOTES
CIVIL
C-101 SITE SURVEY
C-102 SITE PLAN
C-103 GRADING PLAN
C-104 GRADING PLAN SECTIONS AND DETAILS
ARCHITECTURAL
A-201 FLOOR & ROOF PLANS
A-301 ELEVATION VIEWS
STRUCTURAL
S-101 FOUNDATION PROFILES
S-501 FOUNDATION DETAILS
S-502 FOUNDATION REBAR DETAILS
S-503 CAST-IN ANCHOR DETAILS
S-504 CONTAINER WATER CONTROL DETAILS
S-505 CONTAINER WATER CONTROL DETAILS FOR NON-DOOR END
S-506 CONTAINER WATER CONTROL DETAILS FOR DOOR END
S-507 HANDRAIL PLANS AND ELEVATIONS
S-508 HANDRAIL FRAMING DETAILS
S-509 HANDRAIL FRAMING DETAILS AND WELD STUD STRIP PLANS
S-510 HANDRAIL CONNECTION TO CONTAINER STRUCTURE DETAILS
S-511 HANDRAIL CONNECTION DETAILS
S-512 PARAPET WALL CONNECTION DETAILS
S-513 WINDOW FRAME DETAILS
S-514 WINDOW DETAILS
S-515 DOOR FRAME DETAILS
S-516 DOOR FRAME DETAILS
S-517 DOOR FRAME INSTALLATION DETAILS
S-518 DOOR DETAILS
S-519 ROLL-UP DOOR & FRAME DETAILS
S-520 ROLL-UP DOOR FRAME DETAILS
S-521 ROLL-UP DOOR FRAME DETAILS
S-522 ROLL-UP DOOR DETAILS
S-523 ROLL-UP DOOR DETAILS
S-524 ROOF CANOPY SYSTEM
S-525 ROOF CANOPY SYSTEM
S-526 CANOPY FRAMING DETAILS
S-527 ELECTRICAL MAST SUPPORT
ELECTRICAL
E-001 ELECTRICAL GENERAL INFORMATION
E-002 ELECTRICAL GENERAL NOTES
E-101 ELECTRICAL SITE PLAN
E-102 LIGHTNING PROTECTION FLOOR PLANS
E-103 LIGHTNING PROTECTION FLOOR PLANS
E-104 LIGHTNING PROTECTION ROOF PLANS
E-201 NORTH ELECTRICAL ELEVATION
E-202 SOUTH ELECTRICAL ELEVATION
E-203 EAST ELECTRICAL ELEVATION
E-204 WEST ELECTRICAL ELEVATION
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
N
ABBREVIATIONS
SPONSOR(S)
MARINE CORPS TRAINING SYSTEMS PROGRAM
MANAGERS (PM TRASYS)
ATTN: SUZANNE M. RUPERT
SUZANNE.M.RUPERT@USMC.MIL
407-380-4923 (OFFICE)
NSWC RS30
NAVAL SURFACE WARFARE CENTER, CORONA DIVISION
DIVISION HEAD (RS30)
ATTN: VINOJ S. ZACHARIAH
1999 FOURTH STREET
NORCO, CA 92860
951-393-4135 (OFFICE)
NAVAL SURFACE WARFARE CENTER, CORONA DIVISION
BRANCH HEAD (RS34)
ATTN: ANTHONY E. FARMAND, PE
1999 FOURTH STREET
NORCO, CA 92860
951-393-4385 (OFFICE)
NAVAL SURFACE WARFARE CENTER, CORONA DIVISION
BRANCH HEAD (RS32)
ATTN:JOARI R. RIVERA
1999 FOURTH STREET
NORCO, CA 92860
951-393-4826 (OFFICE)
PROJECT MANAGER
NAVAL SURFACE WARFARE CENTER, CORONA DIVISION
ATTN: DAYNA L. GARDNER
1999 FOURTH STREET
NORCO, CA 92860
407-381-8745 (OFFICE)
ELECTRICAL ENGINEER OF RECORD
NAVAL SURFACE WARFARE CENTER, CORONA DIVISION
ATTN: LANDON C. BURNS, PE
1999 FOURTH STREET
NORCO, CA 92860
951-393-4638 (OFFICE)
CIVIL ENGINEER OF RECORD
NAVAL SURFACE WARFARE CENTER, CORONA DIVISION
ATTN: MICHAEL G. PIERCE, PE
1999 FOURTH STREET
NORCO, CA 92860
951-393-5843 (OFFICE)
CL
PL
DETAIL INDICATOR
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR
SECTION INDICATOR
NORTH ARROW
X
SYMBOLS AND LINETYPES
[E]
[P]
SHEET IDENTIFICATION
GRID COORDINATE
SHEET IDENTIFICATION
GRID COORDINATE
SHEET IDENTIFICATION
GRID COORDINATE
SHEET IDENTIFICATION
GRID COORDINATE
CONTROL POINT
CENTERLINE
PROPERTY LINE
IRREVERSIBLE CRIMP
TWO HOLE LUG
BREAKLINE
CENTERLINE
CONTOUR
FENCE LINE
ELECTRICAL PRIMARY
ELECTRICAL SECONDARY
PNEUMATIC AIR LINE
EXISTING
PROPOSED
DISCONNECT SWITCH
DUPLEX RECEPTACLE
L15-30R RECEPTACLE
HAND HOLE
STREET LIGHT
SURFACE MOUNTED PANELBOARD
POLE MOUNTED TRANSFORMER
GROUND ROD
HOME RUN
UTILITY POLE
TRUE NORTH
PLAN NORTH
DISCLAIMER
INFORMATION SHOWN IN THESE DRAWINGS DEPICT CONDITIONS AT THE
TIME OF LAST INSPECTION, AND DO NOT REFLECT ANY CHANGES SINCE
THAT TIME.
THROUGHOUT THE PROJECT DURATION, DRAWINGS ARE SUBJECT TO
CHANGE. RECORD FILES ARE CAD MAINTAINED AND ALL CHANGES SHALL
BE DIRECTED TO THE PROJECT MANAGER AND/OR PROJECT ENGINEER IN
THE RANGE SYSTEMS (RS) ENGINEERING DEPARTMENT AT THE NAVAL
SURFACE WARFARE CENTER, CORONA DIVISION (NSWC CORONA).
NSWC CORONA WILL NOT BE RESPONSIBLE FOR ANY MODIFICATIONS ONCE
THE ELECTRONIC COPY HAS BEEN RELEASED AS A FINAL DELIVERY TO THE
PROJECT SPONSOR. THE DRAWINGS WILL BE OWNED, UPDATED, AND
MAINTAINED BY THE SPONSOR.
E
A AMPS
AB AGGREGATE BASE
ABS ABSORBING
AC ALTERNATING CURRENT / ASPHALT CONCRETE
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
ANC ANCHOR BOLT
APPROX APPROXIMATE
ASTM AMERICAN SOCIETY OF INTERNATIONAL
ASSOCIATION FOR TESTING AND MATERIALS
ATM ATMOSPHERE
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAGE
BATT BATTERY
BC BASE COURSE
BET BUILDING ENTRANCE TERMINAL
BKBD BACKBOARD
BLK BLOCK
BLKG BLOCKING
BLDG BUILDING
BM BEAM
BMP BEST MANAGEMENT PRACTICES
BOD BOTTOM OF DECK
BP BASE PLATE
BRG BEARING
BOT BOTTOM
C CHANNEL/CONDUIT
CAB CABINET
CAD COMPUTER-AIDED DESIGN
CF CUBIT FOOT
CG CENTER OF GRAVITY
CJP COMPLETE JOINT PENETRATION
CKT CIRCUIT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COAX COAXIAL CABLE
COMM COMMUNICAITONS
CONC CONCRETE
CONN CONNECTION
COL COLUMN
CONT CONTINUOUS
CP CONTROL POINT
CPT CONTROL POWER TRANSFORMER
CT CURRENT TRANSFORMER
CU COPPER
CU YD CUBIC YARDS
DET DETAIL
DC DIRECT CURRENT
DI DIEONIZED
DIA DIAMETER
DIAG DIAGONAL
DIMS DIMENSIONS
DO DITTO
DWG DRAWING
DWLS DOWELS
E EAST
EA EACH
ECM ELECTRICAL COMBINATION MODULE
EDM ELECTRICAL DISTRIBUTION MODULE
EG EXISTING GRADE
EGB EQUIPMENT GROUND BAR
EL ELEVATION - GRADE OR BUILDING
ELEC ELECTRIC
ELEV ELEVATION
EMT ELECTRICAL METALLIC TUBING
EQ EQUAL
EQUIP EQUIPMENT
ES ENERGY SAVER
EW EACH WAY
EXST EXISTING
FDN FOUNDATION
FF FAR FACE
FG FINAL GRADE
FH FIRE HYDRANT
FIN FINISHED
FL FLOW LINE
FLEX FLEXIBLE
FLR FLOOR
FOUO FOR OFFICIAL USE ONLY
FS FAR SIDE
FTG FOOTING
G GROUND
GA GAGE
GAL GALLON
GALV GALVANIZED
GBAR GROUIND BAR
GC GENERAL CONTRACTOR
GEC GROUNDING ELECTRODE CONDUCTOR
GEN GENERAL
GF GROUND FAULT
GFEP GROUND FAULT EQUIPMENT PROTECTION
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GLB GLUE LAMINATED BEAM
GND GROUND
HDPE HIGH DENSITY POLYETHYLENE
HGT HEIGHT
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HSS HOLLOW STRUCTURAL STEEL
HZ HERTZ
ID INSIDE DIAMETER
IEEE INSTITUTE FOR ELECTRICAL & ELECTRONIC ENGR.
IN INCHES
INCL INCLUDE OR INCLUDED
IOM INPUT OUTPUT MODULE
ISC SHORT CIRCUIT MODULE
ISS INTEGRATED STEEL SKID
J-BOX JUNCTION BOX
K KIPS / KILO
KA KILOAMPERE
KIAC KILOAMPERE INTERRUPTING CAPACITY
KVA KILOVOLT AMPERES
KW KILOWATTS
LBS POUNDS
LG LONG
LGTH LENGTH
LONG LONGITUDINAL
LLBB LONG LEG BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LREC LOW EMISSION RENEWABLE CREDIT
LSIG LONG, SHORT, INSTANTANEOUS, GROUND FAULT
MA MILLIAMPERES
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MDF MAIN DISTRIBUTION FRAME
MDP MAIN DISTRIBUTION PANEL
MDPE MEDIUM DENSITY POLYETHYLENE
MECH MECHANICAL
MFR MANUFACTURER
MGB MAIN GROUND BAR
MIN MINIMUM
MISC MISCELLANEOUS
MM MULTI-MODE FIBER OPTIC CABLE
MMBTU MILLION BRITISH THERMAL UNITS
MNPT MALE NATIONAL PIPE THREAD
MTL METAL
MW MEGAWATTS
N NEW / NORTHING
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NF NEAR FACE
NFPA NATIONAL FIRE PROTECTION AGENCY
NIPR NON-CLASSIFIED INTERNET
PROTOCOL ROUTER NETWORK
NMCI NAVY MARINE CORP INTRANET
NO NUMBER
NOM NORMAL
NTE NOT TO EXCEED
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
ORG ORIGINAL
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMIN.
P POLE
PERP PERPENDICULAR
PEX CROSS-LINED POLYETHYLENE
PCF POUND PER CUBIC FOOT
PCI POUND PER CUBIC INCH
PH PHASE
PL PLATE
PLYWD PLYWOOD
PNL PANEL
POE POINT OF ENTRY
PROP PROPOSED
PROJ PROJECT
PSF POUND PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAGE
PT POST-TENSIONED
PVC POLYVINYL CHLORIDE
PVM POWER MODULE
QDC QUICK DISCONNECT
QTR QUARTER
R RADIUS
RECEPT RECEPTICAL
REINF REINFORCED OR REINFORCING
REQ REQUIRED
REV REVISED OR REVISION
RF ROOF
RM ROOM
RMC RIGID METAL ASSEMBLY
R/W RIGHT OF WAY
SC SLIP CRITICAL
SCH SCHEDULE
SD STORMDRAIN
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SIPR SECRET INTERNET
PROTOCOL ROUTER NETWORK
SK SKETCH
SM SINGLE MODE FIBER OPTIC CABLE
SMAW SHIELDED METAL ARC WELDING
SOG SLAB-ON-GRADE
SPD SURGE PROTECTION DEVICE
SQ YD SQUARE YARD
SS STAINLESS STEEL / SANITARY SEWER
SSH SHORT SLOTTED HOLE
STIFF STIFFENER
STIR STIRRUP
STL STEEL
SWBD SWITCHBOARD
SWPPP STORM WATER POLLUTION PREVENTION PLAN
SYMM SYMMETRICAL
TBD TO BE DETERMINED
TEL TELEPHONE
TELCOM TELECOMMUNICATIONS
THK THICK
THHN THERMOPLASTIC HIGH HEAT-RESISTANT NYLON COATED
THRU THROUGH
TOC TOP OF CONCRETE
TOF TOP OF FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOT TOTAL
TOW TOP OF WALL
TRANSV TRANSVERSE
TYP TYPICAL
UBC UNIFORM BUILDING CODE
UG UNDERGROUND
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
UPM UNITERRUPTIBLE POWER MODULE
UPS UNINTERRUPTED POWER SUPPLY
V VOLTS
VAC VOLTS (AC)
VDC VOLTS (DC)
VF VERIFY IN FIELD
VOL VOLUME
W WIRE
W/ WITH
WWF WELDED WIRE FABRIC
WF WIDE FLANGE
WP WORK POINT
XFMR TRANSFORMER
& AND
@ AT
RELEVANT CODES AND STANDARDS
THE WORK SHALL CONFORM TO THE MOST RECENT APPROVED ADOPTED EDITION OF THE FEDERAL, STATE, COUNTY, CITY, LOCAL AND OSHA CODES AND STANDARDS AS SUPPLEMENTED OR AMENDED.
IN THE EVENT OF A CONFLICT BETWEEN DRAWINGS, WRITTEN SPECIFICATIONS, AND/OR REFERENCED STANDARDS, THE
MOST STRINGENT SHALL GOVERN.
SCOPE OF WORK
NSWC, CORONA
IN ACCORDANCE WITH THE APPROVED DESIGN DRAWINGS AS SHOWN HEREIN - NSWC CORONA'S OVERALL SCOPE OF
WORK INCLUDES -
1. DESIGN OF NEW OBSERVATION TOWER
2. DESIGN OF OBSERVATION TOWER ELECTRICAL GROUNDING SYSTEM
H
ES
A
D
ES
C R
IP
TI
O N
A
M
AR
K D
AT
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
N
AV
AL
S
U R
FA
C
E W
AR
FA
R E
C
EN
TE
R
C O
R O
N A
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E: C
AG
E:
D
IS
TR
IB
U
TI
O N
C : L
IM
IT
ED
T
O T
H E
D
EP
AR
TM
EN
T
O F
D
EF
EN
SE
A G
EN
C
IE
S
AN
D
T H
EI
R
C O
N
TR
AC
TO
R S.
O
TH
ER
R
EQ
U
ES
TS
F O
R T
H
IS
D O
C U
M
EN
T
SH
AL
L
BE
R
EF
ER
R
ED
T O
D
EV
EL
O
PM
EN
T
EN
G
IN
EE
R
IN
G
D
IV
IS
IO
N (R
S3 0)
AT
N
AV
AL
S U
R
FA
C E
W
AR
FA
R
E C
EN
TE
R , C
O R
O N
A.
PE
R D oD I 5
0.
F
O R
C O
N
TR
O
LL
ED
U
N C
LA
SS
IF
IE
D
IN
FO
R
M
AT
IO
N
(C U
I).
WARFARE CENTERS
CORONA
UNCLASSIFIED - CUI
UNCLASSIFIED - CUI
D
EV
EL
O
PM
EN
T
EN
G
IN
EE
R
IN
G
(R S3
0) P.
O . B
O X
C O
R O
N A, C A
8-
AN
SI
D
6D D
TE
M
PL
AT
E
VE
R
SI
O N
.0
JU
LY
D . G
AR
D
N
ER
N
O V
M
AR
IN
E
C O
R
PS
B
AS
E Q
U
AN
TI
C
O , V
A R
AN
G
E
O
BS
ER
VA
TI
O
N T
O W
ER
100% DESIGN PLAN SET - NOT FOR CONSTRUCTIONPlotted: 01-Nov-2021 18:14MCBQ-R7-G-002.DWG
X#
X#
X#
X#
X#X#
X#
M . P
IE
R
C E
M . P
IE
R
C E
G . M
AR
TI
N
EZ
G
EN
ER
AL
IN
FO
R M
AT
IO
N
G-002
PREPARED BY
NAVAL SURFACE WARFARE CENTER (NSWC) CORONA DIVISION
DEVELOPMENT ENGINEERING (RS30)
P.O. BOX 5000
CORONA, CA 92878-5000
THIS PROJECT WAS DESIGNED BY NAVAL SURFACE WARFARE CENTER, CORONA OF THE NAVAL SEA SYSTEMS COMMAND (NAVSEA). THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS
REQUIRED BY USACE DOCUMENT ER 1110-1-8152
PROJECT DESCRIPTION
THIS PROJECT INCLUDES THE CIVIL, STRUCTURAL AND ELECTRICAL DESIGNS FOR A NEW OBSERVATION TOWER AT RANGE 7 IN MARINE CORPS BASE QUANTICO, VA.
PROJECT LOCATION
LOCATION RANGE 7
CITY, STATE MARINE CORPS BASE QUANTICO, VA
LATITUDE: 38°31'08.20"N
LONGITUDE: 77°32'02.60"W
JURISDICTION: MARINE CORPS BASE QUANTICO, VA
CURRENT USE: RIFLE RANGE
PROPOSED USE: RIFLE RANGE
PROJECT TEAM
GENERAL NOTES
(NOTE: THE TERM "CONTRACTOR" OR "CONTRACTORS" AS USED IN THESE GENERAL NOTES SHALL REFER TO THE PRIME CONTRACTOR)
1. THE CONTRACTOR'S WORK SHALL COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS OF FEDERAL, STATE, COUNTY, CITY, LOCAL AND OSHA
STANDARDS, APPROVED DRAWINGS AND PROJECT WORK SPECIFICATIONS.
2. CONTRACTOR SHALL KEEP AN ACCURATE SET OF AS-BUILT PLANS.
3. APPROVED DRAWINGS AND PERMITS SHALL NOT BE CONSTRUED AS LICENSE TO CONSTRUCT WORK NOT CONFORMING TO THE GOVERNING CODES AND SHALL NOT
RELIEVE THE CONTRACTOR FROM COMPLYING WITH THE GOVERNING CODES, PLANS, AND SPECIFICATIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DIMENSIONS, MATERIALS & QUANTITIES AS PART OF THE APPROVED DRAWINGS.
5. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS OF EXISTING PUBLIC AND PRIVATE UTILITIES AND SERVICES PRIOR TO COMMENCING CONSTRUCTION.
CONTRACTOR SHALL CALL 811 FOR FIELD LOCATION OF EXISTING UTILITIES. NOTE THAT 811 ONLY LOCATES THOSE UTILITIES REGISTERED WITH THE SERVICES AND DOES
NOT LOCATE ALL UTILITIES.
6. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND NOTIFY THE ENGINEER, IN WRITING. IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON
THE PLAN, OR IF THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE FEATURES.
7. THESE DRAWINGS DO NOT IMPLY TO SHOW ALL EXISTING UTILITIES. LOCATIONS AND SIZE OF EXISTING PUBLIC AND PRIVATE UTILITIES ARE FROM AVAILABLE RECORDS ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES AND FOR DAMAGES RESULTING FROM FAILURE TO DO SO.
8. THE CONTRACTOR SHALL PERFORM ALL WORK REQUIRED FOR THE CONSTRUCTION OF THE PROPOSED PROJECT AND RELATED STRUCTURES TO BE CONSTRUCTED HEREUNDER AS NECESSARY TO MAKE A COMPLETE AND WORKING INSTALLATION, EXCEPT FOR WORK SPECIFICALLY EXCLUDED.
9. ALL PHASES OF THE PROJECT SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH THESE SPECIFICATIONS AND THE APPROVED CONSTRUCTION DRAWINGS.
IF THERE IS ANY CONFLICT BETWEEN THIS DOCUMENT AND THE DRAWINGS, THE DRAWING(S) SHALL GOVERN AND THE GOVERNMENT SHALL BE NOTIFIED.
10. CONSTRUCTION WORK MAY NOT START UNTIL ALL REQUIRED PERMITS HAVE BEEN OBTAINED. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS REQUIRED BY FEDERAL, STATE, OR LOCAL CODES AND/OR UTILITY SERVICE COMPANIES PRIOR TO START OF CONSTRUCTION.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL OF THE REQUIRED PERMITS (I.E. BUILDING & SAFETY, MECHANICAL, ELECTRICAL, PLUMBING, FIRE DEPARTMENT FEES, ADA, OSHA, ENVIRONMENTAL, CERTIFICATE OF OPERATION OR PERMIT TO OPERATE), AND ALL LICENSES AND TAXES AS REQUIRED FOR THE PROJECT, EXCEPT AS NOTED IN DRAWINGS, SPECIFICATIONS AND/OR CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING FOR ALL REQUIRED INSPECTIONS AT THE APPROPRIATE STAGES OF CONSTRUCTION. IF ANY OF THE CONTRACTOR'S WORK FAILS ANY INSPECTION, THE CONTRACTOR SHALL TAKE THE APPROPRIATE MEASURES TO CORRECT DEFICIENCIES AT NO EXPENSE TO GOVERNMENT.
12. APPROVAL OF THESE PLANS BY THE GOVERNMENT, ITS SPONSORS OR AGENTS DOES NOT RELIEVE THE CONTRACTOR AND THEIR ENGINEER FROM THE RESPONSIBILITY FOR THE CORRECTION OF ERRORS OR OMISSIONS DISCOVERED DURING CONSTRUCTION. UPON REQUEST, THE APPROPRIATE PLAN REVISIONS OR REQUEST FOR INFORMATION SHALL BE PROMPTLY SUBMITTED TO THE GOVERNMENT FOR REVIEW AND APPROVAL.
13. DEBRIS SHALL NOT BE BURIED ON THE SUBJECT SITE AND ALL UNSUITABLE EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANY AND ALL GOVERNMENTAL AUTHORITIES WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER CONTRACTOR.
14. IF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN, WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE GOVERNMENT ENGINEER FOR SUCH DEVIATIONS, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANY WORK DONE WHICH DEVIATES FROM THE PLANS, ALL FINES AND / OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE GOVERNMENT ENGINEER, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, PENALTIES AND THE LIKE RELATED TO SAME.
15. GOVERNMENT IS NOT RESPONSIBLE FOR ANY INJURY OR DAMAGES RESULTING FROM CONTRACTOR'S FAILURE TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS. IF CONTRACTOR FAIL TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD GOVERNMENT HARMLESS FOR ALL INJURIES AND DAMAGES THAT GOVERNMENT EMPLOYEE SUFFERS AND COSTS THAT EMPLOYEE INCURS.
16. THE ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY. THE ENGINEER OF RECORD HAS NOT BEEN RETAINED TO PERFORM OR BE RESPONSIBLE FOR JOB SITE SAFETY, SAME BEING WHOLLY OUTSIDE OF ENGINEER'S SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD IS NOT RESPONSIBLE TO IDENTIFY OR
REPORT ANY JOB SITE SAFETY ISSUES, AT ANY TIME.
17. THE GOVERNMENT ENGINEER MAKES NO REPRESENTATION OF GUARANTEE REGARDING EARTHWORK QUANTITIES OR THAT THE EARTHWORK FOR THIS PROJECT SHALL BALANCE DUE TO THE VARYING FIELD CONDITIONS, CHANGING SOIL TYPES, ALLOWABLE CONSTRUCTION TOLERANCES, AND CONSTRUCTION METHODS THAT ARE
BEYOND THE CONTROL OF THE ENGINEER.
18. AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED APPLICATION DOCUMENTS PREPARED BY THE SIGNATORY PROFESSIONAL ENGINEER, THE USE OF THE WORDS CERTIFY OR CLARIFICATION CONSTITUTES AN EXPRESSION OF "PROFESSIONAL OPINION" REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE UNDERSIGNED PROFESSIONAL'S KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE STANDARDS OF PRACTICE
AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE, EITHER EXPRESSED OR IMPLIED
CONTROLLED UNCLASSIFIED INFORMATION (CUI) DISTRIBUTION
CONTROLLED BY:
DOD, NAVAL SURFACE WARFARE CENTER, CORONA DIVISION
DEVELOPMENT ENGINEERING DIVISION, RS30
CUI CATEGORY:
CONTROLLED TECHNICAL INFORMATION (CTI)
DISTRIBUTION STATEMENT:
STATEMENT C (FEDERAL EMPLOYEES AND CONTRACTORS ONLY (FEDCON)
POC:
VINOJ S. ZACHARIAH (RS30 DIVISION HEAD)
951-393-4135 (OFFICE)
M . P
IE
R
C E
M . P
IE
R
C E
G . M
AR
TI
N
EZ
D . G
AR
D
N
ER
G
EN
ER
AL
N O
TE
S
G-003
GENERAL NOTES
1. PRIOR TO ANY CONSTRUCTION, THE GOVERNMENT
REPRESENTATIVE SHALL CONVENE A PRE-CONSTRUCTION
MEETING BETWEEN THE OWNER REPRESENTATIVE, VENDOR,
THE CONTRACTOR, OTHER UTILITY COMPANIES, ANY
AFFECTED PARTIES AND ANY OTHER ENTITY MAY REQUIRE. IF
CONSTRUCTION IS NOT STARTED ON THE SITE WITHIN 30
CALENDAR DAYS AFTER THE PRE-CONSTRUCTION
CONFERENCE, THE GOVERNMENT REPRESENTATIVE SHALL
CONVENE A NEW PRE-CONSTRUCTION CONFERENCE
BETWEEN THE ABOVE MENTIONED ENTITIES.
2. ALL CONSTRUCTION OPERATIONS SHALL BE PERFORMED IN
ACCORDANCE WITH APPROVED GOVERNMENT ENGINEERING
MANUAL AND STANDARD CONSTRUCTION SPECIFICATIONS
AND DETAILS.
3. ALL CONSTRUCTION OPERATIONS SHALL BE ACCOMPLISHED
IN ACCORDANCE WITH APPLICABLE REGULATIONS OF THE U.S.
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION. OSHA
STANDARDS MAY BE PURCHASED FROM THE GOVERNMENT
PRINTING OFFICE; INFORMATION AND RELATED REFERENCE
MATERIALS MAY BE PURCHASED FROM OSHA.
4. CONTRACTOR SHALL TAKE ALL DUE PRECAUTIONS TO
PROTECT EXISTING FACILITIES FROM DAMAGE. ANY DAMAGE
INCURRED TO EXISTING FACILITIES AS A RESULT OF
CONSTRUCTION OPERATIONS TO BE REPAIRED IMMEDIATELY
BY THE CONTRACTOR, AT NO ADDITIONAL COST TO
GOVERNMENT.
5. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL,
STATE, AND FEDERAL REQUIREMENTS REGARDING EXCESS
AND WASTE MATERIAL, INCLUDING METHODS OF HANDLING
AND DISPOSAL.
6. CONTRACTOR SHALL COORDINATE INTERRUPTIONS OF ALL
UTILITIES AND SERVICES. ALL WORK TO BE IN ACCORDANCE
WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY
COMPANY OR AGENCY INVOLVED.
7. WHEN UN-LOCATED OR INCORRECTLY LOCATED, A BREAK IN
UTILITY LINES, OR OTHER UTILITIES AND SERVICES ARE
ENCOUNTERED DURING SITE WORK OPERATIONS,
CONTRACTOR SHALL NOTIFY THE GOVERNMENT
REPRESENTATIVE AND APPLICABLE UTILITY COMPANY
IMMEDIATELY TO OBTAIN PROCEDURE DIRECTIONS.
CONTRACTOR SHALL COOPERATE WITH THE APPLICABLE
UTILITY COMPANY IN MAINTAINING ACTIVE SERVICES IN
OPERATION.
8. CONTRACTOR SHALL LOCATE, PROTECT, AND MAINTAIN
BENCHMARKS, MONUMENTS, CONTROL POINTS AND PROJECT
ENGINEERING REFERENCE POINTS. RE-ESTABLISH DISTURBED
OR DESTROYED ITEMS BY REGISTERED PROFESSIONAL LAND
SURVEYOR, AT NO ADDITIONAL COST TO GOVERNMENT.
9. THE CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ALL
CONSTRUCTION THAT DEVIATES FROM THE PLANS.
ACCURATE “RECORD” DRAWINGS WILL BE PROVIDED TO THE
GOVERNMENT.
10. CONTRACTOR SHALL STRIP SIX (6) INCHES OF TOPSOIL FROM
ALL AREAS SUBJECT TO GRADE MODIFICATION. REMOVE ALL
AREAS OF WEAK SOIL.
11. THE CONTRACTOR SHALL PROTECT ALL EXISTING FENCES. IN
THE EVENT THAT A FENCE MUST BE REMOVED, THE
CONTRACTOR SHALL REPLACE SAID FENCE OR PORTION
THEREOF WITH THE SAME TYPE OF FENCING TO A QUALITY OF
EQUAL OR BETTER THAN THE ORIGINAL FENCE.
12. UPON COMPLETION OF THE PROJECT, THE CONSTRUCTION
SITE(S) SHALL BE CLEANED OF ALL DEBRIS AND LEFT IN A
NEAT AND PRESENTABLE CONDITION.
13. ALL ADJOINING UNDERGROUND AND ABOVE GROUND
FACILITIES, BUILDINGS, UTILITIES, AND PAVEMENTS SHALL BE
PROTECTED DURING ALL PHASES OF CONSTRUCTION AND
ANY DAMAGES INCURRED DUE TO CONTRACTOR’S
OPERATION SHALL BE REPAIRED AND/OR REPLACED AT THE
CONTRACTOR’S EXPENSE.
14. CONTRACTOR SHALL CONTROL DUST CAUSED BY THE WORK
AND COMPLY WITH POLLUTION CONTROL REGULATIONS OF
GOVERNING AUTHORITIES (NO SEPARATE PAY).
15. CONTRACTOR SHALL EXERCISE CAUTION DURING
CONSTRUCTION NEAR AND AROUND GAS LINES AND POWER
LINES.
16. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION
VERTICALLY AND HORIZONTALLY OF ALL EXISTING UTILITIES
PRIOR TO COMMENCING WORK, AND SHALL NOTIFY THE
ENGINEER AND THE GOVERNMENT REPRESENTATIVE IF THE
EXISTING UTILITY LOCATION AND DEPTHS ARE DIFFERENT
FROM WHAT IS SHOWN ON THE PLANS. THE CONTRACTOR
AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL
DAMAGES WHICH MIGHT BE ASSOCIATED BY THE
CONTRACTOR’S FAILURE TO EXACTLY LOCATE AND
PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADS
AND DRIVES ADJACENT TO AND NEAR THE SITE FREE FROM
SOIL, SEDIMENT AND DEBRIS. CONTRACTOR WILL NOT
REMOVE SOIL, SEDIMENT OR DEBRIS FROM ANY AREA OR
VEHICLE BY MEANS OF WATER, ONLY SHOVELING AND
SWEEPING WILL BE ALLOWED. CONTRACTOR WILL BE
RESPONSIBLE FOR DUST CONTROL FROM THE SITE.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE
TO PRIVATE PROPERTY WHICH OCCURS AS A RESULT OF ANY
PORTION OF THIS PROJECT. ANY DAMAGE TO PRIVATE
PROPERTY SHALL BE REPAIRED TO EQUAL OR BETTER
CONDITION. THE CONTRACTOR SHALL PAY AND/OR SETTLE
WITH PRIVATE PROPERTY OWNER(S) FOR ALL COST RELATED
TO DAMAGE. THE GOVERNMENT WILL NOT PROVIDE
SEPARATE PAY FOR REPAIR OF DAMAGES, REIMBURSEMENTS
OR SETTLEMENTS.
19. CONTRACTOR SHALL WARRANTY THEIR WORKMANSHIP FOR A
PERIOD OF 1-YEAR FROM THE DATE OF ACCEPTANCE BY THE
GOVERNMENT AND OWNER.
CIVIL NOTES
DRAWINGS
1. FINAL INTERPRETATION OF ALL DRAWINGS WILL BE BY THE
GOVERNMENT, IN CONSULTATION WITH THE ENGINEER, AND
THE GOVERNMENT'S DECISION WILL BE FINAL.
2. ALL DRAWINGS PREPARED BY THE CONTRACTOR SHALL BE
SUBMITTED TO THE GOVERNMENT FOR APPROVAL PRIOR TO
ADMITTING DRAWINGS INTO THE CONSTRUCTION DRAWING
SET.
3. CONTRACTOR SHALL LOCATE, PROTECT, AND MAINTAIN
BENCHMARKS, MONUMENTS, CONTROL POINTS AND PROJECT
ENGINEERING REFERENCE POINTS. RE-ESTABLISH DISTURBED
OR DESTROYED ITEMS BY REGISTERED PROFESSIONAL LAND
SURVEYOR, AT NO ADDITIONAL COST TO GOVERNMENT.
4. EVERY REQUEST FOR INSPECTION SHALL REQUIRE A
FORTY-EIGHT (48) HOUR ADVANCE NOTICE BEFORE SUCH
INSPECTION IS DESIRED.
5. FINAL WALK-THROUGH SHALL BE CONDUCTED WITH
GOVERNMENT'S REPRESENTATIVE, ENGINEER OR THEIR
AUTHORIZED REPRESENTATIVE, AND THE CONTRACTOR TO
SIGN OFF THE COMPLETION OF THE PUNCH LIST ITEMS. ALL
ITEMS SHALL BE COMPLETED, SIGNED OFF AND ACCEPTED
PRIOR TO FINAL PAYMENT TO THE CONTRACTOR.
6. UPON SUBSTANTIAL COMPLETION OF CONSTRUCTION, THE
CONTRACTOR SHALL MARK-UP ONE (1) COPY OF "APPROVED
FOR CONSTRUCTION" DRAWINGS TO AS-BUILT CONDITIONS.
AS-BUILT DRAWINGS SHALL SHOW ALL SIGNIFICANT CHANGES,
DIMENSIONS (INCLUDING DEPTH), AND RELATIVE POINTS OF
REFERENCE. THESE ALTERED DRAWINGS SHALL BE
SUBMITTED TO GOVERNMENT WITHIN TWO (2) WEEKS (TEN
(10) WORKING DAYS) AFTER COMPLETION OF CONSTRUCTION.
RETENTION RELEASE IS CONTINGENT UPON RECEIVING
ACCURATE AS-BUILT DRAWINGS.
MATERIALS HANDLING AND STORAGE
1. UPON RECEIPT OF ALL FURNISHED MATERIALS, THE
CONTRACTOR SHALL BE FINANCIALLY ACCOUNTABLE FOR
ANY LOST OR STOLEN FURNISHED MATERIALS.
2. AFTER RECEIPT OF FURNISHED MATERIALS BY THE
CONTRACTOR, ANY SHORTAGES OF AND/OR DAMAGES TO
THE MATERIALS SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL BE FINANCIALLY
ACCOUNTABLE FOR SUCH SHORTAGES, ERRORS, OR
DAMAGES.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER
STORAGE AND HANDLING OF ALL FURNISHED EQUIPMENT AND
MATERIALS UNTIL THE INSTALLATION IS ACCEPTED BY THE
GOVERNMENT'S REPRESENTATIVE.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAULING
AWAY ALL UNUSED CONTRACTOR SUPPLIED MATERIALS,
WASTE, AND SPOILS. ALL CONSTRUCTION DEBRIS SHALL BE
REMOVED FROM THE SITE DAILY AND DISPOSED OF IN A
LEGAL MANNER.
5. ALL UNUSED SUPPLIED MATERIAL SHALL BE RETURNED TO
GOVERNMENT UPON COMPLETION OF CONSTRUCTION.
6. THE CONTRACTOR SHALL HANDLE AND INSTALL ALL MATERIAL
AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S
INSTALLATION INSTRUCTIONS AND THE REQUIREMENTS IN
THESE CONSTRUCTION SPECIFICATIONS.
7. THE CONTRACTOR'S ACTIVITIES SHALL BE RESTRICTED TO
THE DESIGNATED CONSTRUCTION SITE AND STORAGE AREAS
DURING EXECUTION OF THIS WORK.
8. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY
TEMPORARY CLEARANCES FOR INSPECTION PURPOSES
PRIOR TO START-UP. THIS WILL NOT INCLUDE FINAL
INSPECTION BY AGENCIES WHICH REQUIRE A CERTIFICATE TO
OPERATE.
9. THE CONTRACTOR SHALL NOTIFY GOVERNMENT A MINIMUM
OF THREE (3) WEEKS BEFORE THE DATE THE SYSTEM CAN BE
STARTED SO AS TO COORDINATE START-UP WITH THE
EQUIPMENT VENDOR(S) AND/OR APPROVED
REPRESENTATIVES.
10. THE CONTRACTOR SHALL HAVE QUALIFIED DISCIPLINE
REPRESENTATIVES PRESENT DURING START-UP TO MAKE
ANY NECESSARY REPAIRS IN THE EVENT OF ANY FAILURES.
11. A PRELIMINARY WALK-THROUGH SHALL BE MADE AFTER
START-UP WITH GOVERNMENT REPRESENTATIVES. THE
ITEMS ON THE PUNCH LIST DEVELOPED DURING THIS
WALK-THROUGH SHALL BE COMPLETED WITHIN TEN (10)
WORKING DAYS.
CONCRETE & MASONRY
1. ALL CONCRETE, MASONRY, AND EARTHWORK SHALL COMPLY
WITH THESE DRAWINGS INCLUDING THE LATEST ADOPTED
APPROVED EDITIONS OF THE FOLLOWING CODES:
INTERNATIONAL BUILDING CODE (IBC)
AMERICAN CONCRETE INSTITUTE (ACI)
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
2. THE CONTRACTOR SHALL NOT MAKE ANY CONCRETE POURS
WITHOUT FIRST NOTIFYING THE GOVERNMENT.
3. IF FOUNDATION SLABS AND FOOTINGS ARE POURED PRIOR TO
TRENCHING FOR PIPING AND ELECTRICAL, SLEEVES ARE
REQUIRED UNDER BLOCK WALL FOOTINGS OR EQUIPMENT
FOUNDATIONS FOR ALL PROPOSED PIPING OR ELECTRICAL
CONDUITS PASSING UNDER FOOTINGS OR FOUNDATIONS.
4. READY MIX CONCRETE SHALL BE MIXED AND DELIVERED IN
ACCORDANCE WITH REQUIREMENTS OF IBC STANDARDS.
BATCH TICKETS SHALL BE RETURNED TO GOVERNMENT.
5. MASONRY MATERIALS SHALL BE STORED SO THAT AT THE
TIME OF USE THE MATERIALS ARE CLEAN AND STRUCTURALLY
SUITABLE FOR THE INTENDED USE.
6. SURFACES TO BE IN CONTACT WITH MASONRY GROUT OR
MORTAR SHALL BE CLEAN AND FREE OF DELETERIOUS
MATERIALS.
INSTALLATION
1. THE CONTRACTOR SHALL CHECK THE ACCURACY OF
FOUNDATION LOCATIONS, ELEVATIONS, LOCATION AND
PROJECTION OF ALL ANCHOR BOLTS AND EMBEDDED ITEMS.
GOVERNMENT WILL REQUIRE FORTY-EIGHT (48) HOURS'
NOTICE FOR INSPECTION OF THE CONTRACTOR'S WORK.
2. APPROVED ANCHORING METHODS ARE TO BE USED FOR
ANCHORING EQUIPMENT AS SPECIFIED ON DRAWINGS.
RED-HEADS SHALL NOT BE PERMITTED FOR MISALIGNED
ANCHOR BOLTS. GOVERNMENT AND ENGINEER SHALL BE
NOTIFIED AND CONSULTED FOR ANY REQUIRED CORRECTION
METHODS FOR MISPLACED BOLTS OR ANCHORS.
3. THE COMPACTION TEST RESULTS SHALL BE AVAILABLE PRIOR
TO THE CONCRETE POUR.
4. REMOVE ALL LOOSE MATERIAL AND DEBRIS FROM
COMPACTED SUBGRADE SURFACE PRIOR TO PLACING
CONCRETE.
5. WHEN AMBIENT TEMPERATURE IS BELOW 50 DEGREES
FAHRENHEIT, CONCRETE MATERIALS AND PLACEMENT SHALL
CONFORM TO THE RECOMMENDATIONS OF ACI 306R “COLD
WEATHER CONCRETING”.
6. WHEN AMBIENT TEMPERATURE IS ABOVE 90 DEGREES
FAHRENHEIT, CONCRETE MATERIALS AND PLACEMENT SHALL
CONFORM TO THE RECOMMENDATIONS OF ACI 305R “HOT
WREATHING CONCRETING”.
TESTING
1. FOR CONCRETE DESIGN STRENGTHS ABOVE 2,500 PSI, THE
CONTRACTOR SHALL MAKE ARRANGEMENTS WITH AN
INDEPENDENT TESTING AGENCY TO TEST CONCRETE
CYLINDERS FOR FOUNDATIONS AND SLABS UNLESS WAIVED
BY GOVERNMENT. THREE (3) CYLINDERS SHALL BE RANDOMLY
SELECTED AND TESTED FROM EACH MIX USED. ALL
HANDLING OF SAMPLES SHALL MEET ASTM STANDARDS.
COMPRESSION TESTS SHALL BE LOGGED AT THE 7-DAY AND
28 DAY MARK. THE CONTRACTOR SHALL FURNISH
GOVERNMENT WITH ALL TEST RESULTS FROM EACH SAMPLE.
THE THIRD CYLINDER SHALL BE KEPT IN THE EVENT THE
28-DAY BREAK PROVES NOT TO BE IN COMPLIANCE. THIS
CYLINDER SHALL THEN BE BROKEN AT 56 DAYS.
2. IN THE EVENT OF FAILURE, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL COSTS INCLUDING REMOVAL,
RECONSTRUCTION AND RE-TESTING OF NEW CONCRETE.
FINISHES
1. ALL SOLID AND HOLLOW MASONRY UNITS SHALL BE CLEAN
AND ALL DUST AND DIRT REMOVED FROM THE SURFACE. ALL
EXPOSED FACES OF ANY WALL SHOWING GROUT SPOTTING
OR JOINT MORTAR PROJECTION SHALL BE WIRE BRUSHED
AND/OR TOOLED CLEANED TO ENSURE A UNIFORM
APPEARANCE.
2. ALL CONCRETE SLABS SHALL BE A SMOOTH TROWEL FINISH
ON ALL CURB FACES AND EDGES WITH BROOM FINISH ON ALL
FLAT SURFACES EXCEPT WHEN MATCHING EXISTING
CONCRETE SURFACES. ALL SLAB FINISHES SHALL BE FREE OF
STAINS, DISCOLORATION, VOIDS, CRACKS, OR SURFACE
DISCONTINUITIES. IF ANY OF THESE CONDITIONS EXIST,
GOVERNMENT WILL REQUIRE THE CONTRACTOR TO REPLACE
THE SLAB. THE CONTRACTOR SHALL VERIFY WITH
GOVERNMENT WHICH TYPE OF BROOM FINISH WHICH WILL BE
ACCEPTABLE.
3. DRYING OUT OF CONCRETE, ESPECIALLY DURING THE FIRST
24 HOURS, SHALL BE CAREFULLY GUARDED AGAINST. ALL
SURFACES SHALL BE MOIST AND CURED OR PROTECTED
USING A MEMBRANE CURING AGENT APPLIED AS SOON AS
FORMS ARE REMOVED. IF MEMBRANE CURING AGENT IS USED,
EXERCISE CARE NOT TO DAMAGE SURFACE.
STRUCTURAL STEEL
1. ALL STRUCTURAL STEEL WORK SHALL COMPLY WITH THESE
DRAWINGS INCLUDING THE LATEST ADOPTED APPROVED
EDITIONS OF THE FOLLOWING CODES:
1.1. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
1.2. AMERICAN WELDING SOCIETY (AWS)
1.3. AMERICAN INSTITUTE FOR STEEL CONSTRUCTION (AISC)
2. STRUCTURAL STEEL FRAMING SHALL BE TRUE AND PLUMB
BEFORE CONNECTIONS ARE FINAL FOR BOLTING OR WELDING.
3. PROVIDE TEMPORARY ERECTION BRACING AND SUPPORTS TO
HOLD STRUCTURAL STEEL FRAMING SECURELY IN POSITION.
SUCH TEMPORARY BRACING AND SUPPORTS SHALL NOT BE
REMOVED UNTIL PERMANENT BRACING OR STABILIZING
ELEMENTS HAVE BEEN INSTALLED.
4. WELD SHALL DEVELOP THE FULL STRENGTH OF THE
MATERIAL BEING WELDED, UNLESS NOTED OTHERWISE,
EXCEPT THAT FILLET WELD SHALL BE A MINIMUM OF 3/16”.
5. WELDING OF REINFORCING STEEL IS SPECIFICALLY
PROHIBITED.
SITE NOTES
1. THE CONTRACTOR'S WORK SHALL COMPLY WITH ALL
APPLICABLE CODES, ORDINANCES, AND REGULATIONS OF
FEDERAL, STATE, COUNTY, CITY, LOCAL AND OSHA
STANDARDS, APPROVED DRAWINGS AND PROJECT WORK
SPECIFICATIONS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY
AT ALL TIMES, MEANS AND METHODS OF CONSTRUCTION.
3. IF THE CONTRACTOR, IN THE COURSE OF THE WORK, FINDS
ANY DISCREPANCIES BETWEEN THE PLANS AND THE
PHYSICAL CONDITIONS OF THE LOCALITY, OR ANY ERRORS
OR OMISSIONS IN THE PLANS OR IN THE LAYOUT AS GIVEN BY
THE GOVERNMENT, IT SHALL BE THEIR DUTY TO IMMEDIATELY
INFORM THE GOVERNMENT, IN WRITING, AND THE
GOVERNMENT WILL PROMPTLY VERIFY THE SAME. ANY WORK
DONE AFTER SUCH A DISCOVERY, UNTIL AUTHORIZED, SHALL
BE AT THE CONTRACTOR'S RISK.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF
ALL SETBACKS, EASEMENTS, AND DIMENSIONS SHOWN
HEREON BEFORE BEGINNING CONSTRUCTION.
5. CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO
THAT WORKMEN AND PUBLIC SHALL BE PROTECTED FROM
INJURY, AND ADJOINING PROPERTY PROTECTED FROM
DAMAGE.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING
EXISTING ITEMS DAMAGED DURING
CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE,
UTILITIES, PAVEMENT, STRIPING, CURB, ETC. DAMAGES SHALL
BE REPORTED TO GOVERNMENT PRIOR TO REPAIR. REPAIRS
SHALL BE EQUAL TO OR BETTER THAN EXISTING CONDITIONS.
7. ALL INDICATED ELEVATIONS ARE FINISHED ELEVATIONS
UNLESS OTHERWISE INDICATED ON THE PLAN.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION AND
REPLACEMENT OF ALL PROPERTY CORNERS, TEMPORARY
BENCHMARKS, OR MONUMENTS. DAMAGES MADE BY
CONTRACTOR SHALL BE REPLACED BY A REGISTERED
PROFESSIONAL LAND SURVEYOR AT CONTRACTOR'S
EXPENSE.
EARTHWORK & GRADING NOTES
1. THE CONTRACTOR'S WORK SHALL COMPLY WITH ALL
APPLICABLE CODES, ORDINANCES, AND REGULATIONS OF
FEDERAL, STATE, COUNTY, CITY, LOCAL AND OSHA
STANDARDS, APPROVED DRAWINGS AND PROJECT WORK
SPECIFICATIONS.
2. EARTHWORK SHALL BE PER GEOTECHNICAL ENGINEERING
REPORT UNLESS OTHERWISE NOTED.
3. EXCAVATION SHALL BE PERFORMED AT SPECIFIED
LOCATIONS AS REQUIRED PER APPROVED DRAWINGS. CARE
SHALL BE TAKEN NOT TO EXCAVATE BELOW THE BOTTOM
LEVEL OF FOOTINGS. ALL FOOTINGS SHALL BE PLACED ON
UNDISTURBED NATURAL EARTH OR ON PREPARED
SUBGRADE.
4. THE CONTRACTOR SHALL NOTIFY GOVERNMENT IN WRITING
FOR ANY POTENTIAL TRENCHING DEVIATION FROM APPROVED
PLANS OR EXCAVATING PROBLEMS PRIOR TO START OF
CONSTRUCTION. NEGLIGENCE SHALL NOT CONSTITUTE A
CHANGE ORDER.
5. ANY MATERIALS USED FOR BACKFILL SHALL BE CLEAN AND
FREE OF ALL DEBRIS (WOOD SCRAPS, WELDING ROD, PIPE
SCRAPS, OR OTHER DELETERIOUS SUBSTANCES). NO LUMPS
OR ROCK LARGER THAN 4 INCHES IN DIAMETER ARE ALLOWED
WITHIN TWELVE (12) INCHES OF ANY FOUNDATION.
6. ALL BACKFILL UNDER FOUNDATIONS AND SLABS SHALL BE
COMPACTED TO A MINIMUM OF 95% MODIFIED PROCTOR AT
THE OPTIMUM MOISTURE CONTENT. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL COST OF OBTAINING A
COMPACTION REPORT AND SUBMITTING THE RESULT TO THE
GOVERNMENT UNLESS OTHERWISE NOTED.
7. ALL TRENCHES FOR PIPES SHALL HAVE A MINIMUM COVER OF
EIGHTEEN (18) INCHES ABOVE THE TOP OF PIPE (OR SLEEVE)
FROM FINISH GRADE. A MINIMUM OF TWELVE (12) INCHES OF
SAND SHALL BE PROVIDED BELOW THE PIPE AND SIX (6)
INCHES ABOVE THE PIPE UNLESS OTHERWISE NOTED.
8. ALL TRENCHES FOR ELECTRICAL CONDUITS SHALL HAVE A
MINIMUM COVER OF TWENTY-FOUR (24) INCHES ABOVE THE
TOP OF CONDUIT FROM FINISH GRADE. BACKFILL SHALL BE
CLEAN NATURAL SOIL UNLESS OTHERWISE SPECIFIED.
9. EXPANSIVE SOILS SHALL REQUIRE THAT ELECTRICAL
CONDUIT(S) TRENCHES BE FILLED WITH SAND A MINIMUM SIX
(6) INCHES ABOVE THE TOP OF CONDUIT.
10. SLURRY BACKFILL MAY BE USED AT THE CONTRACTOR'S
EXPENSE INSTEAD OF SOIL FOR BACKFILL TO EXPEDITE
COMPLETION OF TRENCHES WITH GOVERNMENT'S PRIOR
WRITTEN APPROVAL.
11. THE CONTRACTOR SHALL PROTECT OPEN TRENCHES OR
EXCAVATIONS FROM WATER RUN OFF OR RAIN. THE
CONTRACTOR SHALL ANTICIPATE AND BE PREPARED TO
AVOID ANY DELAYS DUE TO WATER INFILTRATION OR RAIN
12. THE CONTRACTOR SHALL LEGALLY DISPOSE OF ALL
CONTAMINATED SOILS, HAZARDOUS WASTE, AND / OR OTHER
MATERIALS TO AN APPROVED WASTE SITE AT THEIR OWN
EXPENSE. THE CONTRACTOR SHALL COMPLY WITH ALL
FEDERAL, STATE, AND LOCAL RULES, REGULATIONS, AND
REQUIREMENTS AND SHALL BE RESPONSIBLE FOR THE
HAZARDOUS WASTE MANIFEST SHIPPING FROM THE POINT OF
GENERATION, THROUGH TRANSPORTATION, TO THE FINAL
APPROVED TREATMENT, STORAGE, AND DISPOSAL FACILITY.
13. ALL DIMENSIONS AND RADII ARE TO THE FACE OF CURB,
CENTER OR END OF STRIPE, FACE OF BUILDING, OR EDGE OF
PAVEMENT, UNLESS OTHERWISE NOTED.
14. ALL EARTHWORK AND BASE COURSE FOR THE PARKING
AREA(S) SHALL BE COMPACTED TO A MINIMUM OF 95%
MODIFIED PROCTOR COMPACTION TESTING UNLESS
OTHERWISE NOTED. CERTIFICATION OF SAID COMPACTION
SHALL BE SUBMITTED BY THE CONTRACTOR TO THE
GOVERNMENT PRIOR TO THE PLACEMENT OF THE BASE
COURSE MATERIAL.
15. IF AREAS ARE DISTURBED BEYOND PROPOSED GRADES BY
NEGLIGENCE OF THE CONTRACTOR, THE CONTRACTOR SHALL
BE HELD RESPONSIBLE FOR ANY RE-GRADING OR REPAIR TO
MATCH ORIGINAL EXISTING CONDITIONS.
16. THE PAVEMENT SUBGRADE AND BASE COURSE MATERIAL
SHALL BE INSPECTED AND APPROVED BY THE GOVERNMENT
REPRESENTATIVE PRIOR TO CONSTRUCTING THE BASE AND
SURFACE COURSES THEREON.
17. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE TO ALL
INLETS AND CATCH BASINS. AREAS OF SURFACE PONDING
SHALL BE CORRECTED BY CONTRACTOR AT NO ADDITIONAL
EXPENSE TO THE GOVERNMENT.
18. MAINTAIN PROPER SITE DRAINAGE AT ALL TIMES DURING THE
COURSE OF CONSTRUCTION, AND PREVENT STORM WATER
FROM RUNNING INTO OR STANDING IN EXCAVATED AREAS.
19. SPREAD AND COMPACT UNIFORMLY TO THE DEGREE
SPECIFIED ALL EXCESS TRENCH SPOIL AFTER COMPLETION
OF THE UNDERGROUND IMPROVEMENTS. EARTHWORK
CONTRACTOR SHALL MAKE APPROPRIATE ADJUSTMENTS IN
ROUGH GRADING TO ACCOMMODATE TRENCH SPOIL.
20. PROVIDE WATER TO ADD TO DRY MATERIAL IN ORDER TO
ADJUST THE MOISTURE CONTENT FOR THE PURPOSE OF
ACHIEVING THE SPECIFIED COMPACTION.
21. NO FILL SHALL BE PLACED ON EXISTING GROUND UNTIL THE
GROUND HAS BEEN CLEARED OF WEEDS, DEBRIS, TOPSOIL,
AND OTHER DELETERIOUS MATERIAL.
22. IF STEEP SLOPING TERRAIN OCCURS UPON WHICH FILL IS TO
BE PLACED, IT SHALL BE CLEARED, KEYED, AND BENCHED
INTO FIRM NATURAL SOIL FOR FULL SUPPORT. PREPARATION
SHALL BE APPROVED BY THE GOVERNMENT PRIOR TO
PLACEMENT OF FILL MATERIAL.
23. DURING ROUGH GRADING OPERATIONS AND PRIOR TO
CONSTRUCTION OF PERMANENT DRAINAGE STRUCTURES
TEMPORARY DRAINAGE CONTROL SHALL BE PROVIDED TO
PREVENT PONDING WATER AND DAMAGE TO ADJACENT
PROPERTIES.
24. DUST SHALL BE CONTROLLED BY WATER OR OTHER
APPROVED METHODS.
25. ALL EXISTING DRAINAGE COURSES ON THE PROJECT SITE
SHALL CONTINUE TO FUNCTION, ESPECIALLY DURING STORM
CONDITIONS. PROTECTIVE MEASURES AND TEMPORARY
DRAINAGE PROVISIONS SHALL BE USED TO PROTECT
ADJOINING PROPERTIES DURING GRADING OPERATIONS.
26. NO OBSTRUCTION OF FLOOD PLAINS OR NATURAL WATER
COURSES SHALL BE PERMITTED.
D
ES
C R
IP
TI
O N
A
M
AR
K D
AT
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
N
AV
AL
S
U R
FA
C
E W
AR
FA
R E
C
EN
TE
R
C O
R O
N A
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E: C
AG
E:
D
IS
TR
IB
U
TI
O N
C : L
IM
IT
ED
T
O T
H E
D
EP
AR
TM
EN
T
O F
D
EF
EN
SE
A G
EN
C
IE
S
AN
D
T H
EI
R
C O
N
TR
AC
TO
R S.
O
TH
ER
R
EQ
U
ES
TS
F O
R T
H
IS
D O
C U
M
EN
T
SH
AL
L
BE
R
EF
ER
R
ED
T O
D
EV
EL
O
PM
EN
T
EN
G
IN
EE
R
IN
G
D
IV
IS
IO
N (R
S3 0)
AT
N
AV
AL
S U
R
FA
C E
W
AR
FA
R
E C
EN
TE
R , C
O R
O N
A.
PE
R D oD I 5
0.
F
O R
C O
N
TR
O
LL
ED
U
N C
LA
SS
IF
IE
D
IN
FO
R
M
AT
IO
N
(C U
I).
WARFARE CENTERS
CORONA
UNCLASSIFIED - CUI
UNCLASSIFIED - CUI
D
EV
EL
O
PM
EN
T
EN
G
IN
EE
R
IN
G
(R S3
0) P.
O . B
O X
C O
R O
N A, C A
8-
AN
SI
D
6D D
TE
M
PL
AT
E
VE
R
SI
O N
.0
JU
LY
D . G
AR
D
N
ER
N
O V
M
AR
IN
E
C O
R
PS
B
AS
E Q
U
AN
TI
C
O , V
A R
AN
G
E
O
BS
ER
VA
TI
O
N T
O W
ER
100% DESIGN PLAN SET - NOT FOR CONSTRUCTIONPlotted: 01-Nov-2021 18:15MCBQ-R7-G-003.DWG
M . P
IE
R
C E
M . P
IE
R
C E
G . M
AR
TI
N
EZ
D . G
AR
D
N
ER
G
EN
ER
AL
N O
TE
S
G-004
EARTHWORK & GRADING NOTES
(CONTINUED)
27. ALL EXISTING STRUCTURES, FENCING AND TREES WITHIN
CONSTRUCTION AREA, UNLESS NOTED OTHERWISE TO
REMAIN, SHALL BE REMOVED AND DISPOSED LEGALLY OF
OFF-SITE.
28. SITE GRADING ACTIVITIES SHALL NOT COMMENCE UNTIL
EROSION CONTROL MEASURES HAVE BEEN INSTALLED.
29. DUST CONTROL SHALL BE ACCOMPLISHED BY WATERING
DRY, EXPOSED AREAS ON A REGULAR BASIS. SPRAYING OF
PETROLEUM BASED OR TOXIC LIQUIDS FOR THIS PURPOSE IS
PROHIBITED. THE CONTRACTOR SHALL COMPLY WITH ALL
GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL
PROTECTION.
30. ALL CUT OR FILL SLOPES SHALL BE 4:1 MAXIMUM UNLESS
OTHERWISE NOTED.
31. CONTRACTOR SHALL APPLY STABILIZATION FABRIC TO ALL
SLOPES, 3:1 OR STEEPER. ANY AREAS DISTURBED FOR ANY
REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE
CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE GOVERNMENT.
32. CONTRACTOR SHALL ADJUST GRADES ADJACENT TO
EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH
FIT AND CONTINUOUS GRADE.
33. ALL SLOPES ON SIDEWALKS ADJACENT TO BUILDINGS SHALL
BE AT ¼” PER FOOT MAX DOWN TO THE TOP OF CONCRETE
CURB.
34. ALL SLOPES WITHIN ACCESSIBLE PARKING SPACES AND
ADJACENT MANEUVERING AREAS SHALL BE A MAXIMUM OF
2% SLOPE IN ALL DIRECTIONS.
35. ALL SLOPES ON SIDEWALKS SHALL BE A MAXIMUM OF 2%
CROSS SLOPE AND 5% IN THE DIRECTION OF TRAVEL.
36. GRADING LIMITS ARE FOR REFERENCE PURPOSES ONLY AND
SHALL NOT BE USED FOR CONSTRUCTION STAKING. ALL
GRADING ACTIVITIES SHALL BE CONDUCTED WITHIN THE
PROPERTY BOUNDARY UNLESS OTHERWISE NOTED.
EROSION & SEDIMENT CONTROL NOTES
1. THE CONTRACTOR'S WORK SHALL COMPLY WITH ALL APPLICABLE
CODES, ORDINANCES, AND REGULATIONS OF FEDERAL, STATE,
COUNTY, CITY, LOCAL AND OSHA STANDARDS, APPROVED
DRAWINGS AND PROJECT WORK SPECIFICATIONS.
2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE
MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON.
NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND
STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID
CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS
IMMINENT.
3. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH
STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF
THE STORM WATER POLLUTION PREVENTION PLAN (SWPP) AND
THE RESPECTIVE STATES CONSTRUCTION GENERAL PERMIT AND
BECOME FAMILIAR WITH ITS CONTENTS.
4. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES
AS REQUIRED BY THE SWPP. ADDITIONAL BEST MANAGEMENT
PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS
AT NO ADDITIONAL COST TO GOVERNMENT THROUGHOUT ALL
PHASES OF CONSTRUCTION.
5. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL
CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR
MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL
IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE
PERMITTING AGENCY OR GOVERNMENT.
6. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE
WATERS OR REGULATED WETLANDS SHALL BE MAINTAINED ON
SITE AT ALL TIMES.
7. CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM
EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT.
8. GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY
PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE
EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE
PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES,
OFFICE TRAILERS, AND TOILET FACILITIES.
9. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING,
EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND PROPERLY
TREATED OR DISPOSED.
10. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND
FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY
AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS
AND LEAKS.
11. DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR
OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST
SUPPRESSION OPERATIONS IS PROHIBITED.
12. RUBBISH, TRASH, GARBAGE, UTTER, OR OTHER SUCH MATERIALS
SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS
SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH
THE ACTION OF WIND OR STORM WATER DISCHARGE INTO
DRAINAGE DITCHES OR WATERS OF THE STATE.
13. ALL STORM WATER POLLUTION PREVENTION MEASURES
PRESENTED ON THIS PLAN SHALL BE INITIATED AS SOON AS
PRACTICABLE.
14. ANY DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION
ACTIVITY HAS STOPPED FOR AT LEAST 14 DAYS, SHALL BE
TEMPORARILY SEEDED. THESE AREAS SHALL BE SEEDED NO LATER
THAN 14 DAYS FROM THE LAST CONSTRUCTION ACTIVITY
OCCURRING IN THESE AREAS.
15. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION
ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY
SEEDED. THESE AREAS SHALL BE SEEDED NO LATER THAN 7 DAYS
AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE
AREAS. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PL.AN.
16. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL
CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO REMOVE THE
MAJORITY OF DIRT OR MUD, THEN THE TIRES SHALL BE WASHED
BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS
USED, PROVISIONS SHALL BE MADE TO INTERCEPT THE WASH
WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE
SITE.
17. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM
VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS SHALL BE
REMOVED IMMEDIATELY.
18. CONTRACTORS OR SUBCONTRACTORS SHALL BE RESPONSIBLE FOR
REMOVING SEDIMENT IN THE DETENTION/RETENTION POND AND
ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM
WATER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE
STABILIZATION OF THE SITE.
19. ON-SITE & OFFSITE SOIL STOCKPILE AND BORROW AREAS SHALL BE
PROTECTED FROM EROSION AND SEDIMENTATION THROUGH
IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE
AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE SITE
MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT
REQUIREMENTS.
20. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE
GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION.
SLOPES LEFT EXPOSED SHALL, WITHIN 14 CALENDAR DAYS OF
COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR
OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT
GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION.
21. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE
PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES,
GRAVEL BAG BARRIERS, ETC.) TO PREVENT EROSION.
22. ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH
WORKING DAY, INCLUDING BACKFILLING OF TRENCHES FOR
UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR
BITUMINOUS PAVING FOR ROAD CONSTRUCTION.
23. LAND DISTURBING ACTIVITIES SHALL NOT COMMENCE UNTIL
APPROVAL TO DO SO HAS BEEN PROVIDED BY THE GOVERNMENT.
THE GENERAL CONTRACTOR SHALL STRICTLY ADHERE TO THE
APPROVED SWPP DRAWINGS DURING CONSTRUCTION
OPERATIONS.
24. CONTRACTOR SHALL PREVENT ANY SILTATION FROM ENTERING
THE STORM DRAIN SYSTEM. ALL INLETS & INLET OPENINGS SHALL
BE FULLY ENCIRCLED WITH SILT FENCE DURING AND AFTER
CONSTRUCTION OF INLET
25. NO LAND CLEARING OR GRADING SHALL BEGIN UNTIL ALL EROSION
CONTROL MEASURES HAVE BEEN INSTALLED.
26. MAINTAIN EROSION CONTROL MEASURES AFTER EACH RAIN AND
AT LEAST ONCE A WEEK.
27. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE, AS THE
CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO
PREVENT SOIL SEDIMENT FROM LEAVING THE SITE.
28. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE INSTALLED IF DEEMED NECESSARY BY ON-SITE INSPECTION.
29. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE
INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL
BE COVERED WITH FILTER FABRIC.
30. ALL EXPOSED AREAS SHALL BE SEEDED AS SPECIFIED WITHIN 7
DAYS OF FINAL GRADING. SHOULD CONSTRUCTION STOP FOR
LONGER THAN 14 DAYS, THE SITE SHALL BE SEEDED AS SPECIFIED.
31. CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER MEANS
NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION.
32. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE
LOCATIONS OF OFF-SITE MATERIAL, WASTE, BORROW, FILL, OR
EQUIPMENT STORAGE AREAS ON THIS SITE MAP AND ENSURING
THAT EACH LOCATION HAS THE NECESSARY PERMITS IF NOT
COVERED UNDER THE GENERAL PERMIT FOR THIS PROJECT. THE
SITE MAP SHALL BE REVISED AND DATED IF THESE LOCATIONS
CHANGE.
33. THE STORM WATER POLLUTION PREVENTION PLAN IS COMPRISED
OF THIS DRAWING (SITE MAP), THE STANDARD DETAILS, THE PLAN
NARRATIVE, ATTACHMENTS INCLUDED IN THE SWPP, PLUS THE
PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED
DOCUMENTS.
34. GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY
PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE
EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE
PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES,
OFFICE TRAILERS, AND TOILET FACILITIES.
35. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING,
EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND PROPERLY
TREATED OR LEGALLY DISPOSED.
36. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND
FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY
AVAILABLE TO CONTAIN AND CLEANUP FUEL OR CHEMICAL SPILLS
OR LEAKS.
37. DUST ON THE SITE SHALL BE CONTROLLED BY SPRAYING WATER
ON DRY AREAS OF THE SITE, THE USE OF MOTOR OILS AND OTHER
PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION
OPERATIONS IS PROHIBITED.
38. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS
SHALL BE DEPOSITED INTO SEALED CONTAINERS, MATERIALS
SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH
THE ACTION OF WIND OR STORM WATER DISCHARGE INTO
DRAINAGE DITCHES OR WATERS OF THE STATE.
39. ALL STORM WATER POLLUTION PREVENTION MEASURES
PRESENTED ON THIS PLAN, AND IN THE STORM WATER POLLUTION
PREVENTION PLAN, SHALL BE INITIATED AS SOON AS PRACTICABLE.
40. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION
ACTIVITY HAS STOPPED FOR AT LEAST 21 DAYS SHALL BE
TEMPORARILY SEEDED. THESE AREAS SHALL BE SEEDED NO LATER
THAN 14 DAYS FROM THE LAST CONSTRUCTION ACTIVITY
OCCURRING IN THESE AREAS.
41. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL
CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO REMOVE THE
MAJORITY OF DIRT OR MUD, THEN THE TIRES SHALL BE WASHED
BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS
USED, PROVISIONS SHALL BE MADE TO INTERCEPT THE WASH
WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE
SITE.
42. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM
VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS SHALL BE
REMOVED IMMEDIATELY.
43. CONTRACTORS OR SUBCONTRACTORS SHALL BE RESPONSIBLE FOR
REMOVING SEDIMENT IN THE DETENTION POND AND ANY
SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER
DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION
OF THE SITE.
44. ON-SITE & OFFSITE SOIL STOCKPILE AND BORROW AREAS SHALL BE
PROTECTED FROM EROSION AND SEDIMENTATION THROUGH
IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE
AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE SITE
MAP AND PERMITTED IN
45. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE
GRADING PHASE TO REDUCE RUN OFF VELOCITIES AND EROSION.
46. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE
PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES,
STRAW BALES, ETC.) TO PREVENT EROSION.
47. ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH
WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR
UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR
BITUMINOUS PAVING FOR ROAD CONSTRUCTION.
STORM WATER POLLUTION PREVENTION SYSTEM INSPECTIONS
AND MAINTENANCE
1. BETWEEN THE TIME THIS SWPPP IS IMPLEMENTED AND FINAL
SITE STABILIZATION IS ACHIEVED, ALL DISTURBED AREAS
AND POLLUTANT CONTROLS SHALL BE INSPECTED AT LEAST
ONCE EVERY FOURTEEN CALENDAR DAYS AND WITHIN 24
HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR GREATER.
2. THE PURPOSE OF SITE INSPECTIONS IS TO ASSESS
PERFORMANCE OF POLLUTANT CONTROLS. THE
INSPECTIONS SHALL BE CONDUCTED BY THE GENERAL
CONTRACTOR'S DESIGNATED REPRESENTATIVE. BASED ON
THESE INSPECTIONS, THE GENERAL CONTRACTOR SHALL
DECIDE WHETHER IT IS NECESSARY TO MODIFY THIS SWPPP,
ADD OR RELOCATE SEDIMENT BARRIERS, OR WHATEVER
ELSE MAY BE NEEDED IN ORDER TO PREVENT POLLUTANTS
FROM LEAVING THE SITE VIA STORM WATER RUNOFF. THE
GENERAL CONTRACTOR HAS THE DUTY TO CAUSE
POLLUTANT CONTROL MEASURES TO BE REPAIRED,
MODIFIED, MAINTAINED, SUPPLEMENTED, OR WHATEVER
ELSE IS NECESSARY IN ORDER TO ACHIEVE EFFECTIVE
POLLUTANT CONTROL
3. DURING EACH INSPECTION THE INSPECTOR SHALL EVALUATE
OVERALL POLLUTANT CONTROL SYSTEM PERFORMANCE AS
WELL AS PARTICULAR DETAILS OF INDIVIDUAL SYSTEM
COMPONENTS. ADDITIONAL FACTORS SHOULD BE
CONSIDERED AS APPROPRIATE TO THE CIRCUMSTANCES.
4. LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE
SHALL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT
TRAC…
This is the start of the file's text. The full file is on GovTribe.