Qualification_Requirements_for_Contractor.pdf
PDF 155 KB Posted
- Solicitation number
- 2025-05
- Issued by
- Hartford County, Connecticut
About this file
This is a qualification requirements form for contractors seeking to bid on a golf course sand bunker construction project for the Town of Berlin. The project involves the installation of drainage systems and rebuilding of sand bunkers with capillary concrete liners, requiring contractors to demonstrate they have completed at least 40 capillary concrete sand bunkers within the past three years and have experience with similar golf course projects over the past five years. Contractors must provide detailed information about previous golf course projects including course names, dates, addresses, golf course architects, and contact information, along with details about any sub-contractors they plan to use for the work.
To qualify for consideration, contractors must have successfully completed multiple similar projects in the past five years and must assign a full-time supervisor and shaper with relevant capillary concrete and sand bunker experience to the project. The form serves as a mandatory qualification document that must be completed accurately and submitted with the bid proposal, as failure to do so will render the proposal non-responsive. The Town of Berlin reserves sole discretion in determining whether proposers are qualified and responsible for the contract award, and contractors must certify under signature that all information provided is true and accurate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Timberlin_Golf_Course_Sand_Bunker_Restoration_Project_-_RE_BID.pdf | ||
| Drawings.pdf | ||
| Scope.pdf | ||
| Bid_Sheet.pdf | ||
| Prevailing_Wage_Rates_(Heavy).pdf | ||
| Installation_Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALIFICATION REQUIREMENTS FOR CONTRACTOR
In order to be considered for a contract award, all respondents, proposers must be qualified and responsible and must submit a responsive proposal. The Town, in its sole discretion, shall determine if a proposer is qualified and responsible. To be deemed qualified, respondents must, at a minimum, have (1) successfully completed multiple similar projects in the past five (5) years, (2) completed, from the start to the finish of construction, at least 40 (Forty) capillary concrete sand bunkers in the past 3 (three) years, (3) experience installing Capillary Concrete liners in sand bunkers, (4) a a full time Supervisor and Shaper for this project with the experience outlined in (1)-(3) above. Respondents must complete this form concerning qualifications and submit with bid and do not include more info. Failure to fully and accurately complete this form shall render the proposal non-responsive.
Contractor (submitting bid) _____________________________________________________
Please list golf courses where you have installed drainage and rebuilt sand bunkers and the date of each project:
Golf Course/Date:_____________________________________________
Address:________________________________________________
Golf Course Architect:_____________________________________________
Contact at Course:_________________________________________
Golf Course/Date:_____________________________________________
Address:________________________________________________
Golf Course Architect:_____________________________________________
Contact at Course:_________________________________________
The Contractor shall also list any sub-contractors it will be using.
Sub-Contractor _____________________________________ phone ______________for
I hereby certify that the information contained herein is true and accurate, and I acknowledge that the Town of Berlin is relying upon my statements herein.
BY__________________
Date:_________________
File details come from the government source that posted it. Updated .