Drawings.pdf

PDF 5 MB Posted

Attached to
Timberlin Golf Course Sand Bunker Restoration Project - RE BID
Solicitation number
2025-05
Issued by
Hartford County, Connecticut

About this file

This document is a set of construction drawings for a golf course renovation project created by Golf Design Unlimited, showing proposed improvements to 18 holes at what appears to be Timberlin golf course. The drawings detail extensive bunker renovations, green modifications, drainage improvements, and fairway work across all holes, with specific measurements provided for sodding areas (ranging from 600-3,000+ square feet per feature), perforated drainage installations (typically 50-100 linear feet per hole), and new catch basin installations. Each hole drawing shows both schematic layouts and aerial photographs of current conditions, with features labeled by alphanumeric codes (such as 1-G3, 2-F2, etc.) and detailed specifications for drainage connections to new sumps and catch basins. The drawings include revision dates through August 2025 and comprehensive construction details for bunker reconstruction, silt fence installation, drainage systems, and sump construction.

The technical specifications include detailed cross-sections for new sand bunker construction with capillary concrete liners, drainage sump details with filter fabric and stone requirements, and standardized 4-inch drainage systems with specific depth and grading requirements. The project involves significant earthwork with extensive sodding requirements (individual areas ranging from 600 to over 18,000 square feet), bunker rebuilding with modern drainage systems, and integration of new perforated drain tiles connecting to catch basins positioned 4-5 feet from bunker edges. Additional work includes fairway widening, tree removal as necessary, and the installation of silt fencing for erosion control during construction, with all drainage systems designed to connect to existing infrastructure or new collection points.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Timberlin 8 Pro Final

6" N-12 Pipe

NEW & REBUILD SAND BUNKER DETAIL

with Capillary Concrete Liner (No Scale)

Min. 5'

Sod

Subsoil

Endcap

Subsoil Peagravel

Plastic Green Grate (6" Min.)

Sand (as above)

4" Perforated Drain Tile

6" Topsoil

4" Non-Perforated or Perforated Pipe to Drainage Sump, Ditch or Pond.

6" Topsoil

View of 8" N-12 Pipe w/ Grate

4" Tamped Sand

SEE

ENLARGEMENT

ABOVE

4" Perforated Drain Tile

6" - 12"

2"

12"

Subsoil

Sodded Slope

6" Topsoil 2" Capillary Concrete

2" Sand into Trench 4" Pea Gravel above Tile

SECTION 'A-A'

BUNKER PERIMETER

SODDED

(SEE SPECIFICATIONS)

Sod at 90 degree angle

Sod-- Minimum 2 Strips or Whole Area

Sand Capillary Concrete

(Under Sod & Under Sand)

0.5% Min. Fall

BB

A

A 6" Catch Basin 4' to 5' away from bunker edge

DRAIN TILE

PLAN VIEW

SECTION 'B-B'

File details come from the government source that posted it. Updated .