Amendment_2_-_A2SB_SF30.pdf

PDF 199 KB Posted

Attached to
Alliant 2 Small Business (A2SB) Governmentwide Acquisition Contract (GWAC)
Solicitation number
QTA0016GBA0002
Issued by

About this file

Amendment 2 - A2SB SF30

View the file

Other files

File Type Posted
A2SB SF30 Cancellation Amendment Final.pdf PDF
A2SB_AMEND_9_FBO_INTRO.pdf PDF
A2SB_RFP_QTA0016GBA0002_AMEND_9_SECTIONS_L_&_M.pdf PDF
A2SB_Amendment_9_-_J.P-6_Direct_Labor_Rate_Ranges.pdf PDF
A2SB_Amendment_9-Attachment_2-Instructions_to_Offerors_-_Draft.pdf PDF
A2SB_Amendment_9_-_Draft.pdf PDF
A2SB_Amendment_9-Attachment_1-_Draft.pdf PDF
A2SB_RFP_Question_Template.xlsx XLSX spreadsheet
FBO_Contract_Rescission_Notice.pdf PDF
Alliant_2_Small_Business_Notice_of_Award.pdf PDF
A2SB_Offer_Acceptance_Period_Extension.pdf PDF
A2SB_Preaward_Notice_for_Small_Business_Programs.pdf PDF
A2SB_Offer_Acceptance_Period__Extension.pdf PDF
QTA0016GBA0002_-_Questions_ _Responses__4.pdf PDF
Amendment_8_-_A2SB_SF30.pdf PDF
Amendment_8_-_A2SB_RFP_QTA0016GBA0002.pdf PDF
Amendment_7_-_A2SB_SF30.pdf PDF
Amendment_7_-_A2SB_RFP_QTA0016GBA0002.pdf PDF
Amendment_6_-_A2SB_RFP_QTA0016GBA0002.pdf PDF
Amendment_6_-_A2SB_SF30.pdf PDF
Amendment_5_-_J.P-7_CTA_Template.pdf PDF
Amendment_5_-_A2SB_SF30.pdf PDF
Amendment_5_-_A2SB_RFP_QTA0016GBA0002.pdf PDF
QTA0016GBA0002_-_Questions_ _Responses__3.pdf PDF
Amendment_4_-_A2SB_RFP_QTA0016GBA0002.pdf PDF
Amendment_4_-_A2SB_SF30.pdf PDF
07-18-2016_Virtual_Pre-proposal_Conference.pdf PDF
07-12-2016_Pre-proposal_Conference_(both_sessions).pdf PDF
07-12-2016_GWAC_Pre-Proposal_Conference_Power_Point_Slides.pptx PPTX presentation
Amendment_3_-_A2SB_RFP_QTA0016GBA0002.pdf PDF
Amendment_3_-_A2SB_SF30.pdf PDF
Amendment_3_-_J.P-3_Relevant_Experience_(Leading_Edge_Technology)_Project_Template.pdf PDF
Amendment_3_-_J.P-2_Relevant_Experience_(PSC_Group)_Project_Template.pdf PDF
QTA0016GBA0002_-_Questions_ _Responses__2.pdf PDF
QTA0016GBA0002_-_Questions_ _Responses__1.pdf PDF
Amendment_2_-_J.P-1_Document_Verification_and_Self_Scoring_Worksheet_-_A2SB.xlsx XLSX spreadsheet
Amendment_1_-_A2SB_SF30.pdf PDF
Amendment_2_-_J.P-9_FPDS_Sample.pdf PDF
Amendment_2_-_J.P-3_Relevant_Experience_(Leading_Edge_Technology)_Project_Template.docx DOCX document
Amendment_2_-_A2SB_RFP_QTA0016GBA0002.pdf PDF
Amendment_2_-_J.P-2_Relevant_Experience_(PSC_Group)_Project_Template.docx DOCX document
A2SB_Virtual_Pre-proposal_Conference.pdf PDF
A2SB_Pre-proposal_Conference_Details.pdf PDF
Section_A_-_A2SB_SF33_(corrected).pdf PDF
A2SB_RFP_QTA0016GBA0002.pdf PDF
J.P-8_Cost_Price_Template.xlsx XLSX spreadsheet
J.P-5_Past_Performance_Rating_Form.docx DOCX document
A2SB_RFP_Question_Template.xlsx XLSX spreadsheet
J.P-3_Relevant_Experience_(Leading_Edge_Technology)_Project_Template.docx DOCX document
J.P-1_Document_Verification_and_Self_Scoring_Worksheet_-_A2SB.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SEE ATTACHED PAGES 2-6

GENERAL SERVICES ADMINISTRATION

2300 MAIN ST, KANSAS CITY, MO 64108

SAME AS BLOCK 6

QTA0016GBA0002

1 6

06/27/2016

06/24/2016

Alliant 2 Small Business GWAC Solicitation No.: QTA0016GBA0002

Amendment 2

The purpose of this amendment is to make the following changes. All changes to the RFP are denoted in red text in the Amendment 2 – A2SB RFP QTA0016GBA0002 document and J.P Attachments included with this amendment:

1. B.14 GWAC CONTRACT ACCESS FEE (CAF)

Add the following sentence to the third paragraph as follows – “The CAF Rate at the time of Task

Order Award shall remain the same for that Task Order for the full duration of the Order.”

2. G.21 CONTRACT ACCESS FEE (CAF)

Complete the last sentence in paragraph (d) as follows – “This written permission must be remitted to and approved by the GWAC Program Office.”

3. SECTION I CONTRACT CLAUSES

Correct Section L.2.1.2 to read I.2.1.2

Correct first Section I.11 to read I.10

Correct Section I.12 to read I.11

Correct Section I.10 to read I.12

Correct second Section I.11 to read I.13

4. L.2.1 FAR 52.215-20 Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data

Alternate IV (OCT 2010)

Correct the reference in paragraph (b) to read “L.5.6 Volume 6.”

5. L.3.5 Solicitation Questions

Correct the email address in the second paragraph to read as follows – A2SB@gsa.gov

6. L.4 PROPOSAL FORMAT (PROPOSAL FORMAT TABLE)

Those parts of the Proposal Format Table that have changed are noted below (red text). There are no changes to any other parts.

1 L.5.1.2

Document Verification and

Self Scoring Worksheet

“No change in this cell”

“No change in this cell” ABC.VOL1.JP1.xls

1 L.5.1.5.1

Joint Venture or Partnership Agreement

“No change in this cell”

“No change in this cell” “No change in this cell”

2 L.5.2.2

PSC Group Relevant

Experience Projects

“No change in this cell”

Section J.P-2 Template limited to three pages.

No page limitations for supporting documents. “No change in this cell”

2 L.5.2.3

Leading Edge Technology

Relevant Experience

Projects

“No change in this cell”

Section J.P-3 Template limited to three pages.

No page limitations for supporting documents. “No change in this cell”

3 L.5.3.3

Negative Past Performance

Narrative

“No change in this cell”

One-page. Page should be 8.5 x 11 inches; font type and size (10 to 12) point Arial; Margins of 1 inch “No change in this cell”

5 L.5.5

Organization Risk

Assessment

“No change in this cell”

Limited to the verification requirements.

If a CTA is not applying for these additional points, no file need be submitted. If an

Offeror is proposing as an individual company no file need be submitted to receive additional points. “No change in this cell”

6 L.5.6.1 Basis of Estimate

As described in L.5.6.1

“No change in this cell” ABC.VOL6.BoE.pdf

6 L.5.6.2 Cost/Price Template

“No change in this cell”

“No change in this cell”

ABC.VOL6.JP8COSTPRICE.xl s

7 L.5.7.1 GSA Form 527

“No change in this cell”

“No change in this cell” ABC.VOL7.527.pdf

7. L.5. PROPOSAL CONTENT

In the first paragraph change the reference from L.5.1.5.1 to L.5.1.5.3

8. L.5.1.2 Document Verification and Self Scoring Worksheet

Change number 3 to read as follows:

3. The Offeror must fill in Column C by entering a “Yes” or “No” for each element (the only exception is row 127, Total PSC Projects Submitted). Just type the word, not the quotation marks. Do not leave any Rows under Column C blank.

9. L.5.1.5.2 Proposed Subcontractors, if applicable

Change paragraph 4(c) FAR clause reference to read – “FAR 52.219-14”

10. L.5.2.1 Relevant Experience Projects

In paragraph one change (5) by deleting “Single Award”

In paragraph three change the reference from L.5.1.5.1 to L.5.1.5.3

11. L.5.2.2 PSC Group Relevant Experience

In paragraph one change the reference from L.5.1.5.1 to L.5.1.5.3

12. L.5.2.2.7 PSC Code Table

In GROUP III change the numbering on the last two PSC code references from 11 and 12 to 10 and

11, respectively.

13. L.5.2.3 Leading Edge Technology Relevant Experience

In the first paragraph change the reference from L.5.1.5.1 to L.5.1.5.3

14. L.5.3.1 Past Performance ((PPIRS) information exists)

To the end of the paragraph add the following sentence – “A finalized CPARS report may be submitted in lieu of PPIRS if a PPIRS report is not available.”

15. L.5.4.1 Cost Accounting System and Audit Information

Delete the fifth paragraph in its entirety.

16. L.5.4.10 Facility Clearance Level (FCL)

Add the following two sentences between the first and second sentence – “In lieu of a letter, Offerors may provide a screen print of their information from the Industrial Security Facilities Database (ISFD).

An interim FCL approval is acceptable.”

17. L.5.5.1 Organizational Risk Assessment

Add the following third paragraph – ““Previously performed”, for the purposes of this evaluation factor, is defined as actual performance on a contract or order that took place before the issuance of the

A2SB solicitation.”

Change the first sentence in the new fourth paragraph to read – “A business arrangement is considered to have previously performed if one of the following applicable conditions is met:”

18. L.5.6.1 Basis of Estimate

Change the reference in (b)(1)(i) from L.5.5.2.1 to L.5.6.2.1

Change the reference in (b)(2)(ii) from L.5.5.2.2 to L.5.6.2.2

Change the reference in (b)(3)(i) from L.5.5.2.2 to L.5.6.2.2

19. L.5.6.2 Cost/Price Methodology and Instructions

Change the first sentence in paragraph three to read – “Offerors shall only provide the ceiling rates for

Year 1 of the contract with an estimated start date of October 1, 2017.”

Change the escalation factor in paragraph three from 1.80% to 1.93%

20. L.5.6.2.1 Direct Labor Rates

In the last paragraph (caution paragraph) change the word “within” to “outside”

21. L.5.7 VOLUME 7 – RESPONSIBILITY

In the first paragraph change the reference from “Volume 6” to “Volume 7”

22. M.5 TECHNICAL EVALUATION

In the first paragraph change the section references as follows – “Sections L.5.2, L.5.3, L.5.4, and

L.5.5”

23. M.5.4.1 Organizational Risk Assessment

Change the reference from M.7 to M.6

24. M.6 SCORING TABLE

In section “L.5.4.6 through L.5.4.9” change the reference from “ISO 9000” to “ISO 9001”

Change reference to section “L.5.3 VOLUME 5 – ORGANIZATIONAL RISK ASSESSMENT” to “L.5.5

VOLUME 5 – ORGANIZATIONAL RISK ASSESSMENT”

25. M.7 VOLUME 6 - COST/PRICE

Change title of the section from “VOLUME 5” to “VOLUME 6”

In the first paragraph change reference from L.5.5 to L.5.6

In the third paragraph change the reference from L.5.5.2.1 to L.5.6.2.1

In the fourth paragraph change the reference from L.5.5.2.2 to L.5.6.2.2

In the fifth paragraph change the reference from L.5.5.2.2 to L.5.6.2.2

26. M.8 VOLUME 7 – Responsibility

Change title of the section from “VOLUME 6” to “VOLUME 7”

In the second paragraph change the reference from L.5.6.1 to L.5.7.1

27. J.P-1 Document Verification and Self Scoring Worksheet

Corrected the calculation error in L.5.2.3.2, cell C:120

Highlighted cell C:127 in bold red borders to bring attention to the fact that this cell requires a response other than “yes”.

28. J.P-2 Relevant Experience (PSC Group) Project Template “NO MATERIAL CHANGES ARE BEING

MADE TO ATTACHEMENT J.P-2. SUBMITTAL OF ORIGINAL J.P-2 IS ACCEPTABLE”

Add the following to Part IV: Project Verification Method to the text above the signature block –

“Signature by COR must include copy of email notification to the cognizant Contracting Officer”

29. J.P-3 Relevant Experience (Leading Edge Technology) Project Template “NO MATERIAL CHANGES

ARE BEING MADE TO ATTACHEMENT J.P-3. SUBMITTAL OF ORIGINAL J.P-3 IS ACCEPTABLE”

In Part I Project Identification, change the reference in the seventh cell from the top from J.P-8 to J.P-7

In Part III Project description, add the following to the text above the signature block – “Signature by

COR must include copy of email notification to the cognizant Contracting Officer”

30. J.P-9 FPDS Sample

Replace J.P-9 with the amended J.P-9

Additional information:

• The offer deadline is not extended.

• Acknowledgement of this amendment is not required.

• Block 13 A, B, C, D, and E on Page 1 of the SF 30 do not apply.

End of Amendment 2

Amendment 2 - SF30
A2SB Amendment 2

File details come from the government source that posted it. Updated .