Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SEE ATTACHED PAGES 2-6
GENERAL SERVICES ADMINISTRATION
2300 MAIN ST, KANSAS CITY, MO 64108
SAME AS BLOCK 6
QTA0016GBA0002
1 6
06/27/2016
06/24/2016
Alliant 2 Small Business GWAC Solicitation No.: QTA0016GBA0002
Amendment 2
The purpose of this amendment is to make the following changes. All changes to the RFP are denoted in red text in the Amendment 2 – A2SB RFP QTA0016GBA0002 document and J.P Attachments included with this amendment:
1. B.14 GWAC CONTRACT ACCESS FEE (CAF)
Add the following sentence to the third paragraph as follows – “The CAF Rate at the time of Task
Order Award shall remain the same for that Task Order for the full duration of the Order.”
2. G.21 CONTRACT ACCESS FEE (CAF)
Complete the last sentence in paragraph (d) as follows – “This written permission must be remitted to and approved by the GWAC Program Office.”
3. SECTION I CONTRACT CLAUSES
Correct Section L.2.1.2 to read I.2.1.2
Correct first Section I.11 to read I.10
Correct Section I.12 to read I.11
Correct Section I.10 to read I.12
Correct second Section I.11 to read I.13
4. L.2.1 FAR 52.215-20 Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data
Alternate IV (OCT 2010)
Correct the reference in paragraph (b) to read “L.5.6 Volume 6.”
5. L.3.5 Solicitation Questions
Correct the email address in the second paragraph to read as follows – A2SB@gsa.gov
6. L.4 PROPOSAL FORMAT (PROPOSAL FORMAT TABLE)
Those parts of the Proposal Format Table that have changed are noted below (red text). There are no changes to any other parts.
1 L.5.1.2
Document Verification and
Self Scoring Worksheet
“No change in this cell”
“No change in this cell” ABC.VOL1.JP1.xls
1 L.5.1.5.1
Joint Venture or Partnership Agreement
“No change in this cell”
“No change in this cell” “No change in this cell”
2 L.5.2.2
PSC Group Relevant
Experience Projects
“No change in this cell”
Section J.P-2 Template limited to three pages.
No page limitations for supporting documents. “No change in this cell”
2 L.5.2.3
Leading Edge Technology
Relevant Experience
Projects
“No change in this cell”
Section J.P-3 Template limited to three pages.
No page limitations for supporting documents. “No change in this cell”
3 L.5.3.3
Negative Past Performance
Narrative
“No change in this cell”
One-page. Page should be 8.5 x 11 inches; font type and size (10 to 12) point Arial; Margins of 1 inch “No change in this cell”
5 L.5.5
Organization Risk
Assessment
“No change in this cell”
Limited to the verification requirements.
If a CTA is not applying for these additional points, no file need be submitted. If an
Offeror is proposing as an individual company no file need be submitted to receive additional points. “No change in this cell”
6 L.5.6.1 Basis of Estimate
As described in L.5.6.1
“No change in this cell” ABC.VOL6.BoE.pdf
6 L.5.6.2 Cost/Price Template
“No change in this cell”
“No change in this cell”
ABC.VOL6.JP8COSTPRICE.xl s
7 L.5.7.1 GSA Form 527
“No change in this cell”
“No change in this cell” ABC.VOL7.527.pdf
7. L.5. PROPOSAL CONTENT
In the first paragraph change the reference from L.5.1.5.1 to L.5.1.5.3
8. L.5.1.2 Document Verification and Self Scoring Worksheet
Change number 3 to read as follows:
3. The Offeror must fill in Column C by entering a “Yes” or “No” for each element (the only exception is row 127, Total PSC Projects Submitted). Just type the word, not the quotation marks. Do not leave any Rows under Column C blank.
9. L.5.1.5.2 Proposed Subcontractors, if applicable
Change paragraph 4(c) FAR clause reference to read – “FAR 52.219-14”
10. L.5.2.1 Relevant Experience Projects
In paragraph one change (5) by deleting “Single Award”
In paragraph three change the reference from L.5.1.5.1 to L.5.1.5.3
11. L.5.2.2 PSC Group Relevant Experience
In paragraph one change the reference from L.5.1.5.1 to L.5.1.5.3
12. L.5.2.2.7 PSC Code Table
In GROUP III change the numbering on the last two PSC code references from 11 and 12 to 10 and
11, respectively.
13. L.5.2.3 Leading Edge Technology Relevant Experience
In the first paragraph change the reference from L.5.1.5.1 to L.5.1.5.3
14. L.5.3.1 Past Performance ((PPIRS) information exists)
To the end of the paragraph add the following sentence – “A finalized CPARS report may be submitted in lieu of PPIRS if a PPIRS report is not available.”
15. L.5.4.1 Cost Accounting System and Audit Information
Delete the fifth paragraph in its entirety.
16. L.5.4.10 Facility Clearance Level (FCL)
Add the following two sentences between the first and second sentence – “In lieu of a letter, Offerors may provide a screen print of their information from the Industrial Security Facilities Database (ISFD).
An interim FCL approval is acceptable.”
17. L.5.5.1 Organizational Risk Assessment
Add the following third paragraph – ““Previously performed”, for the purposes of this evaluation factor, is defined as actual performance on a contract or order that took place before the issuance of the
A2SB solicitation.”
Change the first sentence in the new fourth paragraph to read – “A business arrangement is considered to have previously performed if one of the following applicable conditions is met:”
18. L.5.6.1 Basis of Estimate
Change the reference in (b)(1)(i) from L.5.5.2.1 to L.5.6.2.1
Change the reference in (b)(2)(ii) from L.5.5.2.2 to L.5.6.2.2
Change the reference in (b)(3)(i) from L.5.5.2.2 to L.5.6.2.2
19. L.5.6.2 Cost/Price Methodology and Instructions
Change the first sentence in paragraph three to read – “Offerors shall only provide the ceiling rates for
Year 1 of the contract with an estimated start date of October 1, 2017.”
Change the escalation factor in paragraph three from 1.80% to 1.93%
20. L.5.6.2.1 Direct Labor Rates
In the last paragraph (caution paragraph) change the word “within” to “outside”
21. L.5.7 VOLUME 7 – RESPONSIBILITY
In the first paragraph change the reference from “Volume 6” to “Volume 7”
22. M.5 TECHNICAL EVALUATION
In the first paragraph change the section references as follows – “Sections L.5.2, L.5.3, L.5.4, and
L.5.5”
23. M.5.4.1 Organizational Risk Assessment
Change the reference from M.7 to M.6
24. M.6 SCORING TABLE
In section “L.5.4.6 through L.5.4.9” change the reference from “ISO 9000” to “ISO 9001”
Change reference to section “L.5.3 VOLUME 5 – ORGANIZATIONAL RISK ASSESSMENT” to “L.5.5
VOLUME 5 – ORGANIZATIONAL RISK ASSESSMENT”
25. M.7 VOLUME 6 - COST/PRICE
Change title of the section from “VOLUME 5” to “VOLUME 6”
In the first paragraph change reference from L.5.5 to L.5.6
In the third paragraph change the reference from L.5.5.2.1 to L.5.6.2.1
In the fourth paragraph change the reference from L.5.5.2.2 to L.5.6.2.2
In the fifth paragraph change the reference from L.5.5.2.2 to L.5.6.2.2
26. M.8 VOLUME 7 – Responsibility
Change title of the section from “VOLUME 6” to “VOLUME 7”
In the second paragraph change the reference from L.5.6.1 to L.5.7.1
27. J.P-1 Document Verification and Self Scoring Worksheet
Corrected the calculation error in L.5.2.3.2, cell C:120
Highlighted cell C:127 in bold red borders to bring attention to the fact that this cell requires a response other than “yes”.
28. J.P-2 Relevant Experience (PSC Group) Project Template “NO MATERIAL CHANGES ARE BEING
MADE TO ATTACHEMENT J.P-2. SUBMITTAL OF ORIGINAL J.P-2 IS ACCEPTABLE”
Add the following to Part IV: Project Verification Method to the text above the signature block –
“Signature by COR must include copy of email notification to the cognizant Contracting Officer”
29. J.P-3 Relevant Experience (Leading Edge Technology) Project Template “NO MATERIAL CHANGES
ARE BEING MADE TO ATTACHEMENT J.P-3. SUBMITTAL OF ORIGINAL J.P-3 IS ACCEPTABLE”
In Part I Project Identification, change the reference in the seventh cell from the top from J.P-8 to J.P-7
In Part III Project description, add the following to the text above the signature block – “Signature by
COR must include copy of email notification to the cognizant Contracting Officer”
30. J.P-9 FPDS Sample
Replace J.P-9 with the amended J.P-9
Additional information:
• The offer deadline is not extended.
• Acknowledgement of this amendment is not required.
• Block 13 A, B, C, D, and E on Page 1 of the SF 30 do not apply.