SolicitationAmendment0002.pdf
PDF 226 KB Posted
- Solicitation number
- QSE--36C78626Q50106
About this file
This is an Amendment of Solicitation (Amendment 0002) issued by the National Cemetery Administration, Department of Veterans Affairs, Central CO office located in Triangle, VA for solicitation 36C78626Q50106. The amendment is effective March 4, 2026, and addresses contractor questions regarding the requirement. The quote response due date remains March 20, 2026, with all other terms and conditions unchanged. The contracting officer is Marshand Boone, and the amendment was signed on March 13, 2026.
The amendment includes responses to two contractor questions. The first question addressed whether a 15-yard dumpster on a more frequent schedule could substitute for the standard 40-yard roll-off dumpster requested approximately six times per year. The government clarified that the primary purpose of the 40-yard dumpster is to accommodate headstones, but confirmed there is no objection to using a smaller dumpster as long as the cemetery can dispose of headstones in it. The second question inquired about the current incumbent contractor. The government responded that there is no current incumbent, no existing contract in place, and that the National Cemetery Administration is currently obtaining dumpster services through monthly purchase card transactions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78626Q50106 QA2.docx | DOCX document | |
| WCNC DumpsterWaste Removal Service SOW v22.docx | DOCX document | |
| WD Bucks County.docx | DOCX document | |
| washington crossing waste continuationr.docx | DOCX document | |
| washington crossing waste continuationr.docx | DOCX document | |
| WD Bucks County.docx | DOCX document | |
| QSE 36C78626Q50106.pdf | ||
| SolicitationAmendment0001.pdf | ||
| WCNC DumpsterWaste Removal Service SOW v22.docx | DOCX document | |
| WCNC DumpsterWaste Removal Service SOW v2.docx | DOCX document | |
| washington crossing waste continuationr.docx | DOCX document | |
| Solicitation.pdf | ||
| WD Bucks County.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Number: 36C78626Q50106 PROCESSED Page 1 of 5
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
03/04/2026
4. REQUISITION/PURCHASE REQ. NUMBER 5. PROJECT NUMBER (If applicable)
36C786CODE
NATIONAL CEMETERY ADMIN (786)
NATIONAL CEMETERY ADMIN
DEPT OF VETERANS AFFAIRS-CENTRAL CO
18434 Joplin Road Triangle, VA 22172
6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NUMBER
36C78626Q50106
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
03/04/2026
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to answer contractor questions. The due date for quote responses remains March 20, 2026. All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Marshand Boone
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
03/13/2026
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV.
11/2016) Prescribed by GSA FAR (48 CFR) 53.243
Document Number: 36C78626Q50106 PROCESSED Page 2 of 5
Table of Contents
Section Description Page Number
Document Number: 36C78626Q50106 PROCESSED Page 3 of 5
Document Number: 36C78626Q50106 PROCESSED Page 4 of 5
36C78626Q50106 Amendment 2
Contractor Question and Answers
1. There is a price request for a 40 yard roll off dumped around 6 x per year. Is the reason to minimize traffic in and out of the cemetery to help maintain dignity decorum? I Just wanted to know if an option of doing a 15-yard dumped on a more frequent schedule would be an option if it helps save money?
Answer: The main reason the cemetery gets the 40-yard dumpster is to put headstones in there.
There is no objection to the smaller one as long as the cemetery can put the headstones in it.
2. Could you please advise who the current incumbent contractor is for this requirement?
Answer: There is no current incumbent. There is currently no contract in place. There is monthly pick-up via purchase card.
Document Number: 36C78626Q50106 PROCESSED Page 5 of 5