This is a price schedule template for grounds maintenance services at Danville National Cemetery spanning a base year (04/01/2025 - 03/31/2026) and four option years through 03/31/2030. The schedule outlines 26 Contract Line Items (CLINs) covering various cemetery maintenance tasks including burial services, grounds maintenance, and headstone management.
The scope includes transport and placement of urns/caskets (175 annual interments), weekly mowing and trimming (36 weeks), fertilization and herbicide application (7 times annually), irrigation system maintenance, placement of 11,500 grave flags, headstone cleaning (4,000 annually), headstone alignment (1,200 annually), and daily facility maintenance including restrooms and the committal shelter. The contract incorporates both Service Contract Act (SCA) and Davis-Bacon Act (DBA) wage determinations, with specific CLINs designated for each. The template requires vendors to input unit prices for each line item across the base and option years, though no pricing is shown in this version.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Danville National Cemetery Grounds Maintenance
| Base year | |||||||
| Danville National Cemetery Base Year 04/01/2025 - 03/31/2026 | |||||||
| CLIN | ITEM | EST. QTY | UNIT | UNIT PRICE | TOTAL PRICE | ||
| 0001 | SCA | Base | Transport Urn and Floral Arrangements, tagging of floral arrangements, completion of "chain of custody documents, Place Urn into Columbarium/gravesite, replace headstone/marker/niche cover and temporary tag, Complete chain of custody documents for all interment days including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 100 | EA | ||
| 0002 | SCA | Base | Transport Casket and Floral Arrangements from Committal Shelter, and Place Casket onto lowering device over gravesite for all Casket interments including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 75 | JB | ||
| 0003 | SCA | Base | Remove Sod, excavate assigned casket and cremation gravesite, place and lower casket/urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 75 | JB | ||
| 0004 | SCA | Base | Mow and Trim ALL turfgrass areas including headstones; edge all sidewalks and curbs; blow/sweep/remove grass clipping/debris and fenceline treatment | 36 | WK | ||
| 0005 | SCA | Base | Remove Sod, excavate assigned cremation gravesite, place urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 100 | JB | ||
| 0006 | SCA | Base | Fertilizer: Provide and Apply ALL turfgrass areas (JUNE, SEP., & OCT) /Pre/Post-emergence Herbicide, including grub control insecticide: Provide and Apply on All turfgrass areas -Appropriate to the USDA Hardiness Zone (APR, MAY, JUN, & OCT) | 7 | EA | ||
| 0007 | SCA | Base | Core Aeration of all turfgrass areas | 1 | EA | ||
| 0008 | SCA | Base | Overseed all turfgrass areas | 1 | EA | ||
| 0009 | SCA | Base | Debris Removal from any/all cemetery grounds | 52 | WK | ||
| 0010 | SCA | Base | Pressure Wash Committal Shelter, Hardscapes, Bathroom, fencing in Spoils area, and Pump House Building | 4 | JB | ||
| 0011 | SCA | Base | Committal Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag for all interment days including weekend and Holiday burials as required | 175 | JB | ||
| 0012 | SCA | Base | Placement and removal of Flags (Grave Flags) | 11500 | EA | ||
| 0013 | SCA | Base | Placement and Removal of Flags (50 Avenue Flags) (twice yearly) | 100 | EA | ||
| 0014 | SCA | Base | Turfgrass Renovation: Seed, Sod, establishment for spotty/bare areas | 2000 | SQFT | ||
| 0015 | SCA | Base | Planting Beds and Tree Rings - Maintain edging, mulch and weed-free all planting beds and tree rings. Seasonal removal and replacement of mulch on all trees. | 9 | EA | ||
| 0016 | SCA | Base | Shrub Tree Maintenance/Pruning/Shaping | 2 | EA | ||
| 0017 | SCA | Base | Mole, Gopher, and Rodent Control | 6 | EA | ||
| 0018 | SCA | Base | Maintenance of rock-filled ditch maintenance and treatment, known as “Rip Rap North” and “Rip Rap South” | 12 | MO | ||
| 0019 | SCA | Base | Irrigation System – Full operation and maintenance, including repairs to maintain operation and adjustments as necessary, 1 Fall Shut-Down, 1 Spring Start-Up, Backflow Testing | 9 | EA | ||
| 0020 | SCA | Base | Road parking lots and sidewalk Cleaning/Sweeping/Blowing, includes maintaining free from hazards such as snow and ice (apply ice melt to remove/prevent ice) including weekends and Holidays | 12 | MO | ||
| 0021 | SCA | Base | Cleaning & maintenance of public restrooms and shop areas | 12 | MO | ||
| 0022 | SCA | Base | Headstones – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days | 175 | JB | ||
| 0023 | SCA | Base | Niche Covers - storage and disposal of old/replaced/monuments.Niche Covers – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days and destroying replaced niche covers. | 50 | EA | ||
| 0024 | DBA | Base | Headstone Cleaning | 4000 | EA | ||
| 0025 | DBA | Base | Headstone Fine Tune Alignment | 200 | EA | ||
| 0026 | DBA | Base | Headstone Raise & Realignment | 1000 | EA |
BASE YEAR BASE TOTAL: $0.00
| Option Year 1 | ||||||||
| Danville National Cemetery Year 1 04/01/2026 - 03/31/2027 | ||||||||
| CLIN | ITEM | EST. QTY | UNIT | UNIT PRICE | TOTAL PRICE | |||
| 1001 | SCA | Option Year 1 | Transport Urn and Floral Arrangements, tagging of floral arrangements, completion of "chain of custody documents, Place Urn into Columbarium/gravesite, replace headstone/marker/niche cover and temporary tag, Complete chain of custody documents for all interment days including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 100 | EA | |||
| 1002 | SCA | Option Year 1 | Transport Casket and Floral Arrangements from Committal Shelter, and Place Casket onto lowering device over gravesite for all Casket interments including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 75 | JB | |||
| 1003 | SCA | Option Year 1 | Remove Sod, excavate assigned casket and cremation gravesite, place and lower casket/urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 75 | JB | |||
| 1004 | SCA | Option Year 1 | Mow and Trim ALL turfgrass areas including headstones; edge all sidewalks and curbs; blow/sweep/remove grass clipping/debris and fenceline treatment | 36 | WK | |||
| 1005 | SCA | Option Year 1 | Remove Sod, excavate assigned cremation gravesite, place urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 100 | JB | |||
| 1006 | SCA | Option Year 1 | Fertilizer: Provide and Apply ALL turfgrass areas (JUNE, SEP., & OCT) /Pre/Post-emergence Herbicide, including grub control insecticide: Provide and Apply on All turfgrass areas -Appropriate to the USDA Hardiness Zone (APR, MAY, JUN, & OCT) | 7 | EA | |||
| 1007 | SCA | Option Year 1 | Core Aeration of all turfgrass areas | 1 | EA | |||
| 1008 | SCA | Option Year 1 | Overseed all turfgrass areas | 1 | EA | |||
| 1009 | SCA | Option Year 1 | Debris Removal from any/all cemetery grounds | 52 | WK | 1.05 | ||
| 1010 | SCA | Option Year 1 | Pressure Wash Committal Shelter, Hardscapes, Bathroom, fencing in Spoils area, and Pump House Building | 4 | JB | |||
| 1011 | SCA | Option Year 1 | Committal Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag for all interment days including weekend and Holiday burials as required | 175 | JB | |||
| 1012 | SCA | Option Year 1 | Placement and removal of Flags (Grave Flags) | 11500 | EA | |||
| 1013 | SCA | Option Year 1 | Placement and Removal of Flags (50 Avenue Flags) (twice yearly) | 100 | EA | |||
| 1014 | SCA | Option Year 1 | Turfgrass Renovation: Seed, Sod, establishment for spotty/bare areas | 2000 | SQFT | |||
| 1015 | SCA | Option Year 1 | Planting Beds and Tree Rings - Maintain edging, mulch and weed-free all planting beds and tree rings. Seasonal removal and replacement of mulch on all trees. | 9 | EA | |||
| 1016 | SCA | Option Year 1 | Shrub Tree Maintenance/Pruning/Shaping | 2 | EA | |||
| 1017 | SCA | Option Year 1 | Mole, Gopher, and Rodent Control | 6 | EA | |||
| 1018 | SCA | Option Year 1 | Maintenance of rock-filled ditch maintenance and treatment, known as “Rip Rap North” and “Rip Rap South” | 12 | MO | |||
| 1019 | SCA | Option Year 1 | Irrigation System – Full operation and maintenance, including repairs to maintain operation and adjustments as necessary, 1 Fall Shut-Down, 1 Spring Start-Up, Backflow Testing | 9 | EA | |||
| 1020 | SCA | Option Year 1 | Road parking lots and sidewalk Cleaning/Sweeping/Blowing, includes maintaining free from hazards such as snow and ice (apply ice melt to remove/prevent ice) including weekends and Holidays | 12 | MO | |||
| 1021 | SCA | Option Year 1 | Cleaning & maintenance of public restrooms and shop areas | 12 | MO | |||
| 1022 | SCA | Option Year 1 | Headstones – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days | 175 | JB | |||
| 1023 | SCA | Option Year 1 | Niche Covers - storage and disposal of old/replaced/monuments.Niche Covers – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days and destroying replaced niche covers. | 50 | EA | |||
| 1024 | DBA | Option Year 1 | Headstone Cleaning | 4000 | EA | |||
| 1025 | DBA | Option Year 1 | Headstone Fine Tune Alignment | 200 | EA | |||
| 1026 | DBA | Option Year 1 | Headstone Raise & Realignment | 1000 | EA |
OPTION YEAR 1 BASE TOTAL: $0.00
| Option Year 2 | ||||||||
| Danville National Cemetery Year 2 04/01/2027 - 03/31/2028 | ||||||||
| CLIN | ITEM | EST. QTY | UNIT | UNIT PRICE | TOTAL PRICE | |||
| 2001 | SCA | Option Year 2 | Transport Urn and Floral Arrangements, tagging of floral arrangements, completion of "chain of custody documents, Place Urn into Columbarium/gravesite, replace headstone/marker/niche cover and temporary tag, Complete chain of custody documents for all interment days including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 100 | EA | |||
| 2002 | SCA | Option Year 2 | Transport Casket and Floral Arrangements from Committal Shelter, and Place Casket onto lowering device over gravesite for all Casket interments including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 75 | JB | |||
| 2003 | SCA | Option Year 2 | Remove Sod, excavate assigned casket and cremation gravesite, place and lower casket/urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 75 | JB | 1.1 | ||
| 2004 | SCA | Option Year 2 | Mow and Trim ALL turfgrass areas including headstones; edge all sidewalks and curbs; blow/sweep/remove grass clipping/debris and fenceline treatment | 36 | WK | |||
| 2005 | SCA | Option Year 2 | Remove Sod, excavate assigned cremation gravesite, place urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 100 | JB | |||
| 2006 | SCA | Option Year 2 | Fertilizer: Provide and Apply ALL turfgrass areas (JUNE, SEP., & OCT) /Pre/Post-emergence Herbicide, including grub control insecticide: Provide and Apply on All turfgrass areas -Appropriate to the USDA Hardiness Zone (APR, MAY, JUN, & OCT) | 7 | EA | |||
| 2007 | SCA | Option Year 2 | Core Aeration of all turfgrass areas | 1 | EA | |||
| 2008 | SCA | Option Year 2 | Overseed all turfgrass areas | 1 | EA | |||
| 2009 | SCA | Option Year 2 | Debris Removal from any/all cemetery grounds | 52 | WK | |||
| 2010 | SCA | Option Year 2 | Pressure Wash Committal Shelter, Hardscapes, Bathroom, fencing in Spoils area, and Pump House Building | 4 | JB | |||
| 2011 | SCA | Option Year 2 | Committal Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag for all interment days including weekend and Holiday burials as required | 175 | JB | |||
| 2012 | SCA | Option Year 2 | Placement and removal of Flags (Grave Flags) | 11500 | EA | |||
| 2013 | SCA | Option Year 2 | Placement and Removal of Flags (50 Avenue Flags) (twice yearly) | 100 | EA | |||
| 2014 | SCA | Option Year 2 | Turfgrass Renovation: Seed, Sod, establishment for spotty/bare areas | 2000 | SQFT | |||
| 2015 | SCA | Option Year 2 | Planting Beds and Tree Rings - Maintain edging, mulch and weed-free all planting beds and tree rings. Seasonal removal and replacement of mulch on all trees. | 9 | EA | |||
| 2016 | SCA | Option Year 2 | Shrub Tree Maintenance/Pruning/Shaping | 2 | EA | |||
| 2017 | SCA | Option Year 2 | Mole, Gopher, and Rodent Control | 6 | EA | |||
| 2018 | SCA | Option Year 2 | Maintenance of rock-filled ditch maintenance and treatment, known as “Rip Rap North” and “Rip Rap South” | 12 | MO | |||
| 2019 | SCA | Option Year 2 | Irrigation System – Full operation and maintenance, including repairs to maintain operation and adjustments as necessary, 1 Fall Shut-Down, 1 Spring Start-Up, Backflow Testing | 9 | EA | |||
| 2020 | SCA | Option Year 2 | Road parking lots and sidewalk Cleaning/Sweeping/Blowing, includes maintaining free from hazards such as snow and ice (apply ice melt to remove/prevent ice) including weekends and Holidays | 12 | MO | |||
| 2021 | SCA | Option Year 2 | Cleaning & maintenance of public restrooms and shop areas | 12 | MO | |||
| 2022 | SCA | Option Year 2 | Headstones – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days | 175 | JB | |||
| 2023 | SCA | Option Year 2 | Niche Covers - storage and disposal of old/replaced/monuments.Niche Covers – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days and destroying replaced niche covers. | 50 | EA | |||
| 2024 | DBA | Option Year 2 | Headstone Cleaning | 4000 | EA | |||
| 2025 | DBA | Option Year 2 | Headstone Fine Tune Alignment | 200 | EA | |||
| 2026 | DBA | Option Year 2 | Headstone Raise & Realignment | 1000 | EA | |||
| OPTION YEAR 2 BASE TOTAL: | $0.00 |
| Option Year 3 | ||||||||
| Danville National Cemetery Year 3 04/01/2028 - 03/31/2029 | ||||||||
| CLIN | ITEM | EST. QTY | UNIT | UNIT PRICE | TOTAL PRICE | |||
| 3001 | SCA | Option Year 3 | Transport Urn and Floral Arrangements, tagging of floral arrangements, completion of "chain of custody documents, Place Urn into Columbarium/gravesite, replace headstone/marker/niche cover and temporary tag, Complete chain of custody documents for all interment days including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 100 | EA | |||
| 3002 | SCA | Option Year 3 | Transport Casket and Floral Arrangements from Committal Shelter, and Place Casket onto lowering device over gravesite for all Casket interments including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 75 | JB | |||
| 3003 | SCA | Option Year 3 | Remove Sod, excavate assigned casket and cremation gravesite, place and lower casket/urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 75 | JB | 1.15 | ||
| 3004 | SCA | Option Year 3 | Mow and Trim ALL turfgrass areas including headstones; edge all sidewalks and curbs; blow/sweep/remove grass clipping/debris and fenceline treatment | 36 | WK | |||
| 3005 | SCA | Option Year 3 | Remove Sod, excavate assigned cremation gravesite, place urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 100 | JB | |||
| 3006 | SCA | Option Year 3 | Fertilizer: Provide and Apply ALL turfgrass areas (JUNE, SEP., & OCT) /Pre/Post-emergence Herbicide, including grub control insecticide: Provide and Apply on All turfgrass areas -Appropriate to the USDA Hardiness Zone (APR, MAY, JUN, & OCT) | 7 | EA | |||
| 3007 | SCA | Option Year 3 | Core Aeration of all turfgrass areas | 1 | EA | |||
| 3008 | SCA | Option Year 3 | Overseed all turfgrass areas | 1 | EA | |||
| 3009 | SCA | Option Year 3 | Debris Removal from any/all cemetery grounds | 52 | WK | |||
| 3010 | SCA | Option Year 3 | Pressure Wash Committal Shelter, Hardscapes, Bathroom, fencing in Spoils area, and Pump House Building | 4 | JB | |||
| 3011 | SCA | Option Year 3 | Committal Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag for all interment days including weekend and Holiday burials as required | 175 | JB | |||
| 3012 | SCA | Option Year 3 | Placement and removal of Flags (Grave Flags) | 11500 | EA | |||
| 3013 | SCA | Option Year 3 | Placement and Removal of Flags (50 Avenue Flags) (twice yearly) | 100 | EA | |||
| 3014 | SCA | Option Year 3 | Turfgrass Renovation: Seed, Sod, establishment for spotty/bare areas | 2000 | SQFT | |||
| 3015 | SCA | Option Year 3 | Planting Beds and Tree Rings - Maintain edging, mulch and weed-free all planting beds and tree rings. Seasonal removal and replacement of mulch on all trees. | 9 | EA | |||
| 3016 | SCA | Option Year 3 | Shrub Tree Maintenance/Pruning/Shaping | 2 | EA | |||
| 3017 | SCA | Option Year 3 | Mole, Gopher, and Rodent Control | 6 | EA | |||
| 3018 | SCA | Option Year 3 | Maintenance of rock-filled ditch maintenance and treatment, known as “Rip Rap North” and “Rip Rap South” | 12 | MO | |||
| 3019 | SCA | Option Year 3 | Irrigation System – Full operation and maintenance, including repairs to maintain operation and adjustments as necessary, 1 Fall Shut-Down, 1 Spring Start-Up, Backflow Testing | 9 | EA | |||
| 3020 | SCA | Option Year 3 | Road parking lots and sidewalk Cleaning/Sweeping/Blowing, includes maintaining free from hazards such as snow and ice (apply ice melt to remove/prevent ice) including weekends and Holidays | 12 | MO | |||
| 3021 | SCA | Option Year 3 | Cleaning & maintenance of public restrooms and shop areas | 12 | MO | |||
| 3022 | SCA | Option Year 3 | Headstones – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days | 175 | JB | |||
| 3023 | SCA | Option Year 3 | Niche Covers - storage and disposal of old/replaced/monuments.Niche Covers – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days and destroying replaced niche covers. | 50 | EA | |||
| 3024 | DBA | Option Year 3 | Headstone Cleaning | 4000 | EA | |||
| 3025 | DBA | Option Year 3 | Headstone Fine Tune Alignment | 200 | EA | |||
| 3026 | DBA | Option Year 3 | Headstone Raise & Realignment | 1000 | EA | |||
| OPTION YEAR 3 BASE TOTAL: | $0.00 |
| Option Year 4 | ||||||||
| Danville National Cemetery Year 4 04/01/2029 - 03/31/2030 | ||||||||
| CLIN | ITEM | EST. QTY | UNIT | UNIT PRICE | TOTAL PRICE | |||
| 4001 | SCA | Option Year 4 | Transport Urn and Floral Arrangements, tagging of floral arrangements, completion of "chain of custody documents, Place Urn into Columbarium/gravesite, replace headstone/marker/niche cover and temporary tag, Complete chain of custody documents for all interment days including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 100 | EA | |||
| 4002 | SCA | Option Year 4 | Transport Casket and Floral Arrangements from Committal Shelter, and Place Casket onto lowering device over gravesite for all Casket interments including weekend and Holiday burials, includes first and subsequent interments/ reinterments and dis-interments. | 75 | JB | 1.2 | ||
| 4003 | SCA | Option Year 4 | Remove Sod, excavate assigned casket and cremation gravesite, place and lower casket/urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 75 | JB | |||
| 4004 | SCA | Option Year 4 | Mow and Trim ALL turfgrass areas including headstones; edge all sidewalks and curbs; blow/sweep/remove grass clipping/debris and fenceline treatment | 36 | WK | |||
| 4005 | SCA | Option Year 4 | Remove Sod, excavate assigned cremation gravesite, place urn, backfill grave, tamp grave, place Temporary Marker on gravesite, and properly dress gravesite with approved materials to cover exposed soil and or sod replacement. Tag floral arrangement with grave number and completion of "chain of custody" documents, includes first and subsequent interments/ reinterments/ dis-interments, weekend and Holiday burials | 100 | JB | |||
| 4006 | SCA | Option Year 4 | Fertilizer: Provide and Apply ALL turfgrass areas (JUNE, SEP., & OCT) /Pre/Post-emergence Herbicide, including grub control insecticide: Provide and Apply on All turfgrass areas -Appropriate to the USDA Hardiness Zone (APR, MAY, JUN, & OCT) | 7 | EA | |||
| 4007 | SCA | Option Year 4 | Core Aeration of all turfgrass areas | 1 | EA | |||
| 4008 | SCA | Option Year 4 | Overseed all turfgrass areas | 1 | EA | |||
| 4009 | SCA | Option Year 4 | Debris Removal from any/all cemetery grounds | 52 | WK | |||
| 4010 | SCA | Option Year 4 | Pressure Wash Committal Shelter, Hardscapes, Bathroom, fencing in Spoils area, and Pump House Building | 4 | JB | |||
| 4011 | SCA | Option Year 4 | Committal Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag for all interment days including weekend and Holiday burials as required | 175 | JB | |||
| 4012 | SCA | Option Year 4 | Placement and removal of Flags (Grave Flags) | 11500 | EA | |||
| 4013 | SCA | Option Year 4 | Placement and Removal of Flags (50 Avenue Flags) (twice yearly) | 100 | EA | |||
| 4014 | SCA | Option Year 4 | Turfgrass Renovation: Seed, Sod, establishment for spotty/bare areas | 2000 | SQFT | |||
| 4015 | SCA | Option Year 4 | Planting Beds and Tree Rings - Maintain edging, mulch and weed-free all planting beds and tree rings. Seasonal removal and replacement of mulch on all trees. | 9 | EA | |||
| 4016 | SCA | Option Year 4 | Shrub Tree Maintenance/Pruning/Shaping | 2 | EA | |||
| 4017 | SCA | Option Year 4 | Mole, Gopher, and Rodent Control | 6 | EA | |||
| 4018 | SCA | Option Year 4 | Maintenance of rock-filled ditch maintenance and treatment, known as “Rip Rap North” and “Rip Rap South” | 12 | MO | |||
| 4019 | SCA | Option Year 4 | Irrigation System – Full operation and maintenance, including repairs to maintain operation and adjustments as necessary, 1 Fall Shut-Down, 1 Spring Start-Up, Backflow Testing | 9 | EA | |||
| 4020 | SCA | Option Year 4 | Road parking lots and sidewalk Cleaning/Sweeping/Blowing, includes maintaining free from hazards such as snow and ice (apply ice melt to remove/prevent ice) including weekends and Holidays | 12 | MO | |||
| 4021 | SCA | Option Year 4 | Cleaning & maintenance of public restrooms and shop areas | 12 | MO | |||
| 4022 | SCA | Option Year 4 | Headstones – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days | 175 | JB | |||
| 4023 | SCA | Option Year 4 | Niche Covers - storage and disposal of old/replaced/monuments.Niche Covers – receiving shipments, storage, initial setting within 10 calendar days, replacing within 10 calendar days and destroying replaced niche covers. | 50 | EA | |||
| 4024 | DBA | Option Year 4 | Headstone Cleaning | 4000 | EA | |||
| 4025 | DBA | Option Year 4 | Headstone Fine Tune Alignment | 200 | EA | |||
| 4026 | DBA | Option Year 4 | Headstone Raise & Realignment | 1000 | EA | |||
| OPTION YEAR 4 BASE TOTAL: | $0.00 |
| Danville National Cemetery Grounds Maintenance | Base Year : | |
| Option Year I : | ||
| Option Year II : | ||
| Option Year III | ||
| Option Year IV : | ||
| Grand Total Estimated Cost: |
File details come from the government source that posted it. Updated .