Attachment A - Price-Cost Schedule - Grounds Maintenance - Nashville NC - Rev.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- QSE--36C78624R50078
About this file
This document is a Price-Cost Schedule outlining the various line items and pricing for a federal contract opportunity for Grounds Maintenance Services at the Nashville National Cemetery. The contract is a firm-fixed price IDIQ with a minimum value of $25,000 and a maximum of $5,000,000 over the life of the contract.
The contract includes a base year and four one-year option periods. The required services include daily cemetery grounds maintenance, mowing, edging, headstone/marker cleaning and maintenance, soil preparation and sod installation, power washing of facilities, grave excavation and backfilling, tree and shrub pruning, and headstone setting and alignment. Pricing is provided for each line item across the base and option years. The related federal contract opportunity is solicitation number 36C78624R50078 for Grounds Maintenance Services for the Nashville National Cemetery.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price-Cost Schedule Price/Cost Schedule - Grounds Maintenance at Nashville National Cemetery - 36C78624R50078
| IDIQ minimum is $25,000 and the maximum is $5,000,000.00 for the life of the contract. | |||||||||
| Line Number | Base/Option Indicator | Option Period | Description | Est. Quantity | Unit of Measure | Start Date | End Date | Unit Cost PRICING | Total Cost PRICING |
| 0001 | Base | Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services | 12 | Month | 7/1/24 | 6/30/25 | 0 | ||
| 0002 | Base | Mowing 64.5 turf acres - Services | 40 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0003 | Base | Edging Walkways, Curbs and flat headstones (plastic blade) - Services | 30 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0004 | Base | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services | 30 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0005 | Base | Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services | 20000 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0006 | Base | Soil Preparation and SOD installation by square footage - Services | 20000 | SF | 7/1/24 | 6/30/25 | 0 | ||
| 0007 | Base | Powerwash Commital Shelter and clean gutters - Services | 2 | Job | 7/1/24 | 6/30/25 | 0 | ||
| 0008 | Base | Powerwash Rostrum and clean gutters - Services | 2 | Job | 7/1/24 | 6/30/25 | 0 | ||
| 0009 | Base | Powerwash Columbarium to include top of structure - Services | 2 | Job | 7/1/24 | 6/30/25 | 0 | ||
| 0010 | Base | Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services | 2 | Job | 7/1/24 | 6/30/25 | 0 | ||
| 0011 | Base | Grave excavation & backfilling of casketed remains - Construction | 60 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0012 | Base | Grave excavation & backfilling of cremated remains - Construction | 120 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0013 | Base | Monthly pruning of trees and shrubs - Services | 12 | Month | 7/1/24 | 6/30/25 | 0 | ||
| 0014 | Base | Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction | 180 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0015 | Base | Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction | 40 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0016 | Base | Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction | 400 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0017 | Base | Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction | 400 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0018 | Base | Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction | 100 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 0019 | Base | Repair Sunken Gravesites - Construction | 200 | EA | 7/1/24 | 6/30/25 | 0 | ||
| 1001 | (Unexercised) Option | 1 | Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services | 12 | Month | 7/1/25 | 6/30/26 | 0 | |
| 1002 | (Unexercised) Option | 1 | Mowing 64.5 turf acres - Services | 40 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1003 | (Unexercised) Option | 1 | Edging Walkways, Curbs and flat headstones (plastic blade) - Services | 30 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1004 | (Unexercised) Option | 1 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services | 30 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1005 | (Unexercised) Option | 1 | Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services | 20000 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1006 | (Unexercised) Option | 1 | Soil Preparation and SOD installation by square footage - Services | 20000 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1007 | (Unexercised) Option | 1 | Powerwash Commital Shelter and clean gutters - Services | 2 | Job | 7/1/25 | 6/30/26 | 0 | |
| 1008 | (Unexercised) Option | 1 | Powerwash Rostrum and clean gutters - Services | 2 | Job | 7/1/25 | 6/30/26 | 0 | |
| 1009 | (Unexercised) Option | 1 | Powerwash Columbarium to include top of structure - Services | 2 | Job | 7/1/25 | 6/30/26 | 0 | |
| 1010 | (Unexercised) Option | 1 | Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services | 2 | Job | 7/1/25 | 6/30/26 | 0 | |
| 1011 | (Unexercised) Option | 1 | Grave excavation & backfilling of casketed remains - Construction | 60 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1012 | (Unexercised) Option | 1 | Grave excavation & backfilling of cremated remains - Construction | 120 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1013 | (Unexercised) Option | 1 | Monthly pruning of trees and shrubs - Services | 12 | Month | 7/1/25 | 6/30/26 | 0 | |
| 1014 | (Unexercised) Option | 1 | Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction | 180 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1015 | (Unexercised) Option | 1 | Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction | 40 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1016 | (Unexercised) Option | 1 | Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction | 400 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1017 | (Unexercised) Option | 1 | Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction | 400 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1018 | (Unexercised) Option | 1 | Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction | 100 | EA | 7/1/25 | 6/30/26 | 0 | |
| 1019 | (Unexercised) Option | 1 | Repair Sunken Gravesites - Construction | 200 | EA | 7/1/25 | 6/30/26 | 0 | |
| 2001 | (Unexercised) Option | 2 | Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services | 12 | Month | 7/1/26 | 6/30/27 | 0 | |
| 2002 | (Unexercised) Option | 2 | Mowing 64.5 turf acres - Services | 40 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2003 | (Unexercised) Option | 2 | Edging Walkways, Curbs and flat headstones (plastic blade) - Services | 30 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2004 | (Unexercised) Option | 2 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services | 30 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2005 | (Unexercised) Option | 2 | Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services | 20000 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2006 | (Unexercised) Option | 2 | Soil Preparation and SOD installation by square footage - Services | 20000 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2007 | (Unexercised) Option | 2 | Powerwash Commital Shelter and clean gutters - Services | 2 | Job | 7/1/26 | 6/30/27 | 0 | |
| 2008 | (Unexercised) Option | 2 | Powerwash Rostrum and clean gutters - Services | 2 | Job | 7/1/26 | 6/30/27 | 0 | |
| 2009 | (Unexercised) Option | 2 | Powerwash Columbarium to include top of structure - Services | 2 | Job | 7/1/26 | 6/30/27 | 0 | |
| 2010 | (Unexercised) Option | 2 | Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services | 2 | Job | 7/1/26 | 6/30/27 | 0 | |
| 2011 | (Unexercised) Option | 2 | Grave excavation & backfilling of casketed remains - Construction | 60 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2012 | (Unexercised) Option | 2 | Grave excavation & backfilling of cremated remains - Construction | 120 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2013 | (Unexercised) Option | 2 | Monthly pruning of trees and shrubs - Services | 12 | Month | 7/1/26 | 6/30/27 | 0 | |
| 2014 | (Unexercised) Option | 2 | Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction | 180 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2015 | (Unexercised) Option | 2 | Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction | 40 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2016 | (Unexercised) Option | 2 | Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction | 400 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2017 | (Unexercised) Option | 2 | Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction | 400 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2018 | (Unexercised) Option | 2 | Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction | 100 | EA | 7/1/26 | 6/30/27 | 0 | |
| 2019 | (Unexercised) Option | 2 | Repair Sunken Gravesites - Construction | 200 | EA | 7/1/26 | 6/30/27 | 0 | |
| 3001 | (Unexercised) Option | 3 | Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services | 12 | Month | 7/1/27 | 6/30/28 | 0 | |
| 3002 | (Unexercised) Option | 3 | Mowing 64.5 turf acres - Services | 40 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3003 | (Unexercised) Option | 3 | Edging Walkways, Curbs and flat headstones (plastic blade) - Services | 30 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3004 | (Unexercised) Option | 3 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services | 30 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3005 | (Unexercised) Option | 3 | Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services | 20000 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3006 | (Unexercised) Option | 3 | Soil Preparation and SOD installation by square footage - Services | 20000 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3007 | (Unexercised) Option | 3 | Powerwash Commital Shelter and clean gutters - Services | 2 | Job | 7/1/27 | 6/30/28 | 0 | |
| 3008 | (Unexercised) Option | 3 | Powerwash Rostrum and clean gutters - Services | 2 | Job | 7/1/27 | 6/30/28 | 0 | |
| 3009 | (Unexercised) Option | 3 | Powerwash Columbarium to include top of structure - Services | 2 | Job | 7/1/27 | 6/30/28 | 0 | |
| 3010 | (Unexercised) Option | 3 | Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services | 2 | Job | 7/1/27 | 6/30/28 | 0 | |
| 3011 | (Unexercised) Option | 3 | Grave excavation & backfilling of casketed remains - Construction | 60 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3012 | (Unexercised) Option | 3 | Grave excavation & backfilling of cremated remains - Construction | 120 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3013 | (Unexercised) Option | 3 | Monthly pruning of trees and shrubs - Services | 12 | Month | 7/1/27 | 6/30/28 | 0 | |
| 3014 | (Unexercised) Option | 3 | Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction | 180 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3015 | (Unexercised) Option | 3 | Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction | 40 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3016 | (Unexercised) Option | 3 | Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction | 400 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3017 | (Unexercised) Option | 3 | Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction | 400 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3018 | (Unexercised) Option | 3 | Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction | 100 | EA | 7/1/27 | 6/30/28 | 0 | |
| 3019 | (Unexercised) Option | 3 | Repair Sunken Gravesites - Construction | 200 | EA | 7/1/27 | 6/30/28 | 0 | |
| 4001 | (Unexercised) Option | 4 | Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services | 12 | Month | 7/1/28 | 6/30/29 | 0 | |
| 4002 | (Unexercised) Option | 4 | Mowing 64.5 turf acres - Services | 40 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4003 | (Unexercised) Option | 4 | Edging Walkways, Curbs and flat headstones (plastic blade) - Services | 30 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4004 | (Unexercised) Option | 4 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services | 30 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4005 | (Unexercised) Option | 4 | Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services | 20000 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4006 | (Unexercised) Option | 4 | Soil Preparation and SOD installation by square footage - Services | 20000 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4007 | (Unexercised) Option | 4 | Powerwash Commital Shelter and clean gutters - Services | 2 | Job | 7/1/28 | 6/30/29 | 0 | |
| 4008 | (Unexercised) Option | 4 | Powerwash Rostrum and clean gutters - Services | 2 | Job | 7/1/28 | 6/30/29 | 0 | |
| 4009 | (Unexercised) Option | 4 | Powerwash Columbarium to include top of structure - Services | 2 | Job | 7/1/28 | 6/30/29 | 0 | |
| 4010 | (Unexercised) Option | 4 | Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services | 2 | Job | 7/1/28 | 6/30/29 | 0 | |
| 4011 | (Unexercised) Option | 4 | Grave excavation & backfilling of casketed remains - Construction | 60 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4012 | (Unexercised) Option | 4 | Grave excavation & backfilling of cremated remains - Construction | 120 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4013 | (Unexercised) Option | 4 | Monthly pruning of trees and shrubs - Services | 12 | Month | 7/1/28 | 6/30/29 | 0 | |
| 4014 | (Unexercised) Option | 4 | Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction | 180 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4015 | (Unexercised) Option | 4 | Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction | 40 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4016 | (Unexercised) Option | 4 | Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction | 400 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4017 | (Unexercised) Option | 4 | Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction | 400 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4018 | (Unexercised) Option | 4 | Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction | 100 | EA | 7/1/28 | 6/30/29 | 0 | |
| 4019 | (Unexercised) Option | 4 | Repair Sunken Gravesites - Construction | 200 | EA | 7/1/28 | 6/30/29 | 0 | |
| Base Year Total | 0 | ||||||||
| Option Year 1 Total | 0 | ||||||||
| Option Year 2 Total | 0 | ||||||||
| Option Year 3 Total | 0 | ||||||||
| Option Year 4 Total | 0 | ||||||||
| Contract Total | 0 |
File details come from the government source that posted it. Updated .