Attachment A - Price-Cost Schedule - Grounds Maintenance - Nashville NC.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Amendment to a Previous Combined Synopsis/Solicitation - Grounds Maintenance Services for Nashville National Cemetery -- S208
Solicitation number
QSE--36C78624R50078
Issued by

About this file

This document is a Price-Cost Schedule for Grounds Maintenance Services at the Nashville National Cemetery, part of a larger federal contract opportunity.

The contract is an Indefinite Delivery Indefinite Quantity (IDIQ) with a minimum value of $25,000 and a maximum of $5,000,000 over the life of the contract. The base period is from April 1, 2024 to March 31, 2025, with four one-year option periods available. The required services include daily cemetery grounds maintenance, mowing, edging, trimming, headstone cleaning, soil preparation and sod installation, power washing, grave excavation and backfilling, tree/shrub pruning, headstone setting and alignment, and repair of sunken gravesites. Pricing is provided for each service line item. The related federal contract opportunity is Solicitation Number 36C78624R50078 for Grounds Maintenance Services at the Nashville National Cemetery.

View the file

Other files

File Type Posted
Attachment B - SOW - Grounds Maintenance - Nashville NC - Revised.pdf PDF
Attachment H - NCA Operational Standards and Measures Guidebook - Dec 2023.pdf PDF
Attachment G - Nashville Map Handout.pdf PDF
Brand Name Justification - Nashville NC GM S.pdf PDF
Attachment E - WD - TN20240178 Mod 1 dated 22 March 2024.pdf PDF
Combined Synopsis Solicitaton - Nashville GM - Revised.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment I - 41 SOP 021 Turfgrass Maintenance in VA National Cemeteries.pdf PDF
Attachment J - Handbook 3120 Interment Area Layout.pdf PDF
Attachment F - Contractor Laydown Map.pdf PDF
Attachment D - WD - TN2015-4647 Rev 24 dated 26 December 2023.pdf PDF
Attachment K - Q-A - 36C78624R50078 - Nashville NC GM.pdf PDF
Attachment A - Price-Cost Schedule - Grounds Maintenance - Nashville NC - Rev.xlsx XLSX spreadsheet
Attachment F - Contractor Laydown Map.pdf PDF
Attachment A - Price-Cost Schedule - Grounds Maintenance - Nashville NC - Rev.xlsx XLSX spreadsheet
Attachment H - NCA Operational Standards and Measures Guidebook - Dec 2023.pdf PDF
Attachment G - Nashville Map Handout.pdf PDF
Attachment J - Handbook 3120 Interment Area Layout.pdf PDF
Attachment D - WD - TN2015-4647 Rev 24 dated 26 December 2023.pdf PDF
Attachment B - SOW - Grounds Maintenance - Nashville NC - Revised.pdf PDF
Attachment K - Q-A - 36C78624R50078 - Nashville NC GM.pdf PDF
Brand Name Justification - Nashville NC GM S.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment E - WD - TN20240178 Mod 1 dated 22 March 2024.pdf PDF
Attachment I - 41 SOP 021 Turfgrass Maintenance in VA National Cemeteries.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment B - SOW - Grounds Maintenance - Nashville NC2.pdf PDF
Combined Synopsis Solicitaton - Nashville GM.docx DOCX document
Attachment E - WD - TN20240178 Mod 1 dated 22 March 2024.pdf PDF
Brand Name Justification - Nashville NC GM S.pdf PDF
Attachment D - WD - TN2015-4647 Rev 24 dated 26 December 2023.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price-Cost Schedule Price/Cost Schedule - Grounds Maintenance at Nashville National Cemetery - 36C78624R50078

IDIQ minimum is $25,000 and the maximum is $5,000,000.00 for the life of the contract.
Line NumberBase/Option IndicatorOption PeriodDescriptionEst. QuantityUnit of MeasureStart DateEnd DateUnit Cost PRICINGTotal Cost PRICING
0001BaseDaily Cemetery Grounds Maintenance Services (invoiced monthly) - Services12Month04/01/202403/31/20250
0002BaseMowing 64.5 turf acres - Services40EA04/01/202403/31/20250
0003BaseEdging Walkways, Curbs and flat headstones (plastic blade) - Services30EA04/01/202403/31/20250
0004BaseTrimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services30EA04/01/202403/31/20250
0005BaseHeadstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services20000EA04/01/202403/31/20250
0006BaseSoil Preparation and SOD installation by square footage - Services20000EA04/01/202403/31/20250
0007BasePowerwash Commital Shelter and clean gutters - Services2Job04/01/202403/31/20250
0008BasePowerwash Rostrum and clean gutters - Services2Job04/01/202403/31/20250
0009BasePowerwash Columbarium to include top of structure - Services2Job04/01/202403/31/20250
0010BaseClean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services2Job04/01/202403/31/20250
0011BaseGrave excavation & backfilling of casketed remains - Construction60EA04/01/202403/31/20250
0012BaseGrave excavation & backfilling of cremated remains - Construction120EA04/01/202403/31/20250
0013BaseMonthly pruning of trees and shrubs - Services12Month04/01/202403/31/20250
0014BaseSetting & Alignment of New Initial/New-Replacement Upright Headstones - Construction180EA04/01/202403/31/20250
0015BaseSetting & Alignment of New Initial/New-Replacement Flat Headstones - Construction40EA04/01/202403/31/20250
0016BaseRaise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction400EA04/01/202403/31/20250
0017BaseFlat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction400EA04/01/202403/31/20250
0018BaseDisposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction100EA04/01/202403/31/20250
0019BaseRepair Sunken Gravesites - Construction200EA04/01/202403/31/20250
1001(Unexercised) Option1Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services12Month04/01/202503/31/20260
1002(Unexercised) Option1Mowing 64.5 turf acres - Services40EA04/01/202503/31/20260
1003(Unexercised) Option1Edging Walkways, Curbs and flat headstones (plastic blade) - Services30EA04/01/202503/31/20260
1004(Unexercised) Option1Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services30EA04/01/202503/31/20260
1005(Unexercised) Option1Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services20000EA04/01/202503/31/20260
1006(Unexercised) Option1Soil Preparation and SOD installation by square footage - Services20000EA04/01/202503/31/20260
1007(Unexercised) Option1Powerwash Commital Shelter and clean gutters - Services2Job04/01/202503/31/20260
1008(Unexercised) Option1Powerwash Rostrum and clean gutters - Services2Job04/01/202503/31/20260
1009(Unexercised) Option1Powerwash Columbarium to include top of structure - Services2Job04/01/202503/31/20260
1010(Unexercised) Option1Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services2Job04/01/202503/31/20260
1011(Unexercised) Option1Grave excavation & backfilling of casketed remains - Construction60EA04/01/202503/31/20260
1012(Unexercised) Option1Grave excavation & backfilling of cremated remains - Construction120EA04/01/202503/31/20260
1013(Unexercised) Option1Monthly pruning of trees and shrubs - Services12Month04/01/202503/31/20260
1014(Unexercised) Option1Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction180EA04/01/202503/31/20260
1015(Unexercised) Option1Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction40EA04/01/202503/31/20260
1016(Unexercised) Option1Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction400EA04/01/202503/31/20260
1017(Unexercised) Option1Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction400EA04/01/202503/31/20260
1018(Unexercised) Option1Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction100EA04/01/202503/31/20260
1019(Unexercised) Option1Repair Sunken Gravesites - Construction200EA04/01/202503/31/20260
2001(Unexercised) Option2Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services12Month04/01/202603/31/20270
2002(Unexercised) Option2Mowing 64.5 turf acres - Services40EA04/01/202603/31/20270
2003(Unexercised) Option2Edging Walkways, Curbs and flat headstones (plastic blade) - Services30EA04/01/202603/31/20270
2004(Unexercised) Option2Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services30EA04/01/202603/31/20270
2005(Unexercised) Option2Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services20000EA04/01/202603/31/20270
2006(Unexercised) Option2Soil Preparation and SOD installation by square footage - Services20000EA04/01/202603/31/20270
2007(Unexercised) Option2Powerwash Commital Shelter and clean gutters - Services2Job04/01/202603/31/20270
2008(Unexercised) Option2Powerwash Rostrum and clean gutters - Services2Job04/01/202603/31/20270
2009(Unexercised) Option2Powerwash Columbarium to include top of structure - Services2Job04/01/202603/31/20270
2010(Unexercised) Option2Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services2Job04/01/202603/31/20270
2011(Unexercised) Option2Grave excavation & backfilling of casketed remains - Construction60EA04/01/202603/31/20270
2012(Unexercised) Option2Grave excavation & backfilling of cremated remains - Construction120EA04/01/202603/31/20270
2013(Unexercised) Option2Monthly pruning of trees and shrubs - Services12Month04/01/202603/31/20270
2014(Unexercised) Option2Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction180EA04/01/202603/31/20270
2015(Unexercised) Option2Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction40EA04/01/202603/31/20270
2016(Unexercised) Option2Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction400EA04/01/202603/31/20270
2017(Unexercised) Option2Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction400EA04/01/202603/31/20270
2018(Unexercised) Option2Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction100EA04/01/202603/31/20270
2019(Unexercised) Option2Repair Sunken Gravesites - Construction200EA04/01/202603/31/20270
3001(Unexercised) Option3Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services12Month04/01/202703/31/20280
3002(Unexercised) Option3Mowing 64.5 turf acres - Services40EA04/01/202703/31/20280
3003(Unexercised) Option3Edging Walkways, Curbs and flat headstones (plastic blade) - Services30EA04/01/202703/31/20280
3004(Unexercised) Option3Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services30EA04/01/202703/31/20280
3005(Unexercised) Option3Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services20000EA04/01/202703/31/20280
3006(Unexercised) Option3Soil Preparation and SOD installation by square footage - Services20000EA04/01/202703/31/20280
3007(Unexercised) Option3Powerwash Commital Shelter and clean gutters - Services2Job04/01/202703/31/20280
3008(Unexercised) Option3Powerwash Rostrum and clean gutters - Services2Job04/01/202703/31/20280
3009(Unexercised) Option3Powerwash Columbarium to include top of structure - Services2Job04/01/202703/31/20280
3010(Unexercised) Option3Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services2Job04/01/202703/31/20280
3011(Unexercised) Option3Grave excavation & backfilling of casketed remains - Construction60EA04/01/202703/31/20280
3012(Unexercised) Option3Grave excavation & backfilling of cremated remains - Construction120EA04/01/202703/31/20280
3013(Unexercised) Option3Monthly pruning of trees and shrubs - Services12Month04/01/202703/31/20280
3014(Unexercised) Option3Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction180EA04/01/202703/31/20280
3015(Unexercised) Option3Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction40EA04/01/202703/31/20280
3016(Unexercised) Option3Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction400EA04/01/202703/31/20280
3017(Unexercised) Option3Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction400EA04/01/202703/31/20280
3018(Unexercised) Option3Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction100EA04/01/202703/31/20280
3019(Unexercised) Option3Repair Sunken Gravesites - Construction200EA04/01/202703/31/20280
4001(Unexercised) Option4Daily Cemetery Grounds Maintenance Services (invoiced monthly) - Services12Month04/01/202803/31/20290
4002(Unexercised) Option4Mowing 64.5 turf acres - Services40EA04/01/202803/31/20290
4003(Unexercised) Option4Edging Walkways, Curbs and flat headstones (plastic blade) - Services30EA04/01/202803/31/20290
4004(Unexercised) Option4Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces - Services30EA04/01/202803/31/20290
4005(Unexercised) Option4Headstone and marker cleaning (weatherzyme 5:1 ratio with brush) - Services20000EA04/01/202803/31/20290
4006(Unexercised) Option4Soil Preparation and SOD installation by square footage - Services20000EA04/01/202803/31/20290
4007(Unexercised) Option4Powerwash Commital Shelter and clean gutters - Services2Job04/01/202803/31/20290
4008(Unexercised) Option4Powerwash Rostrum and clean gutters - Services2Job04/01/202803/31/20290
4009(Unexercised) Option4Powerwash Columbarium to include top of structure - Services2Job04/01/202803/31/20290
4010(Unexercised) Option4Clean and Powerwash entire curbs and sidewalks to remove stains and black mold - Services2Job04/01/202803/31/20290
4011(Unexercised) Option4Grave excavation & backfilling of casketed remains - Construction60EA04/01/202803/31/20290
4012(Unexercised) Option4Grave excavation & backfilling of cremated remains - Construction120EA04/01/202803/31/20290
4013(Unexercised) Option4Monthly pruning of trees and shrubs - Services12Month04/01/202803/31/20290
4014(Unexercised) Option4Setting & Alignment of New Initial/New-Replacement Upright Headstones - Construction180EA04/01/202803/31/20290
4015(Unexercised) Option4Setting & Alignment of New Initial/New-Replacement Flat Headstones - Construction40EA04/01/202803/31/20290
4016(Unexercised) Option4Raise, Lower, Realign, Reset, Backfill & Clean Existing Headstones - Construction400EA04/01/202803/31/20290
4017(Unexercised) Option4Flat Marker Headstones Set / Raise / Lower / Realign / & Reset - Construction400EA04/01/202803/31/20290
4018(Unexercised) Option4Disposal of Unuesable Headstones & Markers and monthly destruction log keeping. - Construction100EA04/01/202803/31/20290
4019(Unexercised) Option4Repair Sunken Gravesites - Construction200EA04/01/202803/31/20290
Base Year Total0
Option Year 1 Total0
Option Year 2 Total0
Option Year 3 Total0
Option Year 4 Total0
Contract Total0

File details come from the government source that posted it. Updated .