Amendment 002 pages 2-20.pdf
PDF 125 KB Posted
- Attached to
- Transit Buses Solicitation QMAE-CY-110303-N
- Solicitation number
- QMAE-CY-110303-N
- Issued by
-
GSA Federal Acquisition Service
About this file
Amendment 002 pages 2-20
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 2 OF 20
The purpose of this Amendment 002 to Solicitation QMAE-CY-110303-N is to:
1) Make the following technical changes to:
Sin 377A Bus-Transit-Heavy Duty- Low Floor-40 ft.-39 Passenger-Diesel Sin 377B Bus-Transit-Heavy Duty- Low Floor-40 ft.-39 Passenger-CNG Sin 377C Bus-Transit-Heavy Duty- Low Floor-40 ft.-39 Passenger-Diesel Electric Hybrid
A1. Section 3.0.1.5 Maintainability Requirements
Delete this section in its entirety and replace with the following:
Routine, scheduled maintenance or inspection tasks as specified by the Contractor shall require an ASE (National Institute for Automotive Service Excellence) technician skill level of 3M or less (target). To facilitate ease of maintenance, the vehicle design shall maximize the use of line replaceable units (LRUs). All LRUs shall allow expedient replacement.
Readily accessible test ports shall be provided for routinely checked functions on-board the proposed vehicle (such as air intake, exhaust, hydraulic, pneumatic, charge-air, and engine cooling system(s)).
A2. Section 3.2 Fire Detection/Suppression System
Delete this section in its entirety and replace with the following:
The contractor shall furnish a fully automatic and integrated Amerex Vehicle Safety Net fire detection and dry chemical (ABC rated) fire suppression system consisting of the following:
Amerex V25 fire detection and suppression system with a minimum of three (3) detectors and four (4) discharge nozzles. A manual actuator shall be furnished at the driver’s station
One Amerex Safety Network Operator Display One Amerex Vehicle Network Driver panel
The system, integration, and installation shall be First Article Approved by Amerex Corporation.
A3. Section 3.46.13 Microprocessor/PLC Based Systems
Delete this section in its entirety and replace with the following:
The electrical system shall be controlled by a multiplex programmable logic controller that shall be located in a compartment sealed from moisture, dust, and dirt.
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 3 OF 20
Versatility and future expansion shall be provided for by the system architecture. The multiplex wiring system shall provide and distribute power to ensure satisfactory performance of all electrical components. The system shall be capable of monitoring select bus systems including, but not limited to, passenger counts, door operation, engine, and transmission. The mechanical and electrical systems requiring monitoring will be determined at a post award meeting. The multiplex system shall also be in accordance with all specified modular design requirements. All electrical and electronic devices, subsystems, and components shall be repairable and maintainable by the Government.
The components of the multiplex system shall be of modular design, thereby providing for ease of replacement by maintenance personnel. The modules shall be easily accessible for troubleshooting electrical failures and performing system maintenance. Each module shall be shielded to prevent interference by EMI and RFI; and shall utilize LEDs to indicate circuit integrity and assist in rapid circuit diagnostics and verification of the load and wiring integrity. In conjunction with relays, if necessary, each circuit shall be capable of providing a current load of up to 10 Amperes. The internal controls shall be a solid state device, providing an extended service life. Wiring for data bus and node module power shall consist of three, 22 gage or larger, UL approved, shielded, twisted pairs.
Protection to each individual circuit shall be provided. A communication check system, integral to the multiplexing, shall be provided.
The system shall be hosted on a customer furnished IBM-compatible personal computer as well as a hand held field diagnostic unit, if available from the manufacturer, capable of reading the network data control function and address data, or function code.
All wire and cable insulation shall meet the flame and smoke test requirements of this specification. The contractor shall mark each wire every foot by wire type and each wire end with a function code using a scheme subject to approval by the Government.
All electrical wire and cable used in the vehicles shall be approved by the Government.
Braided copper wire shall be used in all ground strap applications. Flexible stranded copper wire is acceptable in other applications. All conductors of multi-conductor cables shall be terminated. The shields on multi-conductor low voltage control cables shall be terminated on one end only to minimize the effects of ground-loops.
A4. Section 3.1.2.10 Air Compressor
Delete this section in its entirety and replace with the following:
An engine driven air compressor and air system shall be furnished that meets the following requirements:
Minimum 18.0 CFM Engine flange mounted and gear driven Integral unloader
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 4 OF 20
The compressor discharge hose shall be SAE 100R14A PTFE, stainless steel braid covered hose routed to a point isolated from compressor vibration and movement (i.e. to a bulkhead). Zinc plated steel, or stainless steel, tubing is acceptable if run to a component on the engine assembly.
Copper tubing of any type is not acceptable as discharge tubing directly off the compressor discharge head.
See section 3.7 for air system requirements
Regardless of the system's air pressure, idle up to the rated engine speed shall be available to the operator with the transmission in neutral and the parking brake applied.
A5. Section 3.4.5 Kneeling
Delete this section in its entirety and replace with the following:
A full front and right rear (or full rear) kneeling system shall lower the entrance(s) of the bus a minimum of 2.5 inches during loading or unloading operations regardless of load up to GVWR, measured at the longitudinal centerline of the entrance door(s), by the driver using a three position, spring loaded to center switch. Downward direction will lower the bus.
Release of switch at anytime will completely stop lowering motion and hold height of the bus at that position. Upward direction of the switch will allow the system to go to floor height without the driver having to hold the switch up.
Brake and throttle interlocks shall prevent movement when the bus is kneeled. The kneeling control shall be disabled when the bus is in motion. The bus shall kneel at a maximum rate of
1.25 inches per second at essentially a constant rate. After kneeling, the bus shall rise within 3 seconds to a height permitting the bus to resume service and shall rise to the correct operating height within 7 seconds regardless of load up to GVWR.
An indicator visible to the driver shall be illuminated until the bus is raised to a height adequate for safe street travel. An audible warning alarm will sound simultaneously with the operation of the kneeler to alert passengers and bystanders. A warning light mounted near the curbside of the front door, minimum 2.5 inches diameter, amber lens shall be provided that will blink when the kneel feature is activated. Kneeling shall not be operational while the wheelchair ramp is deployed or in operation.
A6. Section 3.10.2 Wheels
Delete this section in its entirety and replace with the following:
Wheels shall be drop forged aluminum, hub piloted, and designed to meet all operational parameters and resist rim flange wear. The wheels shall be polished on both sides. All wheels shall be interchangeable and shall be removable without a puller. Wheels shall be of the ventilated type with 10 studs, radial approved, reverse mount, and made for tubeless tires.
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 5 OF 20
Wheels shall be compatible with tires in size and load-carrying capacity. Front wheels and tires shall be balanced as an assembly per SAE J1986.
Front wheels and tires shall be spin balanced as an assembly using appropriate weights.
Not more than sixteen (16) ounces of weight per wheel may be used to balance the tire.
The contractor shall furnish one fully balanced spare wheel/tire assembly, shipped loose.
A7. Section 3.17 Finish and Color
Delete this section in its entirety and replace with the following:
Unless a multi-color paint option is selected in the Options List described in Section 4.5 below, the exterior shall be painted the OEM’s standard white. If other optional colors are specified, the roof shall remain the OEM standard white.
All exterior surfaces shall be smooth and free of wrinkles and dents. Exterior surfaces to be painted shall be properly prepared as required by the paint system supplier, prior to application of paint to assure a proper bond between the basic surface and successive coats of original paint for the service life of the bus. Drilled holes and cutouts in exterior surfaces shall be made prior to cleaning, priming and painting to prevent corrosion. The bus shall be completely painted prior to installation of exterior lights, windows, mirrors and other items that are applied to the exterior of the bus. Body filler materials may be used for surface dressing, but not for repair of damaged or improperly fitted panels.
Depending upon the primer/topcoat system selected, surfaces shall be cleaned with solvent, chemical, or mechanical methods meeting the paint manufacturer’s recommendations.
A rust inhibitive primer, Dupont Corlar 824S, or equal, and polyurethane topcoat, Dupont Imron 5000, Dupont Imron Elite/Elite Express, or equal, shall be applied.
Offering: Exterior paint
Manufacturer: _________________________________________
Brand, Type: __________________________________________
Paint shall be applied smoothly and evenly with the finished surface free of dirt and the following other imperfections:
A. Blisters or bubbles appearing in the topcoat film.
B. Chips, scratches, or gouges of the surface finish.
C. Cracks in the paint film.
D. Craters where paint failed to cover due to surface contamination.
E. Overspray.
F. Peeling
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 6 OF 20
G. Runs or sags from excessive flow and failure to adhere uniformly to the surface.
H. Chemical stains and water spots.
I. Orange peel
All dents, roughness, or other surface imperfections shall be corrected prior to the application of the priming coat. Primer and finish paint shall be supplied as a system by a single manufacturer. Preparation for paint application shall follow the paint manufacturer’s recommendations. As a minimum, prior to paint application, surfaces shall be cleaned to remove all traces of contamination.
Paint shall be applied evenly, and the finished surface shall be free of dirt, runs, "orange peel" or other imperfections. At least two coats of paint shall be applied, with appropriate surface preparation between coats. Touch-up paint shall be identical in all respects to the original paint.
Prior to assembly, all low-alloy steel areas shall be painted with one coat of an approved primer followed by one coat of an approved sealer to prevent rusting.
A8. Section 3.43.1 HVAC Configuration
Delete this section in its entirety and replace with the following:
The HVAC unit shall be a Thermo King T series. If offered as an OEM option, a rear-mounted system shall be furnished and installed to be easily accessible for routine servicing without the use of ladder. If a rear mounted system is not an OEM option, the HVAC system may be roof mounted.
The Thermo King T series system shall be furnished with the following:
S391 Rotary Screw Compressor Brushless evaporator and condenser fan motors R-407C chlorine free, non-ozone depleting refrigerant IntelligAIRE® III Total Climate Control system (includes RS-232 serial interface)
Manually controlled shutoff valves in the refrigerant lines located on either side of all circulating/booster pumps shall be implemented to facilitate ease of service. Self-sealing couplings utilizing O-rings seals, or shut off valves, shall be used to break and seal the refrigerant lines during major components removal.
The condenser shall be located to efficiently transfer heat to the atmosphere without ingesting air warmed by other components and discharging air to other components. The condenser shall also be obstruction free from wheel splash, road dirt, or debris.
All HVAC components located within 6 inches of floor level shall be constructed to resist corrosion and damage.
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 7 OF 20
A9. Section 3.44.2 Destination Signs-General
Delete this section in its entirety and replace with the following:
The contractor shall provide an ADA-compliant visible passenger information system providing announcements outside of bus vehicle. Control of displays shall be integrated as a dedicated subsystem unit into the overall communication system. All messages shall be easily updated by utilizing a plug-in hand-held device. Two such devices shall be furnished per bus.
The display shall be electronic, alphanumeric, and completely self-contained. All passenger information shall be ADA compliant and shall consist of a minimum of 15 characters and a minimum of 60mm (2.4 in.) high. Information displays shall be pitched slightly downward to allow maximum visibility to passengers.
The displays shall be readable in direct sunlight or complete darkness and all degrees of light in between. The horizontal and vertical readable viewing angles shall be a minimum of 170 degrees. The display shall have a minimum contrast ratio, in daytime, of 35:1. The displays shall not require any external mask between pixels and shall not require any framing or support structure between characters which would give the sign a discontinuous appearance.
Power to the sign shall be controlled by the Master Run Switch. The signs shall operate in all positions of this switch except "OFF". Sign lighting shall operate in the "RUN" and park positions. The sign shall be internally protected against voltage transients and RFI interference to ensure proper operation in the transit operating environment.
A10. Section 3.46.3 Wiring and Terminals
Delete this section in its entirety and replace with the following:
All lamp sockets shall be of two-wire design with disconnects to eliminate corrosion or ground problems. To facilitate servicing, all lamp wires shall have leaders of at least 6 inches.
All wiring between major electrical components and terminations shall have double electrical insulation, shall be waterproof, and shall conform to specification requirements of SAE Recommended practice J1127 and J1128. The requirement for double insulation shall be met by sheathing all insulated wires and harnesses with non-conductive rigid or flexible conduit. Flexible conduit shall be nylon-6.
Except as interrupted by the master battery disconnect switch, battery and starter wiring shall be continuous cables grouped and numbered and/or color coded with connections secured by bolted terminals and shall conform to specification requirements of SAE Standard J1127-Type SGT or SGX and SAE recommended practice J541. Wiring shall be color coded and/or coded with a configuration code to determine circuitry. Wiring numbers shall be marked every 6 inches. Insulation shall permit ease of replacement. All wiring harnesses over 5 feet long and containing at least 5 wires shall include 10 percent excess
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 8 OF 20 wires for spares. Ground harness and cables, except for battery cables, shall be neutral or off-white in color.
Double insulation shall be maintained as close to the terminals as possible. The requirement for double insulation shall be met by sheathing all wires and harnesses with non-conductive rigid or flexible conduit. Conduits for all low voltage conductors shall be constructed of Nylon-6, or Kynar PVDF. Strain-relief fittings shall be provided at points where wiring enters all electrical components. Grommets of elastomeric material shall be provided at points where wiring penetrates metal structures outside of electrical enclosures and all other apertures in the vehicle. Any clamps used throughout the electrical system shall be stainless steel and of aircraft-type quality and shall be "dipped" and shall be spaced no greater than 24 inches on center. Individual tie wraps may be used to bundle wires and cable, but shall not be used to support the bundles; however, tie wrap type clamps are approved for use where it is the OEM commercial practice to utilize such clamps for support. Wiring supports shall be non-conductive. Precautions shall be taken to avoid damage from heat, water, solvents, or chafing. All wiring shall be kept at least 15cm (6 inches) away from the exhaust system and engine turbocharger, unless protected by appropriately rated reflective shields, heat resistant tubing, or high temperature loom.
Wiring length shall allow for replacement of end terminals twice without pulling, stretching, or replacing the wire. Except for large wires such as battery cables, terminals shall be crimped to the wiring and may be soldered only if the wire is not stiffened above the terminal and no flux residue remains on the terminal. Terminals shall be corrosion-resistant, full-ring type or interlocking lugs with insulating ferrules. "T" splices may be used when:
• There are less than 25,000 circular mills of copper in the cross-Section;
• A mechanical clamp is used in addition to solder on the splice;
• The wire supports no mechanical load in the area of the splice;
• The wire is supported top prevent flexing.
Connectors shall be common, weather pack, aircraft quality, and self-aligning.
A11. Section 3.46.7 Circuit Protection
Delete this section in its entirety and replace with the following:
All main and branch circuits, except battery-to-starting motor and battery-to- alternator circuits, shall be protected by circuit breakers or fuses sized to the requirements of the load.
Electronic circuit protection for the cranking motor shall be provided to prevent engaging of the motor for no more than 30 seconds at a time to prevent overheating. The circuit breakers or fuses shall be easily accessible for authorized personnel. Fuses shall be used only where it can be demonstrated that circuit breakers are not practicable. Any manually
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 9 OF 20 re-settable circuit breakers shall provide visible indication of open circuits. Circuit breakers shall meet the requirements of SAE J553 or SAE J1625.
Circuit breakers or fuses shall be sized to a maximum of 15 percent larger than the total circuit load current. The current rating for the wire used for each circuit must exceed the size of the circuit protection being used.
Handles shall indicate ON, OFF, and TRIPPED positions, or alternatively, only ON, OFF if there is no “TRIPPED” position . Fail-safe automatic reset circuit breakers shall be employed when it is necessary to quickly re-establish circuit continuity when that portion of the wiring has been subjected to an overload condition. Circuit breakers shall be molded-case type, single- or multi-pole, with frame size suitable for continuous current and interrupting duty. Each pole shall be equipped with a trip mechanism consisting of an inverse time element for overload protection and an instantaneous magnetic element for short circuit protection. Each pole shall be equipped with adequate means of arc extinction to prevent flashover. Multi-pole breakers shall operate contacts simultaneously.
Breaker current rating shall be clearly visible after installation. Electrical wire size versus circuit protection size shall meet the requirements in the table below. Fuses shall not be used except for indicator type fuses within electronic assemblies, high voltage circuit protection, and special applications with approval.
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 10 OF 20
A12. Section 3.46.13 Microprocessor/PLC Based Systems
Delete this section in its entirety and replace with the following:
The electrical system shall be controlled by a multiplex programmable logic controller that shall be located in a compartment sealed from moisture, dust, and dirt. The contractor shall provide complete details of the PLC system to the Government for review and acceptance (see Section 3.56).
Versatility and future expansion shall be provided for by the system architecture. The multiplex wiring system shall provide and distribute power to ensure satisfactory performance of all electrical components. The system shall be capable of monitoring select bus systems including, but not limited to, passenger counts, door operation, engine, and transmission. The mechanical and electrical systems requiring monitoring will be determined at a post award meeting. The multiplex system shall also be in accordance with all specified modular design requirements. All electrical and electronic devices, subsystems, and components shall be repairable and maintainable by the Government.
CIRCUIT WIRE, LOAD, AND CIRCUIT BREAKER SIZING
Circuit Wire Size
Maximum Allowable
Circuit Current
Load (Amps)
Maximum Circuit Breaker Current Rating (Amps) Protecting
Circuit
#18
AWG
4.25 6
#16
AWG
8.5 10
#14
AWG
12.75 15
#12
AWG
17 20
#10
AWG
25.5 30
# 8
AWG
42.5 50
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 11 OF 20
The components of the multiplex system shall be of modular design, thereby providing for ease of replacement by maintenance personnel. The modules shall be easily accessible for troubleshooting electrical failures and performing system maintenance. Each module shall be shielded to prevent interference by EMI and RFI; and shall utilize LEDs to indicate circuit integrity and assist in rapid circuit diagnostics and verification of the load and wiring integrity. In conjunction with relays, if necessary, each circuit shall be capable of providing a current load of up to 10 Amperes. The internal controls shall be a solid state device, providing an extended service life. Wiring for data bus and node module power shall consist of three, 22 gage or larger, UL approved, shielded, twisted pairs.
Protection to each individual circuit shall be provided. A communication check system, integral to the multiplexing, shall be provided.
The system shall be hosted on a customer furnished IBM-compatible personal computer as well as a hand held field diagnostic unit, if available from the manufacturer, capable of reading the network data control function and address data, or function code.
All wire and cable insulation shall meet the flame and smoke test requirements of this specification. The contractor shall mark each wire every foot by wire type and each wire end with a function code using a scheme subject to approval by the Government.
All electrical wire and cable used in the vehicles shall be approved by the Government.
Braided copper wire shall be used in all ground strap applications. Flexible stranded copper wire is acceptable in other applications. All conductors of multi-conductor cables shall be terminated. The shields on multi-conductor low voltage control cables shall be terminated on one end only to minimize the effects of ground-loops.
A13. Section 3.53 Operator’s Manuals
Delete this section in its entirety and replace with the following:
Operator’s instruction manuals shall be provided to the Government in the quantities as follows:
Operator's Instructional Manual (pocket size) – 2 copies per bus
The Operator's Instruction Manual shall contain all information needed for the optimum operation of the bus vehicles; including general vehicle familiarization material, location, function and operation of all controls, indicators, switches, and emergency procedures and trouble diagnoses.
A14. Section 3.54 Warranty Requirements
Delete this section in its entirety and replace with the following:
Warranties in this document are in addition to any statutory remedies or warranties imposed on the Offeror. Consistent with this requirement, the Offeror shall warrant and
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 12 OF 20 guarantee to the Government each complete bus vehicle and specific subsystems and components according to the following provisions. All component warranties shall be manufacturer’s warranties furnished by the manufacturer of the component.
The Offeror shall, at its own expense, have one or more competent representative(s) available on request to assist the Government staff in the solution of engineering or design problems that are within the scope of the Specifications and that may arise during the warranty period.
Complete Bus Vehicle:
The complete bus vehicles shall be warranted and guaranteed to be free from defects or related defects for 2 years or 100,000 miles, whichever comes first, beginning on the date of official acceptance by the Government of each bus vehicle. During this warranty period, the bus vehicles shall maintain their structural and functional integrity. The warranty shall be based on regular operation of the bus vehicles under the operating conditions prevailing in Government service.
Chassis Structure:
The chassis structure is composed of all components that are welded together to form the main frame and body structure. Bolted on components, unsprung suspension components, sheet metal side panels, and operating hardware are considered add-ons and therefore are not a part of the basic body structure.
The chassis structure, including structural elements of the suspension attached to the body structure but excluding suspension walking beams, shall be warranted against corrosion failure and/or fatigue failure for a period of 12 years or 500,000 miles, whichever comes first.
Subsystem and Components:
Specific subsystems and components shall be warranted and guaranteed to be free from defects and related defects for the times or mileages given in Table 0-1 below, beginning on the date of official acceptance of each bus or piece of equipment. Extended warranties shall be purchased by the contractor if required to meet the required warranty years/mileage in Table 0-1. The contractor shall furnish the manufacturer’s base or standard warranty certificates for all warrantable items, and proof of purchase from the manufacturer of extended warranties, all to be included with each bus vehicle. Copies of base or standard warranty certificates and proof of purchase of extended warranties shall be furnished to the government inspector prior to acceptance of the bus by the inspector and sent to the contracting officer within 10 days after acceptance of the bus. The proof of purchase of extended warranties shall consist of at least one of the following:
Extended warranty certificate with specific item serial number Invoice for extended warranty referencing specific serial number and proof of payment
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 13 OF 20
Table 0-1: Subsystem and Component Warranty
Whichever Occurs First Item Description Years Mileage 1 Diesel Engine
(Requires purchase of extended warranty)
5 300,000
2 Transmission 2 Unlimited 3 Drive and non-drive axles 3 150,000 4 Suspension 1 50,000 5 Basic body structural integrity 3 150,000 6 Reserved 7 Corrosion protection OEM
Commercial Standard
OEM
Commercial Standard
8 Reserved
9 Radiator and Charge Air Cooler 2 unlimited
10 Reserved
11 HVAC 3 Unlimited 12 Destination Signs 3 150,000 13 Door systems 3 150,000
14 Wheelchair ramp 3 150,000
15 Alternator 2 Unlimited
Voiding of Warranty:
The warranty shall not apply to any part or component of the bus vehicles that has failed as a direct result of misuse, negligence, accident, or that has been repaired or altered in any way so as to affect adversely its performance or reliability, except insofar as such repairs were in accordance with the Offeror's maintenance manuals and the workmanship was in accordance with recognized standards of the industry.
The warranty on any part or component of the bus vehicles shall also be void if the Government fails to conduct normal inspections and scheduled preventive maintenance procedures on the same part or component substantially as recommended in the Offeror's maintenance manuals and such failure by the Government is the sole cause of the part or component failure.
Exceptions to Warranty:
The warranty shall not apply to scheduled maintenance items and items furnished by the Government, except insofar as such equipment may be damaged by the failure of a part or component for which the Offeror is responsible.
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 14 OF 20
Detection of Defects:
If the Government detects a defect within the warranty periods, it shall promptly notify the Offeror's representative. Within 5 working days after receipt of notification, the Offeror's representative shall either agree that the defect is in fact covered by warranty, or reserve judgment until the subsystem or component is inspected by the Offeror's representative or is removed and examined at Government property or at the Offeror's plant. At that time the status of warranty coverage on the subsystem or component shall be mutually resolved between the Government and the Offeror. Work necessary to effect the repairs shall commence within 10 working days after receipt of notification by the Offeror.
Scope of Warranty Repairs:
When warranty repairs are required, the Government and the Offeror's representative shall agree within 5 working days after notification of a detected defect on the most appropriate course for the repairs and the exact scope of the repairs to be performed under the warranty.
If no agreement is obtained within the 5-day period, the Government reserves the right to commence the repairs.
Repair Parts and Service
Continuous operation of the buses is of utmost importance. Parts such as body panels, window assemblies excluding glass panels and windshields, doors, seats, seat covers, engines, and transmissions shall be shipped within 30 days from order. Parts shall be available for a period not less than 10 years from the date of delivery.
A15. Section 4.5.4 Option SRCB Stop Request Cables
Delete this section in its entirety and replace with the following:
If option SRCB is selected, a passenger "Stop Requested" signal system that complies with applicable ADA requirements defined in 49 CFR, Part 38.37 shall be provided. The system shall consist of a heavy-duty pull cable, chime, and interior sign message. The pull cable shall be located the full length of the bus on the sidewalls at the level where the transom is located. If no transom window is required, height of pull cable shall approximate this transom level and shall be no greater than 63 inches as measured from floor surface. It shall be easily accessible to all passengers, seated or standing. At each wheelchair parking position and priority seating positions additional provisions shall be included to allow a passenger in a mobility aid to easily activate “Stop Requested” signal
A16. Section 3.12.2 Fillers.
Delete this section in its entirety and replace with the following:
Engine oil and coolant filler caps shall be connected to the filler neck and closed with spring pressure or screw type positive locks. Fillers shall be properly labeled. All fillers
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 15 OF 20 shall be accessible with standard funnels, pour spouts, and automatic dispensing equipment.
A17. Section 4.5.5 Option PNT Custom Exterior Paint
Delete this section in its entirety and replace with the following:
4.5.5 Option PSM Parts and Service Manuals
If option PSM is selected, the following shall be furnished as one set for the entire order (not per bus):
Preventive Maintenance Manual – two copies, one with laminated pages.
Parts Catalog – two copies, one with laminated pages.
Service Manual-two copies, one with laminated pages, consisting of the following:
o Electrical Schematics Manual o System Interface Diagrams-Electrical o Integrated Wiring Diagrams
Major sub-contractor manuals (engine, transmission, wheelchair lift, HVAC)
All publications submitted as hard copies shall, wherever possible, also be submitted in electronic format in the form of CD-ROM disks.
Preventive Maintenance Manual
The Preventive Maintenance Manual shall enable the maintainer to perform the periodic inspection and preventive maintenance tasks. These shall include all lubrication and inspection requirements for all apparatus requiring such work on a periodic basis to maintain the bus vehicles in satisfactory working order.
The Diagnostic and Troubleshooting section of the manual shall enable the maintainer to troubleshoot, adjust and complete running repair for all systems on the bus vehicles.
Running repair is the diagnosis and correction of any subsystem or component malfunction by adjustment, repair or replacement in order to return the vehicle to service in a reasonably short period of time. The section shall include a general description and operation of each system, block diagrams, signal flow diagrams, detailed schematics with narrative and functional wiring and piping diagrams.
The manual shall contain a detailed description of each component of the bus to enable a maintainer to service, maintain, and repair the vehicle. The manual shall include a complete systematic procedure for troubleshooting and long term periodic maintenance requirements for all components.
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 16 OF 20
Parts Manual
The Parts Manual shall enumerate and describe every component with its related parts and contractor part numbers. Sub-contractor and supplier part numbers shall be included in their respective manuals. Cut-away and exploded drawings shall be used to permit identification of all parts not readily identified by description. Each part or component shall be identified as being part of a functional group.
An important aspect of the parts catalog shall be the complete itemization of all servicing materials (oils, paints, special compounds, greases, other) required on the bus vehicles and the component requiring its use.
Sub-contractor/supplier manuals shall be purchased and may be furnished “as is”. Within the manuals, the bus vehicles shall be treated as a whole and not as a grouping of disassociated parts from various suppliers. It shall be the responsibility of the bus OEM to insure that all of the suppliers' subsystems are presented in sufficient detail to present a complete and clear picture of the whole vehicle and that terms and functional designations of wires and components are consistent throughout. The material in all manuals shall be identically organized and indexed with compatible numbering.
A18. Section 4.5.6 Option UPHL Custom Upholstery
Delete this section in its entirety and replace with the following:
4.5.6 Option DIAG Diagnostic Software and Hardware
If option DIAG is selected, the following shall be furnished for the order (not per bus):
One set of multiplex electrical system service and diagnostic software One hand held multiplex diagnostic tool, if available from the multiplex system manufacturer.
One Amerex part no. 16609 Safety Net software and Cable kit for use in downloading data logs to a PC.
B. A. The following change(s) apply only to:
Sin 377A Bus-Transit-Heavy Duty- Low Floor-40 ft.-39 Passenger-Diesel Sin 377B Bus-Transit-Heavy Duty- Low Floor-40 ft.-39 Passenger-CNG
B1. Section 3.1.4 Diesel Fuel Tank(s)
Delete this section in its entirety and replace with the following:
The fuel tank(s) shall be aluminum or stainless steel and shall be equipped with an external, square or hex head, stainless steel drain plug. It shall be at least a 3/8-inch size and shall be located at the
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 17 OF 20 lowest point of the tank(s). The fuel tank(s) shall have an inspection plate or easily removable filler neck to permit cleaning and inspection of the tank(s) without removal from the bus. The tank(s) shall be baffled internally to prevent fuel-sloshing noise regardless of fill level. The baffles or fuel pickup location shall assure continuous full power operation on a 6 percent upgrade for 15 minutes starting with no more than 25 gallons of fuel over the unusable amount in the tank(s). The bus shall operate at idle on a 6 percent downgrade for 30 minutes starting with no more than 10 gallons of fuel over the unusable amount in the tank(s).
The fuel tank(s) shall be securely mounted to the bus to prevent movement during bus maneuvers, but shall be capable of being removed and reinstalled by a 2M mechanic for cleaning or replacement in 1.5 hours or less.
The capacity, date of manufacture, manufacturer name, location of manufacture, and certification of compliance to Federal Motor Carrier Safety Regulation shall be permanently marked on the fuel tank(s). The markings shall be readily visible and shall not be covered with an undercoating material.
C. A. The following changes apply only to:
Sin 377C Bus-Transit-Heavy Duty- Low Floor-40 ft.-39 Passenger-Diesel Electric Hybrid
C1. Section 3.1.2.19 Engine Coolant Heater
Delete this section in its entirety and replace with the following:
The engine shall be furnished with one 750 watt block coolant heater, with electrical cord(s) enclosed in a split nylon loom. The heater(s) shall be connected to weather proof plug(s). To help prevent corrosion on the plug prongs, a suitable anti-corrosion spray shall be applied to the plug connection (tangs). The block heater cavity shall be filled with appropriate dielectric grease before screwing the electrical cord onto the block heater. If a block heater is mounted in a coolant pipe/hose, the block heater shall have a separate ground wire to the engine block.
C2. Section 3.1.2.20 Oil Filter
Delete this section in its entirety and replace with the following:
The engine shall be furnished with an engine OEM approved oil filter.
C3. Section 3.1.2.22 Air Compressor
Delete this section in its entirety and replace with the following:
An engine driven air compressor and air system shall be furnished that meets the following requirements:
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 18 OF 20
Minimum 18.0 CFM Engine flange mounted and gear driven Integral unloader The compressor discharge hose shall be SAE 100R14A PTFE, stainless steel braid covered hose routed to a point isolated from compressor vibration and movement (i.e. to a bulkhead). Zinc plated steel, or stainless steel, tubing is acceptable if run to a component on the engine assembly.
Copper tubing of any type is not acceptable as discharge tubing directly off the compressor discharge head.
See section 3.7 for air system requirements
Regardless of the system's air pressure, idle up to the rated engine speed shall be available to the operator with the transmission in neutral and the parking brake applied
C4. Section 3.1.2.17 Alternator
Delete this section in its entirety and replace with the following:
If low voltage 24/28 volt DC is furnished by the hybrid drive system in lieu of a separate, mechanically driven, alternator, the following alternator is not required.
If low voltage 24/28 volt DC is not furnished by the hybrid drive system, the alternator shall be a 24 Volt Leese-Neville, Niehoff, or Delco rated to continuously supply 100% of the full-load amperage (FLA) at rated regulated output voltage with the engine at base idle speed and at an ambient operating temperature of 93C/200F. The full-load amperage (FLA) of the bus is the maximum concurrent load when all on-board electrical equipment is operating simultaneously.
Full-load amperage (FLA) and regulated voltage output shall be confirmed and validated through engineering testing and measurement under the following conditions on the first article:
at engine base idle speed all on-board electrical is operating concurrently, FLA condition at an ambient operating temperature of approximately 25C/77F
The rated output of the alternator shall be determined through analysis using manufacturer’s supplied performance data, under the following conditions:
at engine base idle speed at regulated output voltage at an ambient operating temperature of 93C/200F.
The rated output of the selected alternator shall then be compared to the FLA test data. The contractor shall confirm and validate that the contractor selected alternator meets all
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 19 OF 20 requirements. The contractor shall provide detailed test plan, prior to start of test, for Government approval. The offeror shall provide a draft copy of the test results to the Government immediately upon completion of the testing. The offeror shall submit a final test report for Government approval. The Government reserves the right to witness this testing.
C5. Section 3.1.2.23 Air Filter
Delete this section in its entirety and replace with the following:
The air filter shall be dry type, single or two-stage, engine OEM approved air cleaner with service indicator mounted on the dashboard of the bus or in the engine compartment in the engine air intake piping. If mounted in the engine compartment, the service indicator shall be easily observable by maintenance personnel standing on the ground.
C6. Section 3.46.10 Batteries
Delete this section in its entirety and replace with the following:
Two lead-acid batteries, meeting the following requirements, shall be provided for 12/24 volt service:
Interstate No. U8D-1400BUS, or equal- 12 Volt, 450 RC min. @ 25amp @ 80 deg. F.
They shall bear an initial warranty date no earlier than 60 days prior to bus manufacture.
Positive and negative terminals shall have different size studs, or the battery terminals and cables shall be arranged to prevent incorrect installation. Battery terminals shall be located for access in less than 30 seconds with jumper cables. Battery cables shall be flexible and sufficiently long to reach the batteries in the extended tray position without stretching or pulling on any connection. Cables shall not lie on top of batteries. The battery terminals and cables shall be color-coded with red for the primary positive and black for negative.
The battery tray shall be made of stainless steel and shall pull out easily and properly support the batteries during service, filling by manual or automatic equipment, inspection of water levels, and replacement. In the normal position, the battery tray shall not be supported by rollers. A positive lock shall retain the battery tray in the normal position.
Batteries shall be easily accessible for inspection, serviceable only from outside the bus, securely mounted on a sliding or swing out stainless steel tray, treated to prevent corrosion and be readily accessible for servicing, under the bus floor and separate from the engine compartment.
C7. Section 4.5.5 Option SRCB Stop Request Cables
Delete this section in its entirety and replace with the following:
Solicitation QMAE-CY-110303-N Amendment 002 PAGE 20 OF 20
If option SRCB is selected, a passenger "Stop Requested" signal system that complies with applicable ADA requirements defined in 49 CFR, Part 38.37 shall be provided. The system shall consist of a heavy-duty pull cable, chime, and interior sign message. The pull cable shall be located the full length of the bus on the sidewalls at the level where the transom is located. If no transom window is required, height of pull cable shall approximate this transom level and shall be no greater than 63 inches as measured from floor surface. It shall be easily accessible to all passengers, seated or standing. At each wheelchair parking position and priority seating positions additional provisions shall be included to allow a passenger in a mobility aid to easily activate “Stop Requested” signal
C8. Section 4.5.6 Custom Exterior Paint
Delete this section in its entirety.
C9. Section 4.5.7 Option UPHL Custom Upholstery
Delete this section in its entirety.
2) All other terms and conditions remain in full force and effect.