QASP Matrix.pdf
PDF 116 KB Posted
- Attached to
- Sailor Transportation Newport News, Va
- Solicitation number
- N0018926RB004
About this file
This is a Quality Assurance Surveillance Plan (QASP) for a sailor transportation services contract supporting PEO CIV. The QASP establishes systematic methods for the Contracting Officer's Representative (COR) to verify that the contractor performs all services required by the Performance Work Statement in a timely, accurate, and complete manner.
The plan measures performance across six key elements: documentation and receipts supporting work completion (100% compliance with USN Standards, >95% deliverables submitted timely without rework via random inspection); provision of sufficient transportation to sailors as prescribed in the PWS (work done safely and timely via random inspections); overall contract performance (annual COR assessment requiring a Satisfactory or higher rating); invoicing accuracy and timeliness (100% accuracy via monthly review); and compliance with FAR Clause 52.222-50 regarding combatting trafficking in persons (100% compliance monitored randomly with immediate reporting of non-compliance to the Contracting Officer). Performance within acceptable quality levels is considered satisfactory; failure to meet standards may result in Contract Discrepancy Reports requiring written responses within five days, contract termination, or loss of future government contracts. The contractor is incentivized to deliver quality services timely, as the Government can require replacement or correction of non-compliant work at no additional cost to the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions sailor transportation 4-14.pdf | ||
| Questions 4-2.pdf | ||
| Newport news Sailor Transportation Example Schedule - 31 Mar 26.xlsx | XLSX spreadsheet | |
| PWS REVISED 4-2-26.pdf | ||
| Solicitation - N0018926RB004 (1).pdf | ||
| PWS.pdf | ||
| Past Performance Info Form (1).pdf | ||
| Newport News Wage determination.pdf | ||
| Past Performance Report Form (1).pdf | ||
| DD2579 Sailor Transport Redacted.pdf | ||
| CDR (2).pdf | ||
| Sailor Transportation Worksheet Blank.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP & MATRIX
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose- To ensure that the Government has an effective and systematic method of surveillance for the services in the Performance Work Statement, PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. Critical to the performance of sailor transportation services in support of PEO CIV is the timely, accurate and thorough completion of all contract requirements as stated in the PWS.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against standards set in the PWS.
b. Deliverables – The required deliverables will be assessed against the specifications for the deliverables detailed in the PWS for transporting sailors safely to and from associated tasks.
c. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods- The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic inspection, and validated customer complaints.
4. Performance Measurement- Performance will be measured in accordance with the following table-
QASP MATRIX
Performance
Element
Performance Requirement Surveillance
Method
Frequency Acceptable Quality
Level
Documentation and receipts supporting completion of all work action items.
100% compliance with USN Standards.
Inspection by the
COR
Random >95% of deliverables submitted timely and without rework required.
Provide sufficient transportation to
Sailors.
As prescribed in the PWS Inspection by the
COR.
Randomly, on occasion.
Work done safely and in a timely manner
Overall Contract
Performance
Overall contract performance of sufficient quality to earn a
Satisfactory (or higher) rating in the COR’s annual report on
Contractor Performance
Assessment by the COR
Annual All performance elements rated
Satisfactory (or higher)
Invoicing Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice
Monthly 100% accuracy.
Submitted as required in the Contract Compliance with FAR Clause 52.222- 50 Combatting Trafficking In Persons (CTIP)
The COR will monitor the Contractor's performance regarding trafficking in persons such that non-compliance with FAR Clause 52.222-50 is brought to the immediate attention of the Contracting Officer.
Inspection by the
COR.
100% compliance;
Randomly
Non-compliance will be immediately reported to the Contracting Officer
(DFARS PGI
222.1703).
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives-
The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract, reflected in the COR’s annual report, may result in termination of the contract and may result in the loss of future Government contracts.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report
(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented.
Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements. To maximize the profit earned on costs incurred, the contractor is incentivized to ensure that quality services are provided in a timely manner.
File details come from the government source that posted it. Updated .