QASP for Post 911 survey.pdf
PDF 133 KB Posted
- Attached to
- R702--Study for Department of Veterans Affairs Health Outcomes of Military Exposures Epidemiology
- Solicitation number
- 36C24526Q0544
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a Post 9/11 Survey contract. The QASP establishes performance standards and surveillance methods across four primary task categories over a 34-month contract period.
Task #1 (Program and Project Management Services) requires the contractor to deliver project management documentation within one month of award, including a detailed Project Management Plan with Quality Control Plan, Project Plan, and Confidentiality Plan with Data Security Procedures. The contractor must provide ongoing toll-free technical support and maintain weekly meeting agendas and minutes, weekly reports during data collection, and monthly reports throughout the contract life. All deliverables under this task have 95% quality standards and are monitored through 100% inspection. Task #2 (Data Collection Surveys/Studies and Reporting) encompasses the most extensive scope, including vital status updates coordinated with the VA, contact information development using location algorithms (4 months, 90% standard), questionnaire design for web-based and Computer-Assisted Telephone Interview (CATI) modes (5 months, 95% standard), and securing domain hosting for the electronic survey instrument (6 months, 90% standard). The contractor must print and mail study materials to 109,000 respondents (8-21 months, 95% standard), conduct a pilot study with 100 participants (10 months, 90% standard), and execute full data collection using both web-based and CATI modes (8-24 months, 95% standard). Additional deliverables include PDF conversion of hard copy documents (70% standard), a data management system (3 months, 90% standard), data entry and scanning services (8-30 months, 95% standard), incentive plan management (85% standard beginning month 5), interim and final database submissions (85-95% standards), and methodology reports (80-95% standards). Task #3 (Simple & Complex Data Analyses) requires focused methods and technique information papers (34 months, 85% standard), programming language development (5 months, 90% standard), analysis plan development for sampling weights (32 months, 90% standard), and non-response analysis (35 months, 90% standard). Task #4 (Educational and Informational Materials) calls for creation of an information sheet (8 months, 90% standard), marketing brochures (5 months, 90% standard), fact sheets (5 months, 90% standard), and six social media promotional posts (5 months, 90% standard). Surveillance methods include 100% inspection for critical deliverables, contractor-reported data, periodic surveillance, user surveys, and progress reports depending on the specific indicator.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and R - 5.xlsx | XLSX spreadsheet | |
| Q and R -1.docx | DOCX document | |
| Q and R - 3.xlsx | XLSX spreadsheet | |
| Q and R - 7.docx | DOCX document | |
| Q and R - 4.xlsx | XLSX spreadsheet | |
| Q and R - 2.xlsx | XLSX spreadsheet | |
| Q and R - 6.docx | DOCX document | |
| Q and R - 8.docx | DOCX document | |
| Amendment - Solicitation No. 36C24526Q0544 0002.pdf | ||
| Amendment - Solicitation No. 36C24526Q0544 0001.pdf | ||
| Solicitation No. 36C24526Q0544.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| Supplemental Instructions.pdf | ||
| VHA 1605.05 BUSINESS ASSOCIATE AGREEMENT.docx | DOCX document | |
| VHA 1605.05 BUSINESS ASSOCIATE AGREEMENT.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP for Post 9/11 Survey
TASKS
Task
Ref
Indicator/Deliverable Standard AQ
L
Method(s) of
Surveillance
TASK #1
Program and
Project
Management
Services
7.1.1 Provide and maintain a
detailed Project
Management Plan that includes a Quality
Control Plan
1 month after award of contract
95% 100%
Inspection
7.1.2 Provide and maintain a
detailed Project Plan
1 month after award of contract
95% 100%
Inspection
7.1.3 Provide a
Confidentiality Plan and Data Security
Procedures
1 month after award of contract
95% 100%
Inspection
7.1.4 Provide toll free
number and email technical support
4 months after award of contract
95% 100%
Inspection
7.1.5 Prepare Agendas and
minutes for weekly meetings
Weekly, throughout the life of the contract
95% 100%
Inspection
7.1.6 Provide weekly reports
during data collection
Weekly, throughout the data collection period
95% 100%
Inspection
7.1.7 Provide monthly
reports during the award period
Monthly, throughout the life of the contract
95% 100%
Inspection
TASK #2
7.2.1 Assist with obtaining
necessary IRB and
OMB Approvals
6 months after award of contract
85% Contractor-reported data
Data
Collection
Surveys/Stu dies and
Reporting
7.2.2 Perform vital status
update in coordination with VA on members of the cohort
4 months 90% Contractor-reported data
7.2.3 Develop Contact
Information/ Locate
Addresses: i.e., location algorithm
4 months after award of contract
90% Contractor-reported data
7.2.4 Design questionnaire
(web based and CATI)
5 months after award of contract
95% 100%
Inspection
7.2.5 Secure a domain
name; host site;
program and manage electronic survey instrument
6 months after award of contract
90% Contractor-reported data
7.2.6 Print and mail study
materials as directed
(n=109,000)
8-21 months after award of contract
95% Contractor-reported data;
Periodic
Surveillance;
Progress
Report
7.2.7 Create a telephone
script for Computer-
Assisted Telephone
Interviews (CATI)
5 months after award of contract
90% Contractor-reported data
7.2.8 Conduct a Pilot Study
(n=100)
10 months after award of contract
90% Progress
Report
7.2.9 Conduct data
collection using the appropriate mode:
web-based, CATI
(n=109,000), 8-24 months after award of contract
95% Progress
Report
7.2.1
Create a pdf of returned hard copy documents as indicated
8-28 months after award of contract
70% Contractor-reported data
7.2.1
Develop and implement a Data
Management system
3 months after award of contract
90% 100%
Inspection
7.2.1
Data Entry: Scanning and editing questionnaire responses; coding open-ended questions;
format of data entry and reporting; late-arriving questionnaires, etc
8-30 months after award of contract
95% Periodic
Surveillance
7.2.1
Create and manage an incentive plan
Throughout the life of the contract, beginning in month 5
85% Periodic
Surveillance;
Progress
Reports
7.2.1
Conduct literature reviews
4 months after award of contract
90% Contractor-reported data
7.2.1
Create a coding manual
5 months after award of contract
90% Contractor-reported data
7.2.1
Submit interim data sets
4 times throughout data collection
85% Contractor-reported data
7.2.1
Submit pre-final databases
28 months after award of contract
95% Contractor-
7.2.1
Submit final databases 30 months after award of contract
95% Contractor-reported data
7.2.1
Prepare draft methodology report for review
32 months after award of contract
80% Contractor-reported data
7.2.2
Prepare final methodology report for review
34 months after award of contract
95% Contractor-reported data
7.2.2
Develop a Data
Destruction Plan
12 months after award of contract
95% Contractor-reported data
TASK #3
Simple &
Complex
Data
Analyses
7.3.1 Provide focused
methods and technique information papers (n=3)
34 months after award of contract
85% Periodic
Surveillance
7.3.2 Develop programming
language for coding procedures
5 months after award of contract
90% Contractor-
7.3.3
Develop and perform an analysis plan for calculation of sampling weights and correction factors
32 months after award of contract
90% Contractor-reported data
7.3.4 Perform non-response
analysis
35 months after award of contract
90% Periodic
Surveillance
TASK #4
Educational and
Informational
Materials
7.4.1 Create a 1-page
information sheet (n=1)
8 months after award of contract
90% 100%
Inspection;
User Survey
7.4.2 Create and format
brochures for marketing purposes
(n=1)
5 months after award of contract
90% User survey;
Contractor-
7.4.3 Create and format Fact
Sheets (n=1)
5 months after award of contract
90% User survey;
Contractor-reported data
7.4.4 Create promotional
materials (n=6 social media posts)
5 months after award of contract
90% Contractor-reported data;
Progress
Report
File details come from the government source that posted it. Updated .