This document is a Quality Assurance Surveillance Plan (QASP) for a Post 9/11 Survey contract. The QASP establishes performance standards and surveillance methods across four primary task categories over a 34-month contract period.

Task #1 (Program and Project Management Services) requires the contractor to deliver project management documentation within one month of award, including a detailed Project Management Plan with Quality Control Plan, Project Plan, and Confidentiality Plan with Data Security Procedures. The contractor must provide ongoing toll-free technical support and maintain weekly meeting agendas and minutes, weekly reports during data collection, and monthly reports throughout the contract life. All deliverables under this task have 95% quality standards and are monitored through 100% inspection. Task #2 (Data Collection Surveys/Studies and Reporting) encompasses the most extensive scope, including vital status updates coordinated with the VA, contact information development using location algorithms (4 months, 90% standard), questionnaire design for web-based and Computer-Assisted Telephone Interview (CATI) modes (5 months, 95% standard), and securing domain hosting for the electronic survey instrument (6 months, 90% standard). The contractor must print and mail study materials to 109,000 respondents (8-21 months, 95% standard), conduct a pilot study with 100 participants (10 months, 90% standard), and execute full data collection using both web-based and CATI modes (8-24 months, 95% standard). Additional deliverables include PDF conversion of hard copy documents (70% standard), a data management system (3 months, 90% standard), data entry and scanning services (8-30 months, 95% standard), incentive plan management (85% standard beginning month 5), interim and final database submissions (85-95% standards), and methodology reports (80-95% standards). Task #3 (Simple & Complex Data Analyses) requires focused methods and technique information papers (34 months, 85% standard), programming language development (5 months, 90% standard), analysis plan development for sampling weights (32 months, 90% standard), and non-response analysis (35 months, 90% standard). Task #4 (Educational and Informational Materials) calls for creation of an information sheet (8 months, 90% standard), marketing brochures (5 months, 90% standard), fact sheets (5 months, 90% standard), and six social media promotional posts (5 months, 90% standard). Surveillance methods include 100% inspection for critical deliverables, contractor-reported data, periodic surveillance, user surveys, and progress reports depending on the specific indicator.

View the file

Other files

File Type Posted
Q and R - 5.xlsx XLSX spreadsheet
Q and R -1.docx DOCX document
Q and R - 3.xlsx XLSX spreadsheet
Q and R - 7.docx DOCX document
Q and R - 4.xlsx XLSX spreadsheet
Q and R - 2.xlsx XLSX spreadsheet
Q and R - 6.docx DOCX document
Q and R - 8.docx DOCX document
Amendment - Solicitation No. 36C24526Q0544 0002.pdf PDF
Amendment - Solicitation No. 36C24526Q0544 0001.pdf PDF
Solicitation No. 36C24526Q0544.pdf PDF
Past Performance Questionnaire.pdf PDF
Past Performance Questionnaire.docx DOCX document
Supplemental Instructions.pdf PDF
VHA 1605.05 BUSINESS ASSOCIATE AGREEMENT.docx DOCX document
VHA 1605.05 BUSINESS ASSOCIATE AGREEMENT.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP for Post 9/11 Survey

TASKS

Task

Ref

Indicator/Deliverable Standard AQ

L

Method(s) of

Surveillance

TASK #1

Program and

Project

Management

Services

7.1.1 Provide and maintain a

detailed Project

Management Plan that includes a Quality

Control Plan

1 month after award of contract

95% 100%

Inspection

7.1.2 Provide and maintain a

detailed Project Plan

1 month after award of contract

95% 100%

Inspection

7.1.3 Provide a

Confidentiality Plan and Data Security

Procedures

1 month after award of contract

95% 100%

Inspection

7.1.4 Provide toll free

number and email technical support

4 months after award of contract

95% 100%

Inspection

7.1.5 Prepare Agendas and

minutes for weekly meetings

Weekly, throughout the life of the contract

95% 100%

Inspection

7.1.6 Provide weekly reports

during data collection

Weekly, throughout the data collection period

95% 100%

Inspection

7.1.7 Provide monthly

reports during the award period

Monthly, throughout the life of the contract

95% 100%

Inspection

TASK #2

7.2.1 Assist with obtaining

necessary IRB and

OMB Approvals

6 months after award of contract

85% Contractor-reported data

Data

Collection

Surveys/Stu dies and

Reporting

7.2.2 Perform vital status

update in coordination with VA on members of the cohort

4 months 90% Contractor-reported data

7.2.3 Develop Contact

Information/ Locate

Addresses: i.e., location algorithm

4 months after award of contract

90% Contractor-reported data

7.2.4 Design questionnaire

(web based and CATI)

5 months after award of contract

95% 100%

Inspection

7.2.5 Secure a domain

name; host site;

program and manage electronic survey instrument

6 months after award of contract

90% Contractor-reported data

7.2.6 Print and mail study

materials as directed

(n=109,000)

8-21 months after award of contract

95% Contractor-reported data;

Periodic

Surveillance;

Progress

Report

7.2.7 Create a telephone

script for Computer-

Assisted Telephone

Interviews (CATI)

5 months after award of contract

90% Contractor-reported data

7.2.8 Conduct a Pilot Study

(n=100)

10 months after award of contract

90% Progress

Report

7.2.9 Conduct data

collection using the appropriate mode:

web-based, CATI

(n=109,000), 8-24 months after award of contract

95% Progress

Report

7.2.1

Create a pdf of returned hard copy documents as indicated

8-28 months after award of contract

70% Contractor-reported data

7.2.1

Develop and implement a Data

Management system

3 months after award of contract

90% 100%

Inspection

7.2.1

Data Entry: Scanning and editing questionnaire responses; coding open-ended questions;

format of data entry and reporting; late-arriving questionnaires, etc

8-30 months after award of contract

95% Periodic

Surveillance

7.2.1

Create and manage an incentive plan

Throughout the life of the contract, beginning in month 5

85% Periodic

Surveillance;

Progress

Reports

7.2.1

Conduct literature reviews

4 months after award of contract

90% Contractor-reported data

7.2.1

Create a coding manual

5 months after award of contract

90% Contractor-reported data

7.2.1

Submit interim data sets

4 times throughout data collection

85% Contractor-reported data

7.2.1

Submit pre-final databases

28 months after award of contract

95% Contractor-

7.2.1

Submit final databases 30 months after award of contract

95% Contractor-reported data

7.2.1

Prepare draft methodology report for review

32 months after award of contract

80% Contractor-reported data

7.2.2

Prepare final methodology report for review

34 months after award of contract

95% Contractor-reported data

7.2.2

Develop a Data

Destruction Plan

12 months after award of contract

95% Contractor-reported data

TASK #3

Simple &

Complex

Data

Analyses

7.3.1 Provide focused

methods and technique information papers (n=3)

34 months after award of contract

85% Periodic

Surveillance

7.3.2 Develop programming

language for coding procedures

5 months after award of contract

90% Contractor-

7.3.3

Develop and perform an analysis plan for calculation of sampling weights and correction factors

32 months after award of contract

90% Contractor-reported data

7.3.4 Perform non-response

analysis

35 months after award of contract

90% Periodic

Surveillance

TASK #4

Educational and

Informational

Materials

7.4.1 Create a 1-page

information sheet (n=1)

8 months after award of contract

90% 100%

Inspection;

User Survey

7.4.2 Create and format

brochures for marketing purposes

(n=1)

5 months after award of contract

90% User survey;

Contractor-

7.4.3 Create and format Fact

Sheets (n=1)

5 months after award of contract

90% User survey;

Contractor-reported data

7.4.4 Create promotional

materials (n=6 social media posts)

5 months after award of contract

90% Contractor-reported data;

Progress

Report

File details come from the government source that posted it. Updated .