This is a Quality Assurance Surveillance Plan (QASP) for elevator maintenance and repair services. The document outlines the Government's approach to monitoring contractor performance and verifying compliance with the underlying Performance Work Statement (PWS).
The QASP establishes five key performance objectives with corresponding standards, metrics, and acceptable quality levels (AQL). Preventive Maintenance requires 100% completion of monthly maintenance for each elevator, monitored through Contracting Officer Representative (COR) review of maintenance logs and random inspections. Emergency Response to entrapment or unsafe conditions must occur within 3 hours with a 95% AQL, verified through incident logs and service tickets. Urgent Response to service calls requires response within 6 hours at 95% compliance, and Routine Response requires completion within 1 business day at 95% compliance, both tracked via work order tracking and COR review. Repair Completion requires 95% of repairs to be finished within required timeframes, verified through service tickets and work order tracking. Surveillance methods include monthly reviews of contractor-submitted maintenance logs, verification of completion dates and technician signatures, and random spot-check inspections. Remedies for non-compliance range from re-performance at no cost and documentation in CPARS for recurring preventive maintenance failures to corrective action plans for response time and repair completion failures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_75H70726Q00099.pdf | ||
| IEE Representation Form.pdf | ||
| Attachment C- Question Request Form.xlsx | XLSX spreadsheet | |
| FillableTable Elevator PM.RS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. PURPOSE
This QASP defines the Government’s approach to monitoring contractor performance and verifying compliance with the PWS.
2. SURVEILLANCE METHODS
Review contractor-submitted monthly maintenance logs for each elevator Verify completion dates, technician signatures, and tasks performed Conduct random spot-check inspections of elevators after maintenance Compare logs against scheduled maintenance plan
3. PERFORMANCE STANDARDS AND INSPECTION CRITERIA
Performance
Objective Standard Performance
Metric AQL Surveillance
Method Frequenc y Remedy
Preventive Maintenance
Monthly maintenance completed for each elevator in accordance with PWS 4.1
% of scheduled maintenance completed
100% COR review of maintenance logs; random inspections
Monthly Re-performance at no cost;
document in CPARS if recurring
Emergency Response
Response to entrapment or unsafe condition within 3 hours (PWS 4.3)
% of emergency calls responded to within required timeframe
95% Incident logs;
service tickets;
COR
verification
As needed Corrective action plan required;
document in CPARS if recurring
Urgent Response
Response to urgent service calls within 6 hours (PWS 4.3)
% of urgent calls responded to within required timeframe
95% Work order tracking; COR review
As needed Corrective action plan required
Routine Response
Response to routine service calls within 1 business day
(PWS 4.3)
% of routine calls responded to within required timeframe
95% Work order tracking; COR review
As needed Corrective action plan required
Repair Completion
Repairs completed within required timeframes:
% of repairs completed within required timeframe
95% Service tickets; work order tracking;
COR
verification
As needed Corrective action plan; re-performance if applicable;