QASP.docx
DOCX document 34 KB Posted
- Solicitation number
- 36C26126Q1056
About this file
This is a Quality Assurance Surveillance Plan (QASP) for housekeeping equipment maintenance services at the Palo Alto VA Medical Center. The QASP establishes government oversight mechanisms to monitor contractor performance against contractual requirements without duplicating the contractor's internal quality control efforts. The contracting officer and contracting officer's representative (COR) are responsible for surveillance activities, including periodic site visits, customer complaint collection, and 100% inspections or random sampling as needed. The COR maintains a complete quality assurance file containing all reports, evaluations, and surveillance activity records for the contract duration.
The contractor must meet five key performance standards with 100% acceptable quality levels: (1) execution of all required preventive maintenance services on EMS floor housekeeping equipment according to original equipment manufacturer (OEM) standards and guidelines; (2) performance of corrective maintenance and repairs on broken or inoperable equipment, with prior approval for repairs or replacement assessments; (3) adherence to scheduling requirements of two monthly site visits with minimum 16 hours per month; (4) employment of personnel qualified in OEM standards for preventive and corrective maintenance; and (5) proper documentation and reporting of all work performed. Performance is measured quarterly through contractor meetings and evaluated using a five-tier rating system (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory). Non-compliance requires corrective action at no cost to the government, with contractors required to respond in writing within five days to any notifications of performance failures, including proposed corrective measures and preventive actions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126Q1056 0001.docx | DOCX document | |
| WD San Mateo 2015-5637 REV 32 05.13.26.pdf | ||
| Equipment List EIL046 EMS FY2026.xlsx | XLSX spreadsheet | |
| WD Santa Clara 2015-5641 REV 30 05.13.26.pdf | ||
| Equipment ListEIL041 EMS FY2026.xlsx | XLSX spreadsheet | |
| WD Alameda 2015-5623 REV 29 05.13.26.pdf | ||
| Equipment list EIL040 EMS FY2026.xlsx | XLSX spreadsheet | |
| 36C26126Q1056.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Housekeeping Equipment Maintenance Services
Quality Assurance Surveillance Plan
1. Purpose
This quality assurance surveillance plan (QASP) is a government-developed and applied document used to make systematic quality assurance methods used in the administration of the performance-based service acquisition (PBSA) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the government receives the quality of services called for in the contract, and that the government only pays for the acceptable level of services received.
2. Authority
Authority to issue this QASP is provided under Federal Acquisition Clause (FAR) 52.212-4(a) Inspection and Acceptance, which provided for inspections and acceptance of the articles, services, and documentation called for in the contract to be accomplished by the contracting officer or a duly appointed representative.
3 Scope
The contractor, and not the government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract. The QASP is put in place to provide government surveillance oversight of the contractor’s quality control efforts to assure that they are timely, effective, and delivering the results specified in the contract. The QASP is not a part of the contract, nor is it intended to duplicate the contractor’s quality control plan.
4. Government Resources
The following definitions for government resources are applicable to this plan:
Contracting Officer
A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the government.
Contracting officer’s Representative (COR)
An individual designated in writing by the contracting officer to act as his or her authorized representative to assist in administering a contract. The source and authority for a COR is from the contracting officer. COR limitations are contained in the written letter of designation.
5. Responsibilities
The government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer
The contracting officer ensures performance of all necessary actions for effective contracting and ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the contracting officer who assures that the contractor receives impartial, fair, and equitable treatment under the contract. The contracting officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
COR
The COR is responsible for technical administration of the contract and assures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the contracting officer for action.
Documentation
The COR will, in addition to providing documentation to the contracting officer, maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the government’s performance of the quality assurance function, including the originals of all surveillance activity checklists. All such records will be retained for the life of this contract. The COR shall forward these records to the contracting officer at termination or completion of the contract.
6. Methods of Surveillance
The below listed methods of surveillance shall be used in the administration of this QASP.
Periodic Surveillance by the COR
The COR periodically sit in on the classes to verify that the contractor is meeting the goals of the training course.
Customer complaint
The COR is the point of contact and will collect all customer complaints. The COR will review all complaints and contact the originator to determine the validity of any claims. Customer complaints will become a permanent part of the COR surveillance records.
100% Inspections
Complete evaluation of the performance element.
Random Sampling
Method used to evaluate performance by randomly selecting and inspecting a sample of cases.
7. Identified QA Surveillance Tasks
The following PBSA items are identified within the contract performance work statement and will be monitored by period surveillance from the COR and customer complaints in the event that a task is not be adequately performed.
8. Performance Indicators (Measures). Contractor performance will be rated/evaluated by the COR or other authorized designee using the following metrics in the table below. The contractor’s performance under the terms and conditions of this contract will be based on how successfully the contractor executes the tasks/deliverables listed in the Performance Work Statement (PWS). At a minimum, the contractor must complete the required tasks and deliverables that are contained within the Performance Work Statement for this requirement.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) – PERFORMANCE METRICS
HOUSEKEEPING EQUIPMENT PREVENTIVE MAINTENANCE SERVICES AND REPAIR
PALO ALTO VA MEDICAL CENTER
TASK NAME & PWS REFERENCE
TASK DESCRIPTION
SCHEDULE, EXPLANTION, PERFORMANCE STANDARD
Acceptable Quality Levels (AQL)
INCENTIVES/ DISINCENTIVES FOR MEETING/
NOT MEETING AQL
Contractor performs all
100%. (Unless there are issues and/or mitigating circumstances which includes actions by the government that prevents or limits contractor performance) required preventative maintenance services
Preventive Maintenance Services (PWS Sections 5 and 9)
| Contractor performs Preventive Maintenance Services on the equipment. |
| according to the |
standards, guidelines, and based on the recommendations from the Original Equipment Manufacturer (OEM)
1,2,3, & Quarterly Contractor Performance and Quality Control Meeting for all EMS floor housekeeping equipment.
| Contractor |
| Contractor repairs |
| 100%. With prior |
| 1,2,3, & |
| Corrective |
| performs |
| equipment that is |
| approval, |
| Quarterly |
| Maintenance & |
| Corrective |
| broken, inoperable, |
| equipment is |
| Contractor |
| Repairs (PWS |
| Maintenance & |
| needs repair, and/or is |
| repaired or |
| Performance |
| Sections 5 and 9) |
| Repair on the equipment. |
| otherwise not operating at full capacity/full functionality. |
| condition. Or a BER assessment is made which facilitates replacement of such equipment that cannot or should not be repaired. |
| and Quality Control Meeting |
TASK NAME & PWS REFERENCE
TASK DESCRIPTION
SCHEDULE, EXPLANTION, PERFORMANCE STANDARD
Acceptable Quality Levels (AQL)
INCENTIVES/ DISINCENTIVES FOR MEETING/ NOT MEETING
AQL
Schedule (PWS Section 9) Contractor executes services and completes tasks/deliverables IAW scheduling timelines which includes proper check in and check out procedures while on site.
Two (2) visits to the site monthly to execute services for a minimum of sixteen (16) hours each month.
100% (Contractor meets frequency and duration of schedule as outlined)
1,2,3, &
Qualifications of Personnel performing services and executing tasks/deliverables (PWS Section 8)
Qualifications of Personnel Personnel performing services are knowledgeable of the original equipment manufacturer standards associated with conducting Preventative Maintenance Services and Corrective Maintenance & Repairs on the equipment 100; Contractor will correct deficiencies for negative actions or poor performance that results from the actions or inactions of unqualified personnel.
Documentation and Reporting (PWS Section 9)
Required reports and documentation by contractor.
For work performed, services executed, and for tasks/deliverables completed the contractor will appropriately document their effort.
100% Required reports submitted as stipulated in the contract. Reports and/or service logs submitted mirror the work that the contractor has performed.
Incentive/Disincentives for Meeting/Not Meeting AQL
1. Positive and negative performance will be documented locally (contract file) and/or in the appropriate contractor performance assessment reporting system/database.
2. Noncompliance to contract standards will be corrected at no cost to the government. The government reserves the right and may elect to measure/document negative performance through utilization of a performance report and/or a contract discrepancy report.
3. The contractor shall respond in writing to the Contracting Officer Representative (COR) to all notifications of failure to meet acceptable quality levels within 5 days of issuance by the Contracting Officer Representative and/or the Contracting Officer. The contractor’s response shall include the corrective action taken to rectify the problem and the proposed measure to preclude the recurrence of the problem.
The Performance Requirements Summary Matrix includes performance standards. The Government will use these standards to determine Contractor performance and will compare Contractor performance to the Acceptable Quality Level (AQL).
9. RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. Metrics and methods are also designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance meets contractual requirements and exceeds many to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
| VERY GOOD: | |
| Performance meets contractual requirements and exceeds some to the | Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
| SATISFACTORY: |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
| MARGINAL: |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g.,. Management, Quality, Safety or Environmental Deficiency Report or letter).
| UNSATISFACTORY: | |
| Performance does not meet most contractual requirements and recovery | is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency
10. Documenting Performance
a. ACCEPTABLE PERFORMANCE.
If contractual terms and conditions are being met and/or exceeded documentation is not necessarily required. However positive performance by the contractor will be referenced and/or documented if/when the Quarterly Contractor Performance and Quality Control Meeting is held. If the total contract cost exceeds the Simplified Acquisition Threshold (SAT) a CPAR’s (Contractor Performance Assessment Reporting System) report is required where contractor performance information will be recorded.
b. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the COR will inform the Contractor. This notification will normally be in writing unless circumstances necessitate verbal communication. Formal reporting may be done through generation of a Contract Discrepancy Report (CDR) if the issue cannot be rectified by other means.
When the COR determines that formal written communication and reporting is required the COR will prepare a Contract Discrepancy Report (CDR) and will present it to the appropriate Contractor representative.
The Contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the Contractor must present this corrective action plan back to the COR. The Government will review the Contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, other non-payment actions, or other actions deemed necessary by the CO.
The government reserves the right to document negative performance as stipulated above if/when a Quarterly Contractor Performance and Quality Control Meeting is held. If a CPARS report is required contractor performance will also be annotated in this database.
11. FREQUENCY OF MEASUREMENT
During contract performance, the COR will take periodic measurements as specified in the AQL column of the Performance Standards Summary Matrix and will analyze whether the negotiated frequency of measurement is appropriate for the work being performed.