This is a Quality Assurance Surveillance Plan (QASP) for reusable medical devices courier services between the VA Health System of the Ozarks' Fayetteville, AR main campus and Springfield, MO CBOC. The QASP outlines the systematic method for evaluating contractor performance, including monitoring procedures, roles and responsibilities of key personnel (CO and COR), and specific performance standards.

The QASP details six key performance areas that will be monitored through direct observation and periodic inspection: trained drivers, insurance compliance, operational vehicles, delivery tickets, temperature/humidity controls, and cross-contamination measures. All performance standards require 100% compliance and will be evaluated through observation and random inspections by the COR. Unacceptable performance requires the contractor to submit a corrective action plan, and performance evaluations will affect future contract opportunities with the agency. The QASP is described as a "living document" that can be revised with contractor coordination.

View the file

Other files

File Type Posted
36C25625Q0076 0003.docx DOCX document
36C25625Q0076 0002.docx DOCX document
36C25625Q0076-0001.pdf PDF
36C25625Q0076 0001.docx DOCX document
Final Invoice Memo.pdf PDF
2015-5109.pdf PDF
VHA-V16-564-SPS-SOP-1018.pdf PDF
VHA DIRECTIVE 1116.pdf PDF
VA Privacy Training.pdf PDF
36C25625Q0076.pdf PDF
WD 2015-5087.pdf PDF
36C25625Q0076_1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25625Q0076 Attachment 3

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

For: Reusable Medical Devices Courier Services Fayetteville to Springfield MO Contract Number:

Contract Description: The contractor shall provide all equipment, materials, supplies, labor, supervision, and transportation necessary for the transport of sterile and contaminated/soiled RMD between VHSO’s Fayetteville, AR main campus and Springfield, MO CBOC.

Contractor’s name: _____________________. (hereafter referred to as the contractor).

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

•What will be monitored.
•How monitoring will take place.
•Who will conduct the monitoring.
•How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: __________________ Organization or Agency: Department of Veterans Affairs, Office of Acquisition and Materiel Management

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: _________________

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager – _____________________________________

b. Other Contractor Personnel - <Enter name(s) or delete these lines if not applicable> Title: <Enter title(s) or delete these lines if not applicable.>

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Contractor shall perform the services at the acceptable levels as identified in the chart below. Results of the quality assurance surveillance shall be evaluated recorded as part of past performance documentation and shall have a direct effect on future modifications and possible contracts with this agency.

5. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. shall be performed periodically or through 100% surveillance

b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)

c. 100% INSPECTION. (Evaluates all outcomes.)

7. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

After award, both the contractor’s Program Manager and the COR shall sign this document.> Signature – Contractor Program Manager Signature – Contracting Officer’s Technical Representative

QASP

Task
ID
Standard
Acceptable Quality Level
Method of Surveillance
Incentive
Trained Drivers
1
In accordance with PWS 1.3
100%
Observation and random inspection by COR
Contractor will receive an unfavorable performance rating if acceptable level of quality is not met.
Insurance
2
Insurance

accordance with PWS 6.6 and 8

100%
Observation and random inspection by COR
Contractor will receive an unfavorable performance rating if acceptable level of quality is not met.
Vehicles
3
Operational vehicles

accordance with PWS 1.3

100%
Observation and random inspection by COR
Contractor will receive an unfavorable performance rating if acceptable level of quality is not met.
Delivery Tickets
4
Contractor shall provide delivery tickets accordance with PWS 6.1
100%
Observation and random inspection by COR
Contractor will receive an unfavorable performance rating if acceptable level of quality is not met.
Temperature and humidity controls
5
In accordance with 1.6 and 5.4 identified in the PWS
100%
Observation and random inspection by COR
Contractor will receive an unfavorable performance rating if acceptable level of quality is not met
Cross Contamination Measures
6
Cross Contamination Measures in accordance with 1.5
100%
Observation and random inspection by COR
Contractor will receive an unfavorable performance rating if acceptable level of quality is not met

File details come from the government source that posted it. Updated .