QASP Centralized Verification Counting Machines_08222024.docx

DOCX document 3 MB Posted

Attached to
Centralized Verification Counting Machine
Solicitation number
2031ZA25Q00085
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for Centralized Verification Counting Machines for the Bureau of Engraving & Printing (BEP) Office of Currency, dated August 8, 2024. The QASP establishes methods and procedures for government oversight of a firm-fixed-price contract for production counting machines, with key performance requirements including maintenance and repairs to maintain fully operational condition, provision of all labor, parts, materials, equipment and supplies, telephone support within 2 hours of problem notification, and maintenance service at least 3 times per year.

The plan details three levels of non-conformance (Minor, Major, and Critical) and their corresponding remedies, with specific performance thresholds requiring 100% compliance for operational conditions and equipment provision, and 99% compliance for telephone response and maintenance frequency. The QASP explicitly prohibits acceptance of counting machines assembled or partially assembled from Korea, Russia, and China. Oversight includes periodic inspections, random sampling, and customer feedback, with performance documented through monthly COR Status Reports and ultimately reflected in Contractor Performance Assessment Reporting System (CPARS) ratings.

View the file

Other files

File Type Posted
RFQ 2031ZA25Q00085 - Currency Counters.rtf RTF text file
SOW_V2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

For

Centralized Verification Counting Machines

8 August 2024

COR

Barrie Parker

DATE
BEP

CONTRACTING OFFICER

Marc Curry

DATE

August 8, 2024

August 8, 2024

Version 01/24/2018

SUMMARY OF REVISIONS

Revision Dated
Revision page(s) number
Content
Position
Name

Original version Date

Original

COR

TABLE OF CONTENTS

Subject Page Number

1. Overview

2. Description of Services/Supply/Product

3. Roles and Responsibilities

4. Contract Quality Requirements

5. Government Surveillance

6. Non-Conforming Performance

7. Data Analysis

8. Acceptance of Services

9. COR Status Report

10. Contractor Performance Assessment Reporting System (CPARS)

11. COR/Quality Assurance Surveillance Files

12. QASP Changes

1. Overview.

1.1. Purpose. The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to ensure it receives the services under this contract as identified in the Performance Work Statement (PWS).

1.2. Intent. The intent of this QASP is to: 1) ensure Contractor performance meets or exceeds contract terms, conditions, and specifications; 2) hold the Contractor accountable for quality control; and 3) encourage the Contractor to take appropriate steps to control and improve quality. Accordingly, the Government will perform surveillance on the contract in accordance with this QASP but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary to ensure that the rendered services conform to contract requirements. The Government also reserves the right to perform quality assurance at the Subcontractor level and perform quality assurance at the contractor's place of business, if applicable. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor.

2. Description of Services.

2.1. Scope of Work. The Bureau of Engraving & Printing (BEP), Office of Currency has a requirement for Centralized Verification Counting Machines. The Contractor shall provide the required production counting machines that meets or exceeds the technical requirements stated under Technical Specifications. During the solicitation phase, no counting machines will be accepted if assembled or partially assembled from the following countries: Korea, Russia, and China

2.2. Type of Contract. The government will award a firm fixed price contract.

3. Roles and Responsibilities. N/A

3.1. Government.

3.1.1. Contracting Officer (CO). The CO is the only person with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

3.1.2. Contracting Officer’s Representative (COR). The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

3.1.3. Contract Specialist. Ensures proper administration and contractor performance of the contract. Completes administrative portions of the contract to include modifications, letters and other documents as required. Ensures the proper processing and payment of invoices. Conducts conferences with contractors to clarify issues on contractual requirements, such as billing procedures, material submittals, and socioeconomic clauses. Monitors contractor performance through telephone conversations, correspondence, and visits for compliance with applicable laws, delivery schedules, payment provisions, inspections, and other requirements as stated in the contract. Provides guidance to contractor concerning obligations to perform within contractual terms. Serves a liaison between the contractor and the COR. Provides information and guidance IAW all applicable regulations and guidelines. Advising both the contractor and contracting officer representative on contractual matters/issues.

3.2. Contractor. A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.

4. Contract Quality Requirements.

4.1. Contractor’s Quality Control Program. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The Contractor shall ensure services are performed in accordance with this PWS. The Contractor shall identify, prevent, and ensure non-recurrence of defective services.

4.2. Government Quality Assurance. The Government shall evaluate the Contractor’s performance under this contract in accordance with this QASP. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and minimum acceptable defect rate(s).

5. Government Surveillance.

5.1. Methods of Surveillance. The following Methods of Surveillance will be utilized in monitoring the Contractors’ performance:

1. Performance Requirements Summary (PRS)

2. Customer Complaint Records, BEP OA Form 3436

3. Surveillance Schedule

4. Surveillance Checklist(s)

5. Contract Discrepancy Report, DA Form 5749

5.1.1. 100% Inspection Reserved for the highest risk areas where consequence of failure is high (i.e. life or limb are threatened) or there is likelihood of mission failure.

5.1.2. Random Sampling - When a service is performed relatively frequently and a statistically valid sample can be selected for audit. The most appropriate method for frequently recurring tasks.

5.1.3. Periodic Inspection - Planned sampling of a service at specific predetermined dates and times. May be appropriate for tasks that occur infrequently.

5.1.4. Customer Feedback. The Customer Complaint Record, Attachment 2, will be used to document/record all complaints. The following procedures will be followed when a complaint is received.

· The COR will investigate and determine the validity of the complaint.

· If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical.

· For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be followed.

5.2. Surveillance Schedule. A Surveillance Schedule will be created each month utilizing the COR Surveillance Schedule, Attachment 3. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. A copy of the Surveillance Schedule will be filed and will become part of the CORs file.

5.3. Surveillance Instructions/Checklists. Surveillance Checklists, Attachment 4, will be utilized and completed when surveillances are conducted.

5.4. Surveillance Documentation. The applicable Surveillance Checklist(s) will be completed when/as Surveillances are conducted. Completed Surveillance Checklist(s) will be filed in CORs file. The file will have ready access to the BEP Office of Acquisition

6. Non-Conforming Performance. Non-conformance occurs when a Contractor fails to meet Contract or Task Order terms, conditions and/or specifications. All instances of non-conformance will be documented, and the Contractor will be notified. Resolution of non-conformance discovered at the Subcontractor level will be addressed with the prime Contractor. Non-conformance is classified as either: Level I (Minor); Level II (Major); or Level III (Critical).

6.1. Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written Contract Discrepancy Report (CDR). However, the Government is still required to document verbal Level I CDRs. The COR may issue verbal Level I CDRs directly to the appropriate level of Contractor management. The COR will notify the CO as soon as practical when a verbal Level I CDR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency. The CO will issue and sign written Level I CDRs, Attachment 5.

6.2. Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, a large number of documented Level I CDRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II CDRs. The CO issues all Level II CDRs in writing, Attachment 5. The COR will notify the CO as soon as practical when a major non-conformance is identified.

6.3. Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the manner in which the services are performed; prevent or impact a vital agency mission as a result of performance; or are for repeated or uncorrected Level II CDRs. The Contracting Office Director or Deputy Director issues written Level III CDRs. The COR is responsible for notifying the CO immediately upon discovery of a critical non-conformance.

6.4. Documenting CDRs. Documentation, as a minimum, will include: the Contract or Task Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; Contractor representative who was notified; and the suspense date for Contractor response/corrective action.

6.5. Tracking and Resolving CDRs. All CDRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The COR and CO shall track CDRs to ensure the Contractor identifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The CO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work

7. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Status Reports and may be used to make adjustments to surveillance schedules, increase or decrease surveillance, if deemed appropriate. Negative trends noted using Government data/observations could result in issuing the Contractor a Contract Discrepancy Report. Trends noted using Contractor data will not result in a CDR unless the Contractor is not addressing the negative trend.

8. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment of the Contractor. This is accomplished by approving the Contractor’s Receiving Reports via IPP.

9. COR Status Report. COR Status Reports will be submitted on a Monthly basis to the Contracting Officer. COR Status Reports will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis will contain a summary of: surveillances performed; Customer Feedback, if any; CDRs, if any; an analysis of the Contractors performance; recommended adjustments to surveillance schedules; and any other pertinent contract information. Completed Surveillance Checklists and CDRs, if any, will be included as attachments to COR Status Reports or uploaded separately in the Miscellaneous Documents Section of the CORs’ Online file.

10. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback and CDRs, if any) will be used to support CPARS ratings.

11. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance File will be maintained by the COR.

12. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes.

Attachments:

1. Performance Requirements Summary (PRS)

2. Customer Complaint Record

3. Surveillance Schedule

4. Surveillance Checklist(s)

5. Contract Discrepancy Report

Attachment 1

Performance Requirements Summary (PRS)

The contractor services requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.

Performance Objective

Performance Standard
Performance Threshold
Method of Surveillance
Incentives (Positive or Negative)
The Contractor shall perform maintenance and repairs to fully operational condition in IAW PWS para 5.1
This standard is in accordance with all applicable guidelines identified within this agreement.
Zero deviation
Periodic inspections
Positive or negative performance in CPARS.
The Contractor shall provide all labor, travel, parts, materials, transportation, equipment, tools, training, supplies, management and supervision and all other items and services necessary to perform these services in support of this equipment.
Contractor provides this requirement 100% of the time at initial response.
100%
Periodic inspections
Positive or negative performance in CPARS reporting periods.
The Contractor shall provide telephone support with a response time within two (2) hours of calling in problem.
Contractor provides this requirement 99% of the time at initial response
99%
Periodic inspections
Positive or negative performance in CPARS reporting periods.
Contractor shall provide maintenance service for at least 3 times a year
Contractor provides this requirement 99% of the time at initial response
99%
Periodic inspections
Positive or negative performance in CPARS reporting periods

Attachment 2

Customer Complaint Record

Attachment 3

Surveillance Schedule

Attachment 4

Surveillance Checklist(s)

Attachment 5

Contract Discrepancy Report image1.png image2.emf image3.png image4.emf

Surveillance Schedule _.pdf

5. Planned Date for Surveillance

1. Contract:

3. Surveillance Month:

COR SURVEILLANCE SCHEDULE

2. Contractor:

4. COR:

BEP_OA_SS Rev#1_1-24-18

Sheet1

1 Contract:

2 Contractor:

3 Surveillance MonthRow2:

3 Surveillance MonthRow2_2:

3 Surveillance MonthRow2_3:

3 Surveillance MonthRow2_4:

4 CORRow2:

4 CORRow2_2:

4 CORRow2_3:

4 CORRow2_4:

4 CORRow2_5:

3 Surveillance MonthRow3:

3 Surveillance MonthRow3_2:

3 Surveillance MonthRow3_3:

3 Surveillance MonthRow3_4:

4 CORRow3:

4 CORRow3_2:

4 CORRow3_3:

4 CORRow3_4:

4 CORRow3_5:

3 Surveillance MonthRow4:

3 Surveillance MonthRow4_2:

3 Surveillance MonthRow4_3:

3 Surveillance MonthRow4_4:

4 CORRow4:

4 CORRow4_2:

4 CORRow4_3:

4 CORRow4_4:

4 CORRow4_5:

3 Surveillance MonthRow5:

3 Surveillance MonthRow5_2:

3 Surveillance MonthRow5_3:

3 Surveillance MonthRow5_4:

4 CORRow5:

4 CORRow5_2:

4 CORRow5_3:

4 CORRow5_4:

4 CORRow5_5:

3 Surveillance MonthRow6:

3 Surveillance MonthRow6_2:

3 Surveillance MonthRow6_3:

3 Surveillance MonthRow6_4:

4 CORRow6:

4 CORRow6_2:

4 CORRow6_3:

4 CORRow6_4:

4 CORRow6_5:

3 Surveillance MonthRow7:

3 Surveillance MonthRow7_2:

3 Surveillance MonthRow7_3:

3 Surveillance MonthRow7_4:

4 CORRow7:

4 CORRow7_2:

4 CORRow7_3:

4 CORRow7_4:

4 CORRow7_5:

3 Surveillance MonthRow8:

3 Surveillance MonthRow8_2:

3 Surveillance MonthRow8_3:

3 Surveillance MonthRow8_4:

4 CORRow8:

4 CORRow8_2:

4 CORRow8_3:

4 CORRow8_4:

4 CORRow8_5:

3 Surveillance MonthRow9:

3 Surveillance MonthRow9_2:

3 Surveillance MonthRow9_3:

3 Surveillance MonthRow9_4:

4 CORRow9:

4 CORRow9_2:

4 CORRow9_3:

4 CORRow9_4:

4 CORRow9_5:

3 Surveillance MonthRow10:

3 Surveillance MonthRow10_2:

3 Surveillance MonthRow10_3:

3 Surveillance MonthRow10_4:

4 CORRow10:

4 CORRow10_2:

4 CORRow10_3:

4 CORRow10_4:

4 CORRow10_5:

3 Surveillance MonthRow11:

3 Surveillance MonthRow11_2:

3 Surveillance MonthRow11_3:

3 Surveillance MonthRow11_4:

4 CORRow11:

4 CORRow11_2:

4 CORRow11_3:

4 CORRow11_4:

4 CORRow11_5:

3 Surveillance MonthRow12:

3 Surveillance MonthRow12_2:

3 Surveillance MonthRow12_3:

3 Surveillance MonthRow12_4:

4 CORRow12:

4 CORRow12_2:

4 CORRow12_3:

4 CORRow12_4:

4 CORRow12_5:

3 Surveillance MonthRow13:

3 Surveillance MonthRow13_2:

3 Surveillance MonthRow13_3:

3 Surveillance MonthRow13_4:

4 CORRow13:

4 CORRow13_2:

4 CORRow13_3:

4 CORRow13_4:

4 CORRow13_5:

3 Surveillance MonthRow14:

3 Surveillance MonthRow14_2:

3 Surveillance MonthRow14_3:

3 Surveillance MonthRow14_4:

4 CORRow14:

4 CORRow14_2:

4 CORRow14_3:

4 CORRow14_4:

4 CORRow14_5:

3 Surveillance MonthRow15:

3 Surveillance MonthRow15_2:

3 Surveillance MonthRow15_3:

3 Surveillance MonthRow15_4:

4 CORRow15:

4 CORRow15_2:

4 CORRow15_3:

4 CORRow15_4:

4 CORRow15_5:

3 Surveillance MonthRow16:

3 Surveillance MonthRow16_2:

3 Surveillance MonthRow16_3:

3 Surveillance MonthRow16_4:

4 CORRow16:

4 CORRow16_2:

4 CORRow16_3:

4 CORRow16_4:

4 CORRow16_5:

3 Surveillance MonthRow17:

3 Surveillance MonthRow17_2:

3 Surveillance MonthRow17_3:

3 Surveillance MonthRow17_4:

4 CORRow17:

4 CORRow17_2:

4 CORRow17_3:

4 CORRow17_4:

4 CORRow17_5:

3 Surveillance MonthRow18:

3 Surveillance MonthRow18_2:

3 Surveillance MonthRow18_3:

3 Surveillance MonthRow18_4:

4 CORRow18:

4 CORRow18_2:

4 CORRow18_3:

4 CORRow18_4:

4 CORRow18_5:

3 Surveillance MonthRow19:

3 Surveillance MonthRow19_2:

3 Surveillance MonthRow19_3:

3 Surveillance MonthRow19_4:

4 CORRow19:

4 CORRow19_2:

4 CORRow19_3:

4 CORRow19_4:

4 CORRow19_5:

3 Surveillance MonthRow20:

3 Surveillance MonthRow20_2:

3 Surveillance MonthRow20_3:

3 Surveillance MonthRow20_4:

4 CORRow20:

4 CORRow20_2:

4 CORRow20_3:

4 CORRow20_4:

4 CORRow20_5:

3 Surveillance MonthRow21:

3 Surveillance MonthRow21_2:

3 Surveillance MonthRow21_3:

3 Surveillance MonthRow21_4:

4 CORRow21:

4 CORRow21_2:

4 CORRow21_3:

4 CORRow21_4:

4 CORRow21_5:

3 Surveillance MonthRow22:

3 Surveillance MonthRow22_2:

3 Surveillance MonthRow22_3:

3 Surveillance MonthRow22_4:

4 CORRow22:

4 CORRow22_2:

4 CORRow22_3:

4 CORRow22_4:

4 CORRow22_5:

3 Surveillance MonthRow23:

3 Surveillance MonthRow23_2:

3 Surveillance MonthRow23_3:

3 Surveillance MonthRow23_4:

4 CORRow23:

4 CORRow23_2:

4 CORRow23_3:

4 CORRow23_4:

4 CORRow23_5:

3 Surveillance MonthRow24:

3 Surveillance MonthRow24_2:

3 Surveillance MonthRow24_3:

3 Surveillance MonthRow24_4:

4 CORRow24:

4 CORRow24_2:

4 CORRow24_3:

4 CORRow24_4:

4 CORRow24_5:

3 Surveillance MonthRow25:

3 Surveillance MonthRow25_2:

3 Surveillance MonthRow25_3:

3 Surveillance MonthRow25_4:

4 CORRow25:

4 CORRow25_2:

4 CORRow25_3:

4 CORRow25_4:

4 CORRow25_5:

3 Surveillance MonthRow26:

3 Surveillance MonthRow26_2:

3 Surveillance MonthRow26_3:

3 Surveillance MonthRow26_4:

4 CORRow26:

4 CORRow26_2:

4 CORRow26_3:

4 CORRow26_4:

4 CORRow26_5:

3 Surveillance MonthRow27:

3 Surveillance MonthRow27_2:

3 Surveillance MonthRow27_3:

3 Surveillance MonthRow27_4:

4 CORRow27:

4 CORRow27_2:

4 CORRow27_3:

4 CORRow27_4:

4 CORRow27_5:

3 Surveillance MonthRow28:

3 Surveillance MonthRow28_2:

3 Surveillance MonthRow28_3:

3 Surveillance MonthRow28_4:

4 CORRow28:

4 CORRow28_2:

4 CORRow28_3:

4 CORRow28_4:

4 CORRow28_5:

Text1:

Text2:

Text7:

Text8:

Text9:

Text10:

Text11:

PWS Paragraph #:

Date: Week 1

PWS Paragraph #2:

PWS Paragraph #3:

PWS Paragraph #4:

Date2: Week 2

Date3: Week 3

Date4: Week 4

Date5:

Date6:

Date7:

Date8:

Date9:

Date10:

Date11:

Date12:

Date13:

Date14:

Date15:

Date16:

Date17:

Date18:

Date19:

Date20:

Date21:

Date22:

Date23:

Date24:

Date25:

Date26:

Date27:

image5.png image6.emf

COR Inspection Checklist.pdf

COR Inspection Checklist

Meeting Contract Requirements

Contractor:

Contract Number:

Service Provided:

COR Name:

Date: YES No N/A

1.

Comments:

2.

3.

4.

5.

6.

7.

8.

9.

10.

BEP_OA_IC_Rev#1_1-24-18

11.

12.

Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:

BEP_OA_IC_Rev#1_1-24-18

Contractor:

Contract Number:

Service Provided:

COR Name:

Date:

YES1:

No1:

NA1:

YES2:

No2:

NA2:

YES3:

No3:

NA3:

YES4:

No4:

NA4:

YES5:

No5:

NA5:

YES6:

No6:

NA6:

YES7:

No7:

NA7:

YES8:

No8:

NA8:

YES9:

No9:

NA9:

YES10:

No10:

NA10:

Comments summary to include positive trends negative trends concerns customer comments and any additional COR commentsRow1:

Text1:

Text2:

Text3:

Text4:

Text5:

Text6:

Text7:

Text8:

Text9:

Text10:

Text11:

Text12:

Text13:

Text14:

Text15:

Text16:

Text17:

Text18:

Text19:

Text20:

Text21:

Text22:

Text23:

Text24:

11:

12:

Text25:

Text26:

Text27:

Text29:

image7.png image8.emf

SURVEILLANCE ACTIVITY CHECKLIST.pdf

SURVEILLANCE ACTIVITY CHECKLIST

Date

CONTRACT REQUIREMENT CONTRACT

PARAGRAPH

NUMBER

METHOD OF

SURVEILLANCE

DATE

ACCOMPLISHED

WHERE

ACCOMPLISHED

COMPLIANCE

BEP SAC_Rev #1_1_23_18

Date:

CONTRACT REQUIREMENTRow1:

CONTRACT PARAGRAPH NUMBERRow1:

METHOD OF SURVEILLANCERow1:

DATE ACCOMPLISHEDRow1:

WHERE ACCOMPLISHEDRow1:

COMPLIANCERow1:

CONTRACT REQUIREMENTRow2:

CONTRACT PARAGRAPH NUMBERRow2:

METHOD OF SURVEILLANCERow2:

DATE ACCOMPLISHEDRow2:

WHERE ACCOMPLISHEDRow2:

COMPLIANCERow2:

CONTRACT REQUIREMENTRow3:

CONTRACT PARAGRAPH NUMBERRow3:

METHOD OF SURVEILLANCERow3:

DATE ACCOMPLISHEDRow3:

WHERE ACCOMPLISHEDRow3:

COMPLIANCERow3:

CONTRACT REQUIREMENTRow4:

CONTRACT PARAGRAPH NUMBERRow4:

METHOD OF SURVEILLANCERow4:

DATE ACCOMPLISHEDRow4:

WHERE ACCOMPLISHEDRow4:

COMPLIANCERow4:

CONTRACT REQUIREMENTRow5:

CONTRACT PARAGRAPH NUMBERRow5:

METHOD OF SURVEILLANCERow5:

DATE ACCOMPLISHEDRow5:

WHERE ACCOMPLISHEDRow5:

COMPLIANCERow5:

CONTRACT REQUIREMENTRow6:

CONTRACT PARAGRAPH NUMBERRow6:

METHOD OF SURVEILLANCERow6:

DATE ACCOMPLISHEDRow6:

WHERE ACCOMPLISHEDRow6:

COMPLIANCERow6:

CONTRACT REQUIREMENTRow7:

CONTRACT PARAGRAPH NUMBERRow7:

METHOD OF SURVEILLANCERow7:

DATE ACCOMPLISHEDRow7:

WHERE ACCOMPLISHEDRow7:

COMPLIANCERow7:

CONTRACT REQUIREMENTRow8:

CONTRACT PARAGRAPH NUMBERRow8:

METHOD OF SURVEILLANCERow8:

DATE ACCOMPLISHEDRow8:

WHERE ACCOMPLISHEDRow8:

COMPLIANCERow8:

CONTRACT REQUIREMENTRow9:

CONTRACT PARAGRAPH NUMBERRow9:

METHOD OF SURVEILLANCERow9:

DATE ACCOMPLISHEDRow9:

WHERE ACCOMPLISHEDRow9:

COMPLIANCERow9:

CONTRACT REQUIREMENTRow10:

CONTRACT PARAGRAPH NUMBERRow10:

METHOD OF SURVEILLANCERow10:

DATE ACCOMPLISHEDRow10:

WHERE ACCOMPLISHEDRow10:

COMPLIANCERow10:

image9.png image10.emf

TALLY CHECKLIST.pdf

BEP OA FORM 3437

TALLY CHECKLIST

CONTRACT NUMBER:

ITEM

INSPECTED

TYPE

OF

SERVICE

DATE

SAT

UNSAT

REMARKS REC’D DEL’D INSPT’D

BEP_OA_TC_Rev#1_1-24-18

Text1:

RECDRow1:

REMARKS1:

REMARKS2:

REMARKS3:

REMARKS4:

REMARKS5:

REMARKS6:

REMARKS7:

REMARKS8:

REMARKS9:

REMARKS10:

REMARKS11:

REMARKS12:

REMARKS13:

REMARKS14:

REMARKS15:

REMARKS16:

REMARKS17:

REMARKS18:

UNSAT1:

UNSAT2:

UNSAT3:

UNSAT4:

UNSAT5:

UNSAT6:

UNSAT7:

UNSAT8:

UNSAT9:

UNSAT10:

UNSAT11:

UNSAT12:

UNSAT13:

UNSAT14:

UNSAT15:

UNSAT16:

UNSAT17:

UNSAT18:

SAT1:

SAT2:

SAT3:

SAT4:

SAT5:

SAT6:

SAT7:

SAT8:

SAT9:

SAT10:

SAT11:

SAT12:

SAT13:

SAT14:

SAT15:

SAT16:

SAT17:

SAT18:

INSPTD1:

INSPTD2:

INSPTD3:

INSPTD4:

INSPTD5:

INSPTD6:

INSPTD7:

INSPTD8:

INSPTD9:

INSPTD10:

INSPTD11:

INSPTD12:

INSPTD13:

INSPTD14:

INSPTD15:

INSPTD16:

INSPTD17:

INSPTD18:

DEL1:

DEL2:

DEL3:

DEL4:

DEL5:

DEL6:

DEL7:

DEL8:

DEL9:

DEL10:

DEL11:

DEL12:

DEL13:

DEL14:

DEL15:

DEL16:

DEL17:

DEL18:

RECDRow2:

RECDRow3:

RECDRow4:

RECDRow5:

RECDRow6:

RECDRow7:

RECDRow8:

RECDRow9:

RECDRow10:

RECDRow11:

RECDRow12:

RECDRow13:

RECDRow14:

RECDRow15:

RECDRow16:

RECDRow17:

RECDRow18:

TYPE OF SERVICE1:

TYPE OF SERVICE2:

TYPE OF SERVICE3:

TYPE OF SERVICE4:

TYPE OF SERVICE5:

TYPE OF SERVICE6:

TYPE OF SERVICE7:

TYPE OF SERVICE8:

TYPE OF SERVICE9:

TYPE OF SERVICE10:

TYPE OF SERVICE11:

TYPE OF SERVICE12:

TYPE OF SERVICE13:

TYPE OF SERVICE14:

TYPE OF SERVICE15:

TYPE OF SERVICE16:

TYPE OF SERVICE17:

TYPE OF SERVICE18:

ITEM INSPECTED1:

ITEM INSPECTED2:

ITEM INSPECTED3:

ITEM INSPECTED4:

ITEM INSPECTED5:

ITEM INSPECTED6:

ITEM INSPECTED7:

ITEM INSPECTED8:

ITEM INSPECTED9:

ITEM INSPECTED10:

ITEM INSPECTED11:

ITEM INSPECTED12:

ITEM INSPECTED13:

ITEM INSPECTED14:

ITEM INSPECTED15:

ITEM INSPECTED16:

ITEM INSPECTED17:

ITEM INSPECTED18:

image11.png image12.emf

BEP_OA_CDR.pdf

CONTRACT DISCREPANCY REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY

3. TO (Contractor and Manager's Name) 4. FROM (Name of COR)

5. DATES (YYYYMMDD)

a. DATE PREPARED b. CDR DATE RETURNED BY CONTRACTOR c. ACTION COMPLETE DATE

6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF CONTRACTING OFFICER

8a. TO (Contracting Officer) b. FROM (Contractor)

9. CONTRACTOR RESPONSE FOR ADDRESSING ROOT CAUSE OF DEFICIENCY, ACTION TAKEN TO CORRECT THE SPECIFIC DEFICIENCY, ACTION TAKEN TO CORRECT AND PREVENT THE RECURRENCE OF THE ROOT CAUSE OF DEFICIENCY AND TARGET DATES FOR IMPLEMENATION OF IDENTIFIED CORRECTIVE ACTION. (Cite applicable Q.C. program procedures or new Q.C. procedures.

Attach continuation sheet(s) if necessary.)

10. SIGNATURE OF CONTRACTOR REPRESENTATIVE b. DATE (YYYYMMDD)

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, rejected. Attach continuation sheet(s) if necessary)

12. GOVERNMENT ACTIONS (Reduced payment, cure notice, show cause, other)

13. CLOSE OUT

NAME

(1)

TITLE

(2)

SIGNATURE

(3)

DATE (YYYYMMDD)

(4)

a. CONTRACTOR

b. COR

c. CO

BEP_OA_CDR_Rev#1_1-24-18

1 CONTRACT NUMBER:

2 REPORT NUMBER FOR THIS DISCREPANCY:

3 TO Contractor and Manager s Name:

4 FROM Name of COR:

a DATE PREPARED:

b C D R D AT E RETURNED BY CONTRACTOR:

c ACTION COMPLETE DATE:

6 DISCREPANCY OR PROBLEM Describe in detail Include reference to PWS Directive attach continuation s heet if necessary:

8a TO Contracting Officer:

b FROM Contractor:

9 CONTRACTOR RESPONSE FOR ADDRESSING ROOT CAUSE OF DEFICIENCY ACTION TAKEN TO CORRECT THE SPECIFIC DEFICIENCY ACTION TAKEN TO CORRECT AND PREVENT THE RECURRENCE OF THE ROOT CAUSE OF DEFICIENCY AND TARGET DATES FOR IMPLEMENATION OF IDENTIFIED CORRECTIVE ACTION Cite applicable QC program procedures or new QC procedures Attach continuation s heet s if necessary:

b DATE YYYYMMDD:

11 GOVERNMENT EVALUATION Acceptance partial acceptance rejected Attach continuation sheets if necessary:

12 GOVERNMENT ACTIONS Reduced payment cure notice show cause other:

13 CLOSE OUTRow1:

NAME 1a CONTRACTOR:

TITLE 2a CONTRACTOR:

DATE YYYYMMDD 4a CONTRACTOR:

NAME 1b COR:

TITLE 2b COR:

DATE YYYYMMDD 4b COR:

NAME 1c CO:

TITLE 2c CO:

DATE YYYYMMDD 4c CO:

File details come from the government source that posted it. Updated .