QASP Attachment 1 - Performance Requirements Summary.pdf
PDF 65 KB Posted
- Attached to
- Refuse Service Federal contract opportunity
- Solicitation number
- W50S7T
About this file
This document includes a performance requirements summary and a solicitation for refuse services. The performance requirements summary outlines standards for refuse, recycling, and construction debris removal from a military base on a weekly, every other week, and on-call basis respectively. It also requires annual inspection and maintenance of dumpsters. The solicitation seeks a firm-fixed price contract for refuse services at a military base from August 2020 to 2025. Offerors must submit responses in three volumes for past performance, technical capability, and price. The solicitation will result in a single award to the offeror providing the best value based on performance, price, and tradeoff considerations. The contract value and pricing terms are not specified. The solicitation is a total small business set-aside under NAICS code 562111 and is issued by the Illinois Army National Guard Department of the Army.
View the file
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP Attachment 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
PWS Paragraph Task Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
Step 1: Step 2: State the Step 3: Determine Step 4: Step 5: Determine how
5.0 Provide and
service (14) refuse dumpsters
The contractor shall fully (100%) perform refuse removal from the base weekly
Must be fully acceptable
COR will review
5.0 Provide and
service (11) recycling dumpsters
The contractor shall fully (100%) perform recycling removal from the base every other week
Must be fully acceptable
COR will review
5.0 Provide and
service (1) construction dumpster
The contractor shall fully (100%) perform construction debris removal from the base on call within 48 hours
Must be fully acceptable
COR will review
5.0 Contractor shall
perform regular maintenance to all dumpsters or replace dumpsters
The contractor shall perform (100%) of an annual inspection and preventive maintenance to the dumpsters or replace dumpsters as needed
Must be fully acceptable
COR will review
5.2 The Contractor will
weigh the recycling truck, on GOV scale, when they arrive and when they leave the base indicating the quantity by weight of recycling generated and removed from the base
The contractor shall fully (100%) perform weighing of recycled materials prior to removal from the base every other week
Must be fully acceptable
COR will review
File details come from the government source that posted it. Updated .