QASP 5.7.2026.pdf
PDF 185 KB Posted
- Attached to
- 6515--VISN 1 Robot Delivery System BPA
- Solicitation number
- 36C24126Q0372
About this file
This is a Quality Assurance Surveillance Plan (QASP) for the VISN 1 Robotic Delivery System Blanket Purchase Agreement (BPA), which establishes the Government's systematic methods for evaluating contractor performance in providing Autonomous Mobile Robot (AMR) Delivery System services across VISN 1 (Veterans Integrated Service Network 1). The QASP defines 12 performance objectives with corresponding standards, surveillance methods, and remedies to ensure contractor compliance with requirements outlined in the Performance Work Statement (PWS).
The QASP establishes performance standards including Fleet Uptime (≥99.5% monthly), Incident Response (phone ≤1 hour; onsite ≤4 hours), Mean Time to Repair (≤8 hours from onsite arrival), Security Patch Management (≤30 days for standard patches; ≤7 days for emergency), Configuration & Map Control (zero unauthorized changes), Elevator & Door Integration (100% Acceptance Test Procedure pass), Reporting Accuracy (≥98%), Training Completion & Competency (100% trained; ≥90% pass rate), Data Security & Logging (FIPS 140-2 encryption), Spare Parts Availability (critical spares ≤24 hours after receipt of order), Legacy AMR Decommissioning (media sanitization with certificates), and Customer Satisfaction (≥4.5/5 average score). Surveillance frequencies range from weekly to quarterly and per-incident, with methods including automated reports, ticket timestamps, change log audits, data sampling, inventory audits, and monthly surveys. Remedies for non-compliance include service credits, warranty extensions, corrective action plans, payment withholding, training refreshers at vendor cost, suspension of remote privileges, and expedited shipping at vendor cost. The Contracting Officer (CO), Contract Specialist (CS), and Contracting Officer's Representative (COR) are responsible for surveillance and verification through documentation using checklists, discrepancy reports, and corrective action requests.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24126Q0372 0002.docx | DOCX document | |
| RFQ Amendment 1 - 36C24126Q0372 0001.pdf | ||
| 36C24126Q0372 AMR Solicitation_r4.pdf | ||
| AMR_Pricing_Spreadsheet 5.8.2026_r1.xlsx | XLSX spreadsheet | |
| PWS 1.16.2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) – VISN 1 Robotic Delivery
System BPA
1. Purpose This Quality Assurance Surveillance Plan (QASP) outlines the systematic methods the Government will use to evaluate the performance of the Contractor in providing the VISN 1 Robotic Delivery System (Autonomous Mobile Robot Delivery System). The QASP ensures contractor services meet the performance standards in the Performance Work Statement
(PWS).
2. Government Roles and Responsibilities The Contracting Officer (CO), Contract Specialist (CS), and Contracting Officer's Representative (COR) are responsible for surveillance and verifying contractor compliance with contract requirements.
3. Contractor Roles and Responsibilities The Contractor shall provide qualified personnel responsible for installation, configuration, maintenance, training, and support of the AMR Delivery System across VISN 1.
4. Performance Standards Performance Standards are defined in the table below, adapted from the Performance Requirements Summary (PRS).
5. Incentives and Remedies Incentives and remedies include acceptance, rejection, re-performance, or reduction in payment when performance does not meet standards.
6. Surveillance Methods Surveillance methods include direct observation, system reporting, random inspections, customer feedback, and review of maintenance logs.
7. Performance Ratings Performance ratings reflect compliance with Acceptable Quality Levels (AQLs) as defined in the PRS.
8. Documentation and Reporting The COR will document contractor performance using surveillance checklists, discrepancy reports, and corrective action requests.
9. Surveillance Frequency Surveillance will occur at frequencies defined in the PRS and as determined necessary by the COR.
# Performance Objective
Performance Standard /
AQL
Method of Surveillance
Frequency Remedies/Incentives
1 Fleet Uptime ≥ 99.5% monthly uptime
Automated reports +
COR
validation
Weekly & Monthly
Service credit or warranty extension
2 Incident Response Phone ≤1h;
Onsite ≤4h
Ticket timestamps;
COR checks
Per incident
Labor credit; CAP for repeated misses
3 Mean Time to Repair (MTTR)
≤8h from onsite arrival
ESRs and ticket data
Monthly Same credits as #2
4 Patch & Vulnerability Management
Security patches ≤30 days;
emergency ≤7 days
Patch advisories;
validation report
Quarterly Withhold payment until compliant
5 Configuration & Map Control
Zero unauthorized changes;
versioning
Change log audit
Monthly Cure notice; retraining if recurrence
6 Elevator & Door Integration
100% ATP
pass
ATP results;
Facilities sign-off
At go-live Withhold acceptance until pass
7 Reporting Accuracy
≥98% accuracy
Data sampling vs logs
Weekly Correct report within 2 days
8 Training Completion & Competency
100% trained;
≥90% pass
Sign-in sheets;
assessments
Go-live & annual
Hold acceptance;
refresher at vendor cost
9 Data Security & Logging
FIPS 140-2
encryption;
zero
Log review;
ISO checks
Monthly Suspend remote privileges; incident report unauthorized remote sessions 10 Spare Parts
Availability Critical spares
≤24h ARO Inventory audits Monthly Expedited shipping at vendor cost 11 Legacy AMR
Decommissioning Media sanitized;
certificates provided
Certificate review
Per deinstall
Withhold payment until complete
12 Customer Satisfaction
≥4.5/5 average score
Monthly survey
Monthly Action plan for <4.0;
incentive for ≥4.8
Signature – Contractor
Signature – COR / Government Representative
Signature – Contracting Officer
| 1. Purpose |
| 2. Government Roles and Responsibilities |
| 3. Contractor Roles and Responsibilities |
| 4. Performance Standards |
| 5. Incentives and Remedies |
| 6. Surveillance Methods |
| 7. Performance Ratings |
| 8. Documentation and Reporting |
| 9. Surveillance Frequency |
File details come from the government source that posted it. Updated .