This document is a Q&A compilation issued by the State of Colorado Department of Agriculture-State Fair in response to inquiries submitted regarding Invitation for Bid (IFB) No. 1,BSFA,2026-0182 for Creative Arts Building ADA and HVAC Upgrades Phase 1 of 2. The project is estimated at $1.5 million and involves design/bid/build services for ADA accessibility improvements and HVAC system upgrades to the Creative Arts Building at the Colorado State Fair. The scope includes modifications to electrical systems, plumbing infrastructure, site work including removal and replacement of concrete elements, landscape work, and utility line installation. The bid dates cannot be extended due to procurement scheduling requirements, with pricing to be held until the project commences after the State Fair. Bidders are required to review the solicitation documents and Addendum 1 thoroughly, with all published documentation available on Colorado Box. A site walk for roofing contractors was offered on June 2, coordinated through Ken Roberts, Property & Facilities Manager, at 719.568.2561.
Key specifications and requirements clarified through the Q&A process include that HVAC contractors need not be certified Seely installers but must utilize factory-authorized start-up services; the project is subject to City of Pueblo sales tax at 3.7% in addition to state and county exemptions; 100% IFB drawings are not required for submission; bedding sand and flow fill are required for fire lines and sanitary sewer; 2-inch HDPE pipe is acceptable for domestic water instead of copper; and the Apprenticeship Utilization Certification is mandatory. Liquidated damages are anticipated to range between $100 and $250 per day, to be determined during the contracting phase. Site-specific clarifications included removal of existing trees, removal and replacement of damaged sidewalk and curb sections as required for utility installation, protection of a memorial bench from construction damage, retention of existing building steps, and installation of 2-inch to 4-inch river rock over landscape fabric with landscaping edging in areas where planters are removed.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
pg. 1
ADVERTISEMENT FOR BIDS
Design / Bid / Build State of Colorado
Department of Agriculture-State Fair
Notice Number: IFB1,BSFA,2026-0182 Project Number: 2024-011M24 Project Title: Creative Arts Bldg ADA & HVAC Upgrades PH 1 of 2 Estimated Project Cost: $1.5 M
Included in this document are Questions and Inquiries submitted to the Procurement Official as of 5/27/2026. The State’s Responses are provided directly below each question.
HGF Note: In addition to answers provided, there are additional items that have been addressed in Addendum 1. All bidders are required to review the solicitation documents and Addendum 1 thoroughly. In the event of a conflict or inconsistency, please contact the Procurement Official immediately.
VSS Published Docs are also available on Box.com for view only. Click on the link below to access the same docs.
https://colorado.box.com/s/czhg5thgwvnrakqm7xl2lgflfm5xzmdl
1. Is there a finish schedule for the bid set?
Answer: Yes, A room finish schedule has been added to the documents, Reference Addendum 1, ITEM A7.
2. Does the HVAC contractor need to be a certified Seely installer.
Answer: HVAC contractor is not required to be a certified Seely installer.
However, specification section 237323 3.03 requires factory authorized start-up services for the equipment. The manufacturer does not require certification for the installer for their warranty.
3. What is the sales tax rate on this project? I’m assuming state/county exempt, but what about City of Pueblo 3.7% Answer: The project is only State and County, not city exempt. Contact City of Pueblo for required taxes and additional information.
4. Since project is bidding in just couple weeks, and project won’t start until after State Fair, are we expected to hold pricing for 3+ months? Not sure how we can do that in today’s current market & economy.
pg. 2
Answer: We’ve considered adjusting the solicitation dates however, due to scheduling and procurement requirements, the Bid Dates cannot be extended. The Schedule remains unchanged.
5. In the specs and bidding instructions, we are instructed to upload several standard bid documents, but it also says to upload 100% bid plans. Is this correct? I just haven’t heard that before… Answer: 100% IFB drawings not required for this solicitation.
6. The plans indicate a planter to be removed along the east side of the building and pavers to be installed in that location. Is there a specification for the required concrete/masonry pavers?
Answer: Construction note 32.01 has been revised to reflect 2”-4” river rock over landscape fabric, with a landscaping edge, RE: Addendum 1.
ITEM A6.
7. Specification / Drawing Ref. No. E1.1. Please provide a scale for sheet E1.1 site drawing.
Answer: The scale for the site plan is 1”=10’-0”. Refer to revised drawings in Addendum 1.
8. Specification / Drawing Ref. No. E5.1. Please update electrical feeder Table for FSE on sheet E5.1. It appears to be for a 200A feed and not a 600A feed.
Assume feed to be a 4WG600?
Answer: That is correct. It is a 4WG600 feed in existing conduit. Refer to revised drawings in Addendum 1.
9. Specification / Drawing Ref. No. E3.1. Please clarify circuiting for type Z1 fixtures on sheet E3.1 Answer: Fixture to be circuited to “MDP-90”. Refer to revised drawings in Addendum 1.
10. Do you want bedding sand and flow fill for the fire line and sanitary sewer?
Answer: Yes, Refer to specification section 221319 – Sanitary Waste and Vent Piping.
11. Can we use 2” HDPE for the domestic water instead of copper and do we need to include sidewalk repair?
Answer: Yes, Refer to specification section 221319 – Sanitary Waste and Vent Piping for 2” HDPE. Also, an enlarged site plan has been added to sheet A2.1-1 for site work at the northwest corner of building. Reference Addendum 1, ITEM A5
12. What type of edging do you want for the landscape rock after we demo the flower bed and curb?
pg. 3
Answer: Construction note 32.01 has been revised to reflect 2”-4” river rock over landscape fabric, with a landscaping edge, RE: Addendum 1, ITEM A6.
13. On east side of building where planter is to be removed, do the concrete steps (2 sets) need removed as well? The doors to the building appear to be closed off and not usable. (Please see attached photos and redline site plan for a few additional site items I feel need to be addressed in an upcoming addendum.)
Answer: The 2 existing set of steps can remain., RE: Addendum 1, ITEM A6.
14. On north side of building there is a large, mature tree, in very healthy condition that will probably be lost due to excavation for new utilities.
Verifying this loss is acceptable, or will owner choose to relocate? (Please see attached photos and redline site plan for a few additional site items I feel need to be addressed in an upcoming addendum.)
Answer: The existing tree shall be removed. RE: Addendum 1, ITEM A5.
15. On north side of building at sidewalk there is a section of badly damaged (cracked & broken) sidewalk that is in the ADA accessible route, should we include replacing this section during this project? (Please see attached photos and redline site plan for a few additional site items I feel need to be addressed in an upcoming addendum.)
Answer: The existing concrete walk that is currently damaged can remain and will be addressed at a later time/ phase. RE: Addendum 1, ITEM A5 for extents of areas being replaced.
16. We will need to remove/replace existing sidewalk, roll-over curb, & handicap ramp on north side of building for new utilities, nothing is indicated on the site plan for this work. Please advise. (Please see attached photos and redline site plan for a few additional site items I feel need to be addressed in an upcoming addendum.)
Answer: Yes, Remove portion of existing sidewalk, curb as required for installation of new Utility lines. RE: Addendum 1, ITEM A5
17. There is an existing “memorial bench” on north side of building that will need removed/reset for utility install, nothing is noted on plans for this item. Please advise.
Answer: The existing memorial bench is located to the east of where the utility connections will be made and shall remain. Protect bench from damage during construction operations. RE: Addendum 1, ITEM A5.
pg. 4
18. Please see attached photos and redline site plan for a few additional site items I feel need to be addressed in an upcoming addendum.
Answer: A partial site plan has been added to SHT A2.1-1, RE: Addendum 1, ITEM A5. (The following are copies of the photos submitted as part of the written inquiries for reference.)
pg. 5
19. Are there LD’s for this project and if so, how much are they?
Answer: Liquidated damages will be determined during the contracting phase. The State anticipates a range between $100 and $250 per day..
20. Please confirm we are requiring the “Apprenticeship Utilization Certification” Answer: Yes. Reference Appendix D and E.
21. Can we schedule a walk with roofing contractors on 2 June?
Answer: General Contractors may have roofing contractors review the roofing. Coordinate date and times through the state fair contact below.
Please note, questions, inquiries or additional information provided during the walk are non-binding. Contact the Procurement Official if questions arise.
Contact: Ken Roberts, Property & Facilities Manager, State Fair
C: 719.568.2561