This is a Questions and Answers document issued by the Florida Department of Transportation (FDOT) District 5 on February 26, 2026, in response to bidder inquiries regarding Advertisement Number DOT-ITB-5012-OBWE for the construction of bay walls and installation of electrical infrastructure at the Orlando Operations facility.

The document clarifies three key project specifications: one electrical receptacle will be installed on the interior bay wall where the 3-foot door will be located, with no receptacles on the other two walls; FDOT will remove the chain-link fence and clear all bays prior to construction; and the hollow metal door frame will be set in a 2x6 studded wall with OSB sheathing on both sides, plus 3/8 to 5/8 inch stucco on the exterior, resulting in approximately 7 inches of total depth. These responses directly address common bidder questions and provide specific technical guidance necessary for accurate bid preparation and cost estimation.

No pricing information, set-asides, or funding details are included in this Q&A document. The response clarifies that site preparation work will be performed by FDOT prior to construction, reducing the contractor's scope of work and associated costs. Bidders should reference the original Invitation to Bid document and any posted addenda for complete project specifications, qualification requirements, insurance requirements, mandatory site visit dates (February 23, 2026), bid submission details, and award timeline (intended award by March 16, 2026, with contract commencement on March 19, 2026, and completion by June 1, 2026).

View the file

Other files

File Type Posted
Addendum 1- Selection Meeting Date CHANGE.pdf PDF
Q&A#2.pdf PDF
DOT-ITB-26-5012-OBWE COMPLETE.pdf PDF
Q&A #1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

719 S. Woodland Boulevard DeLand, Florida 32720-6834

JARED W. PERDUE, P.E.

SECRETARY

Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov

Questions and Answers #2

ADVERTISEMENT NUMBER: DOT-ITB-5012-OBWE

DESCRIPTION: District 5, Orlando Ops Construction of Bay Walls & Installation of Electric

DATE: 2/26/2026

1. Are receptacles only to be installed on the wall with the 3-0 door, and not the other two walls?

RESPONSE: Yes one (1) receptacle on inside of bay on the wall where the 3-0 door will be installed.

2. Will others remove the chain-link fence before construction of the walls?

RESPONSE: Yes, chain link fence will be removed, and all bays will be cleared out by FDOT.

3. Please specify the jamb width / depth of the Hollow Metal Door Frame.

RESPONSE: 2x6 studded wall / ½ OSB on both sides of wall / plus 3/8 to 5/8 of stucco on one exterior of wall looking like around 7” of depth