| RFP DGS 56956 | Question and Answer (Q&A) Set #1 |
| DRAFT (rev 4/8/2009) |
| Event ID #:0000031286 | Alternate Fuel Vehicles |
| October 25, 2024 |
Question and Answer (Q&A) Set # 2
| Item |
| IFB Section |
| Question |
| State’s Response |
| 2-1 |
| Attachment 2 – Bid Specification 2310-BS-0194616-1, Section 3.1; Attachment 3 – Bid Specification 2310-BS-0194616-2, Section 3.1: and Attachment 1 – Pricing Workbook |
| If the vehicle GVWR exceeds one line item (to next class) but battery capacity indicated in the next class is above that available on the product, should the product be listed under both line items for DGS to consider the appropriate line/category for the product? (I.e. battery capacity is nearly mid-way between the GVWR requirement lines). |
All proposed vehicles must meet the requirements for the line item and the corresponding Bid Specification. If a proposed vehicle does not meet the minimum requirements, the vehicle will not be considered for award.
| 2-2 |
| Attachment 1 – Pricing Workbook |
| If the vehicle being proposed has two wheelbases (e.g. corresponding to two different cab-to-axle configurations), should both wheelbases be listed in the corresponding worksheet cell. |
Awarded line item vehicles may be upfitted to different configurations as long as the vehicle does not conflict with another line item awarded for this potential contract. The proposed vehicle would still need to meet the minimum requirements required for the line item with the upfitting.
| 2-3 |
| Attachment 4 – Technical Questionnaire |
| For an intended future feature that is not yet available (perhaps a future model year) does declaring “UNAVAILABLE” preclude its future inclusion as a standard or optional feature for the life of the contract? |
No, features may change in the future as long as the feature does not upgrade the vehicle to conflict with another line item awarded for this potential contract and the proposed vehicle still meets the minimum requirements required for the line item.
| 2-4 |
| Attachment 4- Technical Questionnaire |
| The CNG Fueled line items (MD-HD Trucks worksheet Line Items 10,11,12) do not include a specific DGE fuel requirement. Is there a base line or is the CNG tank system not part of the quote? |
| There is no minimum requirement for fuel capacity. The manufacturer’s standard tank is acceptable. |
| 2-5 |
| Attachment 4-Technical Questionnaire |
| All line times (MD-HD Trucks worksheet Line Items 10,11,12) are conventional cab. Is there a way to add Cab Over CNG Fueled line items? |
| Yes, Cab Over CNG line items have been added. |
See MD-HD Trucks CLIN 26, 27, 28 in Attachment 1 – Pricing Workbook - Addendum #3.
| 2-6 |
| Attachment 1 – Pricing Workbook |
| For CLIN 19 on tab MD-HD Trucks, will you accept a vehicle with a 140kWh that meets all other requirements? The line item currently calls for a 200 kWh battery. |
| An additional line item for a lesser kWh battery requirement has been added. |
See MD-HD Trucks CLIN 29 in Attachment 1 – Pricing Workbook – Addendum #3
| 2-7 |
| Attachment 1 – Pricing Workbook and Attachment 4 – Technical Questionnaire |
| For CLIN 23 on tab MD-HD Trucks, the 80,000 lb. GCWR requirement can’t be met with a 4x2 tractor configuration. If the GCWR was changed to 68,000 lbs., that would allow for a compliant bid to be submitted. Will you please consider this change? |
| Yes, line-item requirements have been updated. |
See MD-HD Trucks CLIN 24 in Attachment 1 – Pricing Workbook – Addendum #3. Please note, CLIN 23 is now CLIN 24 due to the addition of MD-HD Vans CLIN 10.
| 2-8 |
| Attachment 2 – Bid Specification 2310-BS-0194616-1 |
| The workbook on SUV's references 2320-BS-0194616-1 per the example below, but this spec reference does not exist. |
| All Light Duty Vehicles fall under Attachment 2 – Bid Specification 2310-BS-0194616-1. Please see Attachment 1 – Pricing Workbook, Addendum 2. |
| 2-9 |
| IFB, Section 1, Scope |
| Year Model Exemption - We have attached a letter requesting a year model exception for a NEW EV that would exceed the BID specifications. Is there a process to request this exception? |
| All vehicles offered must be new and the latest model available for order. There are no exceptions. |
| 2-10 |
| IFB Section 15, Agreement Cover Letter and Contract Provisions |
| What are States' net terms for payment? |
| Non-IT Goods General Provisions, Article 30, Required Payment Date states that payment will be made in accordance with the provisions of the California Prompt Payment Act, Government Code Section |
927 et. seq. Unless expressly exempted by statute, the Act requires state agencies to pay properly submitted, undisputed invoices not more than 45 days after (i) the date of acceptance of Goods or performance of services; or (ii)receipt of an undisputed invoice, whichever is later.
| 2-11 |
| IFB Section 15, Agreement Cover Letter and Contract Provisions and IFB Section 68, Receiving Inspection and Acceptance |
| Once we receive a purchase order from a customer for a vehicle that is readily available from inventory we are concerned about the timeline between commitment and delivery. Our concern is the carrying costs of holding vehicles until you take delivery, especially if there is up fitting needed. Can a delivery/payment timeline be established so that we know what our true costs will be as interest on vehicles accrues daily. |
| Payment will be made in accordance with the provisions of the California Prompt Payment Act, Government Code Section |
927 et. seq. Unless expressly exempted by statute, the Act requires state agencies to pay properly submitted, undisputed invoices not more than 45 days after (i) the date of acceptance of Goods or performance of services; or (ii)receipt of an undisputed invoice, whichever is later. Inspection will commence within five working days of notification that a vehicle is ready for inspection. In the event deficiencies are detected, the vehicle will be rejected and the delivering dealer will make the necessary repairs, adjustments, or replacements. Payment and/or the commencement of a discount period (if applicable) will not begin until the defects are corrected, and the vehicle is re-inspected and accepted.
| 2-12 |
| IFB Section 77, Restocking Fees |
| If an ordered vehicle requires third party upfitting, can we stipulate that the order can no longer be canceled once the upfitting work has started, or any work that alters the vehicle in any way? |
| No, the Contractor may impose a restocking fee to the ordering agency on any order cancelled after the order has been placed with the manufacturer except for cases of product defect or recall. The Contractor shall notify the ordering agency of the order placement per Section 60, Order Acknowledgment. |
Re-stocking fees can be no greater than 10 percent of the price of the vehicle needing restocking. Bidder shall provide their restocking fee on Attachment 5 – Narrative Response.
| 2-13 |
| IFB Section 68, Receiving Inspection and Acceptance |
| Inspection - where does that occur? Is this done at a state specified location or by the vendor? |
| Vehicles ordered for state use will be inspected by a state inspector at the dealer’s place of business or designated business site. |
| 2-14 |
| IFB Section 52, Options and Attachment 1 – Pricing Workbook |
| Line items for third party upfitting (dump body, reefer) - Should we add this information as separate line items or just list in the narrative? |
| Options and upfitting will be determined by ordering agencies and the Contractor at time of quote or purchase order. The available options and upfitting are not listed in the potential contract. The State requests all bidders to provide additional options (upfitting) upcharge percentage (not to exceed 10%) on Attachment A – Pricing Workbook. |
| 2-15 |
| IFB Section 77, Restocking Fees and Attachment 5 – Narrative Response |
| Restocking Fee - Can we get clarification on restocking terms and conditions. Once a manufacturer starts to fulfill an order, we are “on the hook for the vehicle” if the state cancels an order when the vehicle is in process what does the State expect in terms of the “restocking fee”? |
| The Contractor may impose a restocking fee to the ordering agency on any order cancelled after the order has been placed with the manufacturer except for cases of product defect or recall. The Contractor shall notify the ordering agency of the order placement per Section 60, Order Acknowledgment. |
Re-stocking fees can be no greater than 10 percent of the price of the vehicle needing restocking. Bidder shall provide their restocking fee on Attachment 5 – Narrative Response
| 2-16 |
| Attachment 1 – Pricing Workbook and Attachment 4 – Technical Questionnaire |
| Line 4 Van Pricing sheet can the state consider adding “cutaway/Chassis” to match other line items on the pricing spreadsheet? |
| Yes, an additional line item has been added. |
See LD Vans CLIN 10 in Attachment 1 – Pricing Workbook – Addendum #3.
| 2-17 |
| Attachment 4 – Technical Questionnaire |
| Our conventional cab truck (CLIN 19) can safely handle any GVWR weight between 19,500 to 26,000 pounds. We want to make it clear that our range is 19,500 to 26,000. Are we allowed to input a range in the GVWR column on the Technical Questionnaire? If not, what would be the best way to make it clear that our GVWR weight range is 19,500 to 26,000 for the vehicle? |
| Attachment 4 – Technical Questionnaire will allow you to type a range into the cell for the GVWR column. |
| 2-18 |
| Attachment 1- Pricing Workbook and Attachment 3 – Bid Specification 2320-BS-0194616-2 |
| Under Workbook MD-HD Vans #1 will you consider Vans that are 9990 lb. GVWR? Also, will you consider vans with no side cargo door? |
| No, vans under 10,000 lbs. GVWR should be bid on the Light Duty (LD) Vans contract line items. |
No, side cargo doors are required.
| 2-19 |
| Attachment 1- Pricing Workbook and Attachment 3 – Bid Specification 2320-BS-0194616-2 |
| Under Workbook MD-HD Vans #2 will you consider Vans that are 11000 lb. GVWR? Also, will you consider vans with no side cargo door? |
| An additional line item with a 10,000 lbs. GVWR minimum requirement has been added. |
See MD-HD Vans CLIN 10 in Attachment 1- Pricing Workbook – Addendum #3.
No, side cargo doors are required.
| 2-20 |
| IFB Section 4, Method of Award and IFB Section 21, Proposed Products |
| Can dealers proposing non-CARB-aligned OEM vehicles participate in this RFP? |
| Yes, bids from non-CARB aligned OEM vehicles are being accepted. However, please note that the resulting contracts are subject to Vehicle Manufacturer Purchasing Restrictions, State Administrative Manual (SAM) Section 4121.8. Additionally, a CARB aligned OEM vehicle bid by a responsive and responsible Bidder cannot lose an award to a non-CARB aligned OEM vehicle. |
See IFB Event ID 0000031286 – Addendum 3 Section 4 – Method of Award and Section 21 – Proposed Products.
| 2-21 |
| IFB Section 28, Volume Discounts and IFB Section 4, Method of Award |
| Is a volume discount (IFB Section 28) mandatory and will the proposal score be affected by not offering a volume discount? |
| Volume discounts are not mandatory. Bidders may offer a volume discount per line item. The award will be made to the responsive and responsible Bidder with the lowest cost (including all applicable preference and incentive calculations). It is not a scored evaluation. |
| 2-22 |
| IFB Section 23, Pricing Structure and IFB Section 26, Sales Tax |
| Are State entities subject to fees besides sales tax? Some local government entities incur tire fees, registration fees, license fees, etc. |
| Awarded line items will be available for purchase by ordering agencies at a fixed contract price (offered on Attachment 1 – Pricing Workbook) for each vehicle for the applicable line item for delivery in Sacramento County. Prices quoted do not include Federal Excise Tax, the California Tire Fee, the Documentation Fee, or the Electronic Filing Fee. Sales tax is also not to be included in the bid quote. Any additional applicable fees would be added at the time of invoicing. |
| 2-23 |
| Attachment 1 – Pricing Workbook |
| Would the state consider changing the battery size to a minimum of 138KWH for MD-HD Vehicles CLIN 18? |
| An additional line item for 130 kWh minimum battery requirement has been added. |
See MD-HD Trucks CLIN 30 in Attachment 1 – Pricing Workbook – Addendum #3.
| 2-24 |
| Attachment 1 – Pricing Workbook |
| In MD-HD Trucks CLI #14 the battery capacity minimum spec is 100kWh and in CLI #19 it is 200kWh. Would DGS entertain lowering the minimum of CLIN 19 or creating a line for 19,500 lbs conventional chassis cab with a 130kWh minimum battery spec to increase the competitive set or potentially clarifying this situation? |
| An additional line item has been added. |
See MD-HD Trucks CLIN 31 in Attachment 1 – Pricing Workbook – Addendum #3.
| 2-25 |
| IFB Section 52, Options and Attachment 1 – Contract Pricing |
| If a bidder only includes pricing for a cab and chassis in Attachment 1 – Pricing Workbook, how will purchasers using the Alternative Fuel Vehicles – 0000031286 contract select and pay for the equipment and body? |
| Options and upfitting will be determined by ordering agencies and the Contractor at time of quote or purchase order. The available options and upfitting are not listed in the potential contract. The State requests all bidders to provide additional options (upfitting) upcharge percentage (not to exceed 10%) on Attachment A – Pricing Workbook. |
| 2-26 |
| IFB Section 52, Options |
| Must bidders include a list of their preferred equipment and body manufacturer/distributor/installers, equipment, and body options in the bid package? |
| No, bidders do not need to include a list of preferred equipment and body manufacturer/distributor/installers, equipment, and body options in the bid package. |
| 2-27 |
| N/A |
| Our Class 5 truck is classified as a cab-over but does not tilt forward, because there is no engine, it is an electric truck. Will our bid be disqualified if our cab does not tilt, but still allows access for all maintenance components? |
| No, the bid will not be disqualified if all maintenance and repair is unaffected by not having the tilt cab. |
| 2-28 |
| IFB Section 4, Method of Award and Section 24, Pricing Workbook |
| If we would like to bid a few configurations of the same vehicle model, should we submit several copies of Attachment 1 – Pricing Workbook and Attachment 4 – Technical Questionnaire with our bid package or duplicate the MD-HD Trucks tab within Attachment 1, and duplicate MD-HD Trucks in Attachment 4 however many times we need it? |
| Each line item will be awarded to the responsive and responsible bidder with the lowest cost. There are not multiple awards for each line item. If a bidder chooses to submit multiple bids for the same line item, they should submit additional Pricing Workbooks and Technical Questionnaires for each bid. |
| 2-29 |
| Attachment 1 – Pricing Workbook |
| If bidder offers more than one battery capacity option for a vehicle model, how can we include the additional battery capacity pricing and range in Attachment 1 – Pricing Workbook? If there is no place for it in Attachment 1, can vendors add battery capacity as an option on purchase order? |
| Awarded line item vehicles may be upfitted to different configurations as long as the vehicle does not conflict with another line item awarded for this potential contract. The proposed vehicle would still need to meet the minimum requirements required for the line item with the upfitting. |
| 2-30 |
| Attachment 3 - Bid Specification 2320-BS-0194616-2 |
| Can DGS please confirm/clarify that the GVWR/GCWR weight on each contract line item in Attachment 1 – Pricing Workbook are “minimum” weights that must be met, and that the weights can be exceeded? |
| Attachment 3 – Bid Specification 2320-BS-0194616-2, Section 3.1 states “Vehicles bid must meet or exceed the requirements in the solicitation line item description.” |
| 2-31 |
| Attachment 3 - Bid Specification 2320-BS-0194616-2 and Attachment 1- Pricing Workbook |
| Regarding CLIN #18 in Attachment 1 Pricing Workbook – MD-HD Trucks: |
1.What are the allowable GVWR ranges?
2.What are the allowable battery size ranges?
3.Can bidders propose vehicles exceeding the 19,500 lbs GVWR for line #18?
4.Can we bid a 19,500lb GVWR and 22,470lb GVWR regarding line #18?
Attachment 3 – Bid Specification 2320-BS-0194616-2, Section 3.1 states “Vehicles bid must meet or exceed the requirements in the solicitation line item description.”
1. 19,500 pounds to 25999 pounds.
2. At least 200 kWh.
3. Yes, see answer #1.
4. Yes, see answer #1.
Please see Attachment 1 – Pricing Workbook – Addendum #3. MD-HD Trucks, CLIN 18 is now CLIN 19.
| 2-32 |
| Attachment 3 – Bid Specification 2310-BS-0194616-2 and Attachment 1- Pricing Workbook |
| Regarding CLIN #20 in in Attachment 1 Pricing Workbook – MD-HD Trucks: |
1.What are the allowable GVWR ranges?
2.What are the allowable battery size ranges?
Attachment 3 – Bid Specification 2310-BS-0194616-2, Section 3.1 states “Vehicles bid must meet or exceed the requirements in the solicitation line item description.”
1. At least 26,000 pounds.
2. At least 240 kWh.
Please see Attachment 1 – Pricing Workbook – Addendum #3. MD-HD Trucks, CLIN 20 is now CLIN 21.
| 2-33 |
| Attachment 3 – Bid Specification 2310-BS-0194616-2 and Attachment 1- Pricing Workbook |
| Regarding CLIN #22 in in Attachment 1 Pricing Workbook – MD-HD Trucks: |
1.What are the allowable GCWR ranges?
2.What are the allowable battery size ranges?
3.Can bidders propose vehicles that exceed the 75,000 lbs. GCWR for line #22?
Attachment 3 – Bid Specification 2310-BS-0194616-2, Section 3.1 states “Vehicles bid must meet or exceed the requirements in the solicitation line item description.”
1. At least 75,000 pounds.
2. There is no minimum requirement for battery size.
3. Yes.
Please see Attachment 1 – Pricing Workbook – Addendum #3. MD-HD Trucks, CLIN 22 is now CLIN 23.
| 2-34 |
| IFB Section 52, Options and Attachment 1 – Pricing Workbook. |
| Where do we add vehicle options in our bid response? Ex: aerodynamic kit, power door lock, bumper color, etc. |
| Options and upfitting will be determined by ordering agencies and the Contractor at time of quote or purchase order. The available options and upfitting are not listed in the potential contract. The State requests all bidders to provide additional options (upfitting) upcharge percentage (not to exceed 10%) on Attachment A – Pricing Workbook. |
| 2-35 |
| Attachment 4 – Technical Questionnaire. |
| Besides the technical literature, where should a bidder indicate that battery capacity exceeds the minimum capacity requested in the bid (i.e. for CLIN 20 if the battery capacity offered is 250 kWh rather than the 240 kWh mandated in the description)? |
| The battery capacity for the vehicle bid must be indicated on the latest addendum of Attachment 4 – Technical Questionnaire at time of bid. |
| 2-36 |
| IFB Section 1, Scope and IFB Section 51, Price Adjustments |
| If awarded, are vendors allowed to offer multiple vehicle model years under the contract? Or will only the latest vehicle model year be accepted? If our vehicle model year transitions in the spring of each year, when should awardees notify DGS about the change? |
| All vehicles offered must be the latest model available for order. Contractors should notify DGS-PD as soon as possible once a new model year is released. If a price adjustment is needed, Contractor must follow requirements as stated in IFB Section 51, Price Adjustments. |
| 2-37 |
| IFB Section 1, Scope |
| If bidders are currently selling more than one model year, should bidders include the range of years in Attachment 1 – Pricing Workbook, or are bidders expected to select only one model year? |
| All vehicles offered must be that latest model available for order. |
| 2-38 |
| Attachment 4 – Technical Questionnaire |
| Can DGS please define what is the function of “parking sensors”, as listed in Attachment 4 – Technical Questionnaire? |
| To assist the driver in preventing damaging the vehicle or surroundings while parking. |
| 2-39 |
| IFB Section 31, Narrative Response |
| Is there a maximum word count for responses in Attachment 5 – Narrative Response? |
| No. Bidders shall input narrative responses on the attachment only, and only for the items requested. If necessary, Bidders may add pages to the attachment to further explain their response. |
| 2-40 |
| IFB Section 57, Contractor Ordering Information |
| Our company does not accept purchase orders via facsimile or mail, will we be disqualified from this bid? |
| See IFB Event ID 0000031286 – Addendum #3 Section 57 – Contractor Ordering Information. |
Purchase Orders are typically delivered via email, but if mailed to the contractors specified address, contractor shall accept it. Facsimile is optional.
| 2-41 |
| IFB Section 7, Alternative Protest Process |
| When can bidders expect to be notified about an award decision? |
| After bid evaluations are completed, a Notice of Intent to Award for this solicitation will be publicly posted on the Department of General Services Procurement Division webpage and sent via facsimile to any bidder who submits a written request for notice and provided a facsimile number. |
| 2-42 |
| N/A |
| What is the tentative start date of the Alternative Fuel Vehicles – 0000031286 contract? |
| There is no tentative start date for the contract. The contract will be awarded after the evaluation is completed and the Notice of Intent to Award has been posted. |
| 2-43 |
| N/A |
| Will a draft copy of the contract for Alternative Fuel Vehicles – 0000031286 be shared with bidders prior to the October 23rd, 2024, deadline? |
| No, the State does not provide a draft copy of the contract. The requirements of the contract are in the Invitation for Bid (IFB). |
| 2-44 |
| IFB Section 13, Bidder Questions |
| If selected for an award, will awardees have the opportunity to provide comments/edits before signing the contract agreement? |
| This IFB addresses all requirements that Bidders must meet to be eligible for consideration. Bidders must carefully read the entire IFB, ask appropriate questions in a timely manner, and make sure all procedures and requirements of the IFB are accurately followed and addressed. |
All questions, comments, and concerns should be immediately directed to the Procurement Official, in writing, no later than four working days prior to bid due date. All questions and/or concerns shall be directed to Eugene.Shemereko@dgs.ca.gov.
Comments or requests for edits to contract requirements submitted during the contract implementation phase will not be considered.
| 2-45 |
| N/A |
| What is the typical timeframe for contract negotiations from notification of award and signed contract? |
| Contract negotiations are not a standard step in the process and will typically only be conducted if conditions exist and the State elects to do so. The timeline from bid submission to contract award varies based on several factors, such as the number of bids received and any required bid clarifications. As a result, there is no fixed timeframe for this process. |
| 2-46 |
| IFB Section 36, Declaration Forms, Bidder Declaration Form (GSPD-05-105), |
| Is a signature required on the bidder declaration form? Where exactly on this document should the signature be listed? |
| A signature may be done on the bottom of the Bidder Declaration Form (GSPD-05-105), but signing the Agreement Cover Letter will also commit the Bidder to the information provided on the form. |
| 2-47 |
| IFB Section 63, Delivery Schedules and IFB Section 60, Order Acknowledgement |
| Is there a maximum number of delivery days to be respected under this contract if there are delays with production for a certain model? |
| Delivery shall be within 150 days after receipt of order unless there is a delay in production/order acceptance from the manufacturer when changing from one model year to the next. Contractor shall notify the ordering agency of such delay per Section 60, Order Acknowledgment. Additional delivery time may be granted upon mutual consent between the ordering agency and the Contractor. |
| 2-48 |
| IFB Section 15, Agreement Cover Letter and Contract Provisions and Non-IT General Provisions (rev 6/21/2022) Article 30, Required Payment Date |
| Does DGS have payment terms we need to respect under the contract or are bidders and purchasers allowed to negotiate the payment terms of the order separately? |
| No, payment terms are not negotiable. Payment terms are located in the Non-IT General Provisions (rev 6/21/2022), Article 30, Required Payment Date. |
| 2-49 |
| IFB Section 52, Options |
| Will DGS allow for the inclusion of bodies or equipment on a purchase order that is secured from this contract? Does DGS have a separate statewide contract established for bodies/equipment that purchasers can use? |
| No, DGS does not have a separate contract established for upfitting or additional options. Upfitting and options are based on the needs of the ordering agency and will be included on the purchase order. |
| 2-50 |
| IFB Section 52, Options |
| Must all factory options available from the OEM be included in the vehicle list price in Attachment 1 – Pricing Workbook? |
| No, factory options are not included in the vehicle price on Attachment 1 – Pricing Workbook. All factory options shall be available and priced at dealer cost plus up to 10 percent for an addition or dealer cost minus up to 10 percent for a deletion in accordance with the manufacturer’s current model year price list. Options upcharge percentage is to be submitted in the additional options and removal of options line items at the bottom of each worksheet the Bidder is proposing bids for vehicles in Attachment 1- Pricing Workbook. |
| 2-51 |
| IFB Section 52, Options |
| Can we please request clarification on why a bidder may have an options upcharge % number on top of the vehicle list price? Is the Options Upcharge % a fee that the bidder would charge to the purchaser if changes were requested to the order? |
| All factory options and upfitting shall be available and priced at dealer cost plus up to 10 percent for an addition or dealer cost minus up to 10 percent for a deletion in accordance with the manufacturer’s current model year price list. |
| 2-52 |
| IFB Section 52, Options |
| Will DGS accept an Options Upcharge % that includes the cost of labor? |
| The State does not limit what is included in the options pricing, but options pricing is limited to cost plus up to 10 percent in accordance with the manufacturer’s current model year price list. |
| 2-53 |
| IFB Cover Page |
| Is the bid open date still next Wednesday, 10/23/2024? |
| IFB Event 0000031286 has been modified to extend the bid due date to October 30, 2024, at 2:00 PM PST. |
| 2-54 |
| IFB Section 4, Method of Award |
| As we're putting together our response, the bid states "submissions for existing vehicles on the current statewide contract will not be accepted." Going through the CLINS, we're finding EVs that satisfy the specifications, but are already on the contract. Can we bid vehicles that are already on contract. |
| This was answered in Question & Answer Set 2. The State will not accept bids for vehicles already on Statewide Contracts 1-22-23-10B-E, 1-22-23-20B-K, 1-22-23-23B-I, and 1-23-23-22A-D & F-G. |
| 2-55 |
| N/A |
| Links are not working in the IFB. Where can I go to locate the documents? |
| All links have been tested and are working correctly. Please check with your IT Department to adjust security, firewall, or other applicable settings. |
| 2-56 |
| N/A |
| Can we submit draft bid documents for review prior to the bid due date to ensure they are filled out correctly? |
| No, DGS-PD is unable to review any bid documents prior to the bid due date and time. |
| 2-57 |
| IFB Section 37, Socioeconomic Programs and IFB Section 83, Bid Response List |
| Are we required to submit the TACPA forms? |
| This solicitation provides for the optional TACPA preference. Bidders are not required to apply for this preference. The TACPA forms are only required if the Bidder is claiming the TACPA preference. |
| 2-58 |
| IFB Section 69, Warranty/Maintenance |
| We would like to please request clarification about the Power Train/Drive Unit warranty for vehicles over 8500 lbs. GVWR shall cover not less than five years/60,000 miles, no charge for parts and labor. Is the request for the warranty to be not less than five years or 60,000 miles or not less than five years and 60,000 miles? |
| The warranty is not less than five years or 60,000 miles, whichever comes first. |
| 2-59 |
| Attachment 1 – Pricing Workbook |
| Would the State consider the addition of a category for large sedan with a minimum range of 400 miles with a lockable trunk. |
| A large sedan with a 400-mile driving range can be bid on Cars CLIN 13 or 14. To avoid a risk of non-compliance, the State suggests that the latest addendum of Attachment 1 – Pricing Workbook be submitted with the bid. |
| 2-60 |
| Attachment 1 – Pricing Workbook |
| Is DGS willing to accept bids for MD Cargo Vans under 10,000 GVWR? |
| Vans under 10,000 pounds GVWR should be bid in the LD Vans line item(s). |
| 2-61 |
| Attachment 3 – Bid Specification 2320-BS-0194616-2 Section 3.5 – Compressed Natural Gas Vehicle |
| Would the State consider four-wheel hydraulic disc brakes in replacement of air brakes CNG vehicles with a GVWR of more than 26,000 lbs.? |
| No, per Attachment 3 – Bid Specification 2320-BS-0194616-2 Section 3.5 – Compressed Natural Gas Vehicle, air brakes are required for CNG vehicles over 26,000 GVWR. |
| 2-62 |
| IFB Section 4, Method of Award and IFB Section 21, Proposed Products |
| If our proposed vehicle OEM is CARB aligned, can we lose an award to a vehicle from a non-CARB aligned OEM? |
| A proposed CARB aligned OEM vehicle from a compliant Bidder cannot lose an award to a proposed non-CARB aligned OEM vehicle. |
See IFB Event ID 0000031286 – Addendum 3 Section 4 – Method of Award and Section 21 – Proposed Products.
| 2-63 |
| IFB Section 27, Promotional Pricing |
| Does the State support any scenarios associated with ad hoc or to be determined incentives that we may offer? For example, common during model year transition (often in Q4 of a calendar year) to provide specific incentives on remaining "in stock" end of model year inventory. If we have a contract with the State, is it possible to share (and thus have displayed/communicated with potential State buyers) ad hoc incentives that may become available at a later date? |
| Yes, the State supports ad hoc or to be determined incentives. Incentives that are offered for an extended period would be best processed as a price adjustment. However, limited-term or limited-quantity incentives are handled differently. Upon receiving notification from the Contractor, the Contract Administrator will inform the State Fleet Managers of the available incentives. It is the Contractor's responsibility to provide all relevant details regarding the promotion or incentives being offered. |
| 2-64 |
| IFB Section 34, Authorized Dealer |
| Are we allowed to respond to certain line items where we are not technically the authorized dealer? |
| If the Bidder is not the Original Equipment Manufacturer (OEM) of the vehicle being proposed, the Bidder must provide, on OEM company letterhead and signed by an authorized OEM representative, documentation identifying the Bidder as an authorized OEM dealer. |