Q&A Document 2.pdf

PDF 2 KB Posted

Attached to
City of Lafayette: Starkey Building Renovation
Solicitation number
RFP-24-08-ACRD
Issued by
Boulder County, Lakewood City, Colorado

About this file

This document is a Questions & Answers (Q&A) document for the City of Lafayette's Starkey Building Renovation project (RFP-24-08-ACRD), featuring three key clarifications for potential design-build contractors. The Q&A addresses specific technical inquiries related to the renovation project, dated 07/18/2024, focusing on utility service capabilities, commissioning requirements, and energy modeling expectations.

The document provides critical guidance for bidders, specifically noting that the design-build team must independently verify existing building utility service sizes and determine if upgrades are necessary. The project does not require third-party commissioning, and MEP sub-contractors should include standard startup services in their bid packages. Additionally, the city has confirmed that energy modeling will not be required for this renovation, which involves converting a 1,200 square foot, 1970s-era single-story structure into a community hub located at 309 S Public Rd in Lafayette, Colorado.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - 2

Project RFP-24-08-ACRD - City of Lafayette: Starkey Building Renovation

Buying Organization City of Lafayette

No Question/Answer Question Date

Q27 Question: Utility Service Size(s)

Are current utility service sizes (water line and electrical feed) capable of handling proposed renovation/improvements, or should the design-build team carry cost for upsizing services in their cost proposal?

Answer: The Design/Build effort will need to determine if existing building services are capable of the proposed renovation. Include necessary design time to verify existing conditions.

07/18/2024

Q29 Question: 3rd Party Commissioning

Will the owner provide 3rd party commissioning or should design-build team account for costs associated with 3rd party commissioning in their cost proposal?

Answer: The size of this project will not require 3rd party commissioning and the proposals should not include this service. The Design Builder will need to have the MEP sub-contractors include normal startup services when the construction is bid out in bid packages.

07/18/2024

Q30 Question: Energy Modeling

Will the city require energy modeling for permit?

Answer: The size of this project should not require energy modeling.

07/18/2024