Q&A Document 2.pdf
PDF 2 KB Posted
- Attached to
- City of Lafayette: Starkey Building Renovation
- Solicitation number
- RFP-24-08-ACRD
- Issued by
- Boulder County, Lakewood City, Colorado
About this file
This document is a Questions & Answers (Q&A) document for the City of Lafayette's Starkey Building Renovation project (RFP-24-08-ACRD), featuring three key clarifications for potential design-build contractors. The Q&A addresses specific technical inquiries related to the renovation project, dated 07/18/2024, focusing on utility service capabilities, commissioning requirements, and energy modeling expectations.
The document provides critical guidance for bidders, specifically noting that the design-build team must independently verify existing building utility service sizes and determine if upgrades are necessary. The project does not require third-party commissioning, and MEP sub-contractors should include standard startup services in their bid packages. Additionally, the city has confirmed that energy modeling will not be required for this renovation, which involves converting a 1,200 square foot, 1970s-era single-story structure into a community hub located at 309 S Public Rd in Lafayette, Colorado.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| APPENDIX A 1-2022 Construction Contract - CONTRACT (Aug 2022 Final).docx | DOCX document | |
| Q&A Document 1.pdf | ||
| APPENDIX A 2-2021 Construction Contract - GENERAL CONDITIONS (TOC corrected Dec 2022).docx | DOCX document | |
| RFP-24-08-ACRD (Starkey Renovation) EAM-6-10-24.docx | DOCX document | |
| ADDENDUM 1 GMP.pdf | ||
| APPENDIX B Starkey Building Design Sketches.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers - 2
Project RFP-24-08-ACRD - City of Lafayette: Starkey Building Renovation
Buying Organization City of Lafayette
No Question/Answer Question Date
Q27 Question: Utility Service Size(s)
Are current utility service sizes (water line and electrical feed) capable of handling proposed renovation/improvements, or should the design-build team carry cost for upsizing services in their cost proposal?
Answer: The Design/Build effort will need to determine if existing building services are capable of the proposed renovation. Include necessary design time to verify existing conditions.
07/18/2024
Q29 Question: 3rd Party Commissioning
Will the owner provide 3rd party commissioning or should design-build team account for costs associated with 3rd party commissioning in their cost proposal?
Answer: The size of this project will not require 3rd party commissioning and the proposals should not include this service. The Design Builder will need to have the MEP sub-contractors include normal startup services when the construction is bid out in bid packages.
07/18/2024
Q30 Question: Energy Modeling
Will the city require energy modeling for permit?
Answer: The size of this project should not require energy modeling.
07/18/2024
Questions & Answers - 2